Summary of the invention
The technical problem to be solved in the present invention is: overcome the deficiencies in the prior art, a kind of pressure-accumulating toilet bowl is provided, guarantee that water saving can be rinsed well again.
The technical solution adopted for the present invention to solve the technical problems is: a kind of pressure-accumulating toilet bowl, there is water tank assembly, described water tank assembly has water tank, water intaking valve, drain valve, described water tank has lower box, described lower box divides and is separated with water filling cavity, center cavity, described water filling cavity communicates with the internal cavities of upper box, described center cavity and water intaking valve, drain valve communicates, described center cavity upper end and the sealing of water filling cavity junction, described center cavity lower ending opening, described center cavity inwall has cascaded surface, the cascaded surface lower ending opening place of described center cavity is provided with the main valve valve that rushes, the described main valve valve that rushes has upper opening formula sealing position and closed sealing position, bottom.
Described lower box lower end is provided with lower cover, lower cover has main blurting out, the ladder place that the master of lower cover blurts out is provided with rubber ring, when described water intaking valve unlatching drain valve cuts out, the described main closed sealing position, bottom that rushes valve valve is connected with seal with elastometic washer, when described water intaking valve is closed drain valve unlatching, described main closed sealing position, bottom and the rubber ring that rushes valve valve departs from.
Further, when described water intaking valve is closed drain valve unlatching, the cascaded surface that described main upper opening formula of rushing valve valve seals position and center cavity is tightly connected.
It is further, described that main to rush closed sealing position, valve valve bottom be taper.
Further, the described main outer wall that rushes valve valve has horizontal bar for increasing the resistance to water-flow of current downflow in surrounding and/or the longitudinal rib for guide-localization.
Further, described water intaking valve is arranged on a side of center cavity, and described drain valve is arranged on the opposite side of center cavity, and described water filling cavity is connected with water injection valve,
Described pressure-accumulating toilet bowl has upper water spray assembly, described upper water spray assembly comprises that water spray bend pipe, main punching in valve tapping pipe, upper water spray connect bend pipe, described upper water spray bend pipe is arc, described upper water spray bend pipe both ends open, described main valve tapping pipe one end that rushes connects drain valve, the described main valve tapping pipe other end that rushes connects upper water spray bend pipe, and the described main low delivery port of water inlet that rushes valve tapping pipe is high.
In described upper water spray, connect bend pipe one end and connect upper water injection valve, the other end that connects bend pipe in described upper water spray connects upper water spray bend pipe, in described upper water spray, connect the low delivery port of bend pipe water inlet high, in described upper water spray bend pipe, upper water spray, connect bend pipe, the upper air supply passage of upper water injection valve formation.
Further, described pressure-accumulating toilet bowl has lower water spray assembly, described lower water spray assembly comprises plug, lower sparge pipe, lower sparge pipe rubber seal, described lower sparge pipe water inlet end is connected with plug, described plug is connected with lower cover, the described first side that patches has passive blowdown pipe, and passive blowdown pipe inner chamber communicates with plug inner chamber, and passive blowdown pipe outer end is provided with passive aeration valve.
Further, described passive aeration valve comprises protruding core valve gap, rubber cover, the valve gap part of protruding core valve gap is connected with passive blowdown pipe outer wall, the valve gap part of protruding core valve gap has the air inlet port for tonifying Qi, the protruding core segment of protruding core valve gap is positioned at passive blowdown pipe inner chamber, the protruding core segment end of protruding core valve gap has the protruding core of taper, described rubber cover is arranged between protruding core segment and passive blowdown pipe, the hood section of described rubber cover has opening, when described lower sparge pipe internal gas pressure is malleation, the opening of the hood section of described rubber cover is pushed down the protruding core of taper of protruding core valve gap, when described lower sparge pipe internal gas pressure is negative pressure, the opening of the hood section of described rubber cover departs from the protruding core of taper of protruding core valve gap, and the air inlet port of the valve gap part of protruding core valve gap communicates with passive blowdown pipe.
Further, described water tank has upper box, described upper water box is provided with hydraulic pressure sensor, described hydraulic pressure sensor comprises a floating bottle removable guide, floating bottle, magnet steel, tongue tube for inductive magnetic steel position, described floating bottle removable guide is arranged in upper water box, and floating bottle is arranged on floating bottle removable guide, on floating bottle, is stamped floating bottle cap, described magnet steel is arranged in floating bottle cap, and described tongue tube is arranged on upper box outer wall.
Further, described pressure-accumulating toilet bowl has a basin assembly, described seat basin assembly comprises a basin, seat basin below has the main jet mouth of a river, seat basin top has water jet, seat basin top is departed from water jet place and is had pressure relief opening, the main jet mouth of a river is connected with the water side of the lower sparge pipe of lower water spray assembly, installs in the upper water spray in water spray assembly and connect bend pipe in upper water jet, installs the main valve tapping pipe that rushes in water spray assembly in pressure relief opening.
Further, described water intaking valve, drain valve adopt electromagnetic valve, and described pressure-accumulating toilet bowl comprises microcomputer controller, and described microcomputer controller comprises control section, favourable opposition key, the little key that rushes, control section and water intaking valve, the equal control connection of drain valve.
The invention has the beneficial effects as follows: while needing water tank water intake, water intaking valve is opened, drain valve cuts out, tap water is entered the center cavity of lower header by water intaking valve, the main valve valve that rushes moves down rapidly under the drive of upper and lower pressure reduction and current, the main closed sealing position, bottom that rushes valve valve compresses rubber ring, and tap water enters center cavity, then flows into lower cover, the water filling cavity of lower box, the internal cavities of upper box downwards through the main valve valve surrounding of rushing.When flushing, water intaking valve is closed, and drain valve is opened, and the water pressurized of center cavity is discharged through the main valve tapping pipe that rushes by drain valve, enters water spray bend pipe, leaks into a basin.Main punching above valve valve rushes at rapidly under the drive of upper and lower pressure reduction and current, departs from rubber ring, and current moment flows out, and enters the lower water spray assembly that below connects, and is sprayed by the main jet mouth of a river.Of the present invention main rush valve valve can moment upper punch or press down, make the water ejection at a high speed in water tank, do not need too much water flushable, i.e. water saving can be rinsed well again.
The specific embodiment
The present invention is further illustrated by reference to the accompanying drawings now.The schematic diagram that these accompanying drawings are simplification only illustrates basic structure of the present invention in a schematic way, and therefore it only shows the formation relevant with the present invention.
A kind of pressure-accumulating toilet bowl, has water tank assembly, upper water spray assembly, lower water spray assembly, seat basin assembly, and water tank assembly has water tank, water intaking valve 1, drain valve 2, and water tank is made up of upper box 11, lower box 12.
As shown in Figure 1,12 points of lower boxes are separated with water filling cavity 122, center cavity 121, and water filling cavity communicates with the internal cavities of upper box 11, and water intaking valve 1 is arranged on a side of center cavity 121, drain valve 2 is arranged on the opposite side of center cavity 121, and water filling cavity is connected with water injection valve 3.
Center cavity 121 communicates with water intaking valve 1, drain valve 2, center cavity 121 upper ends and the sealing of water filling cavity junction, center cavity 121 lower ending openings communicate with water filling cavity 122, center cavity 121 inwalls have cascaded surface, the cascaded surface lower ending opening place of center cavity 121 is provided with the main valve valve 13 that rushes, and the main valve valve 13 that rushes has upper opening formula sealing position and closed sealing position, bottom.It is main that to rush valve valve 13 closed sealing positions, bottom be taper.
Lower box 12 lower ends are provided with lower cover 15, lower cover 15 has main blurting out, the ladder place that the master of lower cover 15 blurts out is provided with rubber ring 14, when water intaking valve 1 is opened drain valve 2 and is closed, main closed sealing position, bottom and the rubber ring 14 that rushes valve valve 13 is tightly connected, water intaking valve 1 is closed drain valve 2 while opening, and main closed sealing position, bottom and the rubber ring 14 that rushes valve valve 13 departs from.Water intaking valve 1 is closed drain valve 2 while opening, mainly rushes the upper opening formula sealing position of valve valve 13 and the cascaded surface of center cavity 121 is tightly connected.
As shown in Figure 2, the main outer wall that rushes valve valve 13 has horizontal bar 131 for increasing the resistance to water-flow of current downflow in surrounding and the longitudinal rib 132 for guide-localization.
As shown in Figure 3, upper water spray assembly comprises that water spray bend pipe 21, main punching in valve tapping pipe 22, upper water spray connect bend pipe 23, and upper water spray bend pipe 21 is arc, upper water spray bend pipe 21 both ends opens, and 6-8 the spray orifice that Open Side Down arranged at bottom.Main valve tapping pipe 22 one end that rush connect drain valve 2, main valve tapping pipe 22 other ends that rush connect upper water spray bend pipe 21, the main low delivery port of water inlet that rushes valve tapping pipe 22 is high, in upper water spray, connect bend pipe 23 one end and connect upper water injection valve 3, the other end that connects bend pipe 23 in upper water spray connects upper water spray bend pipe 21, in upper water spray, connect the low delivery port of bend pipe 23 water inlet high, in upper water spray bend pipe 21, upper water spray, connect bend pipe 23, the upper air supply passage of upper water injection valve 3 formation.
The water outlet of upper water spray assembly sprays into a basin surrounding by the upper water spray bend pipe 21 of laying present basin top, be used for the surrounding of toilet seat basin, upper water spray assembly has two-way water inlet, one tunnel flows into through upper water injection valve 3, water spray passage and upper air supply passage in formation, one tunnel flows into through drain valve 2, forms the main valve drainage gallery that rushes.
After upper water injection valve 3 is opened, the water in water tank connects bend pipe 23 in upper water injection valve 3, upper water spray, upper water spray bend pipe 21 sprays in a basin.In upper water spray, connect the high Curved of the low delivery port of 23 one-tenth water inlets of bend pipe, be provided with like this 2 large benefits: first, before upper water injection valve 3 is opened, in upper water spray, connect bend pipe 23 internal memory full waters, therefore after upper water injection valve 3 is opened, greatly reduce the stroke of current through blank pipe, increased impulsive force.Secondly, reduced the setting height(from bottom) of whole upper water spray assembly.
In upper water spray bend pipe 21, upper water spray, connecing bend pipe 22, upper water injection valve 3 forms upper water spray group and realizes to the upper air supply passage of tonifying Qi initiatively in water tank.When needs are in water tank when tonifying Qi, in water tank, produce water injection valve 3 on negative pressure front opening, in water tank under the effect of negative pressure, in upper water spray, connect the interior original water of bend pipe 23 and upper water injection valve 3 and flow into water tank, meanwhile, air connects bend pipe 23 in upper water spray bend pipe 21, upper water spray, upper water injection valve 3 enters in water tank, realizes initiatively tonifying Qi.
Drain valve 2, the main valve tapping pipe 22, upper water spray bend pipe 21 of rushing form the main valve that rushes and open sluicing group.Drain valve 2 is opened, water in center cavity 121 through drain valve 2, mainly rush valve tapping pipe 22, upper water spray bend pipe 21 leaks into a basin, realizes main quick unlatching of rushing valve valve 13.The main valve that rushes is opened sluicing group and is adopted independent passage, and its benefit is to sluice more smooth and easy, and main unlatching of rushing valve valve 13 is faster.
As shown in Figure 4, lower water spray assembly comprises plug 31, lower sparge pipe 32, lower sparge pipe rubber seal 33, lower sparge pipe 32 water inlet ends are connected with plug 31, plug 31 is connected with lower cover 15, plug 31 1 sides have passive blowdown pipe, passive blowdown pipe inner chamber communicates with plug 31 inner chambers, and passive blowdown pipe outer end is provided with passive aeration valve 34.Lower sparge pipe 32 water sides have reducing shape water jet.
As shown in Fig. 4 Fig. 5, described passive aeration valve comprises protruding core valve gap 341, rubber cover 342, the valve gap part of protruding core valve gap 341 is connected with passive blowdown pipe outer wall, the valve gap part of protruding core valve gap 341 has the air inlet port 343 for tonifying Qi, the protruding core segment of protruding core valve gap 341 is positioned at passive blowdown pipe inner chamber, the protruding core segment end of protruding core valve gap 341 has the protruding core of taper, rubber cover 342 is arranged between protruding core segment and passive blowdown pipe, the hood section of rubber cover 342 has opening, when lower sparge pipe 32 internal gas pressures are malleation, the opening of the hood section of rubber cover 342 is pushed down the protruding core of taper of protruding core valve gap 341, when lower sparge pipe 32 internal gas pressures are negative pressure, the opening of the hood section of rubber cover 342 departs from the protruding core of taper of protruding core valve gap 341, and the air inlet port 343 of the valve gap part of protruding core valve gap 341 communicates with passive blowdown pipe.
Seat basin assembly comprises a basin, seat basin below has the main jet mouth of a river, seat basin top has water jet, seat basin top is departed from water jet place and is had pressure relief opening, the main jet mouth of a river is connected with the water side of the lower sparge pipe 32 of lower water spray assembly, in upper water jet, install in the upper water spray in water spray assembly and connect bend pipe 23, in pressure relief opening, install the main valve tapping pipe 22 that rushes in water spray assembly.When flushing, current spray into high-velocity flow by the main jet mouth of a river in blow-off pipe, and dirt is gone out to a basin, and current are sprayed water to seat basin top via upper water spray bend pipe 21, for Flushing sitting basin surrounding.
As shown in Figure 6, upper water box 11 is provided with hydraulic pressure sensor, hydraulic pressure sensor comprises a floating bottle removable guide 41, floating bottle 42, magnet steel 43, tongue tube 44 for inductive magnetic steel position, floating bottle removable guide 41 is arranged in upper water box 11, floating bottle 42 is arranged on floating bottle removable guide 41, on floating bottle 42, be stamped floating bottle cap, magnet steel 43 is arranged in floating bottle cap, and tongue tube 44 is arranged on upper box 11 outer walls.
Water intaking valve 1, drain valve 2, upper water injection valve 3 all adopt electromagnetic valve.Microcomputer controller comprises control section, favourable opposition key, the little key that rushes, control section and water intaking valve 1, drain valve 2, the equal control connection of upper water injection valve 3, control section and favourable opposition key, littlely rush key, hydraulic pressure sensor signal is connected.
The course of work of the present invention is: water intaking valve 1 is opened, drain valve 2 cuts out, tap water is entered the center cavity 121 of lower header 12 by water intaking valve 1, the main valve valve 13 that rushes moves down rapidly under the drive of upper and lower pressure reduction and current, the main closed sealing position, bottom that rushes valve valve 13 compresses rubber ring 14, and main closed sealing position, bottom and the rubber ring 14 that rushes valve valve 13 is tightly connected.Tap water enters center cavity 121, then flows into lower cover 15, the water filling cavity of lower box 12, the internal cavities of upper box 11 downwards through main valve valve 13 surroundings of rushing.
When flushing, water intaking valve 1 is closed, and drain valve 2 is opened, and the water pressurized of center cavity 121 is discharged through the main valve tapping pipe 22 that rushes by drain valve 2, enters water spray bend pipe 21, leaks into a basin.Main punching above valve valve 13 rushes at rapidly under the drive of upper and lower pressure reduction and current, departs from rubber ring 14, and current moment flows out, and enters the lower water spray assembly that lower cover 15 belows connect, and is sprayed by the main jet mouth of a river.
Main rush valve valve 13 and open after, in water tank, flow into the high-velocity flow of lower sparge pipe 32, the blow-off pipe that fills rapidly toilet through the water jet of lower sparge pipe 32 produces siphon, produce after siphon, microcomputer controller control drain valve 2 cuts out rapidly, the main valve valve 13 that rushes is closed, due to the effect of inertia of current, in lower sparge pipe 32, may produce negative pressure, the existence of negative pressure will reduce mobile speed before the interior current direction of lower sparge pipe 32 greatly, greatly reduce impulsive force, and the generation of negative pressure is avoided in the setting of passive aeration valve 34, guaranteed the maximum impulse force of current.
Instantly when sparge pipe 32 internal gas pressures are malleation, rubber cover 342 compresses the protruding core of protruding core valve gap 341, and passive aeration valve 34 is closed condition.Instantly when sparge pipe 32 internal gas pressures are negative pressure, rubber cover 342 separates with the protruding core of protruding core valve gap 341, and passive aeration valve 34 is open mode, realizes the interior tonifying Qi of downward sparge pipe 32 by air inlet port 343, has guaranteed the impulse force of time sparge pipe 32 interior current.
In addition, the passive aeration valve 34 of lower water spray assembly can be used as to the lower air supply passage of tonifying Qi initiatively in water tank, the main valve valve 13 that rushes is opened and is continued for some time until the interior water of water tank has sprayed, in water tank, form negative pressure, rubber cover 342 separates with the protruding core of protruding core valve gap 341, is realized to initiatively tonifying Qi in water tank by air inlet port 343.
Take above-mentioned foundation desirable embodiment of the present invention as enlightenment, by above-mentioned description, relevant staff can, not departing from the scope of this invention technological thought, carry out various change and modification completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to claim scope.