CN102493364B - Ballasting method in large-span girder cantilever construction - Google Patents

Ballasting method in large-span girder cantilever construction Download PDF

Info

Publication number
CN102493364B
CN102493364B CN201110444449.3A CN201110444449A CN102493364B CN 102493364 B CN102493364 B CN 102493364B CN 201110444449 A CN201110444449 A CN 201110444449A CN 102493364 B CN102493364 B CN 102493364B
Authority
CN
China
Prior art keywords
steel
ballast
girder
end bay
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110444449.3A
Other languages
Chinese (zh)
Other versions
CN102493364A (en
Inventor
覃勇刚
邓敬雄
汪芳进
李军堂
涂满明
王东辉
宋小三
张爱花
陈国祥
钱洪燕
王殿伟
徐启利
彭梦泽
胡雄伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN201110444449.3A priority Critical patent/CN102493364B/en
Publication of CN102493364A publication Critical patent/CN102493364A/en
Application granted granted Critical
Publication of CN102493364B publication Critical patent/CN102493364B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a ballasting method in large-span girder cantilever construction. The ballasting method comprises the following steps of: A10, constructing an enlarged foundation of temporary piers for a side span girder, and arranging an embedded steel strand; A20, constructing the temporary piers on the enlarge foundation; A30, detaching the temporary piers after the side span girder is erected; A40, mounting distributive girders on a bridge deck of the side span girder, and making a steel strand pass through drain holes on the bridge deck of the side span girder and fixedly connected with the embedded steel strand; A50, when the factor of safety against overturning of the girder cantilever is less than 1.3, beginning ballasting, tensioning the steel strand by using a tensioning jack arranged on the bridge deck of the side span girder, lifting the enlarged foundation, and anchoring the upper end of the steel strand to the distributive girders to ballast the side span girder; and A60, after a girder is folded, descending the enlarged foundation by using the tensioning jack and the steel strand to unload the ballast. By the method, the enlarged foundation is integrated with a ballasting material, and the method has the advantages of saving materials, not occupying girder operating space, not influencing the jacking and drop and longitudinal shift of the girder, and the like.

Description

Ballast method in large-span steel Cantilever Construction
Technical field
The present invention relates to method for bridge construction, be specifically related to the ballast method in large-span steel Cantilever Construction.
Background technology
In girder steel work progress, end bay generally adopts temporary rest pier auxiliary boom to set up, and end bay steel girder cantilever carries out full cantilever erection after setting up main pier, in finally realizing by roof fall and vertical shift girder steel across closing up.When the jib-length of girder steel is larger, need be on end bay ballast, to meet the requirement of overturning or slip resistance analysis buckling safety factor K≤1.3.
Traditional ballast method has two kinds:
(1) ballast in kind.On bridge floor or on girder steel winds up top, adopt the material objects such as water tank or concrete, steel to carry out ballast, the advantage of the method is the roof fall of girder steel and the impact that vertical shift is not subject to ballast, and shortcoming is that material usage is large, and takies girder steel construction space.
(2) anchoring after.Girder steel on abutment pier fulcrum is anchored on abutment pier by prestressing tendon, and the advantage of the method is that material is economized, and takies girder steel construction space little, and shortcoming is after girder steel after anchor, roof fall and vertical shift difficulty.
Along with the increase of girder steel span, the ballast scale in cantilever construction is also more and more huger.If adopt traditional ballast in kind, not only face material structure difficult problem, be also faced with the problem of heap space deficiency on bridge.If anchoring after adopting,, because of roof fall and vertical shift difficulty, affects girder steel and closes up.
As can be seen here, two kinds of ballast methods that adopt in existing girder steel construction all have some limitations at large-span steel Cantilever Construction.
Summary of the invention
Technical problem to be solved by this invention be solve ballast in kind and after be anchored at the problem that large-span steel Cantilever Construction all has some limitations.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is to provide a kind of ballast method in large-span steel Cantilever Construction, comprises the following steps:
The expansion basis of A10, construction end bay girder steel temporary rest pier, pre-buried steel twisted wire is set, and the basic end face 1.5m of described expansion is stretched out on the top of described pre-buried steel twisted wire;
A20, the basic foundation construction temporary rest pier as temporary rest pier of described expansion of usining, and on described temporary rest pier, set up end bay girder steel;
After A30, end bay steel girder erection, remove described temporary rest pier;
A40, on the bridge floor of end bay girder steel, distribution beam is installed, and steel strand are transferred with described pre-buried steel twisted wire and are connected and fixed through the spilled water hole on end bay girder steel bridge floor;
A50, when the factor of safety against overturning of steel girder cantilever is less than 1.3, start ballast, and by being arranged on stretch-draw jack on described end bay girder steel bridge floor to described steel strand tension, described expansion basis is promoted and departs from ground 0.5m, then by the upper end of described steel strand and described distribution beam anchoring, form the ballast to end bay girder steel;
After A60, girder steel close up, by stretch-draw jack and steel strand, described expansion basis is transferred, complete the removal of ballast.
In said method, in steps A 50, if the basic weight of described expansion is less than the required weight of ballast, on described expansion basis, place extra ballast load; If the basic weight of described expansion is greater than the required weight of ballast, using the basic weight of described expansion as ballast load.
In said method, in steps A 50, according to steel girder cantilever situation, end bay girder steel is carried out to ballast in batches, until complete whole ballasts.
The present invention, will expand basis and the unification of ballast material, have materials and economize, do not take girder steel operating space and do not affect the advantages such as girder steel roof fall and vertical shift.
Accompanying drawing explanation
Fig. 1 is the expansion foundation construction figure of end bay girder steel temporary rest pier in the present invention;
Fig. 2 is that the expansion basis of end bay girder steel temporary rest pier in the present invention promotes ballast schematic diagram;
Fig. 3 is that in the present invention, end bay steel girder cantilever sets up pressure construction schematic diagram.
The specific embodiment
The invention provides a kind of ballast method in large-span steel Cantilever Construction, utilize the concrete of end bay girder steel temporary rest pier to expand basis as ballast material, after end bay girder steel has been constructed, remove temporary rest pier, the concrete of end bay girder steel temporary rest pier is expanded between basis and truss bridge panel and adopts steel strand to be connected, by steel strand, the concrete of end bay girder steel temporary rest pier is expanded to basis and promote, form the ballast to end bay girder steel.
Below in conjunction with accompanying drawing, the present invention is described in detail.
Ballast method in large-span steel Cantilever Construction provided by the invention, concrete steps are as follows:
A10, as shown in Figure 1, the expansion basis 1 of end bay girder steel temporary rest pier of first constructing, and pre-buried steel twisted wire is set, concrete upper surface 1.5m left and right is stretched out in the upper end of pre-buried steel twisted wire.Wherein, expanding basis 1 is reinforced concrete structure, and carries out Reinforcement Design by following two force status, force status when (1) is basic as temporary rest pier; (2) force status during as ballast material lift.
A20, using and expand the basis 1 foundation construction temporary rest pier 10 as temporary rest pier, and on temporary rest pier 10, set up end bay girder steel 11;
After A30, end bay girder steel 11 set up, remove the temporary rest pier 10 of end bay girder steel;
A40, as shown in Figure 2 and Figure 3 installs corresponding distribution beam 4 on the bridge floor 5 of end bay girder steel 11, and anchoring steel strand 3, and transfer through the spilled water hole on the bridge floor 5 of end bay girder steel 11 lower end of steel strand 3, is connected and fixed with the pre-buried steel twisted wire expanding on basis 1.When end bay girder steel 11 is carried out to ballast, by steel strand 3, the ballast load transmitting is passed to the bridge floor 5 of end bay girder steel 11.
A50, when the factor of safety against overturning of steel girder cantilever is less than 1.3, start end bay girder steel 11 to carry out ballast, and by the stretch-draw jack being arranged on the bridge floor 5 of end bay girder steel 11, steel strand 3 are carried out to stretch-draw, to expand basis 1 and promote disengaging ground 0.5m, then by distribution beam 4 anchorings on the bridge floor 5 of steel strand 3 and end bay girder steel 11, form the ballast to end bay girder steel 11.
During ballast, if expand the weight on basis 1, be less than the required weight of ballast, expanding the ballast material 2 that on basis 1, placement increases, this material can be concrete block, steel, stone etc.If expand the weight on basis 1, be greater than the required weight of ballast, using the weight that expands basis 1 as ballast load.Can to end bay girder steel 11, carry out ballast in batches according to steel girder cantilever situation, until complete whole ballasts.
After A60, girder steel close up, by stretch-draw jack, expansion basis 1 is transferred, complete the removal of ballast.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structural change of making under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, within all falling into protection scope of the present invention.

Claims (3)

1. the ballast method in large-span steel Cantilever Construction, is characterized in that comprising the following steps:
The expansion basis of A10, construction end bay girder steel temporary rest pier, pre-buried steel twisted wire is set, and the basic end face 1.5m of described expansion is stretched out on the top of described pre-buried steel twisted wire;
A20, the basic foundation construction temporary rest pier as temporary rest pier of described expansion of usining, and on described temporary rest pier, set up end bay girder steel;
After A30, end bay steel girder erection, remove described temporary rest pier;
A40, on the bridge floor of end bay girder steel, distribution beam is installed, and steel strand are transferred with described pre-buried steel twisted wire and are connected and fixed through the spilled water hole on end bay girder steel bridge floor;
A50, when the factor of safety against overturning of steel girder cantilever is less than 1.3, start ballast, and by being arranged on stretch-draw jack on described end bay girder steel bridge floor to described steel strand tension, described expansion basis is promoted and departs from ground 0.5m, then by the upper end of described steel strand and described distribution beam anchoring, form the ballast to end bay girder steel;
After A60, girder steel close up, by stretch-draw jack and steel strand, described expansion basis is transferred, complete the removal of ballast.
2. the ballast method in large-span steel Cantilever Construction as claimed in claim 1, is characterized in that, in steps A 50, if the basic weight of described expansion is less than the required weight of ballast, on described expansion basis, places extra ballast load; If the basic weight of described expansion is greater than the required weight of ballast, using the basic weight of described expansion as ballast load.
3. the ballast method in large-span steel Cantilever Construction as claimed in claim 1, is characterized in that, in steps A 50, according to steel girder cantilever situation, end bay girder steel is carried out to ballast in batches, until complete whole ballasts.
CN201110444449.3A 2011-12-23 2011-12-23 Ballasting method in large-span girder cantilever construction Active CN102493364B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110444449.3A CN102493364B (en) 2011-12-23 2011-12-23 Ballasting method in large-span girder cantilever construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110444449.3A CN102493364B (en) 2011-12-23 2011-12-23 Ballasting method in large-span girder cantilever construction

Publications (2)

Publication Number Publication Date
CN102493364A CN102493364A (en) 2012-06-13
CN102493364B true CN102493364B (en) 2014-01-15

Family

ID=46185220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110444449.3A Active CN102493364B (en) 2011-12-23 2011-12-23 Ballasting method in large-span girder cantilever construction

Country Status (1)

Country Link
CN (1) CN102493364B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132463B (en) * 2013-03-12 2015-06-24 中国建筑第六工程局有限公司 Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN104674674A (en) * 2015-03-02 2015-06-03 山东省路桥集团有限公司 One-way full cantilever steel arch bridge installation construction method
CN109778718A (en) * 2019-03-05 2019-05-21 中铁四局集团有限公司 Construction method for long-span continuous steel box girder main span pure cantilever assembly mid-span closure
CN112695622A (en) * 2020-12-31 2021-04-23 中交路桥华南工程有限公司 Counterweight type bridge pier
CN113062223A (en) * 2021-03-19 2021-07-02 中铁大桥科学研究院有限公司 Erection method of large-span cantilever steel beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200876A (en) * 2007-12-03 2008-06-18 中铁大桥局集团第四工程有限公司 Erection of second hole large-span steel girder by rear anchorage cable method
CN101298753A (en) * 2008-06-19 2008-11-05 大连理工大学 Space pylon stayed balance bridge
JP2009108635A (en) * 2007-10-31 2009-05-21 Sumitomo Mitsui Construction Co Ltd Bridge construction method
JP2010037726A (en) * 2008-07-31 2010-02-18 Ps Mitsubishi Construction Co Ltd Structure for temporarily fixing pc girder of column capital section in cantilever erection method
CN102134832A (en) * 2011-01-18 2011-07-27 中铁大桥局集团第五工程有限公司 Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009108635A (en) * 2007-10-31 2009-05-21 Sumitomo Mitsui Construction Co Ltd Bridge construction method
CN101200876A (en) * 2007-12-03 2008-06-18 中铁大桥局集团第四工程有限公司 Erection of second hole large-span steel girder by rear anchorage cable method
CN101298753A (en) * 2008-06-19 2008-11-05 大连理工大学 Space pylon stayed balance bridge
JP2010037726A (en) * 2008-07-31 2010-02-18 Ps Mitsubishi Construction Co Ltd Structure for temporarily fixing pc girder of column capital section in cantilever erection method
CN102134832A (en) * 2011-01-18 2011-07-27 中铁大桥局集团第五工程有限公司 Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
南钦铁路三岸邕江特大桥连续钢桁拱架设关键技术;宋小三;《交通科技》;20120428(第251期);第40页"3.1边跨压重"部分 *
宋小三.南钦铁路三岸邕江特大桥连续钢桁拱架设关键技术.《交通科技》.2012,(第251期),第39-42页.

Also Published As

Publication number Publication date
CN102493364A (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN109944170A (en) Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN102493364B (en) Ballasting method in large-span girder cantilever construction
CN106894326B (en) The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder
CN101748681B (en) Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN110552296B (en) Cable-stayed bridge dismantling construction method
CN108547223A (en) The hybrid beam bridge construction method of steel reinforced concrete overlapping
CN203923924U (en) No. 0 section bracket prepressing device
CN110804952B (en) Suspension bridge beam prefabrication and assembly construction process
CN102251667B (en) Construction method for reinforced concrete arched roof of grain store
CN101691742B (en) Construction method for back cable-balancing single-side cantilever concreted beam bodies of slant-legged rigid frame bridges
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN111945568B (en) Temporary limiting structure and method for arc-shaped tower body ultra-wide steel box girder cable-stayed bridge tower beam
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN107190627A (en) Part earth anchored suspension bridge and its construction method
WO2023016573A1 (en) Construction method for steel-concrete main girder of cable-stayed bridge
CN210151596U (en) Integrated construction system for side-span cast-in-place section and closure section of high-pier continuous beam
CN103205930B (en) Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure
CN207244425U (en) Part earth anchored suspension bridge
CN115538340A (en) Rapid dismantling device and construction method for old bridge precast beam plate
CN104404885B (en) The device of pre-jacking force is applied for pier prestressed cap beam with extra length in water
CN107142830A (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method
CN209907223U (en) Temporary anchoring device for bridge tower and n-shaped main beam of cable-stayed bridge
CN113944114A (en) Dismantling construction method for large-span prestressed concrete cable-stayed bridge
CN105971287A (en) Vertical prestress construction method of reaction wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Qin Yonggang

Inventor after: Qian Hongyan

Inventor after: Wang Dianwei

Inventor after: Xu Qili

Inventor after: Peng Mengze

Inventor after: Hu Xiongwei

Inventor after: Deng Jingxiong

Inventor after: Wang Fangjin

Inventor after: Li Juntang

Inventor after: Tu Manming

Inventor after: Wang Donghui

Inventor after: Song Xiaosan

Inventor after: Zhang Aihua

Inventor after: Chen Guoxiang

Inventor before: Qin Yonggang

Inventor before: Hu Xiongwei

Inventor before: Chen Guoxiang

Inventor before: Wang Fangjin

Inventor before: Li Juntang

Inventor before: Tu Manming

Inventor before: Wang Donghui

Inventor before: Song Xiaosan

Inventor before: Zhang Aihua

Inventor before: Xu Qili

Inventor before: Peng Mengze

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: QIN YONGGANG WANG FANGJIN LI JUNTANG TU MANMING WANG DONGHUI SONG XIAOSAN ZHANG AIHUA XU QILI PENG MENGZE HU XIONGWEI CHEN GUOXIANG TO: QIN YONGGANG DENG JINGXIONG WANG FANGJIN LI JUNTANG TU MANMING WANG DONGHUI SONG XIAOSAN ZHANG AIHUA CHEN GUOXIANG QIAN HONGYAN WANG DIANWEI XU QILI PENG MENGZE HU XIONGWEI

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150228

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150228

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.