CN102493364B - Ballasting method in large-span girder cantilever construction - Google Patents
Ballasting method in large-span girder cantilever construction Download PDFInfo
- Publication number
- CN102493364B CN102493364B CN201110444449.3A CN201110444449A CN102493364B CN 102493364 B CN102493364 B CN 102493364B CN 201110444449 A CN201110444449 A CN 201110444449A CN 102493364 B CN102493364 B CN 102493364B
- Authority
- CN
- China
- Prior art keywords
- steel
- ballast
- girder
- end bay
- girder steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110444449.3A CN102493364B (en) | 2011-12-23 | 2011-12-23 | Ballasting method in large-span girder cantilever construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110444449.3A CN102493364B (en) | 2011-12-23 | 2011-12-23 | Ballasting method in large-span girder cantilever construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102493364A CN102493364A (en) | 2012-06-13 |
CN102493364B true CN102493364B (en) | 2014-01-15 |
Family
ID=46185220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110444449.3A Active CN102493364B (en) | 2011-12-23 | 2011-12-23 | Ballasting method in large-span girder cantilever construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102493364B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103132463B (en) * | 2013-03-12 | 2015-06-24 | 中国建筑第六工程局有限公司 | Movable hanger operating platform and manufacturing, installing, using and removing methods thereof |
CN104674674A (en) * | 2015-03-02 | 2015-06-03 | 山东省路桥集团有限公司 | One-way full cantilever steel arch bridge installation construction method |
CN109778718A (en) * | 2019-03-05 | 2019-05-21 | 中铁四局集团有限公司 | Construction method for long-span continuous steel box girder main span pure cantilever assembly mid-span closure |
CN112695622A (en) * | 2020-12-31 | 2021-04-23 | 中交路桥华南工程有限公司 | Counterweight type bridge pier |
CN113062223A (en) * | 2021-03-19 | 2021-07-02 | 中铁大桥科学研究院有限公司 | Erection method of large-span cantilever steel beam |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101200876A (en) * | 2007-12-03 | 2008-06-18 | 中铁大桥局集团第四工程有限公司 | Erection of second hole large-span steel girder by rear anchorage cable method |
CN101298753A (en) * | 2008-06-19 | 2008-11-05 | 大连理工大学 | Space pylon stayed balance bridge |
JP2009108635A (en) * | 2007-10-31 | 2009-05-21 | Sumitomo Mitsui Construction Co Ltd | Bridge construction method |
JP2010037726A (en) * | 2008-07-31 | 2010-02-18 | Ps Mitsubishi Construction Co Ltd | Structure for temporarily fixing pc girder of column capital section in cantilever erection method |
CN102134832A (en) * | 2011-01-18 | 2011-07-27 | 中铁大桥局集团第五工程有限公司 | Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane |
-
2011
- 2011-12-23 CN CN201110444449.3A patent/CN102493364B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009108635A (en) * | 2007-10-31 | 2009-05-21 | Sumitomo Mitsui Construction Co Ltd | Bridge construction method |
CN101200876A (en) * | 2007-12-03 | 2008-06-18 | 中铁大桥局集团第四工程有限公司 | Erection of second hole large-span steel girder by rear anchorage cable method |
CN101298753A (en) * | 2008-06-19 | 2008-11-05 | 大连理工大学 | Space pylon stayed balance bridge |
JP2010037726A (en) * | 2008-07-31 | 2010-02-18 | Ps Mitsubishi Construction Co Ltd | Structure for temporarily fixing pc girder of column capital section in cantilever erection method |
CN102134832A (en) * | 2011-01-18 | 2011-07-27 | 中铁大桥局集团第五工程有限公司 | Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane |
Non-Patent Citations (2)
Title |
---|
南钦铁路三岸邕江特大桥连续钢桁拱架设关键技术;宋小三;《交通科技》;20120428(第251期);第40页"3.1边跨压重"部分 * |
宋小三.南钦铁路三岸邕江特大桥连续钢桁拱架设关键技术.《交通科技》.2012,(第251期),第39-42页. |
Also Published As
Publication number | Publication date |
---|---|
CN102493364A (en) | 2012-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100543235C (en) | The method and system of erecting steel trusses by stay cable auxiliary complete cantilever | |
CN109944170A (en) | Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method | |
CN102493364B (en) | Ballasting method in large-span girder cantilever construction | |
CN106894326B (en) | The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder | |
CN101748681B (en) | Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam | |
CN110552296B (en) | Cable-stayed bridge dismantling construction method | |
CN108547223A (en) | The hybrid beam bridge construction method of steel reinforced concrete overlapping | |
CN203923924U (en) | No. 0 section bracket prepressing device | |
CN110804952B (en) | Suspension bridge beam prefabrication and assembly construction process | |
CN102251667B (en) | Construction method for reinforced concrete arched roof of grain store | |
CN101691742B (en) | Construction method for back cable-balancing single-side cantilever concreted beam bodies of slant-legged rigid frame bridges | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN111945568B (en) | Temporary limiting structure and method for arc-shaped tower body ultra-wide steel box girder cable-stayed bridge tower beam | |
CN106522112A (en) | Cable-stayed bridge side span beam section erecting system and method thereof | |
CN107190627A (en) | Part earth anchored suspension bridge and its construction method | |
WO2023016573A1 (en) | Construction method for steel-concrete main girder of cable-stayed bridge | |
CN210151596U (en) | Integrated construction system for side-span cast-in-place section and closure section of high-pier continuous beam | |
CN103205930B (en) | Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure | |
CN207244425U (en) | Part earth anchored suspension bridge | |
CN115538340A (en) | Rapid dismantling device and construction method for old bridge precast beam plate | |
CN104404885B (en) | The device of pre-jacking force is applied for pier prestressed cap beam with extra length in water | |
CN107142830A (en) | Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method | |
CN209907223U (en) | Temporary anchoring device for bridge tower and n-shaped main beam of cable-stayed bridge | |
CN113944114A (en) | Dismantling construction method for large-span prestressed concrete cable-stayed bridge | |
CN105971287A (en) | Vertical prestress construction method of reaction wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Qin Yonggang Inventor after: Qian Hongyan Inventor after: Wang Dianwei Inventor after: Xu Qili Inventor after: Peng Mengze Inventor after: Hu Xiongwei Inventor after: Deng Jingxiong Inventor after: Wang Fangjin Inventor after: Li Juntang Inventor after: Tu Manming Inventor after: Wang Donghui Inventor after: Song Xiaosan Inventor after: Zhang Aihua Inventor after: Chen Guoxiang Inventor before: Qin Yonggang Inventor before: Hu Xiongwei Inventor before: Chen Guoxiang Inventor before: Wang Fangjin Inventor before: Li Juntang Inventor before: Tu Manming Inventor before: Wang Donghui Inventor before: Song Xiaosan Inventor before: Zhang Aihua Inventor before: Xu Qili Inventor before: Peng Mengze |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: QIN YONGGANG WANG FANGJIN LI JUNTANG TU MANMING WANG DONGHUI SONG XIAOSAN ZHANG AIHUA XU QILI PENG MENGZE HU XIONGWEI CHEN GUOXIANG TO: QIN YONGGANG DENG JINGXIONG WANG FANGJIN LI JUNTANG TU MANMING WANG DONGHUI SONG XIAOSAN ZHANG AIHUA CHEN GUOXIANG QIAN HONGYAN WANG DIANWEI XU QILI PENG MENGZE HU XIONGWEI |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150228 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150228 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |