CN102520365B - Fast battery remaining capacity estimation system and method thereof - Google Patents

Fast battery remaining capacity estimation system and method thereof Download PDF

Info

Publication number
CN102520365B
CN102520365B CN201110440860.3A CN201110440860A CN102520365B CN 102520365 B CN102520365 B CN 102520365B CN 201110440860 A CN201110440860 A CN 201110440860A CN 102520365 B CN102520365 B CN 102520365B
Authority
CN
China
Prior art keywords
battery
dump energy
characteristic extraction
described battery
fast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110440860.3A
Other languages
Chinese (zh)
Other versions
CN102520365A (en
Inventor
李�杰
黄亦翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Original Assignee
Shanghai Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University filed Critical Shanghai Jiaotong University
Priority to CN201110440860.3A priority Critical patent/CN102520365B/en
Publication of CN102520365A publication Critical patent/CN102520365A/en
Application granted granted Critical
Publication of CN102520365B publication Critical patent/CN102520365B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of fast battery remaining capacity estimation system, comprising: battery charging and discharging control module; Battery testing model bank; Voltage characteristic extraction module; Current characteristic extraction module; Dump energy analysis module; And battery dump energy stores display module.A kind of fast battery remaining capacity estimation system of the present invention and method thereof estimate its dump energy by carrying out the test of corresponding fast charging and discharging to battery, its structure is simple, accuracy is high, in real time for user provides battery dump energy information, can be convenient to the management that battery uses.

Description

Fast battery remaining capacity estimation system and method thereof
Technical field
The present invention relates to a kind of technical field of battery, particularly relate to a kind of fast battery remaining capacity estimation system and method thereof.
Background technology
Along with the fast development of various electric energy energy storage device, start to be subject to the people's attention to the estimation of battery dump energy.Only have and battery dump energy is estimated accurately, user could be allowed to understand remaining battery service time in time, thus eliminate in battery use procedure the misgivings of electric energy deficiency.
Especially, current countries in the world are all at concern environmental protection and energy crisis two problems.Relative to traditional fuel-engined vehicle, electric automobile can realize zero-emission.Therefore, electric automobile will become future automobile industrial expansion direction.In electric automobile, battery is directly as Power supply parts, and the quality of its duty is directly connected to the driving safety of whole automobile.Therefore, whole process is needed to estimate accurately battery dump energy.Particularly, before battery product dispatches from the factory, battery dump energy is estimated, the quality that battery dispatches from the factory can be ensured; In battery use procedure, battery dump energy is estimated, energy information accurately can be grasped in time, predict the follow-up spendable time and charge in time; At battery performance along with routine use gradually in degenerative process, remaining battery life can be predicted to the accurate estimation of battery dump energy, carry out in advance and more renew battery, reclaim the plan of used batteries, thus reduce unnecessary charging energy consumption, avoid the burst failure conditions such as leakage, improve the safety and reliability that battery uses.Therefore, the carrying out of battery dump energy is estimated to have very important using value and realistic meaning fast and accurately.
Estimation method of battery dump energy of the prior art comprises open-circuit voltage method, ampere-hour method, coulomb counting and impedance method etc.But when open-circuit voltage method estimates battery dump energy, battery must leave standstill the long period to reach steady state (SS), therefore be only applicable to the battery dump energy estimation of electric automobile under dead ship condition.And ampere-hour rule is easily subject to the impact of current measurement precision, when high temperature or current fluctuation violent, battery dump energy estimate precision very poor, the demand of practical application can not be met.
Summary of the invention
Because the above-mentioned defect of prior art, technical matters to be solved by this invention is to provide a kind of fast battery remaining capacity estimation system and method thereof, the dump energy of battery is estimated according to correlation parameter battery being carried out to fast charging and discharging and test the battery obtained, its speed is fast, and accuracy is high.
For achieving the above object, the invention provides a kind of fast battery remaining capacity estimation system, comprising:
Battery charging and discharging control module, it is connected with battery, and obtains battery size and historical information from described battery;
Battery testing model bank, it is connected with described battery charging and discharging control module, extracts for it the rapid charge discharge test sequence, voltage characteristic extraction model parameter, current characteristic extraction model parameter and the dump energy parameter of analytic model that mate with described battery size and historical information;
Voltage characteristic extraction module, it is connected with described battery charging and discharging control module, and calculates the voltage characteristic of described battery;
Current characteristic extraction module, it is connected with described battery charging and discharging control module, and calculates the current characteristic of described battery;
Dump energy analysis module, it is connected with current charge-discharge electric control module with described voltage characteristic extraction module, current characteristic extraction module, and according to described voltage characteristic and current characteristic, calculates the dump energy of described battery;
And battery dump energy stores display module, it is connected with battery testing model bank with described dump energy analysis module, for storing and show the dump energy information of described battery.
Above-mentioned fast battery remaining capacity estimation system, wherein, the rapid charge discharge test sequence, voltage characteristic extraction model parameter, current characteristic extraction model parameter and the dump energy parameter of analytic model that match with described battery size and historical information is included in described battery testing model bank.
Above-mentioned fast battery remaining capacity estimation system, wherein, described battery is dry cell, accumulator, fuel cell or electrokinetic cell.
Above-mentioned fast battery remaining capacity estimation system, wherein, described battery dump energy stores display module and comprises liquid crystal display.
In addition, the present invention also provides a kind of fast battery method for estimating remaining capacity, comprises the steps:
Extract battery size and the historical information of battery;
According to battery size and the historical information of described battery, extract and described battery size and historical information corresponding rapid charge discharge test sequence, voltage characteristic extraction model parameter, current characteristic extraction model parameter and dump energy parameter of analytic model in battery testing model bank;
According to described rapid charge discharge test sequence, fast charging and discharging test is carried out to described battery;
In described fast charging and discharging test process, gather the voltage of described battery, current information;
The dump energy of described battery is estimated according to the voltage of described battery, current information;
Show and store the dump energy information of described battery.
Above-mentioned fast battery method for estimating remaining capacity, wherein, also comprises battery testing model bank according to described battery dump energy information updating.
Above-mentioned fast battery method for estimating remaining capacity, wherein, fast charging and discharging test obtains by carrying out Sample Cell for voltage characteristic extraction model parameter, current characteristic extraction model parameter and dump energy parameter of analytic model in described battery testing model bank.
Further, above-mentioned fast battery method for estimating remaining capacity, wherein, described fast charging and discharging test is carried out at the arbitrary node place of battery dump energy.
Above-mentioned fast battery method for estimating remaining capacity, wherein, described battery is dry cell, accumulator, fuel cell or electrokinetic cell.
Therefore, a kind of fast battery remaining capacity estimation system of the present invention and method thereof estimate its dump energy by carrying out the test of corresponding fast charging and discharging to battery, and its structure is simple, and accuracy is high, in real time for user provides battery dump energy information, the management that battery uses can be convenient to.
Accompanying drawing explanation
Fig. 1 is the structural representation of fast battery remaining capacity estimation system of the present invention.
Embodiment
Be described further below with reference to the technique effect of accompanying drawing to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.
As shown in Figure 1, fast battery remaining capacity estimation system of the present invention comprises battery charging and discharging control module 102, battery testing model bank 104, voltage characteristic extraction module 105, current characteristic extraction module 106, dump energy analysis module 107 and battery dump energy storage display module 108.Wherein, battery charging and discharging control module is connected with battery 101, battery testing model bank 104, voltage characteristic extraction module 105, current characteristic extraction module 106 and dump energy analysis module 107 are all connected with battery charging and discharging control module 102, dump energy analysis module 107 is connected with current characteristic extraction module 106 with voltage characteristic extraction module 105 again, and battery dump energy stores display module 108 and is connected with battery testing model bank 104 with dump energy analysis module 107.
Battery testing model bank 104 is databases, wherein includes the rapid charge discharge test sequence 103, voltage characteristic extraction model parameter, current characteristic extraction model parameter and the dump energy parameter of analytic model that match with the battery size of battery and historical information.
Introduce fast battery method for estimating remaining capacity of the present invention below in detail.
First, battery 101 is connected with battery charging and discharging control module 102, is extracted battery size and the historical information of battery by battery charging and discharging control module 102, and be transferred to battery testing model bank 104; According to the battery size obtained and historical information, battery charging and discharging control module 102 extracts the rapid charge discharge test sequence 103, voltage characteristic extraction model parameter, current characteristic extraction model parameter and the dump energy parameter of analytic model that match with it in battery testing model bank 104; Rapid charge discharge test sequence 103 is sent to after in battery charging and discharging control module 102 by battery testing module storehouse 104, and battery charging and discharging control module 102 carries out fast charging and discharging test according to rapid charge discharge test sequence 103 pairs of batteries 101; Battery charging and discharging control module 102 gathers electric current and the information of voltage of battery 101 in fast charging and discharging process, and is transferred to voltage characteristic extraction module 105 and current characteristic extraction module 106; Voltage characteristic extraction module 105 and current characteristic extraction module 106 calculate voltage characteristic and the current characteristic of battery respectively, and are transferred to dump energy analysis module 107; Dump energy analysis module 107 utilizes the voltage characteristic of above-mentioned battery and current characteristic to obtain the dump energy of battery 101 by Algorithm Analysis; Being stored by the dump energy of battery 101 and being shown in battery dump energy stores in display module 108; By the battery dump energy information that obtains simultaneously stored in battery testing model bank 104, so that lower primary cell charging or upgrade battery testing model bank 104 when detecting, make battery testing model bank 104 more accurate.
Wherein, voltage characteristic extraction model parameter, current characteristic extraction model parameter and dump energy parameter of analytic model in battery testing model bank 104 obtain by carrying out fast charging and discharging test to Sample Cell in advance.In above-mentioned fast charging and discharging test, a fast charging and discharging test can be carried out at arbitrary dump energy Nodes.Such as, the node often increasing or reduce 10% with dump energy carries out fast charging and discharging test, and the test interval of dump energy also can get 5%, 1% etc.Dump energy test interval obtains thinner, and gained model parameter generally can be more accurate, but the time needed for computation model parameter spends also larger.In addition, each correlation parameter obtained when estimating battery dump energy also can be stored in battery testing model bank 104, so that the data in real-time update and adjustment battery testing model bank 104, makes the estimation of battery dump energy more accurate.
Fast battery remaining capacity estimation system of the present invention and method thereof can be applicable to dry cell, also can be applicable to accumulator, electrokinetic cell, or the multiple battery such as fuel cell.
In a preferred embodiment of the invention, battery dump energy stores display module 108 and comprises a liquid crystal display, also can be the display device on smart mobile phone, digital meter panel etc., for clearly showing the current dump energy of battery, being convenient to user and according to circumstances formulating relevant battery use strategy.
By adopting fast battery method for estimating remaining capacity of the present invention, the target obtaining battery dump energy in 1 minute can be realized, and the error precision between estimated value and actual value is less than 15%.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that the ordinary skill of this area just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (7)

1. a fast battery remaining capacity estimation system, is characterized in that, comprising:
Battery charging and discharging control module, it is connected with battery, and obtains battery size and historical information from described battery;
Battery testing model bank, it is connected with described battery charging and discharging control module, to extract the rapid charge discharge test sequence, voltage characteristic extraction model parameter, current characteristic extraction model parameter and the dump energy parameter of analytic model that mate with described battery size and historical information;
Voltage characteristic extraction module, it is connected with described battery charging and discharging control module, and calculates the voltage characteristic of described battery;
Current characteristic extraction module, it is connected with described battery charging and discharging control module, and calculates the current characteristic of described battery;
Dump energy analysis module, it is connected with current charge-discharge electric control module with described voltage characteristic extraction module, current characteristic extraction module, and according to described voltage characteristic and current characteristic, calculates the dump energy of described battery;
And battery dump energy stores display module, it is connected with battery testing model bank with described dump energy analysis module, for storing and show the dump energy information of described battery;
Described battery charging and discharging control module, according to described rapid charge discharge test sequence, carries out fast charging and discharging test to described battery, and described fast charging and discharging test is carried out at the arbitrary node place of battery dump energy;
Described battery testing model bank is database, described voltage characteristic extraction model parameter, described current characteristic extraction model parameter and described dump energy parameter of analytic model, be obtain by carrying out fast charging and discharging test to Sample Cell in advance, described fast charging and discharging test is carried out with the test interval of the dump energy of setting.
2. fast battery remaining capacity estimation system as claimed in claim 1, it is characterized in that, in described battery testing model bank, include the rapid charge discharge test sequence, voltage characteristic extraction model parameter, current characteristic extraction model parameter and the dump energy parameter of analytic model that match with described battery size and historical information.
3. fast battery remaining capacity estimation system as claimed in claim 1, it is characterized in that, described battery is dry cell, accumulator, fuel cell or electrokinetic cell.
4. fast battery remaining capacity estimation system as claimed in claim 1, is characterized in that, described battery dump energy stores display module and comprises liquid crystal display.
5. a fast battery method for estimating remaining capacity, is characterized in that, comprises the steps:
Extract battery size and the historical information of battery;
According to battery size and the historical information of described battery, extract and described battery size and historical information corresponding rapid charge discharge test sequence, voltage characteristic extraction model parameter, current characteristic extraction model parameter and dump energy parameter of analytic model in battery testing model bank;
According to described rapid charge discharge test sequence, fast charging and discharging test is carried out to described battery;
In described fast charging and discharging test process, gather the voltage of described battery, current information;
The dump energy of described battery is estimated according to the voltage of described battery, current information;
Show and store the dump energy information of described battery;
Described battery is dry cell, accumulator, fuel cell or electrokinetic cell;
Described battery testing model bank is database, described voltage characteristic extraction model parameter, described current characteristic extraction model parameter and described dump energy parameter of analytic model, be obtain by carrying out fast charging and discharging test to Sample Cell in advance, described fast charging and discharging test is carried out with the test interval of the dump energy of setting.
6. fast battery method for estimating remaining capacity as claimed in claim 5, is characterized in that, also comprise battery testing model bank according to described battery dump energy information updating.
7. fast battery method for estimating remaining capacity as claimed in claim 5, it is characterized in that, fast charging and discharging test obtains by carrying out Sample Cell for voltage characteristic extraction model parameter, current characteristic extraction model parameter and dump energy parameter of analytic model in described battery testing model bank.
CN201110440860.3A 2011-12-23 2011-12-23 Fast battery remaining capacity estimation system and method thereof Expired - Fee Related CN102520365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110440860.3A CN102520365B (en) 2011-12-23 2011-12-23 Fast battery remaining capacity estimation system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110440860.3A CN102520365B (en) 2011-12-23 2011-12-23 Fast battery remaining capacity estimation system and method thereof

Publications (2)

Publication Number Publication Date
CN102520365A CN102520365A (en) 2012-06-27
CN102520365B true CN102520365B (en) 2015-10-14

Family

ID=46291350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110440860.3A Expired - Fee Related CN102520365B (en) 2011-12-23 2011-12-23 Fast battery remaining capacity estimation system and method thereof

Country Status (1)

Country Link
CN (1) CN102520365B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102868001B (en) * 2012-09-20 2015-07-01 深圳市卓能新能源科技有限公司 Lithium ion cell electric quantity displaying method and lithium ion cell electric quanity displaying device
CN102944848B (en) * 2012-11-21 2015-04-22 广东省自动化研究所 Real-time evaluation method for remaining capacity of power batteries and device thereof
CN103913706B (en) * 2012-12-29 2016-12-28 北京谊安医疗***股份有限公司 The method of a kind of electric quantity of lithium battery detection and device thereof
CN104301499B (en) * 2013-07-15 2017-12-15 腾讯科技(深圳)有限公司 Battery capacity of mobile terminal log analysis methodology, device, platform and mobile terminal
CN103513188B (en) * 2013-10-15 2016-02-10 清华大学 The electricity computing method of battery cell in a kind of electric system energy storage station
CN103901354B (en) * 2014-04-23 2016-08-17 武汉市欧力普能源与自动化技术有限公司 A kind of electric automobile vehicle-mounted electrokinetic cell SOC Forecasting Methodology
CN104360281A (en) * 2014-11-17 2015-02-18 惠州Tcl移动通信有限公司 Mobile-terminal-based battery identification method and system and mobile terminal
CN104393647B (en) * 2014-11-28 2017-06-13 上海交通大学 A kind of charging pile system for electric automobile
CN107179506A (en) * 2016-03-11 2017-09-19 北汽福田汽车股份有限公司 A kind of method, device, system and vehicle for determining accumulator capacity
TWI687701B (en) 2018-12-05 2020-03-11 宏碁股份有限公司 Method for determining state of charge and electronic device thereof
CN110137544B (en) * 2019-04-18 2021-12-24 上海交通大学 Online detection system for reaction state of proton exchange membrane fuel cell stack and application thereof
CN113673712B (en) * 2021-10-25 2022-01-28 深圳达人高科电子有限公司 Method and device for calculating residual electric quantity value, server and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5672951A (en) * 1994-11-04 1997-09-30 Mitsubishi Denki Kabushiki Kaisha Determination and control of battery state
CN101312260A (en) * 2007-05-23 2008-11-26 佳能株式会社 Battery pack, charging device, control method thereof, electronic device and control method thereof
CN102024999A (en) * 2010-11-16 2011-04-20 上海交通大学 Electric car running power management system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3933919B2 (en) * 2001-11-30 2007-06-20 富士重工業株式会社 Battery storage amount estimation device
US20100219836A1 (en) * 2009-03-02 2010-09-02 Sony Ericsson Mobile Communications Ab Method and arrangement for determining energy source unit status

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5672951A (en) * 1994-11-04 1997-09-30 Mitsubishi Denki Kabushiki Kaisha Determination and control of battery state
CN101312260A (en) * 2007-05-23 2008-11-26 佳能株式会社 Battery pack, charging device, control method thereof, electronic device and control method thereof
CN102024999A (en) * 2010-11-16 2011-04-20 上海交通大学 Electric car running power management system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
A review on prognostics and health monitoring of Li-ion battery;Jingliang Zhang et al.;《Journal of Power Sources》;20110427;6007-6014 *
Answering six questions in extracting children’s mismatch negativity through combining wavelet decomposition and independent component analysis;Fengyu Cong et al.;《Cogn Neurodyn》;20110628;343-359 *
锂电池电量的动态预测;刘霞等;《大庆石油学院院报》;20040430;第28卷(第2期);81-83 *

Also Published As

Publication number Publication date
CN102520365A (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102520365B (en) Fast battery remaining capacity estimation system and method thereof
Zhu et al. A state of charge estimation method for lithium-ion batteries based on fractional order adaptive extended kalman filter
CN103675706B (en) A kind of power battery electric charge quantity estimation method
Sun et al. Adaptive unscented Kalman filtering for state of charge estimation of a lithium-ion battery for electric vehicles
Wang et al. Probability based remaining capacity estimation using data-driven and neural network model
Tian et al. A modified model based state of charge estimation of power lithium-ion batteries using unscented Kalman filter
CN103616647B (en) A kind of estimation method of battery dump energy for cell management system of electric automobile
CN104007395B (en) Charge states of lithium ion battery and parameter adaptive combined estimation method
CN104459551A (en) Electric vehicle power battery state-of-energy estimation method
Zhang et al. State of charge estimation for lithium battery based on adaptively weighting cubature particle filter
CN105140981B (en) Active equalization control method for lithium battery
CN101634687B (en) Method for measuring SOC value of battery of hybrid vehicle
CN110501652A (en) A kind of retired lithium battery active volume fast evaluation method and assessment device
CN103267953B (en) The evaluation method of a kind of lithium iron phosphate dynamic battery SOC
CN103259055B (en) The correction circuit of the electric vehicle battery group OCV-SOC curve of a kind of convenient operation and method
CN105676135A (en) Online estimation method of power lead-acid battery of special engineering vehicle
CN104849672A (en) Lithium battery dynamic impedance parameter identification method based on equivalent circuit model
KR20140053592A (en) Apparatus and method for estimating state of charging of battery
CN104122447A (en) Online estimation method for direct current resistance of power battery of electric vehicle
CN110275113A (en) A kind of lithium battery charge state estimation method
CN102645638B (en) SOC (Stress Optical Coefficient) estimating method of lithium battery pack
CN108572320B (en) Method and device for estimating effective capacity and health state of minimum single battery and system
CN110554321B (en) Method for detecting SOC (state of charge) of retired power battery in real time
Cai et al. Research state of charge estimation tactics of nickel-hydrogen battery
CN103176137B (en) Battery pack health condition evaluation method based on battery SOC (state of charge) inhomogeneity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151014

Termination date: 20211223