CN102469482A - Information switching method and system for broadcast control channel (BCCH) - Google Patents

Information switching method and system for broadcast control channel (BCCH) Download PDF

Info

Publication number
CN102469482A
CN102469482A CN2010105412847A CN201010541284A CN102469482A CN 102469482 A CN102469482 A CN 102469482A CN 2010105412847 A CN2010105412847 A CN 2010105412847A CN 201010541284 A CN201010541284 A CN 201010541284A CN 102469482 A CN102469482 A CN 102469482A
Authority
CN
China
Prior art keywords
receive unit
transmit
base station
bcch
station controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105412847A
Other languages
Chinese (zh)
Inventor
周慧明
王书建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2010105412847A priority Critical patent/CN102469482A/en
Priority to PCT/CN2011/076132 priority patent/WO2012062118A1/en
Publication of CN102469482A publication Critical patent/CN102469482A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/30Resource management for broadcast services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/08Access restriction or access information delivery, e.g. discovery data delivery
    • H04W48/12Access restriction or access information delivery, e.g. discovery data delivery using downlink control channel

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses an information switching method and an information switching system for a broadcast control channel (BCCH). The method comprises the following step that: after determining that BCCH data of a transmitting and receiving unit (TRU) on a base transceiver station (BTS) is needed to be switched, a base station controller (BSC) switches the BCCH data on the TRU to a target TRU which belongs to the same cell with the TRU and is in a normal transmitting and receiving state. By the method and the system, the problem that information receiving in the cell where the TRU is positioned fails because the TRU of the BCCH fails is solved, and the information receiving of a mobile terminal in the cell is ensured. The scheme can be completely integrated into base station software and is easy to implement.

Description

A kind of broadcast control channel information reverse method and system
Technical field
The present invention relates to moving communicating field, relate in particular to a kind of broadcast control channel information reverse method and system.
Background technology
Global mobile communication (Global System For Mobile Communication abbreviates GSM as) is most popular a kind of communication standard in the mobile communication.The Radio Access Network of gsm system is commonly referred to base station sub-system (Base Station Subsystem; BSS); Form by base station controller (BSC) and base station transceiver (BTS); Comprise Transmit-Receive Unit (Transmitting and Receiving Unit is called for short TRU) in the base station transceiver, base station sub-system is carried out the operation of wireless signal transmission, reception and RRM with travelling carriage through wave point.
On the one hand; Portable terminal need be known a large amount of network informations under idle pulley; BCCH (Broadcast Control Channel is passed through with these information in the base station; Be called for short BCCH) be sent to portable terminal, information comprises some option parameter of management, control and selection parameter and sub-district of BCCH frequency, LAI (LAC+MNC+MCC), CCCH (CCCH) and the CBCH (CBCH) of all frequencies of sub-district, adjacent sub-district.When some hardware and software failure takes place the Transmit-Receive Unit at the BCCH of sub-district channel place, will cause the whole sub-district can't operate as normal.On the other hand, in network operation maintenance process, need the scene that the BCCH carrier frequency is safeguarded sometimes.How to realize switching of broadcast control channel information, guarantee that the normal transmission of broadcast control channel information is the technical issues that need to address.
Summary of the invention
The technical problem that the present invention will solve provides a kind of broadcast control channel information reverse method and system, solves because the TRU fault of BCCH causes belonging to the problem that cell information receives fault.
In order to solve the problems of the technologies described above; The invention provides a kind of broadcast control channel information reverse method; Comprise: base station controller judges that the Transmit-Receive Unit on the base station transceiver need carry out after the BCCH data switch, and being switched to the BCCH data on this Transmit-Receive Unit therewith, Transmit-Receive Unit belongs to same sub-district and is on the target Transmit-Receive Unit of normal reiving/transmitting state.
Further, said method can also have following characteristics:
Said base station controller judges that according to one of following condition the Transmit-Receive Unit needs carry out the BCCH data and switch: detect the alarm that the High-Level Data Link Control link breaks off on the said Transmit-Receive Unit; Detect the generation software of said Transmit-Receive Unit or the notice of hardware fault; Receiving needs said Transmit-Receive Unit is carried out the artificial order that BCCH is switched of forcing to carry out.
Further, said method can also have following characteristics:
Under carrier frequency mixed insertion situation, base station controller selects for use the Transmit-Receive Unit identical with fault Transmit-Receive Unit bearing carrier wave type as the target Transmit-Receive Unit.
Further, said method can also have following characteristics:
The Transmit-Receive Unit that base station controller is selected not dispose baseband hopping is as the target Transmit-Receive Unit.
Further, said method can also have following characteristics:
Base station controller judges that Transmit-Receive Unit need carry out starting and switching timer after the BCCH data switch, under the situation that the fault of this Transmit-Receive Unit is eliminated not yet when this timing of switching timer arrives, and the select target Transmit-Receive Unit.
Further, said method can also have following characteristics:
Base station controller comprises the method that the BCCH data on the fault Transmit-Receive Unit are switched on the said target Transmit-Receive Unit: after base station controller is selected the target Transmit-Receive Unit; Send block message to fault Transmit-Receive Unit and target Transmit-Receive Unit; When having traffic on the target Transmit-Receive Unit; After traffic is transferred to other Transmit-Receive Unit that is in normal reiving/transmitting state, carries out and switch order, accomplish switch the back to the fault Transmit-Receive Unit with the target Transmit-Receive Unit transmission separate block message.
In order to solve the problems of the technologies described above, the present invention also provides a kind of broadcast control channel information exchanging system, comprises base station controller and base station transceiver, and base station transceiver comprises Transmit-Receive Unit; Said base station controller; Be used to judge that Transmit-Receive Unit need carry out after the BCCH data switch, being switched to the BCCH data on this Transmit-Receive Unit therewith, Transmit-Receive Unit belongs to same sub-district and is on the target Transmit-Receive Unit of normal reiving/transmitting state.
Further, said system can also have following characteristics:
Said base station controller also is used for judging that according to one of following condition the Transmit-Receive Unit needs carry out the BCCH data and switch: detect the alarm that the High-Level Data Link Control link breaks off on the said Transmit-Receive Unit; Detect the generation software of said Transmit-Receive Unit or the notice of hardware fault; Receiving needs said Transmit-Receive Unit is carried out the artificial order that BCCH is switched of forcing to carry out.
Further, said system can also have following characteristics:
Said base station controller also is used under carrier frequency mixed insertion situation, selects for use the Transmit-Receive Unit identical with fault Transmit-Receive Unit bearing carrier wave type as the target Transmit-Receive Unit.
Further, said system can also have following characteristics:
Said base station controller, the Transmit-Receive Unit that also is used to select not dispose baseband hopping is as the target Transmit-Receive Unit.
The invention solves because the TRU fault of BCCH causes belonging to the problem that cell information receives fault, guarantee the message pick-up of portable terminal in the sub-district, scheme of the present invention can be fully integrated in base station software, realizes simple.
Description of drawings
Fig. 1 is a broadcast control channel information reverse method sketch map among the embodiment.
Embodiment
The broadcast control channel information exchanging system comprises base station controller and base station transceiver, and base station transceiver comprises Transmit-Receive Unit.
Said base station controller is used to judge that Transmit-Receive Unit need carry out after the BCCH data switch, and being switched to the BCCH data on this Transmit-Receive Unit therewith, Transmit-Receive Unit belongs to same sub-district and is on the target Transmit-Receive Unit of normal reiving/transmitting state.
Said base station controller also is used for judging that according to one of following condition the Transmit-Receive Unit needs carry out the BCCH data and switch: detect the alarm that the High-Level Data Link Control link breaks off on the said Transmit-Receive Unit; Detect the generation software of said Transmit-Receive Unit or the notice of hardware fault; Receiving needs said Transmit-Receive Unit is carried out the artificial order that BCCH is switched of forcing to carry out.
Said base station controller also is used under carrier frequency mixed insertion situation, preferentially selects for use the Transmit-Receive Unit identical with fault Transmit-Receive Unit bearing carrier wave type as the target Transmit-Receive Unit.
Said base station controller also is used for Transmit-Receive Unit that preferential selection do not dispose baseband hopping as the target Transmit-Receive Unit.
As shown in Figure 1, the broadcast control channel information reverse method comprises:
Step 101, base station controller judge that the Transmit-Receive Unit on the base station transceiver need carry out the BCCH data and switch.
When BTS High-Level Data Link Control link on Transmit-Receive Unit breaks off or when Transmit-Receive Unit generation software or hardware fault, report to BSC through " state has changed message ".Under the artificial Forced Switch situation, BSC can know that carrying out artificial pressure carries out the order that BCCH is switched.
Base station controller judges that according to one of following condition the Transmit-Receive Unit needs carry out the BCCH data and switch:
Detect the alarm that the High-Level Data Link Control link breaks off on the said Transmit-Receive Unit;
Detect the generation software of said Transmit-Receive Unit or the notice of hardware fault;
Receiving needs said Transmit-Receive Unit is carried out the artificial order that BCCH is switched of forcing to carry out.
When base station controller is received above-mentioned alarm or notice; If this base station controller is carried out BCCH to this Transmit-Receive Unit and is switched; Then abandon the trigger message that this alarm or notice cause, if this base station controller is being carried out Separate Dedicated Control Channel (Separate Dedicated Control Channel is called for short SDCCH) dynamic-configuration; Then in the data field, note for information about, wait for executing and carry out BCCH again after the SDCCH dynamic-configuration and switch.
Base station controller judges that the Transmit-Receive Unit on the base station transceiver need carry out after the BCCH data switch; Start and switch timer (TIME1); Under the situation that the fault of this Transmit-Receive Unit is eliminated not yet when this timing of switching timer arrives; The select target Transmit-Receive Unit is switched the fault of this Transmit-Receive Unit in effective time of timer and is eliminated, and then finishes to switch flow process.
When switching the timing arrival of timer; BSC failure judgement Transmit-Receive Unit is that this Transmit-Receive Unit participation frequency hopping, this sub-district of a unique Transmit-Receive Unit, this sub-district do not allow BCCH to switch in its affiliated subdistrict, perhaps the LAPD of the OMU of BTS is then finished to switch flow process by obturation at this moment.
When the timing of switching timer arrives, can not find target Transmit-Receive Unit that Transmit-Receive Unit therewith belongs to same sub-district and be in normal reiving/transmitting state and then open again and switch timer and wait for inquiry next time.
Step 102, being switched to the BCCH data on this Transmit-Receive Unit therewith, Transmit-Receive Unit belongs to same sub-district and is on the target Transmit-Receive Unit of normal reiving/transmitting state.
Carry out essence that the BCCH data switch and be to carry out the BCCH data when switching at a Transmit-Receive Unit; Target Transmit-Receive Unit with Transmit-Receive Unit therewith belongs to same sub-district and is in normal reiving/transmitting state is inherited the logic configuration on this Transmit-Receive Unit, and the wireless data that the base station is transmitted remains valid.The state, the logical place of carrier frequency, the channel data that comprise carrier frequency in the BCCH data of switching.In the reversed process, following parameter is not switched: power amplifier classification, carrier frequency type, frequency, frequency hopping mode, terminal equipment number (TEI).
During the select target Transmit-Receive Unit; Under carrier frequency mixed insertion situation; Base station controller preferentially selects for use the Transmit-Receive Unit identical with fault Transmit-Receive Unit bearing carrier wave type (being that the BCCH carrier frequency is single carrier carrier frequency or two carrier wave carrier frequency) as the target Transmit-Receive Unit; Do not having to select the TRU of other type for use under the TRU situation of same type.
During the select target Transmit-Receive Unit, base station controller preferentially selection do not dispose baseband hopping Transmit-Receive Unit as the target Transmit-Receive Unit.If that candidate TRU selected during BCCH switched is the TRU that participates in baseband hopping; Then switch and complete successfully back (when receiving that promptly TRU that BCCH that BTS replys switches success and time-delay inspection BCCH is in normal condition) at BCCH; Starting baseband hopping TRU switches; Fault TRU is removed from former base band frequency hopping group, upgrade the baseband hopping table.
After base station controller is selected the target Transmit-Receive Unit; Send block message to fault Transmit-Receive Unit and target Transmit-Receive Unit; When having traffic on the target Transmit-Receive Unit; After traffic is transferred to other Transmit-Receive Unit that is in normal reiving/transmitting state, carries out and switch order, accomplish switch the back to the fault Transmit-Receive Unit with the target Transmit-Receive Unit transmission separate block message.
In concrete the realization, BSC carries out obturation with the TRU of former BCCH and candidate's the TRU that will be configured to new BCCH in database, with the business switching of relevant TRU or close; Timer (TIME2) is set, when the timing of timer (TIME2) arrives, sends block message to fault Transmit-Receive Unit and target Transmit-Receive Unit; Timer (TIME3) is set, receive that in the time of timer (TIME3) the BTS obturation is successfully replied after, issue BCCH and switch order; And opening timing device (TIME4); BTS carries out the BCCH switching operation, changes two logic TRU participating in that BCCH switches and the corresponding relation of physics TRU, and the logic parameter of two TRU that participation BCCH is switched exchanges; After switching successfully, report " BCCH switches acknowledge message "; The time report " BCCH switches failed message " switching failure, BSC is timer (TIME4) is received " BCCH switches acknowledge message " in the time after, and BSC issues to separate and closes two TRU that TRU message will participate in the BCCH reversed process and separate obturation; BSC is then known and is not switched successfully timer (TIME4) is received " BCCH switches failed message " in the time after, finishes this and switch flow process.
Artificial to force BCCH to switch be the particular form that BCCH switches, and below " the artificial BCCH that forces switches triggerings " and " manual work pressure BCCH switches inspection " specified that other content is identical with said method.Artificial pressure BCCH switches by the backstage and initiates.The artificial BCCH that forces switches the support dual mode: mode one, candidate TRU is selected on the foreground, when promptly artificial initiation BCCH switches, carries out BCCH by BSC select target TRU and switches.For single TRU sub-district, BCCH switches switch and does not open, and does not have other TRU of sub-district on the frame at BCCH place, and the backstage can not be initiated the artificial BCCH of pressure and switched.Mode two, backstage designate candidate TRU, the promptly artificial BCCH that initiates selects candidate TRU by the operator when switching, candidate TRU must with the TRU of BCCH on same frame.The foreground is switched to BCCH the TRU of backstage appointment.For single TRU sub-district, BCCH switch that switch is not opened, candidate TRU and BCCH not when the carrier frequency Type-Inconsistencies at the carrier frequency type of same frame, candidate TRU and BCCH place, the backstage can not be initiated the artificial BCCH of pressure and switched.
BSC receive carry out artificial force to carry out order that BCCH switches after; Check current whether can switching earlier; As allow BCCH to switch switch whether to open, simultaneously if the TRU mode is specified on the foreground, judge then whether the TRU that issues is the TRU of BCCH; If the TRU mode is specified on the backstage, judge then whether the TRU frame-saw groove that issues is legal, whether consistent with the carrier frequency type of the TRU of BCCH, on same frame, inspection is not passed through, and then replys to veto and carries the error reason sign indicating number simultaneously.If inspection is passed through, then in the data field, note this and switch for information about.
Certainly; The present invention also can have other various embodiments; Under the situation that does not deviate from spirit of the present invention and essence thereof; Those of ordinary skill in the art can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection range of the appended claim of the present invention.
One of ordinary skill in the art will appreciate that all or part of step in the said method can instruct related hardware to accomplish through program, said program can be stored in the computer-readable recording medium, like read-only memory, disk or CD etc.Alternatively, all or part of step of the foregoing description also can use one or more integrated circuits to realize.Correspondingly, each the module/unit in the foregoing description can adopt the form of hardware to realize, also can adopt the form of software function module to realize.The present invention is not restricted to the combination of the hardware and software of any particular form.

Claims (10)

1. a broadcast control channel information reverse method is characterized in that,
Base station controller judges that the Transmit-Receive Unit on the base station transceiver need carry out after the BCCH data switch, and being switched to the BCCH data on this Transmit-Receive Unit therewith, Transmit-Receive Unit belongs to same sub-district and is on the target Transmit-Receive Unit of normal reiving/transmitting state.
2. the method for claim 1 is characterized in that,
Said base station controller judges that according to one of following condition the Transmit-Receive Unit needs carry out the BCCH data and switch:
Detect the alarm that the High-Level Data Link Control link breaks off on the said Transmit-Receive Unit;
Detect the generation software of said Transmit-Receive Unit or the notice of hardware fault;
Receiving needs said Transmit-Receive Unit is carried out the artificial order that BCCH is switched of forcing to carry out.
3. the method for claim 1 is characterized in that,
Under carrier frequency mixed insertion situation, base station controller selects for use the Transmit-Receive Unit identical with fault Transmit-Receive Unit bearing carrier wave type as the target Transmit-Receive Unit.
4. the method for claim 1 is characterized in that,
The Transmit-Receive Unit that base station controller is selected not dispose baseband hopping is as the target Transmit-Receive Unit.
5. the method for claim 1 is characterized in that,
Base station controller judges that Transmit-Receive Unit need carry out starting and switching timer after the BCCH data switch, under the situation that the fault of this Transmit-Receive Unit is eliminated not yet when this timing of switching timer arrives, and the select target Transmit-Receive Unit.
6. the method for claim 1 is characterized in that,
Base station controller comprises the method that the BCCH data on the fault Transmit-Receive Unit are switched on the said target Transmit-Receive Unit: after base station controller is selected the target Transmit-Receive Unit; Send block message to fault Transmit-Receive Unit and target Transmit-Receive Unit; When having traffic on the target Transmit-Receive Unit; After traffic is transferred to other Transmit-Receive Unit that is in normal reiving/transmitting state, carries out and switch order, accomplish switch the back to the fault Transmit-Receive Unit with the target Transmit-Receive Unit transmission separate block message.
7. a broadcast control channel information exchanging system comprises base station controller and base station transceiver, and base station transceiver comprises Transmit-Receive Unit, it is characterized in that,
Said base station controller; Be used to judge that Transmit-Receive Unit need carry out after the BCCH data switch, being switched to the BCCH data on this Transmit-Receive Unit therewith, Transmit-Receive Unit belongs to same sub-district and is on the target Transmit-Receive Unit of normal reiving/transmitting state.
8. system as claimed in claim 7 is characterized in that,
Said base station controller also is used for judging that according to one of following condition the Transmit-Receive Unit needs carry out the BCCH data and switch:
Detect the alarm that the High-Level Data Link Control link breaks off on the said Transmit-Receive Unit;
Detect the generation software of said Transmit-Receive Unit or the notice of hardware fault;
Receiving needs said Transmit-Receive Unit is carried out the artificial order that BCCH is switched of forcing to carry out.
9. system as claimed in claim 7 is characterized in that,
Said base station controller also is used under carrier frequency mixed insertion situation, selects for use the Transmit-Receive Unit identical with fault Transmit-Receive Unit bearing carrier wave type as the target Transmit-Receive Unit.
10. system as claimed in claim 7 is characterized in that,
Said base station controller, the Transmit-Receive Unit that also is used to select not dispose baseband hopping is as the target Transmit-Receive Unit.
CN2010105412847A 2010-11-12 2010-11-12 Information switching method and system for broadcast control channel (BCCH) Pending CN102469482A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2010105412847A CN102469482A (en) 2010-11-12 2010-11-12 Information switching method and system for broadcast control channel (BCCH)
PCT/CN2011/076132 WO2012062118A1 (en) 2010-11-12 2011-06-22 Method and system for switching broadcast control channel information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105412847A CN102469482A (en) 2010-11-12 2010-11-12 Information switching method and system for broadcast control channel (BCCH)

Publications (1)

Publication Number Publication Date
CN102469482A true CN102469482A (en) 2012-05-23

Family

ID=46050370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105412847A Pending CN102469482A (en) 2010-11-12 2010-11-12 Information switching method and system for broadcast control channel (BCCH)

Country Status (2)

Country Link
CN (1) CN102469482A (en)
WO (1) WO2012062118A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107277926A (en) * 2017-06-22 2017-10-20 哈尔滨海能达科技有限公司 A kind of digital trunking system channel moving method and device
WO2018232702A1 (en) * 2017-06-22 2018-12-27 哈尔滨海能达科技有限公司 Digital trunking system channel migration method and apparatus

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023509373A (en) 2019-12-20 2023-03-08 ノヴァロック バイオセラピューティクス, リミテッド ANTI-INTERLEUKIN-23 P19 ANTIBODY AND METHODS OF USE THEREOF
US20230331867A1 (en) 2020-09-04 2023-10-19 Novarock Biotherapeutics, Ltd. Nectin-4 antibodies and uses thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5487185A (en) * 1992-02-24 1996-01-23 Nokia Telecommunications Oy Method for extending mean time between failures of transmitters used in a cellular system, by intermittently shifting among them which is transmitting a control channel versus which is transmitting a traffic carrier
CN1571551A (en) * 2004-05-13 2005-01-26 中兴通讯股份有限公司 A base station equipment structure and backup method
WO2007110338A2 (en) * 2006-03-29 2007-10-04 Telefonaktiebolaget Lm Ericsson (Publ) Radio coverage enhancement
CN101330711A (en) * 2007-06-20 2008-12-24 中兴通讯股份有限公司 Method and system for managing baseband resource pool of global mobile communication system
CN101662790A (en) * 2009-09-17 2010-03-03 中兴通讯股份有限公司 Automatic processing method of carrier frequency fault and system thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100426693C (en) * 2005-11-03 2008-10-15 华为技术有限公司 Method and system for carrying out backup on base station transceiver single plate channel
CN101646183B (en) * 2009-08-26 2012-09-05 华为技术有限公司 Carrier frequency backup method, backup device and backup system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5487185A (en) * 1992-02-24 1996-01-23 Nokia Telecommunications Oy Method for extending mean time between failures of transmitters used in a cellular system, by intermittently shifting among them which is transmitting a control channel versus which is transmitting a traffic carrier
CN1571551A (en) * 2004-05-13 2005-01-26 中兴通讯股份有限公司 A base station equipment structure and backup method
WO2007110338A2 (en) * 2006-03-29 2007-10-04 Telefonaktiebolaget Lm Ericsson (Publ) Radio coverage enhancement
CN101330711A (en) * 2007-06-20 2008-12-24 中兴通讯股份有限公司 Method and system for managing baseband resource pool of global mobile communication system
CN101662790A (en) * 2009-09-17 2010-03-03 中兴通讯股份有限公司 Automatic processing method of carrier frequency fault and system thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄琼华 等: "1×1跳频与1×3跳频分析", 《西安邮电学院学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107277926A (en) * 2017-06-22 2017-10-20 哈尔滨海能达科技有限公司 A kind of digital trunking system channel moving method and device
WO2018232702A1 (en) * 2017-06-22 2018-12-27 哈尔滨海能达科技有限公司 Digital trunking system channel migration method and apparatus
CN107277926B (en) * 2017-06-22 2020-07-31 哈尔滨海能达科技有限公司 Channel migration method and device for digital cluster system

Also Published As

Publication number Publication date
WO2012062118A1 (en) 2012-05-18

Similar Documents

Publication Publication Date Title
CN102448187B (en) The method of automatic access Wi-Fi network and terminal
CN100499921C (en) Method for shortening timedelay of user's terminal from connecting mode returning to idle mode
CN102421130B (en) Multi-card multimode terminal as well as Inter-RAT cell reselection method and device
CN100466840C (en) Automatic test system and method
CN102939777A (en) Ue-based mdt measuring and reporting after radio link failure in a cellular radio access network
CN102740418A (en) Method for implementing voice service, and terminal
CN102131207A (en) Measurement report method, device and system
EP3158797B1 (en) Detection of neighbor cell relation
CN103702378A (en) Voice service processing method and device of LTE ( long term evolution) cell
CN102883384A (en) Method for changing access cells, user equipment and base station
CN100571465C (en) Location area updating method during double card double standby mobile phone moves
CN102017772B (en) Method, device and system for redirecting
CN103781093A (en) Wireless network optimization method and terminal based on virtual switching
CN103974231A (en) Position updating method and mobile terminal
CN102917336B (en) The method for subscribing of radio link failure report and equipment
CN102685783A (en) Method and device for searching network coverage dead zone in mobile communication network
CN101541009A (en) Method, device and system for optimizing neighbor cell list
CN102469482A (en) Information switching method and system for broadcast control channel (BCCH)
CN103037412A (en) Sending method of minimization of drive test (MDT) related information and radio access network (RAN)
CN102932772A (en) Terminal and method for checking logged minimization of drive test (MDT) configuration
CN103636247A (en) Determination method, device and system for pilot frequency neibouring cells, and measurement method and device for pilot frequency neibouring cells
CN103270793A (en) User terminal and communication method
CN113891371A (en) Frequency point measuring method and related product
CN102238663A (en) Method, system and device for making base station entering working state
CN103260171A (en) Method and terminal of area measurement and reselection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120523