CN102480374B - Method and equipment for alarming information processing report - Google Patents

Method and equipment for alarming information processing report Download PDF

Info

Publication number
CN102480374B
CN102480374B CN201010559152.7A CN201010559152A CN102480374B CN 102480374 B CN102480374 B CN 102480374B CN 201010559152 A CN201010559152 A CN 201010559152A CN 102480374 B CN102480374 B CN 102480374B
Authority
CN
China
Prior art keywords
node
alarm
alarming
transport layer
merge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010559152.7A
Other languages
Chinese (zh)
Other versions
CN102480374A (en
Inventor
胡慧君
刘丛
王东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201010559152.7A priority Critical patent/CN102480374B/en
Priority to PCT/CN2011/071961 priority patent/WO2012068808A1/en
Publication of CN102480374A publication Critical patent/CN102480374A/en
Application granted granted Critical
Publication of CN102480374B publication Critical patent/CN102480374B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • H04L41/0636Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis based on a decision tree analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a method and equipment for alarming information processing report. The method includes firstly, setting up a multi-layer alarming tree according to a layered structure of a transmission layer, wherein each alarming node contained in each layer of the alarming tree consists of a transmission layer node and an alarming manager linked with the transmission layer node, and the alarming manager of each transmission layer node is used for managing alarming information of the transmission layer node linked with the alarming manager; and secondly, detecting the alarming nodes layer by layer from a root node of the alarming tree and reporting the alarming information of the alarming node generating alarms. The simplified alarming tree is set up according to the layered structure in the transmission protocol, the nodes are combined and integrally processed by means of the alarming manager linked with the nodes of each transmission layer, and thereby the alarming tree is simplified, occupied internal memory of the alarming tree is reduced, and alarm detection reporting time is shortened.

Description

A kind of method and apparatus of alarming information processing report
Technical field
The present invention relates to synchronization digital system, particularly relate to a kind of method and apparatus carrying out a kind of alarming information processing report.
Background technology
Alarm management is a critical function of various communication apparatus, when systems axiol-ogy is to equipment operation exception, by the alarm management module process report and alarm information in system, with the object reaching accurate location, fix a breakdown.Common alarming processing flow process is all kinds alarm that each processing unit is responsible for detecting self required process, then these alarm status values is reported network element control unit, then reports webmaster by network element control unit, jointly complete the management of alarm.
The method that current board alarm process reports, generally adopt set up alarm tree mode carry out unified management.The simple partial monopoly described wherein below:
Denomination of invention is alarm reporting method and device and publication number is disclose in the application documents of CN101237661A: generate alarm by incidence relation between alarm and set, detect that father node has alarm then to put child node alarm for disappearing, uploaded state is the node alarm generated.This programme contributes to user to be safeguarded.
Denomination of invention is a kind ofly realize the method for alarming processing and publication number is disclose in the application documents of CN101145944A: the alarm tree of setting up layering according to the transport layer of network, each node of tree is directory node, initialization alarming node is the child node of corresponding directory node, alarm tree is traveled through when detecting alarm, analyze and need the alarm that reports also to process, can deal with according to different situations and solve alarm and too much to report and frequent and repeat to report problem.
Denomination of invention is a kind of alarm reporting method and alarm device and the application documents that publication number is CN100512490C disclose: the alarm received is divided into the raw alarm in source and derivative alarm, by only reporting the raw alarm in source to alleviate server burden, strengthen maintainability.
The method that such scheme relates to is all improvement of the maintainable aspect to alarm, and the complexity aspect of the efficiency do not reported alarm detection process and alarm tree is improved.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of method and apparatus carrying out a kind of alarming information processing report, improves and reports efficiency.
In order to solve the problems of the technologies described above, the invention provides a kind of method of alarming information processing report, comprise: set up multilayer alarm tree according to the hierarchy of transport layer, in alarm tree, every layer of alarming node comprised is made up of transport layer node and transport layer node is associated therewith alarm management person, the warning information of the transport layer node that the alarm management person administrative institute of each transport layer node associates; Successively each alarming node is detected from the root node that described alarm is set, report the warning information of the alarming node producing alarm.
Further, said method can also have following characteristics;
Described transport layer node is ordinary node or merge node, and merge node is by the node being arranged in the different hierarchies of transport layer more than one node and being merged into.
Further, said method can also have following characteristics;
Merge node is formed by extra play node and the merging of virtual container node, or merge node is formed by tributary unit node and the merging of virtual container node.
Further, said method can also have following characteristics;
Detect alarming node produce alarm and in this alarming node, transport layer node is merge node when, this merge node is carried out deconsolidation process, reports each layer alarm after fractionation.
Further, said method can also have following characteristics;
Described alarm management person safeguards the alarm that the transport layer node be associated produces, and the according to priority order of each alarm produced by this transport layer node is safeguarded in chained list mode, when carrying out alarm report, reports the alarm that chained list medium priority is the highest.
In order to solve the problems of the technologies described above, present invention also offers a kind of equipment of alarming information processing report, comprise alarm tree generation unit, alarm detection unit and alarm report unit; Described alarm tree generation unit, for setting up multilayer alarm tree according to the hierarchy of transport layer, in alarm tree, every layer of alarming node comprised is made up of transport layer node and transport layer node is associated therewith alarm management person, the warning information of the transport layer node that the alarm management person administrative institute of each transport layer node associates; Described alarm detection unit, successively detects each alarming node for the root node set from described alarm; Described alarm report unit, for reporting the warning information of the alarming node producing alarm.
Further, the said equipment can also have following characteristics;
Described transport layer node is ordinary node or merge node, and merge node is by the node being arranged in the different hierarchies of transport layer more than one node and being merged into.
Further, the said equipment can also have following characteristics;
Merge node is formed by extra play node and the merging of virtual container node, or merge node is formed by tributary unit node and the merging of virtual container node.
Further, the said equipment can also have following characteristics;
Described equipment also comprises node type judging unit and node split cells; Described node type judging unit, for judging whether this alarming node is merge node, if merge node then notifies described node split cells after described alarm detection unit inspection produces alarm to alarming node; Described node split cells, for after the notice receiving described node type judging unit, carries out deconsolidation process by this merge node, reports each layer alarm after fractionation.
Further, the said equipment can also have following characteristics;
Described alarm tree generation unit, also for being safeguarded the alarm that the transport layer node be associated produces by described alarm management person, and the according to priority order of each alarm produced by this transport layer node is safeguarded in chained list mode, when carrying out alarm report, reports the alarm that chained list medium priority is the highest.
The present invention sets up according to the hierarchy in host-host protocol and simplifies alarm tree, arrange alarm management person and merge node, by the unified process of alarm management person of each transport layer node association, make alarm set complexity to reduce, reduce alarm and set the memory headroom taken, the detection of minimizing alarm is called time, simultaneously under the prerequisite not violating alarm report rule, fast detecting process report and alarm can be convenient to user's real-time tracking and understand equipment operation condition, improve and report efficiency, reach the object of quick position fault.Report the single board system of a large amount of alarm to have for a secondary check processing and obviously improve meaning.
Accompanying drawing explanation
Fig. 1 carries out the method schematic diagram that warning information reports in embodiment;
Fig. 2 is the alarm tree structure schematic diagram of specific embodiment.
Embodiment
Carry out method that warning information reports and SDH (Synchronous Digital Hierarchy) treatment facility, comprise alarm tree generation unit, alarm detection unit, alarm report unit, node type judging unit, node split cells.
Alarm tree generation unit is used for setting up multilayer alarm tree according to the hierarchy of transport layer, in alarm tree, every layer of alarming node comprised is made up of transport layer node and transport layer node is associated therewith alarm management person, the warning information of the transport layer node that the alarm management person administrative institute of each transport layer node associates.
Alarm detection unit is used for successively detecting each alarming node from the root node that described alarm is set.
Alarm report unit is for reporting the warning information of the alarming node producing alarm.
Described alarm tree generation unit is also for safeguarding the alarm that the transport layer node be associated produces by described alarm management person, and the according to priority order of each alarm produced by this transport layer node is safeguarded in chained list mode, when carrying out alarm report, report the alarm that chained list medium priority is the highest.
Above-mentioned transport layer node is ordinary node or merge node, and merge node is by the node being arranged in the different hierarchies of transport layer more than one node and being merged into.Merge node is formed by extra play node and the merging of virtual container node, or merge node is formed by tributary unit node and the merging of virtual container node.
Node type judging unit is used for judging whether this alarming node is merge node, if merge node then notifies described node split cells after described alarm detection unit inspection produces alarm to alarming node.
Node split cells is used for after the notice receiving described node type judging unit, this merge node is carried out deconsolidation process, reports each layer alarm after fractionation.
As shown in Figure 1, carry out the method that warning information reports to comprise:
Step 101, multilayer alarm tree is set up according to the hierarchy of transport layer, in alarm tree, every layer of alarming node comprised is made up of transport layer node and transport layer node is associated therewith alarm management person, the warning information of the transport layer node that the alarm management person administrative institute of each transport layer node associates.
The number of plies of multilayer alarm tree can be identical with the number of plies of the hierarchy of transport layer, every layer of alarm tree and the layer one_to_one corresponding of hierarchy.
First business model tree can be set up according to the hierarchy of transport layer in this step, for each node generates and after associating an alarm management person, alarm type to be processed is needed according to each node, initialization alarming node is also associated with the node that business model sets correspondence position, generates the alarm tree of expection.
Described transport layer node is ordinary node or merge node.
Port nodes etc. can be set up according to ordinary node.
Merge node is by the node being arranged in the different hierarchies of transport layer more than one node and being merged into.Merge node is formed by extra play node and the merging of virtual container node, or merge node is formed by tributary unit node and the merging of virtual container node.Such as, merge node is the node of 12 rank tributary unit node layers and TU12 and 12 rank virtual container node layers and VC12 composition in the multiplex mapping structure of SDH (Synchronous Digital Hierarchy), or merge node is the node of extra play node and 4 rank virtual container node layer compositions.The proposition of merge node concept can reduce the complexity of tree and reduce the time of traversal alarm tree, needs also can greatly reduce internal memory when setting up many alarm trees when some.
As shown in Figure 2, low order interlace algorithm systems soft ware initial phase in SDH equipment, according to SDH multiplexing mapping structure initialization business model tree, the node of its tree is followed successively by veneer root node (ordinary node)-port node (ordinary node)-AU4 node (ordinary node)-VC4 node (ordinary node)-TU12 node (merge node of TU12 and VC12) from top to bottom.Each node is associated with other alarm management of this level person, and the alarming node information of this layer affiliated is by the alarm management person unified management of correspondence.For the merge node that TU12 and VC12 is formed, the alarm of its alarm management person association has all alarms of TU12 and VC12 rank.
Step 102, successively detects each alarming node from the root node that described alarm is set.
In this step, there is actual alarm status according to the time cycle detection hardware chip preset is current, from root node, detected step by step by the alarm management person of every layer of association and search alarming node.
Detect that alarming node produces alarm and in this alarming node, transport layer node is non-conjunction node when being ordinary node, report the alarm of this node.
Detect alarming node produce alarm and in this alarming node, transport layer node is merge node when, this merge node is carried out deconsolidation process (splitting into the node belonging to different layers by merge node).
After being split by merge node, the structure of alarm tree does not send out change, and the layer speed that in the chained list that the alarm management person that this merge node is corresponding safeguards, warning information is corresponding carries out corresponding renewal.
Step 103, reports the warning information of the alarming node producing alarm.
In said method, described alarm management person safeguards the alarm that the transport layer node be associated produces, and the according to priority order of each alarm produced by this transport layer node is safeguarded in chained list mode, about merge node, for the alarm of original VC12 rank, be then associated with in TU12 node under alarm management person, when carrying out alarm report, according to priority orders, filtration treatment is carried out to warning information, report the alarm that chained list medium priority is the highest.
The present invention sets up according to the hierarchy in host-host protocol and simplifies alarm tree, arrange alarm management person and merge node, by the unified process of alarm management person of each transport layer node association, make alarm set complexity to reduce, reduce alarm and set the memory headroom taken, the detection of minimizing alarm is called time, simultaneously under the prerequisite not violating alarm report rule, fast detecting process report and alarm can be convenient to user's real-time tracking and understand equipment operation condition, improve and report efficiency.
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combination in any mutually.
Certainly; the present invention also can have other various embodiments; when not deviating from the present invention's spirit and essence thereof; those of ordinary skill in the art can make various corresponding change and distortion according to the present invention, but these change accordingly and are out of shape the protection range that all should belong to the claim appended by the present invention.
The all or part of step that one of ordinary skill in the art will appreciate that in said method is carried out instruction related hardware by program and is completed, and described program can be stored in computer-readable recording medium, as read-only memory, disk or CD etc.Alternatively, all or part of step of above-described embodiment also can use one or more integrated circuit to realize.Correspondingly, each module/unit in above-described embodiment can adopt the form of hardware to realize, and the form of software function module also can be adopted to realize.The present invention is not restricted to the combination of the hardware and software of any particular form.

Claims (6)

1. a method for alarming information processing report, is characterized in that,
Multilayer alarm tree is set up according to the hierarchy of transport layer, in alarm tree, every layer of alarming node comprised is made up of transport layer node and transport layer node is associated therewith alarm management person, the warning information of the transport layer node that the alarm management person administrative institute of each transport layer node associates; Successively each alarming node is detected from the root node that described alarm is set, report the warning information of the alarming node producing alarm;
Detect alarming node produce alarm and in this alarming node, transport layer node is merge node when, this merge node is carried out deconsolidation process, reports each layer alarm after fractionation;
Described transport layer node is ordinary node or merge node, and merge node is by the node being arranged in the different hierarchies of transport layer more than one node and being merged into.
2. the method for claim 1, is characterized in that,
Merge node is formed by extra play node and the merging of virtual container node, or merge node is formed by tributary unit node and the merging of virtual container node.
3. the method for claim 1, is characterized in that,
Described alarm management person safeguards the alarm that the transport layer node be associated produces, and the according to priority order of each alarm produced by this transport layer node is safeguarded in chained list mode, when carrying out alarm report, reports the alarm that chained list medium priority is the highest.
4. an equipment for alarming information processing report, is characterized in that,
Comprise alarm tree generation unit, alarm detection unit, alarm report unit, node type judging unit and node split cells;
Described alarm tree generation unit, for setting up multilayer alarm tree according to the hierarchy of transport layer, in alarm tree, every layer of alarming node comprised is made up of transport layer node and transport layer node is associated therewith alarm management person, the warning information of the transport layer node that the alarm management person administrative institute of each transport layer node associates;
Described alarm detection unit, successively detects each alarming node for the root node set from described alarm;
Described alarm report unit, for reporting the warning information of the alarming node producing alarm;
Described node type judging unit, for judging whether this alarming node is merge node, if merge node then notifies described node split cells after described alarm detection unit inspection produces alarm to alarming node;
Described node split cells, for after the notice receiving described node type judging unit, carries out deconsolidation process by this merge node, reports each layer alarm after fractionation;
Described transport layer node is ordinary node or merge node, and merge node is by the node being arranged in the different hierarchies of transport layer more than one node and being merged into.
5. equipment as claimed in claim 4, is characterized in that,
Merge node is formed by extra play node and the merging of virtual container node, or merge node is formed by tributary unit node and the merging of virtual container node.
6. equipment as claimed in claim 4, is characterized in that,
Described alarm tree generation unit, also for being safeguarded the alarm that the transport layer node be associated produces by described alarm management person, and the according to priority order of each alarm produced by this transport layer node is safeguarded in chained list mode, when carrying out alarm report, reports the alarm that chained list medium priority is the highest.
CN201010559152.7A 2010-11-25 2010-11-25 Method and equipment for alarming information processing report Expired - Fee Related CN102480374B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010559152.7A CN102480374B (en) 2010-11-25 2010-11-25 Method and equipment for alarming information processing report
PCT/CN2011/071961 WO2012068808A1 (en) 2010-11-25 2011-03-18 Method and equipment for processing and reporting alarm information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010559152.7A CN102480374B (en) 2010-11-25 2010-11-25 Method and equipment for alarming information processing report

Publications (2)

Publication Number Publication Date
CN102480374A CN102480374A (en) 2012-05-30
CN102480374B true CN102480374B (en) 2015-01-28

Family

ID=46092861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010559152.7A Expired - Fee Related CN102480374B (en) 2010-11-25 2010-11-25 Method and equipment for alarming information processing report

Country Status (2)

Country Link
CN (1) CN102480374B (en)
WO (1) WO2012068808A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106506224A (en) * 2016-11-25 2017-03-15 成都广达新网科技股份有限公司 A kind of Real-time Alarm transmission method for realizing device packets management in webmaster

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104702443B (en) * 2012-11-14 2018-03-06 北京奇虎科技有限公司 For handling the processor and method of the data for needing to alarm
CN102970162B (en) * 2012-11-14 2015-04-01 北京奇虎科技有限公司 Processor and method used for processing data to be alarmed
CN109362042A (en) * 2018-09-30 2019-02-19 中国联合网络通信集团有限公司 A kind of transmission method and device of warning information
CN111950270B (en) * 2019-04-29 2023-11-24 ***通信集团湖北有限公司 Communication network alarm association method and device and computing equipment
CN111061616B (en) * 2019-11-25 2024-03-29 京信网络***股份有限公司 Alarm management method, device, communication equipment and storage medium
CN114124654B (en) * 2020-08-10 2023-10-27 ***通信集团浙江有限公司 Alarm merging method, device, computing equipment and computer storage medium
CN112559569B (en) * 2020-12-11 2023-07-21 广东电力通信科技有限公司 Alarm rule processing method for composite condition
CN115333916B (en) * 2022-07-19 2023-07-25 广州爱浦路网络技术有限公司 Network element alarm information processing method, device and storage medium in communication network
CN115396289B (en) * 2022-08-31 2024-03-22 广东电网有限责任公司 Fault alarm determining method and device, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000031522A (en) * 1998-11-06 2000-06-05 윤종용 Method for forming information data tree of equipment management using communication management network and method for processing alarm using the same
CN101022638A (en) * 2007-03-12 2007-08-22 华为技术有限公司 Alarm reporting method and alarm device
CN101145944A (en) * 2007-07-04 2008-03-19 中兴通讯股份有限公司 A method for processing alarm
CN101237661A (en) * 2008-02-28 2008-08-06 中兴通讯股份有限公司 Alarm reporting method and device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100394457C (en) * 2003-12-30 2008-06-11 上海贝尔阿尔卡特股份有限公司 Universal multi-hierarchy alarm processing method
CN101145841B (en) * 2007-06-27 2012-05-30 中兴通讯股份有限公司 A method for optical transmission network processing reporting alarming information

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000031522A (en) * 1998-11-06 2000-06-05 윤종용 Method for forming information data tree of equipment management using communication management network and method for processing alarm using the same
CN101022638A (en) * 2007-03-12 2007-08-22 华为技术有限公司 Alarm reporting method and alarm device
CN101145944A (en) * 2007-07-04 2008-03-19 中兴通讯股份有限公司 A method for processing alarm
CN101237661A (en) * 2008-02-28 2008-08-06 中兴通讯股份有限公司 Alarm reporting method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
3G网管平台告警管理的设计与实现;谢敏;《中国优秀硕士论文库》;20070313;第43页第3-11行,附图5-2 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106506224A (en) * 2016-11-25 2017-03-15 成都广达新网科技股份有限公司 A kind of Real-time Alarm transmission method for realizing device packets management in webmaster

Also Published As

Publication number Publication date
WO2012068808A1 (en) 2012-05-31
CN102480374A (en) 2012-05-30

Similar Documents

Publication Publication Date Title
CN102480374B (en) Method and equipment for alarming information processing report
CN100479385C (en) Integral maintaining method and system for multi-equipment
CA2658579C (en) A method of configuring intelligent electronic devices to facilitate standardized communication messages among a plurality of ieds within a network
US10972359B2 (en) Data structures representing models of networking equipment and methods of network management employing thereof
CN102006191B (en) Method and device for realizing warning
CN109634932A (en) A kind of intelligence contract storage method and storage system
CN103581307A (en) Publishing/subscribing system based on clusters and method for guaranteeing reliability of publishing/subscribing system based on clusters
CN103631666A (en) Data redundancy fault-tolerance adaptation management device, service device, system and method
CN101237661A (en) Alarm reporting method and device
CN108345617A (en) A kind of method of data synchronization, device and electronic equipment
CN101227327B (en) Method for concentrating network managing system and uploading lower level alarm information
CN105591775A (en) Method, device and system for network operation administration maintenance (OAM)
CN102075357A (en) Multi-domain security management method for network management system
CN102970162B (en) Processor and method used for processing data to be alarmed
CN107807884B (en) Method for modular management of error codes
CN103294878A (en) Unified modeling method of multidimensional grid models based on DMS (database management system)
CN106202585B (en) The more scene Multi-state data systems of electric power and management method
CN105704189B (en) Correlation method, device and system between upper layer link and lower layer link
CN108040080A (en) A kind of method for realizing energy cloud service system application model rapid translating
CN102521388A (en) Low-coupling high-availability device for electric power information retrieval
CN109495301B (en) IPTV abnormal network equipment delimitation method based on ARQ log
CN112907233A (en) Management method, device, equipment and storage medium of high availability scheme
CN107888415B (en) Network management system data maintenance method
CN106156069A (en) Log system and log recording method
CN107241415A (en) A kind of collocation method and device in management information bank MIB storehouses

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150128

Termination date: 20191125