CN102518043A CN2011104375900A CN201110437590A CN102518043A CN 102518043 A CN102518043 A CN 102518043A CN 2011104375900 A CN2011104375900 A CN 2011104375900A CN 201110437590 A CN201110437590 A CN 201110437590A CN 102518043 A CN102518043 A CN 102518043A
Authority
CN
China
Prior art keywords
template
bridge
support
bridge pier
absolute altitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104375900A
Other languages
Chinese (zh)
Other versions
CN102518043B (en
Inventor
陈世东
邓小江
杨梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 3rd Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
China Railway Erju 3rd Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, China Railway Erju 3rd Engineering Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN201110437590.0A priority Critical patent/CN102518043B/en
Publication of CN102518043A publication Critical patent/CN102518043A/en
Application granted granted Critical
Publication of CN102518043B publication Critical patent/CN102518043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a landscape bridge pier construction linear control method, which belongs to the technical field of bridge piers. The landscape bridge pier construction linear control method comprises the following steps of: support erection, paying-off measurement, template installation, concrete construction and template dismantling. The landscape bridge pier construction linear control method is simple and convenient to operate, easy to popularize, capable of ensuring bridge construction, bridge stress and appearance, especially suitable for linear control of landscape bridge pier construction, strong in operability and suitable for popularization and application.

Description

A kind of Landscape Bridge Bridge Pier Construction linear control method
Technical field
The present invention relates to the special-shaped Bridge Pier Construction Linear Control technology of view property clear water concrete bridge.
Background technology
At present, at the Bridge Pier Construction technical elements, the technology of ordinary concrete bridge pier is comparative maturity; But, still do not have a kind of construction technology of maturation, thereby make the linear wayward of bridge for the linear control of the special-shaped bridge pier of view property clear water concrete bridge; Both influenced the stressed of whole bridge, influenced the quality of bridge, influenced also that it is specious; Thereby make the manufacturing of bridge not reach construction requirement, be unfavorable for the special-shaped Bridge Pier Construction control of the Linear Control of bridge pier construction, particularly view property clear water concrete bridge; Therefore need a trocar to the linear control technology of the special-shaped bridge pier of view property clear water concrete bridge, to guarantee its normal construction.
Summary of the invention
Goal of the invention of the present invention is: the problem to above-mentioned existence, provide a kind of easy and simple to handle, and be easy to promote; Can guarantee the Linear Control technology of bridge construction, be specially adapted to the Linear Control of Landscape Bridge Bridge Pier Construction, and through this control method; Can guarantee the stressed of bridge; Can guarantee its outward appearance again, this control method is workable, is fit to apply.
The technical scheme that the present invention adopts is following:
Landscape Bridge Bridge Pier Construction linear control method of the present invention, realize through following steps:
Step 1 is set up support: after bracket basis construction is accomplished, set up support again after the basis measured absolute altitude, and check adjustment;
Step 2 is measured unwrapping wire: after 1. support is set up predetermined altitude, support top mark height is measured; And set up the lumps of wood; 2. in the precompressed process, the precompressed section is carried out cross-sectioning, and keep a record; 3. based on the precompressed result; Reserve the rack elasticity deflection, absolute altitude at the bottom of the template is measured, and adjusted; The template of drawing is arranged grid, is that the center symmetry is laid with the axis;
Step 3, template is installed: is that middle alignment bilateral symmetry is laid template 1., 2. piece handled, 3. the bed die absolute altitude is carried out setting-out, and adjust, 4. template surface is handled with the bridge axis, and the brushing release agent;
Step 4, concrete construction: by building toward both sides in the middle of the bridge pier;
Step 5, form removable: 1. stripping, and the bridge pier outline line is carried out bound edge handle.
Since adopted said method, on-the-spot workable, very easily in popularization, guaranteed the linear control of bridge construction; Successively through setting up support, and detect repeatedly and proofread and correct, guarantee that follow-up template mounting structure surely leans on, and guarantees its supporting role; Measure unwrapping wire after this, and divide grid, carry out the installation of template again on this basis, after the template installation; Mix the construction of earth again, owing to before the installation of template, carried out dividing and line, thereby form cell block, therefore in mounting template; Only need handle well, promptly can guarantee to reach requirement after template is installed, when mixing the building of earth, need build from past both sides in the middle of the bridge pier in the template at each cell block place; Make the position, intermediate portion form the load main body, sustain the power of both sides, guarantee the safety of construction, and in the installation process of template; Need handle the leakage when avoiding follow-up mixed earth to build, stripping more at last to the slit between the template; And the bridge pier outline line is carried out bound edge handle, thereby guarantee that Landscape Bridge Bridge Pier Construction linearity reaches construction requirement, can guarantee the stressed of bridge simultaneously; Can guarantee its outward appearance again, this control method is workable, is fit to apply.
Landscape Bridge Bridge Pier Construction linear control method of the present invention in the step 1, is specially: 1. after the bracket basis construction is accomplished, by the measurement group unwrapping wire is measured on the basis, bridge pier outline line and bracket basis absolute altitude draw; 2. according to outline line the bridge pier support is distributed, and calculate every row's support need scaffolding height; 3. measure after support is set up and put in place and check, not meeting position adjustment; 4. support height is checked and is required the back that support is carried out precompressed.
Since adopted said method, draw bridge pier outline line and bracket basis absolute altitude, so that follow-up construction, and piecemeal; Calculate every row's support and need scaffolding height,, make that operation is very easy so that set up support; Measure after support is set up and put in place and check, to not meeting position adjustment, thereby satisfy stressed requirement; Guarantee normally carrying out of construction; Support height is checked and is required the back that support is carried out precompressed, and precompressed adopts water bag dress water to carry out, and makes that its precompressed operation is very easy; Be beneficial to and apply, can guarantee construction Linear Control simultaneously the Landscape Bridge bridge pier.
Landscape Bridge Bridge Pier Construction linear control method of the present invention in the step 2, is specially: 1. encrypt traverse station and fourth class bench mark in the other one-level of laying of Landscape Bridge; Bridge pier line style and absolute altitude are controlled; Before support was set up, the grid in the concrete base surface is made bridge pier sideline scope was measured absolute altitude; According to each point absolute altitude in the grid, carry out support and set up; 2. after support is set up predetermined altitude, support top mark height is measured, set up the lumps of wood after meeting the requirements; 3. in the precompressed process, divide every day and three times the precompressed section carried out cross-sectioning, and survey data is carried out record; 4. before template is installed, according to the precompressed result, reserving the rack elasticity deflection, absolute altitude at the bottom of the template is measured, and absolute altitude is accurately adjusted and the template of drawing is arranged grid through jacking, is that the center symmetry is laid with the axis.
Owing to adopted said method, before support was set up, the grid in the concrete base surface is made bridge pier sideline scope was measured absolute altitude; According to each point absolute altitude in the grid, carry out support and set up, after support is set up predetermined altitude, support top mark height is measured; Basically can carry out the lumps of wood after meeting the requirements and set up, before template is installed, according to the precompressed result; Reserve the rack elasticity deflection, absolute altitude at the bottom of the template is measured, and absolute altitude is accurately adjusted through jacking.The technical cadre is through measurement result, and the template of drawing is arranged grid, is that the center symmetry is laid with the axis.Therefore Landscape Bridge Bridge Pier Construction linear control method of the present invention can be controlled the linearity construction of Landscape Bridge bridge pier, guaranteeing the linear requirement of bridge pier, thereby satisfies construction requirement, and its easy construction, is easy to apply.
Landscape Bridge Bridge Pier Construction linear control method of the present invention in the step 3, is specially: 1. the template laying laterally is symmetrical centre with the bridge axes, is the symmetrical centre symmetrical laying with the pier stud center line vertically, and the bottom template is consistent with sidepiece template piece line; 2. before the formwork erection, remove the impurity of template surface earlier, and wipe dust, again with the joint treatment brushing release agent immediately that finishes; 3. be middle alignment bilateral symmetry shop template with the bridge axis, when the plate seam surpasses 1mm, handle with electric planer, and check whether each piece all drops on the flitch,, then adjust, guarantee that template is in one side if do not drop on the flitch; 4. post double faced adhesive tape earlier at each road edge joint position, carry out assembly unit again, scrape the wide ash of 20mm, make the faulting of slab ends of template piece and two template jointing positions form level and smooth slope, tie again, wear smooth being not easy to the edge joint position that double faced adhesive tape handles; 5. need connect when high when template, piece is located at same curve location; 6. after the bed die installation, the bed die absolute altitude is carried out setting-out, undesirable position is adjusted.
Owing to adopted said method, the quality of template is very big to final clear-water concrete influential effect, should guarantee that the concrete presentation quality guarantees that again bridge pier is linear, the quality of necessary strict control template engineering; Its template quality requires to satisfying intensity, rigidity requirement, dense materials, not imbibition; Do not receive variations in temperature buckling deformation etc.,, build attractive in appearance after the completion in order to guarantee concrete so this bridge abutment moulding plate is selected Finland's plate for use; It laterally is symmetrical centre with the bridge axes that template is laid, and is the symmetrical centre symmetrical laying with the pier stud center line vertically, and bed die is consistent with side form piece line; Improving the presentation quality after bridge pier is built completion, template need connect when high, and piece is located at same curve location; Can improve the presentation quality of finished product, avoid the fissure of displacement and seem in disorder, after the template surface clean; With the joint treatment brushing release agent immediately that finishes, release agent should be selected white aqueous solvent release agent for use, and its feature is air-dry easily at short notice.Because of template has local small concavo-convex unavoidably; If select machine oil or other water-insoluble release agents for use; It is difficult for air-dry at short notice, and under the effect of surface tension of liquid, the oils release agent is promptly concentrated to recess; Make that the release agent of brushing is inhomogeneous, the even phenomenon of irregular colour will appear in concrete surface after form removal.Therefore Landscape Bridge Bridge Pier Construction linear control method of the present invention is easy and simple to handle, is easy to promote; Can guarantee bridge construction; Be specially adapted to the Linear Control of Landscape Bridge Bridge Pier Construction, and can guarantee the stressed of bridge, can guarantee its outward appearance again; This control method is workable, is fit to apply.
In sum, owing to adopted technique scheme, the invention has the beneficial effects as follows:
1, Landscape Bridge Bridge Pier Construction linear control method of the present invention is easy and simple to handle, is easy to promote, and can guarantee bridge construction;
2, Landscape Bridge Bridge Pier Construction linear control method of the present invention is specially adapted to the Linear Control of Landscape Bridge Bridge Pier Construction, and can guarantees the stressed of bridge, can guarantee its outward appearance again, and this control method is workable, is fit to apply.
Description of drawings
The present invention will explain through example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is the processing technological flow of template among the present invention.
The specific embodiment
Disclosed all characteristics in this manual, or the step in disclosed all methods or the process except mutually exclusive characteristic and/or the step, all can make up by any way.
Disclosed arbitrary characteristic in this manual (comprising any accessory claim, summary and accompanying drawing) is only if special narration all can be replaced by other equivalences or the alternative features with similar purpose.That is, only if special narration, each characteristic is an example in a series of equivalences or the similar characteristics.
Shown in Fig. 1, in the present invention, the installation procedure of template, 1. and 2. each operation interpellation wherein as shown in the figure is following: snap the line makes template along bridge axis symmetry shop, can make each plate seam that concrete surface leaves all with the bridge parallel axes, neat and attractive in appearance.3. if the plate seam is too big, then the plate seam is too obvious, influences attractive in appearance.4. prevent the probe plate, cause institute's moulding concrete surface of building to produce the faulting of slab ends phenomenon.5. prevent plate seam place spillage.6. prevent the faulting of slab ends phenomenon.7. guarantee the nail nail that do not fall through.8., 9. with 10. in case stay hole for nailing on the concrete surface.
Landscape Bridge Bridge Pier Construction linear control method of the present invention, realize through following steps:
Step 1 is set up support: after bracket basis construction is accomplished, set up support again after the basis measured absolute altitude, and check adjustment; Be specially: 1. after the bracket basis construction is accomplished, by the measurement group unwrapping wire is measured on the basis, bridge pier outline line and bracket basis absolute altitude draw; 2. according to outline line the bridge pier support is distributed, and calculate every row's support need scaffolding height; 3. measure after support is set up and put in place and check, not meeting position adjustment; 4. support height is checked and is required the back that support is carried out precompressed.
Step 2 is measured unwrapping wire: after 1. support is set up predetermined altitude, support top mark height is measured; And set up the lumps of wood; 2. in the precompressed process, the precompressed section is carried out cross-sectioning, and keep a record; 3. based on the precompressed result; Reserve the rack elasticity deflection, absolute altitude at the bottom of the template is measured, and adjusted; The template of drawing is arranged grid, is that the center symmetry is laid with the axis; Be specially: 1. encrypt traverse point and fourth class bench mark, bridge pier line style and absolute altitude are controlled, before support is set up in the other one-level of laying of Landscape Bridge; Grid in the concrete base surface is made bridge pier sideline scope; Measure absolute altitude,, carry out support and set up based on each point absolute altitude in the grid; 2. after support is set up predetermined altitude, support top mark height is measured, set up the lumps of wood after meeting the requirements; 3. in the precompressed process, divide every day and three times the precompressed section carried out cross-sectioning, and measurement data is carried out record; 4. before template is installed, based on the precompressed result, reserving the rack elasticity deflection, absolute altitude at the bottom of the template is measured, and absolute altitude is accurately adjusted and the template of drawing is arranged grid through jacking, is that the center symmetry is laid with the axis.
Step 3, template is installed: is that middle alignment bilateral symmetry is laid template 1., 2. piece handled, 3. the bed die absolute altitude is carried out setting-out, and adjust, 4. template surface is handled with the bridge axis, and the brushing release agent; Be specially: 1. the template laying laterally is symmetrical centre with the bridge axes, is the symmetrical centre symmetrical laying with the pier stud center line vertically, and the bottom template is consistent with sidepiece template piece line; 2. before the formwork erection, remove the impurity of template surface earlier, and wipe dust, again with the joint treatment brushing release agent immediately that finishes; 3. be middle alignment bilateral symmetry shop template with the bridge axis, when the plate seam surpasses 1mm, handle with electric planer, and check whether each piece all drops on the flitch,, then adjust, guarantee that template is in one side if do not drop on the flitch; 4. post double faced adhesive tape earlier at each road edge joint position, carry out assembly unit again, scrape the wide ash of 20mm, make the faulting of slab ends of template piece and two template jointing positions form level and smooth slope, tie again, wear smooth being not easy to the edge joint position that double faced adhesive tape handles; 5. need connect when high when template, piece is located at same curve location; 6. after the bed die installation, the bed die absolute altitude is carried out setting-out, undesirable position is adjusted
Step 4, concrete construction: casting method: concrete adopts commercial concrete.Concrete is pumped to the job site with concrete placement vehicle and builds, and pump truck is put in the middle of bridge pier.Symmetry is built when building, by building toward both sides in the middle of the bridge pier.Build and send the special messenger that support and template are checked in the process.
Step 5, form removable: 1. stripping, and the bridge pier outline line is carried out bound edge handle.Form removal is careful; Avoid destroying concrete, and note finished product protection, finished product protection mainly is the protection to the negative and positive angle; Directly influence the presentation quality of finished product during formwork hoisting; To pay attention to especially removing stage makeup and costume of template construction, must have the Security Officer on duty when template is removed stage makeup and costume, and tell somebody what one's real intentions are in detail what teams and groups carried out that i iron removes stage makeup and costume.After the template dismounting is accomplished, adopt the plank bound edge to handle to the bridge pier outline line, prevent the bridge pier outline line is damaged.
Step 6, concrete curing: after form removal is accomplished, adopt plastic sheeting to carry out covering curing.
Step 7; Become flat protection: finished product protection mainly is the protection to the negative and positive angle, directly influences the presentation quality of finished product during formwork hoisting, will pay attention to especially removing stage makeup and costume of template construction; Must there be the Security Officer on duty when template is removed stage makeup and costume, and tells somebody what one's real intentions are in detail what teams and groups carried out that i iron removes stage makeup and costume.After the template dismounting is accomplished, adopt the plank bound edge to handle to the bridge pier outline line, prevent the bridge pier outline line is damaged.
The present invention is not limited to the aforesaid specific embodiment.The present invention expands to any new feature or any new combination that discloses in this manual, and the arbitrary new method that discloses or step or any new combination of process.

Claims (4)

1. Landscape Bridge Bridge Pier Construction linear control method is characterized in that: it is realized through following steps:
Step 1 is set up support: after bracket basis construction is accomplished, set up support again after the basis measured absolute altitude, and check adjustment;
Step 2 is measured unwrapping wire: after 1. support is set up predetermined altitude, support top mark height is measured; And set up the lumps of wood; 2. in the precompressed process, the precompressed section is carried out cross-sectioning, and keep a record; 3. based on the precompressed result; Reserve the rack elasticity deflection, absolute altitude at the bottom of the template is measured, and adjusted; The template of drawing is arranged grid, is that the center symmetry is laid with the axis;
Step 3, template is installed: is that middle alignment bilateral symmetry is laid template 1., 2. piece handled, 3. the bed die absolute altitude is carried out setting-out, and adjust, 4. template surface is handled with the bridge axis, and the brushing release agent;
Step 4, concrete construction: by building toward both sides in the middle of the bridge pier;
Step 5, form removable: 1. stripping, and the bridge pier outline line is carried out bound edge handle.
2. Landscape Bridge Bridge Pier Construction linear control method as claimed in claim 1 is characterized in that: in the step 1, be specially: 1. after the bracket basis construction is accomplished, by the measurement group unwrapping wire is measured on the basis, bridge pier outline line and bracket basis absolute altitude draw; 2. according to outline line the bridge pier support is distributed, and calculate every row's support need scaffolding height; 3. measure after support is set up and put in place and check, not meeting position adjustment; 4. support height is checked and is required the back that support is carried out precompressed.
3. Landscape Bridge Bridge Pier Construction linear control method as claimed in claim 1 is characterized in that: in the step 2, be specially: 1. encrypt traverse station and fourth class bench mark in the other one-level of laying of Landscape Bridge; Bridge pier line style and absolute altitude are controlled; Before support was set up, the grid in the concrete base surface is made bridge pier sideline scope was measured absolute altitude; According to each point absolute altitude in the grid, carry out support and set up; 2. after support is set up predetermined altitude, support top mark height is measured, set up the lumps of wood after meeting the requirements; 3. in the precompressed process, divide every day and three times the precompressed section carried out cross-sectioning, and survey data is carried out record; 4. before template is installed, according to the precompressed result, reserving the rack elasticity deflection, absolute altitude at the bottom of the template is measured, and absolute altitude is accurately adjusted and the template of drawing is arranged grid through jacking, is that the center symmetry is laid with the axis.
4. Landscape Bridge Bridge Pier Construction linear control method as claimed in claim 1; It is characterized in that: in the step 3; Be specially: 1. the template laying laterally is symmetrical centre with the bridge axes, is the symmetrical centre symmetrical laying with the pier stud center line vertically, and the bottom template is consistent with sidepiece template piece line; 2. before the formwork erection, remove the impurity of template surface earlier, and wipe dust, again with the joint treatment brushing release agent immediately that finishes; 3. be middle alignment bilateral symmetry shop template with the bridge axis, when the plate seam surpasses 1mm, handle with electric planer, and check whether each piece all drops on the flitch,, then adjust, guarantee that template is in one side if do not drop on the flitch; 4. post double faced adhesive tape earlier at each road edge joint position, carry out assembly unit again, scrape the wide ash of 20mm, make the faulting of slab ends of template piece and two template jointing positions form level and smooth slope, tie again, wear smooth being not easy to the edge joint position that double faced adhesive tape handles; 5. need connect when high when template, piece is located at same curve location; 6. after the bed die installation, the bed die absolute altitude is carried out setting-out, undesirable position is adjusted.
CN201110437590.0A 2011-12-23 2011-12-23 Landscape bridge pier construction linear control method Active CN102518043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110437590.0A CN102518043B (en) 2011-12-23 2011-12-23 Landscape bridge pier construction linear control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110437590.0A CN102518043B (en) 2011-12-23 2011-12-23 Landscape bridge pier construction linear control method

Publications (2)

Publication Number Publication Date
CN102518043A true CN102518043A (en) 2012-06-27
CN102518043B CN102518043B (en) 2014-11-26

Family

ID=46289087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110437590.0A Active CN102518043B (en) 2011-12-23 2011-12-23 Landscape bridge pier construction linear control method

Country Status (1)

Country Link
CN (1) CN102518043B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243654A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN103603262B (en) * 2013-12-09 2015-11-11 中铁二十三局集团有限公司 The linear control method of slant height pier long-span continuous beam
CN111197276A (en) * 2020-01-14 2020-05-26 温州永昌建设有限公司 Template supporting method and device for building road
CN114169050A (en) * 2021-11-26 2022-03-11 上海建工四建集团有限公司 Bridge-forming linear control method for construction of steel concrete composite beam

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429752A (en) * 2007-11-05 2009-05-13 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
JP2010133084A (en) * 2008-12-02 2010-06-17 Totetsu Kogyo Co Ltd Method of constructing hollow high structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429752A (en) * 2007-11-05 2009-05-13 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
JP2010133084A (en) * 2008-12-02 2010-06-17 Totetsu Kogyo Co Ltd Method of constructing hollow high structure

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
姜娜: "浅谈包西铁路陕西段田家沟特大桥墩身施工技术控制", 《科技创业家》, vol. 9, no. 9, 1 May 2011 (2011-05-01), pages 36 *
杨玉俊: "浅谈桥梁空心墩翻模施工", 《价值工程》, vol. 29, no. 7, 28 June 2010 (2010-06-28), pages 112 *
王贵春、胡国双: "浅谈高桥墩滑模施工技术", 《交通科技》, no. 5, 28 December 2007 (2007-12-28), pages 33 - 36 *
苗福旺: "特大桥墩身定型钢模板在连续梁施工中的应用", 《山西建筑》, vol. 36, no. 2, 31 March 2010 (2010-03-31), pages 335 - 337 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243654A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN103603262B (en) * 2013-12-09 2015-11-11 中铁二十三局集团有限公司 The linear control method of slant height pier long-span continuous beam
CN111197276A (en) * 2020-01-14 2020-05-26 温州永昌建设有限公司 Template supporting method and device for building road
CN114169050A (en) * 2021-11-26 2022-03-11 上海建工四建集团有限公司 Bridge-forming linear control method for construction of steel concrete composite beam

Also Published As

Publication number Publication date
CN102518043B (en) 2014-11-26

Similar Documents

Publication Publication Date Title
CN104846744B (en) Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode
CN204781624U (en) Floor elevation and roughness controlling means
CN204076498U (en) A kind of Precast T-Beam beam rib steel-bar binding location moulding bed
CN102518043A (en) Landscape bridge pier construction linear control method
CN103243646B (en) Earthquake proof PTFE (Poly Tetra Fluoro Ethylene) plate rubber bearing small displacement comb plate extensible device
CN204530494U (en) High pier binder template is set up and is used support
CN107988919B (en) Packing stone and pre-buried bolt hole forming device for synchronous construction with bridge pier caps
CN106192717A (en) Bridge steel and concrete mixing section and installation method thereof
CN202899587U (en) Large area factory space ground floor concrete planeness construction device
CN103233409B (en) Vertical along stone construction method of installation
CN205036096U (en) Be used for accessible device that passes through of three -dimensional support of reinforcing bar
CN205099298U (en) Adhere to installation and maintenance platform and tower machine
CN104452581A (en) Cantilever and base bolt anchoring type comb plate retractor
CN202064278U (en) Pre-buried steel plate localizator for bridge padstone
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN209681526U (en) A kind of welding tooling of movable building construction
CN204530480U (en) Faulting of slab ends adjusting device
CN101967884B (en) Method for controlling concrete planeness of large-area steel bar truss template
CN205276166U (en) Guardrail stand positioner
CN105442840A (en) Construction method of cantilever formwork supporting frame
CN205604085U (en) Unsettled support of built -in fitting
CN204899041U (en) Stool with upper and lower protection layer for controlling plate ribs
CN203571219U (en) Novel cable tray for bridge
CN102797224B (en) Paving method and template supporting device of bridge deck slab
CN202810179U (en) Overhanging element anchoring tool for overhanging scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160111

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610041, No. nine, No. 156, building B, Gao Xing Road, Chengdu hi tech Development Zone, Chengdu, Sichuan

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU THIRD ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20181214

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU THIRD ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right