CN102497030A - Line-loss actual-measurement and positioning method based on high-voltage electric energy meter and system thereof - Google Patents
Line-loss actual-measurement and positioning method based on high-voltage electric energy meter and system thereof Download PDFInfo
- Publication number
- CN102497030A CN102497030A CN2011104460937A CN201110446093A CN102497030A CN 102497030 A CN102497030 A CN 102497030A CN 2011104460937 A CN2011104460937 A CN 2011104460937A CN 201110446093 A CN201110446093 A CN 201110446093A CN 102497030 A CN102497030 A CN 102497030A
- Authority
- CN
- China
- Prior art keywords
- point
- line
- electric energy
- sensor type
- type high
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
A line-loss actual-measurement and positioning method based on a high-voltage electric energy meter and a system thereof belong to an intelligent grid power distribution automation field. The method and the system of the invention are characterized in that: sensor-type high-voltage electric energy meters, which are arranged on total loop points, each shunt point, each associated load point and each single-phase end point, use time synchronization technology to collect power consumption; a public network/ an ad hoc network is used to form an electric quantity data cloud systems; the collected data is calculated through a main station and the data is controlled and displayed through an operation end. Therefore, the following advantages can be realized that: line-loss actual-measurement of the line with 6 kV-35kV or a higher voltage grade can be realized; abnormal point positioning can be achieved; electric energy can be directly read, calculated and output; calculation does not substitute a resistance; line loss situation of a distribution line and changes can be real-timely and accurately grasped and an error is small; an application scope is large; fault points can be eliminated; a line loss management level can be substantially increased; management line loss can be reduced; a phenomenon of theft and leakage of electrical energy and measurement errors can be reduced; investment and construction are less, energy consumption is less and economic returns can be improved.
Description
Technical field
The invention belongs to intelligent grid Distribution Automation Technology field, is a kind of line loss actual measurement and localization method based on high-voltage electric energy meter specifically, and the system that realizes this method.
Background technology
Line loss rate is the integrated technology economic index of electric power system, also is a principal economic indicators of power department.The height of line loss rate had both reflected the quality of a power network constructional aspect and management, also reflected the height of a power department technology management level.Analyze the data of line loss accurately, the kind of the classification of line loss, accurate in locating line loss point, bent other loss, distinguish normal loss, unusual loss, or stealing, very important to the energy conservation of electric power system.State Grid Corporation of China to line loss management work pay much attention to, put into effect " State Grid Corporation of China's power network line losses administrative provisions ", spell out and will set about carrying out the power network line losses management from the measure of strengthening management and two aspects of technical measures.Wherein, control measures importance is exactly the line loss INDEX MANAGEMENT.It is thus clear that improve the level of line loss management work, it is crucial formulating a scientific and reasonable line loss index.For grid; Because measuring equipment is complete; Grid equipment parameter and service data ratio are easier to obtain, and the accuracy of data is higher, and theory wire loss calculates and actual line loss statistics is easy to realize; Administrative department is relatively more comprehensive, true to the grasp of high voltage power transmission net wire loss situation, formulates a scientific and reasonable line loss index also than being easier to.Yet; As far as power distribution network, owing to receive the not restriction of congruent multiple factor of measuring equipment, the operational data collection difficulty of its load point or can't accurately collect; This makes power distribution network theory wire loss result of calculation and actual value differ bigger on the one hand, can not accurately add up actual line loss on the other hand.Therefore, making scientific and reasonable power distribution network line loss index at present also has difficulties.In addition, the direct user oriented of power distribution network, the tax evasion electrical phenomena is more outstanding, is the main source that causes the management line loss.In recent years, because many-sided factors such as construction and management, city and rural power distribution net wire loss level are still higher, and economize on electricity is fallen to decrease and had a high potential.
At present; The 35kV of electric company, 10kV side power distribution network line loss index are usually according to line loss statistical analysis data, load variations trend, load measurement, location and Theoretical Calculation result establishment; In order to improve the line loss managerial skills of power distribution network; Electric company usually adopts following two kinds of methods: 1. load measurement, location through organizing considerable scale, improve the accuracy that the power distribution network theory wire loss calculates; Like the method for measurement of the minimum and maximum electric energy loss of one Chinese patent application 200410049711.4 disclosed a kind of medium voltage distribution networks, at first calculate the resistance of power distribution network circuit and transformer; Form power distribution network node conductance matrix, obtain power distribution network node-resistance matrix.Obtain the power that power distribution network consumes by the piecemeal square formation.Minimum and maximum substitutional resistance by given power distribution network head end electric current; Try to achieve the minimum and maximum substitutional resistance linear interpolation function between each given power distribution network head end electric current; Survey, locate the size of each phase current according to power distribution network; Calculate minimum and maximum substitutional resistance, finally calculate the minimum and maximum electric energy loss of power distribution network in the given period.Utilize the method for this utility model, can judge whether power distribution network exists tax evasion electric weight phenomenon or metering that mistake is arranged, the theoretical electric energy loss upper limit that is drawn and the line loss rate upper limit reduce the performance assessment criteria of line loss as power distribution network.But the related human and material resources resource consumption of this method is huge, is difficult to form a kind of normality mechanism.Receive the influence while of present application apparatus; Existing detection means to all distribution lines under all operating modes, carry out load measurement, location work also is inconceivable; Be difficult to implement, and, after equipment is installed and used; Its performance parameter can have influence on the line design ability, produces pressure drop, short circuit current etc. when measurement is set and has a strong impact on the actual measured results precision.
2. wait the loss of adding up power distribution network in real time through installing long-distance meter-reading system on the medium-voltage distribution circuit.One Chinese patent application CN201010250593.9 discloses a kind of power distribution route loss rate computing system and method, mainly is the convenience in order to realize that the power distribution network line loss rate is calculated, rapidity and accuracy and design.Comprise: the amount of power supply collector, be arranged on the public line of said electric substation, gather the amount of power supply of distribution line; The electricity sales amount harvester comprises the field management terminal, is located at the high-pressure side or the low-pressure side of said special-purpose distribution transformer; The terminal collector is arranged on the low-voltage customer end of said public distribution transformer; Low pressure electricity sales amount collector is arranged on the low-pressure side of said public distribution transformer; High pressure electricity sales amount collector is arranged on the distribution line of said electric substation, and links to each other with field management system through optical cable.This utility model need not to gather in advance the parameter of each equipment in the power distribution circuit, but through the electricity sales amount harvester, obtains the data of each load side in real time, and can online calculate line loss rate.
Related equipment investment and the construction volume of method 2 is bigger; Its statistical accuracy also receives load transfer, increase and decrease the having a strong impact on of problem such as metering system multiplying power mistake during capacity easily; And the own energy consumption of sum of errors of amount of power supply collector that this application provides and electricity sales amount harvester is huge, and communication system adopts simultaneously, and this method can't be deducted the loss of " the low meter of high confession " dedicated transformer; Can not in time find to steal, leaky, also can't provide effectively and instruct for falling damage work.
Summary of the invention
According to above deficiency of the prior art; The object of the present invention is to provide and a kind ofly can adapt to various working; The investment construction is few; Error is little, it is little itself to consume energy, use is surveyed and localization method based on the line loss of high-voltage electric energy meter flexibly, and the line loss actual measurement and the navigation system that can realize this method.
The technical solution adopted for the present invention to solve the technical problems is: based on the line loss actual measurement and the localization method of high-voltage electric energy meter; Comprise that ultra-high-tension power transmission line connects the topological structure power distribution network that forms with branched line; Power distribution network is the n level structure; It is characterized in that: the sensor type high tension electricity energy table that on the total loop point of power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; Adopt Time synchronization technique to gather power consumption, utilize public network/ad-hoc network to form the electric quantity data cloud system, institute's image data is carried out computing through the main website with concentrated collection analysis function; Through operating side control and demonstration, comprise following concrete steps:
Step 1: the sensor type high tension electricity energy table that on the total loop point of power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; The sensor type high tension electricity energy table comprises the high tension voltage sampling loop, the high-tension current sampling loop that are electrically connected at least, gets resource loop, voltage regulation unit, data processing metering units, display unit, communication unit and clock; Directly gather the total loop point that has time tag, each shunting point, load point that each is associated and the voltage and current of each single-phase distal point; Calculate electric energy data, connect main website through communication unit;
Step 2: between sensor type high tension electricity energy table, main website and the operating side, utilize public network/ad-hoc network to form the electric quantity data cloud system, communications protocol is set;
Step 3: main website receives total loop point, each shunting point, load point that each is associated and the electric energy data of each single-phase distal point, locatees unusual loss point, and gets rid of;
Step 4: main website is online to calculate the line loss of the total loop o'clock of ultra-high-tension power transmission line to n level branched line, calculates line loss rate, and answers the operating side request to export control.
Signals collecting mainly adopts the sensor type high tension electricity energy table, i.e. sensor type high tension electricity energy gauge table, and its metering method comprises with current method carries out voltage sampling, gathers the voltage signal u that is proportional to high side voltage U, after treatment, input electric energy metrical unit; The collection of I/i penetration type current sampling method is proportional to the current signal i of high voltage side current I, after treatment, and input electric energy metrical unit; Obtain voltage signal with I/P power supply current supply circuit, after treatment, provide the electric energy metrical unit required power Vcc; The electric energy metrical unit carries out electric energy metrical to the voltage signal u and the current signal i of input.I/i penetration type current sampling method is with one or two or many miniature current sensors of penetration type; Being made into a winding is the winding that single casket or punching can be born tested electric current, and secondary winding output adapts to mA level or the little current signal of μ A grade standard that microcomputer type, measurement or metering need.Because the employing current method is measured high tension voltage, solved the EMR electromagnetic resonance that electromagnetic transformer exists, high order harmonic component, switching overvoltage to problems such as safe operation threaten, satisfy the requirement of metering, measurement, monitoring and protection fully; No ferro resonance, strong shock resistance; Avoided adopting the common voltage transducer of partial pressure type method of measurement to receive the influence of distributed capacitance over the ground bigger; The measure error deviation differs in the electric power system of different topology structure, can not adapt to the problem of the electric power system with multiple connection plan form well; The needs that can adapt to grid automation can provide and satisfy the multiple required voltage signal of metering, measurement, monitoring or protection system simultaneously, it is measured oversimplify; Supply power mode is simple and reliable energy-conservation; Its sampling mode had been not only energy-conservation, save installing space, practice thrift manufacturing materials, but also can reduce measuring cost significantly; Environmental protection is convenient to measure, the mounting, commissioning and maintenance of measurement or protective device, has played key effect to improving power supply quality; The safe operation coefficient is high: single turn overcurrent is saturated not to be burnt, and can not occur the over-current phenomenon avoidance voltage transformer during overvoltage does not have the magnetic saturation phenomenon; The input unit of electric energy meter does not have the copper-manganese shunt resistance, has thoroughly solved the problem of burning table tail.Therefore signals collecting of the present invention can adapt to various working, and the investment construction is few, and little, the power consumption of error own is little.
Wherein,
The electric energy data of each sensor type high tension electricity energy table is gathered by described main website through data acquisition unit; Main website through communication module to each sensor type high tension electricity energy table transmitting control commands, to each sensor type high tension electricity energy table start, gather, store, upload, zero clearing, debugging or closing motion control.The unified allocation of resources action can be sent each sensor type high tension electricity energy table of order control from main frame, when line loss is surveyed, starts work, and all the other times can close, and further cut down the consumption of energy.
The method of the unusual loss point in location of described step 3 is the electric energy datas that utilize on each grade branched line, calculates the line loss rate between the adjacent two-stage, and line loss rate surpasses reasonable range of normal value; Promptly be judged to be and have unusual loss point; Calculate the line loss rate of this grade branched line and next stage branched line successively, search, to the last the single-phase distal point of the single-phase low-voltage customer line of one-level at each grade branched line; Confirm to search unusual loss point place branched line, check, get rid of unusual loss point.Because sensor type high tension electricity energy table itself can be gathered low pressure single-phase electricity energy.Unusual loss point can be ground connection, breakdown fault point, also can be stealing, searches unusual loss point by calculating according to method, and convenient and swift, the position is accurate, and speed is fast, and cost is low.
Wireless communication mode is adopted in communication between described sensor type high tension electricity energy table and the main website, also can adopt data wire or optical cable to connect.Wireless communication mode can adapt to complex environment, can reduce wiring cost and workload.
Described sensor type high tension electricity energy table initiatively will have the electric energy data of time tag and upload the electric quantity data cloud system, operate.Can be the electric energy data of the free label of sensor type high tension electricity energy table file also, answer the operating side request to upload the electric quantity data cloud system, operate.Electric energy data uploads that cloud storage, the cloud that operation behind the electric quantity data cloud system is meant the electric quantity data cloud system handled, cloud transmission or the demonstration through main website/operating side etc.
A kind of line loss actual measurement and navigation system based on high-voltage electric energy meter that adopts above method is characterized in that: comprise that main website, operating side and sensor type high tension electricity energy table constitute the electric quantity data cloud system through public network/ad-hoc network; The management platform that main website is provided with communication module, data acquisition unit and is made up of server, software systems, front end processor, the output of communication module connects the input of data acquisition unit, the output Connection Service device of data acquisition unit; The sensor type high tension electricity energy table that on the total loop point of topological structure power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; The sensor type high tension electricity energy table comprises the high tension voltage sampling loop, the high-tension current sampling loop that are electrically connected at least, gets resource loop, voltage regulation unit, data processing metering units, display unit, communication unit and clock, the communication module wireless connections of communication unit and main website.
Wherein preferred version is:
The communication unit of described sensor type high tension electricity energy table comprises wireless transmit receiver module and RS485 communication chip, and the RS485 communication chip is provided with to connect and comprises in optical fiber, GPRS, wireless transparent transmission and the carrier combination one or more.On the basis of original sensor type high tension electricity energy table, further increase multiple transfer function, improve network-adaptive property.
The described resource loop of getting is the high-pressure source removing circuit.
The described resource loop of getting comprises solar panel and storage battery, and solar panel connects storage battery, and the output of storage battery connects voltage regulation unit.From utilizing the solar panel generating, reduce the device power supply cost.
The present invention is based on line loss actual measurement and the localization method of high-voltage electric energy meter and beneficial effect that system had is: rational deployment is used the sensor type high tension electricity energy table; Form outside the beneficial effect that itself brings; Through globality optimal design and processing, utilize this method and system to realize:
1, through surveying, locatees in 6kV-35kV circuit line loss; Directly read electric flux, calculate output, need not calculate alternative resistance; Avoid the misdata that causes because of mutual inductor ratio; Grasp the line loss situation and the variation thereof of distribution line real-time and accurately, the sensor type high tension electricity energy table can make unique definite and its precision height of error, can realize really that the science of line loss index is confirmed;
2, adaptability is strong, can satisfy the operating mode of all power distribution networks, and applied range can be got rid of the abnormal failure point, can improve the line loss managerial skills greatly, reduces the management line loss, reduces tax evasion electric weight phenomenon and metering mistake, for formulation fall damage measure provider to;
3, the investment construction is few, and it is little itself to consume energy, and improves the economic benefit of power supply enterprise.
Description of drawings
Fig. 1 is an electrical schematic diagram of the present invention;
Fig. 2 is the electrical principle block diagram of sensor type high tension electricity energy table of the present invention;
Fig. 3 is an operating process block diagram of the present invention;
Embodiment
Below in conjunction with accompanying drawing embodiments of the invention are done and to be further described:
Embodiment 1:
Like Fig. 1-shown in Figure 3, main website, operating side and sensor type high tension electricity energy table constitute the electric quantity data cloud system through public network/ad-hoc network; The management platform that main website is provided with communication module, data acquisition unit and is made up of server, software systems, front end processor, the output of communication module connects the input of data acquisition unit, the output Connection Service device of data acquisition unit; The sensor type high tension electricity energy table that on the total loop point of topological structure power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; The sensor type high tension electricity energy table comprises the high tension voltage sampling loop, the high-tension current sampling loop that are electrically connected at least, gets resource loop, voltage regulation unit, data processing metering units, display unit, communication unit and clock, the communication module wireless connections of communication unit and main website.Between a plurality of operators of operating side and the management platform can be Wireless/wired the connection, operates through web browser login platform.Management platform is provided with conventional platform management.
The high tension voltage sampling loop is the V/I/v voltage sampling loop that is provided with at the high-voltage load lead; The output in V/I/v voltage sampling loop connects the input of data processing metering units; The output of data processing metering units connects display unit; The high-tension current sampling loop is for to be provided with I/i current sampling loop at the high-voltage load lead; The output in I/i current sampling loop connects the input of data processing metering units, and by getting the supply unit that resource loop, rectification circuit, energy-storage units and voltage regulation unit are formed, getting resource loop is the input that I/P gets the output connection rectification circuit of resource loop in the setting of high-voltage load lead; The output of rectification circuit connects the input of energy-storage travelling wave tube and voltage regulation unit, and the output of voltage regulation unit connects the power end of electric energy metrical unit.
The first order is provided with sensor type high tension electricity energy table (M0); The second level is provided with n sensor type high tension electricity energy table (M1-Mn); Each partial sensor type high tension electricity energy table 1 is provided with n the 3rd utmost point sensor type high tension electricity energy table (M11-M1n) until sensor type high tension electricity energy table (Mnn) is set; And the like, the n level terminal for the single-phase low-voltage customer line of three-phase is provided with the penetration type electric energy meter of communication function also can the sensor type high tension electricity energy table.
The communication unit of sensor type high tension electricity energy table comprises wireless transmit receiver module and RS485 communication chip, and the RS485 communication chip is provided with to connect and comprises in optical fiber, GPRS, wireless transparent transmission and the carrier combination one or more.
Getting resource loop is that the high-pressure source removing circuit also can be to comprise solar panel and storage battery, and solar panel connects storage battery, and the output of storage battery connects voltage regulation unit.
Line loss actual measurement and localization method based on high-voltage electric energy meter are: ultra-high-tension power transmission line connects the topological structure power distribution network that forms with branched line; Power distribution network is the n level structure; It is characterized in that: the sensor type high tension electricity energy table that on the total loop point of power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; Adopt Time synchronization technique to gather power consumption, utilize public network/ad-hoc network to form the electric quantity data cloud system, institute's image data is carried out computing through the main website with concentrated collection analysis function; Through operating side control and demonstration, comprise following concrete steps:
Step 1: the sensor type high tension electricity energy table that on the total loop point of power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; The sensor type high tension electricity energy table comprises the high tension voltage sampling loop, the high-tension current sampling loop that are electrically connected at least, gets resource loop, voltage regulation unit, data processing metering units, display unit, communication unit and clock; Directly gather the total loop point that has time tag, each shunting point, load point that each is associated and the voltage and current of each single-phase distal point; Calculate electric energy data, connect main website through communication unit;
Step 2: between sensor type high tension electricity energy table, main website and the operating side, utilize public network/ad-hoc network to form the electric quantity data cloud system, communications protocol is set;
Step 3: main website receives total loop point, each shunting point, load point that each is associated and the electric energy data of each single-phase distal point, locatees unusual loss point, and gets rid of;
Step 4: main website is online to calculate the line loss of the total loop o'clock of ultra-high-tension power transmission line to n level branched line, calculates line loss rate, and answers the operating side request to export control.
For example calculate second level line loss=M0-(M1+M2 ... + Mn).The rest may be inferred.
Embodiment 2:
On the basis of embodiment 1; The electric energy data of each sensor type high tension electricity energy table is gathered by main website through data acquisition unit; Main website through communication module to each sensor type high tension electricity energy table transmitting control commands, to each sensor type high tension electricity energy table start, gather, store, upload, zero clearing, debugging or closing motion control.The unified allocation of resources action can be sent each sensor type high tension electricity energy table of order control from main frame, when line loss is surveyed, starts work, and all the other times can close, and further cut down the consumption of energy.
Embodiment 3:
On the basis of embodiment 1, the method for the unusual loss point in location of step 3 can be common prior art, also can be the electric energy data that utilizes on each grade branched line; Calculate the line loss rate between the adjacent two-stage; Line loss rate surpasses reasonable range of normal value, promptly is judged to be to have unusual loss point, calculates the line loss rate of this grade branched line and next stage branched line successively; Search at each grade branched line; To the last the single-phase distal point of the single-phase low-voltage customer line of one-level confirms to search unusual loss point place branched line, checks, gets rid of unusual loss point.
Because sensor type high tension electricity energy table itself can be gathered low pressure single-phase electricity energy.Unusual loss point can be ground connection, breakdown fault point, also can be stealing, searches unusual loss point by calculating according to method, and convenient and swift, the position is accurate, and speed is fast, and cost is low.
Embodiment 4:
The sensor type high tension electricity energy table can adopt data wire or optical cable to be connected with the communication between the main website.
Embodiment 5:
The sensor type high tension electricity energy table initiatively will have the electric energy data of time tag and upload the electric quantity data cloud system, operate.The sensor type high tension electricity energy table can be set to acquired signal, metering obtain having directly upload that the electric quantity data cloud system carries out that cloud storage, cloud are handled behind the electric energy data of time tag, cloud transmission or the demonstration through main website/operating side etc.
Embodiment 6:
The electric energy data of the free label of the direct file of sensor type high tension electricity energy table; When carrying out line loss actual measurement or positioning action; The operator sends control command from the operating side, and then uploads the electric quantity data cloud system from the memory read data of sensor type high tension electricity energy table, operates.
The server framework of the main website of mentioning among the present invention and software system function can pass through program setting, by professionals such as common computer and Electrical Engineer are grasped.
Claims (10)
1. survey and localization method based on the line loss of high-voltage electric energy meter; Comprise that ultra-high-tension power transmission line connects the topological structure power distribution network that forms with branched line; Power distribution network is the n level structure, it is characterized in that: the sensor type high tension electricity energy table that on the total loop point of power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with, adopt Time synchronization technique to gather power consumption; Utilize public network/ad-hoc network to form the electric quantity data cloud system; Institute's image data is carried out computing through the main website with concentrated collection analysis function,, comprises following concrete steps through operating side control and demonstration:
Step 1: the sensor type high tension electricity energy table that on the total loop point of power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; The sensor type high tension electricity energy table comprises the high tension voltage sampling loop, the high-tension current sampling loop that are electrically connected at least, gets resource loop, voltage regulation unit, data processing metering units, display unit, communication unit and clock; Directly gather the total loop point that has time tag, each shunting point, load point that each is associated and the voltage and current of each single-phase distal point; Calculate electric energy data, connect main website through communication unit;
Step 2: between sensor type high tension electricity energy table, main website and the operating side, utilize public network/ad-hoc network to form the electric quantity data cloud system, communications protocol is set;
Step 3: main website receives total loop point, each shunting point, load point that each is associated and the electric energy data of each single-phase distal point, locatees unusual loss point, and gets rid of;
Step 4: main website is online to calculate the line loss of the total loop o'clock of ultra-high-tension power transmission line to n level branched line, calculates line loss rate, and answers the operating side request to export control.
2. line loss actual measurement and localization method based on high-voltage electric energy meter according to claim 1; It is characterized in that: the electric energy data of each sensor type high tension electricity energy table is gathered by described main website through data acquisition unit; Main website through communication module to each sensor type high tension electricity energy table transmitting control commands, to each sensor type high tension electricity energy table start, gather, store, upload, zero clearing, debugging or closing motion control.
3. line loss actual measurement and localization method based on high-voltage electric energy meter according to claim 1; It is characterized in that: the method for the unusual loss point in location of described step 3 is the electric energy datas that utilize on each grade branched line, calculates the line loss rate between the adjacent two-stage, and line loss rate surpasses reasonable range of normal value; Promptly be judged to be and have unusual loss point; Calculate the line loss rate of this grade branched line and next stage branched line successively, search, to the last the single-phase distal point of the single-phase low-voltage customer line of one-level at each grade branched line; Confirm to search unusual loss point place branched line, check, get rid of unusual loss point.
4. line loss actual measurement and localization method based on high-voltage electric energy meter according to claim 1, it is characterized in that: wireless communication mode is adopted in the communication between described sensor type high tension electricity energy table and the main website.
5. line loss actual measurement and localization method based on high-voltage electric energy meter according to claim 1 is characterized in that: described sensor type high tension electricity energy table initiatively will have the electric energy data of time tag and upload the electric quantity data cloud system, operate.
6. line loss actual measurement and localization method based on high-voltage electric energy meter according to claim 1; It is characterized in that: the electric energy data of the free label of described sensor type high tension electricity energy table file; Answer the operating side request to upload the electric quantity data cloud system, operate.
7. line loss actual measurement and navigation system based on high-voltage electric energy meter according to the described method of claim 1 is characterized in that: comprise that main website, operating side and sensor type high tension electricity energy table constitute the electric quantity data cloud system through public network/ad-hoc network;
The management platform that main website is provided with communication module, data acquisition unit and is made up of server, software systems, front end processor, the output of communication module connects the input of data acquisition unit, the output Connection Service device of data acquisition unit;
The sensor type high tension electricity energy table that on the total loop point of topological structure power distribution network, each shunting point, load point that each is associated and each single-phase distal point, is provided with; The sensor type high tension electricity energy table comprises the high tension voltage sampling loop, the high-tension current sampling loop that are electrically connected at least, gets resource loop, voltage regulation unit, data processing metering units, display unit, communication unit and clock, the communication module wireless connections of communication unit and main website.
8. line loss actual measurement and navigation system based on high-voltage electric energy meter according to claim 7; It is characterized in that: the communication unit of described sensor type high tension electricity energy table comprises wireless transmit receiver module and RS485 communication chip, and the RS485 communication chip is provided with to connect and comprises in optical fiber, GPRS, wireless transparent transmission and the carrier combination one or more.
9. line loss actual measurement and navigation system based on high-voltage electric energy meter according to claim 7, it is characterized in that: the described resource loop of getting is the high-pressure source removing circuit.
10. line loss actual measurement and navigation system based on high-voltage electric energy meter according to claim 7, it is characterized in that: the described resource loop of getting comprises solar panel and storage battery, and solar panel connects storage battery, and the output of storage battery connects voltage regulation unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104460937A CN102497030A (en) | 2011-12-28 | 2011-12-28 | Line-loss actual-measurement and positioning method based on high-voltage electric energy meter and system thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104460937A CN102497030A (en) | 2011-12-28 | 2011-12-28 | Line-loss actual-measurement and positioning method based on high-voltage electric energy meter and system thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102497030A true CN102497030A (en) | 2012-06-13 |
Family
ID=46188828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104460937A Pending CN102497030A (en) | 2011-12-28 | 2011-12-28 | Line-loss actual-measurement and positioning method based on high-voltage electric energy meter and system thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102497030A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102928721A (en) * | 2012-11-14 | 2013-02-13 | 余姚市供电局 | Line loss concentrator |
CN104502793A (en) * | 2014-11-24 | 2015-04-08 | 广州南方电力集团科技发展有限公司 | Movable type-based power grid electricity stealing prevention monitoring device and method |
CN104901420A (en) * | 2015-02-05 | 2015-09-09 | 江苏技睿通信科技有限公司 | Remote transformer monitoring system based on mid-voltage carrier communication and monitoring method |
CN107505892A (en) * | 2017-09-22 | 2017-12-22 | 深圳安腾创新科技有限公司 | A kind of method and system of miniature data center's refrigeration plant intellectual monitoring |
CN109239498A (en) * | 2018-10-29 | 2019-01-18 | 国网江苏省电力有限公司江阴市供电分公司 | A kind of power supply line's line loss detection method |
CN109270360A (en) * | 2018-11-22 | 2019-01-25 | 南京因泰莱电器股份有限公司 | A kind of method of the online line loss of high precision computation |
CN109726986A (en) * | 2018-12-24 | 2019-05-07 | 国网江苏省电力有限公司扬州供电分公司 | A kind of management method of same period line loss |
CN110045234A (en) * | 2019-05-22 | 2019-07-23 | 广东工业大学 | A kind of DC distribution net line short fault localization auxiliary device |
CN110082579A (en) * | 2019-05-21 | 2019-08-02 | 国网湖南省电力有限公司 | A kind of area's Intelligent power-stealing prevention monitoring method, system, equipment and medium |
CN110780114A (en) * | 2019-11-01 | 2020-02-11 | 国网重庆市电力公司电力科学研究院 | Transformer area theoretical line loss analysis method and readable storage medium |
CN110932403A (en) * | 2019-12-11 | 2020-03-27 | 太原市优特奥科电子科技有限公司 | Line loss information acquisition method, system and processing equipment |
CN110940872A (en) * | 2019-11-02 | 2020-03-31 | 国网上海市电力公司 | Method for analyzing structure and parameters of residential building low-voltage power distribution system by collecting data through HPLC |
CN110988454A (en) * | 2019-12-31 | 2020-04-10 | 山东计保电气有限公司 | Method for monitoring small current by apparent power and real-time disposal |
CN111413594A (en) * | 2019-12-10 | 2020-07-14 | 王纪旋 | Accurate positioning method for electricity stealing |
CN112993988A (en) * | 2021-03-05 | 2021-06-18 | 国网河南省电力公司经济技术研究院 | Power grid line loss analysis method |
CN117871943A (en) * | 2024-03-13 | 2024-04-12 | 保定朗信电子科技有限公司 | Split type high-voltage electric energy metering method and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216503A (en) * | 2008-01-02 | 2008-07-09 | 武汉国测科技股份有限公司 | Hierarchical type electricity anti-theft system and method |
CN101354408A (en) * | 2008-07-31 | 2009-01-28 | 南京能瑞自动化设备有限公司 | Electric energy acquisition and operation management system and method based on platform zone centralized service terminal |
CN101477164A (en) * | 2009-01-04 | 2009-07-08 | 保定市三川电气有限责任公司 | Energy consumption monitoring system |
CN101566657A (en) * | 2008-04-22 | 2009-10-28 | 深圳浩宁达仪表股份有限公司 | Method and system for online metering and real-time monitoring of electric transmission line |
-
2011
- 2011-12-28 CN CN2011104460937A patent/CN102497030A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216503A (en) * | 2008-01-02 | 2008-07-09 | 武汉国测科技股份有限公司 | Hierarchical type electricity anti-theft system and method |
CN101566657A (en) * | 2008-04-22 | 2009-10-28 | 深圳浩宁达仪表股份有限公司 | Method and system for online metering and real-time monitoring of electric transmission line |
CN101354408A (en) * | 2008-07-31 | 2009-01-28 | 南京能瑞自动化设备有限公司 | Electric energy acquisition and operation management system and method based on platform zone centralized service terminal |
CN101477164A (en) * | 2009-01-04 | 2009-07-08 | 保定市三川电气有限责任公司 | Energy consumption monitoring system |
Non-Patent Citations (1)
Title |
---|
林峰浩等: "基于高压电能表的配电网防窃电***设计", 《水电能源科学》 * |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102928721A (en) * | 2012-11-14 | 2013-02-13 | 余姚市供电局 | Line loss concentrator |
CN104502793A (en) * | 2014-11-24 | 2015-04-08 | 广州南方电力集团科技发展有限公司 | Movable type-based power grid electricity stealing prevention monitoring device and method |
CN104901420A (en) * | 2015-02-05 | 2015-09-09 | 江苏技睿通信科技有限公司 | Remote transformer monitoring system based on mid-voltage carrier communication and monitoring method |
CN107505892A (en) * | 2017-09-22 | 2017-12-22 | 深圳安腾创新科技有限公司 | A kind of method and system of miniature data center's refrigeration plant intellectual monitoring |
CN109239498A (en) * | 2018-10-29 | 2019-01-18 | 国网江苏省电力有限公司江阴市供电分公司 | A kind of power supply line's line loss detection method |
CN109270360A (en) * | 2018-11-22 | 2019-01-25 | 南京因泰莱电器股份有限公司 | A kind of method of the online line loss of high precision computation |
CN109270360B (en) * | 2018-11-22 | 2020-10-02 | 南京因泰莱电器股份有限公司 | Method for calculating online line loss with high precision |
CN109726986A (en) * | 2018-12-24 | 2019-05-07 | 国网江苏省电力有限公司扬州供电分公司 | A kind of management method of same period line loss |
CN110082579A (en) * | 2019-05-21 | 2019-08-02 | 国网湖南省电力有限公司 | A kind of area's Intelligent power-stealing prevention monitoring method, system, equipment and medium |
CN110045234A (en) * | 2019-05-22 | 2019-07-23 | 广东工业大学 | A kind of DC distribution net line short fault localization auxiliary device |
CN110780114A (en) * | 2019-11-01 | 2020-02-11 | 国网重庆市电力公司电力科学研究院 | Transformer area theoretical line loss analysis method and readable storage medium |
CN110940872A (en) * | 2019-11-02 | 2020-03-31 | 国网上海市电力公司 | Method for analyzing structure and parameters of residential building low-voltage power distribution system by collecting data through HPLC |
CN110940872B (en) * | 2019-11-02 | 2022-06-21 | 国网上海市电力公司 | Method for analyzing structure and parameters of residential building low-voltage power distribution system by collecting data through HPLC |
CN111413594A (en) * | 2019-12-10 | 2020-07-14 | 王纪旋 | Accurate positioning method for electricity stealing |
CN110932403A (en) * | 2019-12-11 | 2020-03-27 | 太原市优特奥科电子科技有限公司 | Line loss information acquisition method, system and processing equipment |
CN110932403B (en) * | 2019-12-11 | 2021-11-05 | 太原市优特奥科电子科技有限公司 | Line loss information acquisition method, system and processing equipment |
CN110988454A (en) * | 2019-12-31 | 2020-04-10 | 山东计保电气有限公司 | Method for monitoring small current by apparent power and real-time disposal |
CN112993988A (en) * | 2021-03-05 | 2021-06-18 | 国网河南省电力公司经济技术研究院 | Power grid line loss analysis method |
CN112993988B (en) * | 2021-03-05 | 2022-10-11 | 国网河南省电力公司经济技术研究院 | Power grid line loss analysis method |
CN117871943A (en) * | 2024-03-13 | 2024-04-12 | 保定朗信电子科技有限公司 | Split type high-voltage electric energy metering method and system |
CN117871943B (en) * | 2024-03-13 | 2024-05-24 | 保定朗信电子科技有限公司 | Split type high-voltage electric energy metering method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102497030A (en) | Line-loss actual-measurement and positioning method based on high-voltage electric energy meter and system thereof | |
CN202957659U (en) | Line loss actual measurement and positioning system based on high voltage electric energy meter | |
CN103293443B (en) | A kind of distribution network overhead line Earth design method | |
CN203350392U (en) | Fault locating system for high tension transmission line | |
CN103728511B (en) | D.C. high voltage transmission grounded screen state on-line monitoring system and monitoring method | |
CN102305922B (en) | On-load detection method and device for intelligent optical fiber electric energy meter in substation | |
CN103091602B (en) | Power line carrier wave online fault detection device | |
CN102435871A (en) | On-line monitoring system for data collection of electric arresters based on GPS (Global Positioning System) synchronization | |
CN201732120U (en) | Power consumption information collecting and monitoring system in base station | |
CN204536448U (en) | A kind of high voltage supply leakage conductor wireless monitoring device | |
CN107340432A (en) | Grounding resistance data acquisition and analysis system based on wireless measurement module | |
CN106501626A (en) | A kind of wide area kernel phase system based on synchronous phasor measurement | |
CN107478909A (en) | A kind of smart grounding resistance on-line computing model and its system | |
CN105891597A (en) | High voltage power transmission line electric energy wireless monitoring device and monitoring method | |
CN202230195U (en) | On-load detection device for intelligent optical-fiber electric energy meter in transformer station | |
CN104375005A (en) | Networked wind power plant harmonic wave monitoring system and method | |
CN103616616A (en) | Fault detection method for large-scale grounding grid | |
CN203595760U (en) | Insulator safety status detection system | |
CN205539316U (en) | Distribution network mixes trouble range unit based on PMU | |
CN213072726U (en) | Power distribution network architecture system based on intelligent concentrator | |
CN202903892U (en) | A transformer station capacitance on-line monitoring device based on a wireless mode | |
CN102338835A (en) | Power quality dynamic monitoring system | |
CN205139294U (en) | Ground net corrodes situation testing arrangement based on wireless sensor network | |
CN209329781U (en) | A kind of distribution O&M monitoring device | |
CN204649846U (en) | The automatic locating and detecting device of stake resistance GPS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120613 |