CN102505790B - Integrated suspended ceiling structure with layered installation suspended ceiling panels - Google Patents

Integrated suspended ceiling structure with layered installation suspended ceiling panels Download PDF

Info

Publication number
CN102505790B
CN102505790B CN201110370329.3A CN201110370329A CN102505790B CN 102505790 B CN102505790 B CN 102505790B CN 201110370329 A CN201110370329 A CN 201110370329A CN 102505790 B CN102505790 B CN 102505790B
Authority
CN
China
Prior art keywords
press strip
horizontal
clamp
clamp body
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110370329.3A
Other languages
Chinese (zh)
Other versions
CN102505790A (en
Inventor
沈正华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fsilon home building materials Limited by Share Ltd
Original Assignee
HAIYAN FSILON BUILDING MATERIALS TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIYAN FSILON BUILDING MATERIALS TECHNOLOGY CO LTD filed Critical HAIYAN FSILON BUILDING MATERIALS TECHNOLOGY CO LTD
Priority to CN201110370329.3A priority Critical patent/CN102505790B/en
Publication of CN102505790A publication Critical patent/CN102505790A/en
Application granted granted Critical
Publication of CN102505790B publication Critical patent/CN102505790B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)
  • Finishing Walls (AREA)

Abstract

The invention relates to an integrated suspended ceiling structure with layered installation suspended ceiling panels. Presently, there is no structure capable of realizing layered installation of the suspended ceiling panels. The integrated suspended ceiling structure with the layered installation suspended ceiling panels is characterized by comprising a connecting clamping plate, a frame, a triangular keel, an upper panel and a lower panel, wherein the connecting clamping plate comprises a clamping board main body, a clamping strip, a transverse pressure strip and a vertical pressure strip, wherein a transverse mounting plane is arranged on the top of the frame, a vertical mounting plane is arranged on the lower part of the frame, a transverse mounting groove is arranged between the transverse mounting plane and the transverse pressure strip, and a vertical mounting groove is arranged between the vertical mounting plane and the vertical pressure strip; a transverse clamping side is arranged in the upper panel, the lower panel is clamped into the vertical mounting groove and lower than the height of the upper panel. The integrated suspended ceiling structure with layered installation suspended ceiling panels, provided by the invention, has the advantages of simple structure, reasonable design and reliable performance, and can realize the function of high-low layered installation of the suspended ceiling panels.

Description

The assembled ceiling structure that a kind of hang ceiling panel layering is installed
Technical field
The present invention relates to a kind of assembled ceiling structure, especially relate to the assembled ceiling structure that a kind of hang ceiling panel layering is installed, can realize the function that integrated ceiling panel layering is installed, belong to building materials ceiling decoration field.
Background technology
In prior art, the use of Integral ceiling is quite extensive, Integral ceiling is fixed on the indoor top of building conventionally by main joist, triangular keel is connected with main joist by connector, then panel or electrical equipment coordinate with keel as square, rectangle etc. according to the shape that designs, as being mounted to integrated ceiling by modes such as clampings.
Although existing Integral ceiling can make indoor furred ceiling in same level, but, in above-mentioned existing assembled ceiling structure, triangular keel normally laterally arrange by parallel arrangement or parallel longitudinal, and the arragement direction that is arranged in the triangular keel of same level can only be selected one and chooses, be triangular keel in same level laterally parallel arrangement or parallel longitudinal arrange, can not in same level, there is the situation that triangular keel intersects.Hence one can see that, when hang ceiling panel is installed, a hang ceiling panel can only be arranged on respectively by the clamping corner of hang ceiling panel both sides on two triangular keels that are parallel to each other, reduced the sound construction degree of Integral ceiling, only with two triangular keels, be difficult to the heavier integrated ceiling appliance of weight to be firmly fixed on Integral ceiling, thereby bring great inconvenience to heavier integrated ceiling appliance or other the heavier suspended ceiling devices of weight of erection weight.
In addition, along with user the live raising that requires and the diversity development of building structure, for Integral ceiling only the structure in same plane can not meet existing user's demand, have many consumers and wish that indoor suspended ceiling is more personalized, need the global existence of furred ceiling high and low layered, adopt in the space of same furred ceiling the height layering of real hang ceiling panel.Some user also wishes to install in layering place the ceiling appliances such as ornament lamp and decorates, if adopt the furred ceiling mode of prior art, owing to making after furred ceiling layering, the height of installation panel is different, causes the height difference of the triangular keel of installation panel.
If desired in the space of same furred ceiling, realize the height layering of hang ceiling panel, in prior art, need the installation of the high end that changes main joist or triangular keel just can realize hang ceiling panel height layering installation, although this can reach the object of hang ceiling panel layering, but install very trouble, difference in height such as calculated in advance main joist or triangular keel before needs installation, for installing, efficiency is quite low, and after the panel of the height layering completing at same indoor location, the panel junction of different layers is very not attractive in appearance, thereby greatly affect the whole structure of Integral ceiling.For example, open day is on 07 27th, 2011, publication number is in the Chinese patent of CN201908381U, a kind of Integral ceiling is disclosed, this Integral ceiling comprises suspension and a plurality of buckle, suspension comprises the plural row main joist that is suspended on indoor upper space, with the several column triangular keel that is fixed on this main joist below, suspension comprises first floor suspension and is positioned at the second layer suspension of this first floor suspension below, on this first floor suspension, embed buckle and form first floor furred ceiling, on this second layer suspension, embed buckle and form second layer furred ceiling, the joining place of this first floor furred ceiling and second layer furred ceiling is provided with chimeric L-type triangular keel and L-type buckle mutually, the first floor furred ceiling that this Integral ceiling is laid by first floor suspension and second layer suspension and second layer furred ceiling, the workload while not only making layered suspended ceiling install is large, and brings larger inconvenience to the installation of layered suspended ceiling, is difficult to align easily furred ceiling.
In sum, also there is no a kind of structure that hang ceiling panel layering is installed that realizes at present, thereby bring larger inconvenience to the layering installation of hang ceiling panel, affect the effect of Integral ceiling, hindered the development of Integral ceiling industry.
Summary of the invention
The object of the invention is to overcome above shortcomings in prior art, and provide a kind of simple in structure, reasonable in design, easy to use, dependable performance, can reach the hang ceiling panel assembled ceiling structure that just the hang ceiling panel layering of layering installation function is installed.
The present invention addresses the above problem adopted technical scheme: the design feature of the assembled ceiling structure that this hang ceiling panel layering is installed is: comprise and connect clamp, frame, triangular keel, upper deck panels and lower floor's panel, described connection clamp comprises clamp body, card article, horizontal press strip and perpendicular press strip, described card article is fixed on the top of clamp body, described horizontal press strip is fixed on the top of clamp body, this horizontal press strip is positioned at a side of clamp body, described horizontal press strip is transversary, described perpendicular press strip is fixed on the bottom of clamp body, and this perpendicular press strip is vertical structure; It is dull and stereotyped that the top of described frame is provided with horizontal installation, the bottom of this frame is provided with the perpendicular flat board of installing, one side of described frame and a side of clamp body are fixed, dull and stereotyped and the horizontal press strip of described horizontal installation coordinates, between this horizontal installation flat board and horizontal press strip, form horizontal mounting groove, dull and stereotyped and the perpendicular press strip of described perpendicular installation coordinates, and forms perpendicular mounting groove between this perpendicular installation flat board and perpendicular press strip; Card article in described connection clamp is connected in triangular keel, and this connection clamp is positioned at the below of triangular keel; In described upper deck panels, be provided with horizontal clamping limit, on this, deck panels is connected in horizontal mounting groove by horizontal clamping checkpost; Described subsurface board is connected in perpendicular mounting groove, and the height of this lower floor's panel is lower than the height of upper deck panels.Make thus the present invention just can realize without the high end that changes main joist or triangular keel the object that the layering of hang ceiling panel height is installed, the card article connecting in clamp is connected in triangular keel, upper strata erecting of panel is in the horizontal horizontal mounting groove of installing between dull and stereotyped and horizontal press strip, lower floor's panel is arranged on the perpendicular perpendicular mounting groove of installing between dull and stereotyped and perpendicular press strip, and the height of this lower floor's panel is lower than the height of upper deck panels; When the present invention surrounds a frame, both can form the structure of deck panels epirelief, be used to form the Integral ceiling with fovea superior structure, can form structure protruding under lower floor's panel again, be used to form the Integral ceiling of lower male structure, thereby expanded the applicable surface of Integral ceiling, strengthened the third dimension of Integral ceiling, can meet different clients' demand.
As preferably, the horizontal press strip in connection clamp of the present invention is arcuate structure.Make thus in the present invention the elasticity of horizontal press strip better, being conducive to install by horizontal press strip is that hang ceiling panel is more firm.
As preferably, the perpendicular press strip in connection clamp of the present invention is arcuate structure.Make thus the elasticity of perpendicular press strip in the present invention better, being conducive to install by perpendicular press strip is that hang ceiling panel is more firm.
As preferably, connection clamp of the present invention also comprises gusset plate holddown groove, and described gusset plate holddown groove is fixed on the bottom of clamp body, and this gusset plate holddown groove is positioned at the opposite side of clamp body.Make thus the present invention can adopt easily gusset plate and securing member to be fixed by this gusset plate holddown groove, be conducive to increase firmness, strengthen and bear outer intensity of force, make especially connection on the corner more firm.In addition, can also make to adopt same structure to link together and realize the cooperation of the connection clamp that corner connects tightr, between suspended ceiling pinch plate, can not produce gap, can greatly increase aesthetic measure.
As preferably, connection clamp of the present invention also comprises convex tendon No. one, and a described convex tendon is fixed on a side of clamp body, and this convex tendon is positioned at the below of horizontal press strip; In described frame, be provided with groove No. one, a described convex tendon is connected in a groove.Make thus the present invention can be convenient and match with frame accurately, be convenient to the installation of hang ceiling panel and frame.
As preferably, connection clamp of the present invention also comprises convex tendon No. two, and described No. two convex tendons are fixed on a side of clamp body, and these No. two convex tendons are positioned at the below of horizontal press strip; In described frame, be provided with groove No. two, described No. two convex tendons are connected in No. two grooves.Make thus the present invention can be convenient and match with frame accurately, be convenient to the installation of hang ceiling panel and frame.
As preferably, connection clamp of the present invention also comprises keel support shoulders, and described keel support shoulders is fixed on the top of clamp body, and this keel support shoulders is positioned at the opposite side of clamp body.This keel support shoulders can make to connect on the one hand clamp and keep balance, can limit on the other hand the upper-lower position relation that connects clamp, guarantees that hang ceiling panel is more smooth, is conducive to improve the quality of Integral ceiling.
As preferably, a side of frame of the present invention is provided with stressed step, and the bottom of described connection clamp withstands on stressed step.Make thus structure of the present invention more firm.
As preferably, a side of frame of the present invention is provided with holddown groove, and this frame is screwed in a side of clamp body, and described screw cross-under is in holddown groove.Make thus of the present invention easier for installation.
As preferably, in frame of the present invention, be provided with gusset plate mounting groove.Make thus the present invention can adopt easily gusset plate and securing member to be fixed by this gusset plate mounting groove, be conducive to increase firmness, strengthen and bear outer intensity of force, make especially connection on the corner more firm.In addition, can also make to adopt same structure to link together and realize the cooperation of the frame that corner connects tightr, between suspended ceiling pinch plate, can not produce gap, can greatly increase aesthetic measure.
The present invention compared with prior art, have the following advantages and effect: without the high end that changes main joist or triangular keel, install and just can realize the function that the layering of hang ceiling panel height is installed, and can make the hang ceiling panel of different high and low positions in conjunction with quite attractive in appearance, adopt the Integral ceiling of the layering mounting structure in the present invention can in a region, surround a rectangle or foursquare concave inward structure or outside male structure, not only make the third dimension of Integral ceiling stronger, be conducive to improve the overall quality of Integral ceiling, also make the applicable surface of Integral ceiling wider, be conducive to improve the utilization rate of the interior space, when there is concaveconvex structure in indoor top, can according to the concaveconvex structure at indoor top, Integral ceiling be installed by the present invention, need integral body to move down Integral ceiling.
After the present invention coordinates with corresponding section bar, except realizing panel, hang the layering of face height, can also in a plane, form the region of an indent or evagination, in this region, also other ornament can be installed, as pendent lamp etc., can meet customer personalized demand.
Of the present invention simple in structure, reasonable in design, dependable performance, easy for installation, can realize the layering of hang ceiling panel height and install, be conducive to promote Integral ceiling industry better to develop.
Accompanying drawing explanation
Fig. 1 is the structural representation of the assembled ceiling structure that in the embodiment of the present invention, hang ceiling panel layering is installed.
Fig. 2 is the embodiment of the present invention structural representation of panel after amplifying at the middle and upper levels.
Fig. 3 is the structural representation after connection clamp in the embodiment of the present invention and frame fix.
Fig. 4 is the main TV structure schematic diagram of frame in the embodiment of the present invention.
Fig. 5 is the perspective view of frame in the embodiment of the present invention.
Fig. 6 is the structural representation after the amplification of C place in Fig. 5.
Fig. 7 is the main TV structure schematic diagram that connects clamp in the embodiment of the present invention.
Fig. 8 is the left TV structure schematic diagram of Fig. 7.
Fig. 9 is the perspective view that connects clamp in the embodiment of the present invention.
Figure 10 is the structural representation after the amplification of A place in Fig. 8.
Figure 11 is the structural representation after the amplification of B place in Fig. 9.
Figure 12 is the structural representation after the frame of connection clamp in the embodiment of the present invention and another structure fixes.
Figure 13 is the structural representation of frame in Figure 12.
Figure 14 is the structural representation after the frame of connection clamp in the embodiment of the present invention and another structure fixes.
Figure 15 is the structural representation of frame in Figure 14.
Figure 16 is the structural representation that the assembled ceiling structure of the hang ceiling panel layering installation in the embodiment of the present invention forms the Integral ceiling of concave structure.
Figure 17 is the structural representation after the amplification of D place in Figure 16.
Figure 18 is the structural representation that the assembled ceiling structure of the hang ceiling panel layering installation in the embodiment of the present invention forms the Integral ceiling of lower convex structure.
Figure 19 is the structural representation after the amplification of E place in Figure 18.
The specific embodiment
Below in conjunction with accompanying drawing and by embodiment, the present invention is described in further detail, and following examples are explanation of the invention and the present invention is not limited to following examples.
Embodiment.
Referring to Fig. 1 to Figure 19, the assembled ceiling structure that in the present embodiment, hang ceiling panel layering is installed comprises connection clamp 1, frame 2, triangular keel 5, upper deck panels 6 and lower floor's panel 7, wherein, in upper deck panels 6, be provided with horizontal clamping limit 61, generally, this horizontal clamping limit 61 is only arranged on a side of deck panels 6.
Connection clamp 1 in the present embodiment comprises clamp body 11, card article 12, horizontal press strip 13, perpendicular press strip 14, gusset plate holddown groove 15, convex tendon 16, No. two convex tendons 17, keel support shoulders 18, and this connects clamp 1 is integral type structure.Card article 12 in the present embodiment is fixed on the top of clamp body 11, by card article 12, can be fixed on triangular keel 5 connecting clamp 1.
Horizontal press strip 13 in the present embodiment is arcuate structure, and this horizontal press strip 13 is fixed on the top of clamp body 11.Horizontal press strip 13 in the present embodiment is positioned at a side of clamp body 11, and this horizontal press strip 13 is transversary.It should be noted that, in the present invention, said horizontal press strip 13 is transversary and refers to sensu lato transversary, refer to horizontal press strip 13 to horizontal expansion, for example can extend left, also can extend to the right, and, between this horizontal press strip 13 and horizontal plane, can there is certain angle, for example between horizontal press strip 13 and horizontal plane, can be 0-5 degree angle, as long as horizontal press strip 13 can be by upper deck panels 6 clampings after coordinating with frame 2.
Perpendicular press strip 14 in the present embodiment is arcuate structure, and this perpendicular press strip 14 is fixed on the bottom of clamp body 11, and the perpendicular press strip 14 in the present embodiment is vertical structure.It should be noted that, in the present invention, said perpendicular press strip 14 is vertical structure and refers to sensu lato vertical structure, refer to perpendicular press strip 14 to downward-extension, and, between this perpendicular press strip 14 and vertical curve, can there is certain angle, between perpendicular press strip 14 and vertical curve, be to be for example 0-5 degree angle, as long as perpendicular press strip 14 can be by lower floor's panel 7 clampings after coordinating with frame 2.
Gusset plate holddown groove 15 in the present embodiment is fixed on the bottom of clamp body 11, and this gusset plate holddown groove 15 is positioned at the opposite side of clamp body 11.Connection clamp 1 in the present embodiment in use, adopts gusset plate and securing member to be fixed by gusset plate holddown groove 15, is conducive to increase firmness, and the connection that especially makes to be positioned at corner is more firm; By gusset plate holddown groove 15, can make to adopt same structure to link together and realize the cooperation of the connection clamp 1 that corner connects tightr, make can not produce gap between suspended ceiling pinch plate.
A convex tendon 16 in the present embodiment is fixed on a side of clamp body 11, and this convex tendon 16 is positioned at the below of horizontal press strip 13.No. two convex tendons 17 in the present embodiment are fixed on a side of clamp body 11, and these No. two convex tendons 17 are positioned at the below of horizontal press strip 13.A convex tendon 16 in the present embodiment is positioned at the top of No. two convex tendons 17.
Keel support shoulders 18 in the present embodiment is fixed on the top of clamp body 11, and this keel support shoulders 18 is positioned at the opposite side of clamp body 11.This keel support shoulders 18 can either keep connecting the balance of clamp 1, can limit again the upper-lower position relation that connects clamp 1, is convenient to connect the installation of clamp 1, is conducive to guarantee that the installation of hang ceiling panel is more smooth.Keel support shoulders 18 and horizontal press strip 13 in the present embodiment flush, and in fact, the horizontal press strip 13 in the present embodiment also can play the effect of similar keel support shoulders 18 to a certain extent.
The top of the top of said clamp body 11, clamp body 11 in the present invention is, the physical location of the bottom of the bottom of clamp body 11 and clamp body 11, it will be apparent to those skilled in the art that, belong to common practise, so locate no longer above-mentioned position relationship to be described in detail.
In the present embodiment, the top of frame 2 is provided with horizontal installation flat board 21, and the bottom of this frame 2 is provided with the perpendicular flat board 22 of installing.In the present embodiment, a side of frame 2 and a side of clamp body 11 are fixed, horizontal installation dull and stereotyped 21 and horizontal press strip 13 coordinate, between this horizontal installation dull and stereotyped 21 and horizontal press strip 13, form horizontal mounting groove 3, because horizontal press strip 13 is arcuate structure, make horizontal mounting groove 3 there is better clamping force; Perpendicular installation dull and stereotyped 22 and perpendicular press strip 14 coordinate, and this perpendicular installation between flat board 22 and perpendicular press strip 14 forms perpendicular mounting groove 4, because perpendicular press strip 14 is arcuate structure, makes perpendicular mounting groove 4 have better clamping force.
In the frame 2 of the present embodiment, be provided with a groove 25 and No. two grooves 26, this groove 25 and No. two grooves 26 match with a convex tendon 16 and No. two convex tendons 17 respectively, No. one convex tendon 16 is connected in a groove 25, and No. two convex tendon 17 is connected in No. two grooves 26.
In the present embodiment, a side of frame 2 is provided with stressed step 23, and the bottom that connects clamp 1 withstands on stressed step 23, makes the integral body of Integral ceiling layering mounting structure more firm.In the present embodiment, a side of frame 2 is provided with holddown groove 24, and this frame 2 can be screwed in a side of clamp body 11, for fixing screw cross-under at holddown groove 24.
In the frame 2 of the present embodiment, be provided with gusset plate mounting groove 27, frame 2 in the present embodiment in use, adopt gusset plate and securing member to be fixed by gusset plate mounting groove 27, be conducive to increase firmness, especially the connection that makes to be positioned at corner is more firm, make to adopt same structure to link together and realize the cooperation of the frame 2 that corner connects tightr, between suspended ceiling pinch plate, can not produce gap.
The card article 12 that the present embodiment connects in clamp 1 is connected in triangular keel 5, and this connection clamp 1 is positioned at the below of triangular keel 5.In the upper deck panels 6 of the present embodiment, be provided with horizontal clamping limit 61, on this, deck panels 6 is connected in horizontal mounting groove 3 by horizontal clamping limit 61.Lower floor's panel 7 in the present embodiment is connected in perpendicular mounting groove 4, and the height of this lower floor's panel 7 is lower than the height of upper deck panels 6.
Integral ceiling layering mounting structure in the present embodiment is used for installing hang ceiling panel, can realize the function that Integral ceiling layering is installed.During use, by card article 12, clamp body 11 is connected on triangular keel 5, thereby realize, by connecting clamp 1, be arranged on the function on triangular keel 5, connecting clamp 1 matches with frame 2, and, horizontal installation dull and stereotyped 21 and horizontal press strip 13 coordinate, between this horizontal installation dull and stereotyped 21 and horizontal press strip 13, form horizontal mounting groove 3, upper deck panels 6 is connected in horizontal mounting groove 3 by horizontal clamping limit 61, perpendicular installation dull and stereotyped 22 and perpendicular press strip 14 coordinate, this perpendicular installation between flat board 22 and perpendicular press strip 14 forms and erects mounting groove 4, lower floor's panel 7 is connected in perpendicular mounting groove 4, the height of lower floor's panel 7 is lower than the height of upper deck panels 6, thereby reach the object that the layering of hang ceiling panel height is installed.Horizontal clamping limit 61 in the present invention in deck panels 6 can arrange according to actual needs, in upper deck panels 6, need the limit being connected in horizontal mounting groove 3 to be horizontal clamping limit 61, for example, upper deck panels 6 has two limits need to snap fit onto in two horizontal mounting grooves 3, and these two limits of going up in deck panels 6 are horizontal clamping limit 61.
When the assembled ceiling structure that in the present embodiment, hang ceiling panel layering is installed surrounds a frame, both can form the structure of deck panels 6 epireliefs, be used to form the Integral ceiling with fovea superior structure, as shown in figure 16, can form again 6 times protruding structures of lower floor's panel, be used to form the Integral ceiling with lower male structure, as shown in figure 18.The assembled ceiling structure of below hang ceiling panel layering in the present embodiment being installed forms with the Integral ceiling of fovea superior structure and forms and simply introduces with the Integral ceiling of lower male structure.
When the assembled ceiling structure that hang ceiling panel layering is installed in needing the present embodiment forms with the Integral ceiling of fovea superior structure, only need connect clamp 1 by four forms a circle around upper deck panels 6, as shown in Figure 16 and Figure 17, Figure 16 is the sectional structure chart along fovea superior structure place with the Integral ceiling of fovea superior structure, triangular keel 5 is fixed on main joist, thereby formation Integral ceiling, upper deck panels 6 in this Integral ceiling is up protruded, see from the bottom up, whole Integral ceiling forms the structure of fovea superior.
When the assembled ceiling structure that hang ceiling panel layering is installed in needing the present embodiment forms with the Integral ceiling of lower male structure, only need connect clamp 1 by four forms a circle around lower floor's panel 7, as shown in Figure 18 and Figure 19, Figure 18 is the sectional structure chart along lower male structure place with the Integral ceiling of lower male structure, triangular keel 5 is fixed on main joist, thereby formation Integral ceiling, lower floor's panel 7 in this Integral ceiling down protrudes, see from the bottom up, whole Integral ceiling forms lower protruding structure.
In addition, it should be noted that, the specific embodiment described in this manual, the shape of its parts and components, institute's title of being named etc. can be different, and the above content described in this manual is only to structure example of the present invention explanation.All equivalence variation or simple change of doing according to described structure, feature and the principle of patent design of the present invention, are included in the protection domain of patent of the present invention.Those skilled in the art can make various modifications or supplement or adopt similar mode to substitute described specific embodiment; only otherwise depart from structure of the present invention or surmount this scope as defined in the claims, all should belong to protection scope of the present invention.

Claims (10)

1. the assembled ceiling structure that a hang ceiling panel layering is installed, it is characterized in that: comprise and connect clamp, frame, triangular keel, upper deck panels and lower floor's panel, described connection clamp comprises clamp body, card article, horizontal press strip and perpendicular press strip, described card article is fixed on the top of clamp body, described horizontal press strip is fixed on the top of clamp body, this horizontal press strip is positioned at a side of clamp body, described horizontal press strip is transversary, described perpendicular press strip is fixed on the bottom of clamp body, and this perpendicular press strip is vertical structure; It is dull and stereotyped that the top of described frame is provided with horizontal installation, the bottom of this frame is provided with the perpendicular flat board of installing, one side of described frame and a side of clamp body are fixed, dull and stereotyped and the horizontal press strip of described horizontal installation coordinates, between this horizontal installation flat board and horizontal press strip, form horizontal mounting groove, dull and stereotyped and the perpendicular press strip of described perpendicular installation coordinates, and forms perpendicular mounting groove between this perpendicular installation flat board and perpendicular press strip; Card article in described connection clamp is connected in triangular keel, and this connection clamp is positioned at the below of triangular keel; In described upper deck panels, be provided with horizontal clamping limit, on this, deck panels is connected in horizontal mounting groove by horizontal clamping checkpost; Described subsurface board is connected in perpendicular mounting groove, and the height of this lower floor's panel is lower than the height of upper deck panels.
2. the assembled ceiling structure that hang ceiling panel layering according to claim 1 is installed, is characterized in that: the horizontal press strip in described connection clamp is arcuate structure.
3. the assembled ceiling structure that hang ceiling panel layering according to claim 1 is installed, is characterized in that: the perpendicular press strip in described connection clamp is arcuate structure.
4. the assembled ceiling structure of installing according to the hang ceiling panel layering described in claim 1 or 2 or 3, it is characterized in that: described connection clamp also comprises gusset plate holddown groove, described gusset plate holddown groove is fixed on the bottom of clamp body, and this gusset plate holddown groove is positioned at the opposite side of clamp body.
5. the assembled ceiling structure of installing according to the hang ceiling panel layering described in claim 1 or 2 or 3, is characterized in that: described connection clamp also comprises convex tendon No. one, a described convex tendon is fixed on a side of clamp body, and this convex tendon is positioned at the below of horizontal press strip; In described frame, be provided with groove No. one, a described convex tendon is connected in a groove.
6. the assembled ceiling structure of installing according to the hang ceiling panel layering described in claim 1 or 2 or 3, is characterized in that: described connection clamp also comprises convex tendon No. two, described No. two convex tendons are fixed on a side of clamp body, and these No. two convex tendons are positioned at the below of horizontal press strip; In described frame, be provided with groove No. two, described No. two convex tendons are connected in No. two grooves.
7. the assembled ceiling structure of installing according to the hang ceiling panel layering described in claim 1 or 2 or 3, it is characterized in that: described connection clamp also comprises keel support shoulders, described keel support shoulders is fixed on the top of clamp body, and this keel support shoulders is positioned at the opposite side of clamp body.
8. the assembled ceiling structure of installing according to the hang ceiling panel layering described in claim 1 or 2 or 3, is characterized in that: a side of described frame is provided with stressed step, and the bottom of described connection clamp withstands on stressed step.
9. the assembled ceiling structure of installing according to the hang ceiling panel layering described in claim 1 or 2 or 3, is characterized in that: a side of described frame is provided with holddown groove, this frame is screwed in a side of clamp body, and described screw cross-under is in holddown groove.
10. the assembled ceiling structure of installing according to the hang ceiling panel layering described in claim 1 or 2 or 3, is characterized in that: in described frame, be provided with gusset plate mounting groove.
CN201110370329.3A 2011-11-21 2011-11-21 Integrated suspended ceiling structure with layered installation suspended ceiling panels Active CN102505790B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110370329.3A CN102505790B (en) 2011-11-21 2011-11-21 Integrated suspended ceiling structure with layered installation suspended ceiling panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110370329.3A CN102505790B (en) 2011-11-21 2011-11-21 Integrated suspended ceiling structure with layered installation suspended ceiling panels

Publications (2)

Publication Number Publication Date
CN102505790A CN102505790A (en) 2012-06-20
CN102505790B true CN102505790B (en) 2014-03-26

Family

ID=46217917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110370329.3A Active CN102505790B (en) 2011-11-21 2011-11-21 Integrated suspended ceiling structure with layered installation suspended ceiling panels

Country Status (1)

Country Link
CN (1) CN102505790B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015601B (en) * 2012-12-26 2014-09-24 佛山市锦绣明天建材有限公司 Secondary ceiling structural piece
CN105297993B (en) * 2015-12-01 2017-11-14 海盐美赫电器科技有限公司 One kind is without suspension Integral ceiling
CN111042425A (en) * 2019-12-30 2020-04-21 成都劲启材料科技有限公司 Integrated decorative suspended ceiling

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004308380A (en) * 2003-04-01 2004-11-04 Isao Abe Simple temporary vestibule door
CN201068633Y (en) * 2007-06-21 2008-06-04 徐国强 Suspended ceiling buckle connecting component
CN201347608Y (en) * 2009-01-08 2009-11-18 周建成 Flexible-assembly ceiling

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004308380A (en) * 2003-04-01 2004-11-04 Isao Abe Simple temporary vestibule door
CN201068633Y (en) * 2007-06-21 2008-06-04 徐国强 Suspended ceiling buckle connecting component
CN201347608Y (en) * 2009-01-08 2009-11-18 周建成 Flexible-assembly ceiling

Also Published As

Publication number Publication date
CN102505790A (en) 2012-06-20

Similar Documents

Publication Publication Date Title
CN106741597B (en) A kind of efficient ship's space wall-enclosing board
CN102400514B (en) Integrated ceiling formed by installing ceiling panels in layered mode
CN202390993U (en) Connecting clamping plate for integrated suspended ceiling
CN101856181A (en) Portable prefabricated flat bench
CN202390990U (en) Integrated suspended ceiling for mounting suspended ceiling panel in a layering manner
CN102505790B (en) Integrated suspended ceiling structure with layered installation suspended ceiling panels
CN204174809U (en) Super-high glass rib support suspension type hollow full glass curtain wall Glass Rib is refuted and is connect connecting structure
CN109779194A (en) Floor panel structure is built in room
CN204298954U (en) The connected node of dome type structure framework and dome type structure framework
CN202658773U (en) Bamboo-board curtain wall system
CN207776274U (en) Water-proof roofing harden structure and building
CN202265922U (en) Structure for assembling glass plate of shower enclosure against wall
CN113530131A (en) Assembled kitchen wall quick assembly and installation method thereof
CN202390991U (en) Integrated ceiling structure with layered installation of ceiling surfaces
CN105064588A (en) Novel duplex ceiling and mounting method thereof
CN202390994U (en) Layered installation structure for integrated ceiling panel
CN102535698A (en) Heat insulation curtain wall
CN102518244B (en) Integrated suspended ceiling with layered mounting of suspended ceiling panels
CN202390996U (en) Lifting hook for connecting integrated suspended ceiling with keel
CN202390992U (en) Integrated suspended ceiling for layered installation of suspended ceiling panel
CN102518245A (en) Freely combinable decoration beam
CN215889115U (en) Assembled kitchen wall fast-assembling assembly
CN202390995U (en) Connection clamp plate for integrated suspended ceiling
CN201679204U (en) Fastener used on floors and floors using fastener
CN205954982U (en) Fixed mounting spare for suspended ceiling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 314300, No. 3, Star Road, Saline Lake Road Industrial District, Haiyan Town, Haiyan County, Zhejiang, Jiaxing

Patentee after: Fsilon Building Material Technology Co., Ltd.

Address before: 314300, No. 3, Star Road, Saline Lake Road Industrial District, Haiyan Town, Haiyan County, Zhejiang, Jiaxing

Patentee before: Haiyan Fsilon Building Materials Technology Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 314300 3 Donghai Road, Venus area, Wuyuan Street (Industrial Park), Haiyan County, Jiaxing, Zhejiang

Patentee after: Fsilon home building materials Limited by Share Ltd

Address before: 314300 3 star road, Saline Lake Highway Industrial Zone, Wuyuan Town, Haiyan County, Jiaxing, Zhejiang

Patentee before: Fsilon Building Material Technology Co., Ltd.