CN102457035A - 高压输电线路改造方法 - Google Patents

高压输电线路改造方法 Download PDF

Info

Publication number
CN102457035A
CN102457035A CN2010105223648A CN201010522364A CN102457035A CN 102457035 A CN102457035 A CN 102457035A CN 2010105223648 A CN2010105223648 A CN 2010105223648A CN 201010522364 A CN201010522364 A CN 201010522364A CN 102457035 A CN102457035 A CN 102457035A
Authority
CN
China
Prior art keywords
arm
node
cross
transmission line
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105223648A
Other languages
English (en)
Inventor
盛从兵
郭保康
邵震
王喜忠
朱国营
吴述伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puyang Power Supply Co of Henan Electric Power Co Ltd
Original Assignee
Puyang Power Supply Co of Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puyang Power Supply Co of Henan Electric Power Co Ltd filed Critical Puyang Power Supply Co of Henan Electric Power Co Ltd
Priority to CN2010105223648A priority Critical patent/CN102457035A/zh
Publication of CN102457035A publication Critical patent/CN102457035A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

高压输电线路改造方法,输电线路导线A、B、C相和避雷线左、右相通过第一跨越错层塔提升输电线路的高度,跨越一定距离后,通过第二跨越错层塔降回到原来的高度。由于采用的上述技术方案,能够满足对高速路和220kv线的对地安全距离;线路结构简单,路径较短,便于施工作业和日常维护,整体工程造价较低;线路改造长度约0.75公里,占地面积小,对路边农作物或建筑损坏较低。

Description

高压输电线路改造方法
技术领域
本发明涉及一种线路改造方法,具体涉及一种高压输电线路改造方法。
背景技术
在高速公路施工过程中,经常会遇到高速公路需要穿过高压线路下面,造成原有线路对地安全距离不足,为确保高速公路建设必须对线路改造。目前主要对原有线路改造主要采用架设高跨塔或地下电缆的方法。这两种方法虽然能够满足对高速路和220kv线路的对地安全距离;但架设高跨塔存在以下缺点:(1)需要增加多基铁塔,工程造价较高;(2)线路改造长度较长,占地赔偿费用较高;(3)当公诉公路施工附近有交叉高压线时,需要对两条线路进行改造,施工造价高,另外改造后不美观。地下电缆方法存在的不足是:(1)高速公路下面挖掘电缆隧道,作业技术不足,施工难度大;(2)高压电缆价格、架设人工成本较高,整体工程造价高;(3)线路需增加耐张塔,增加了施工工作量,提高了工程造价。
发明内容
本发明的目的在于解决现有技术中存在的上述问题,提供一种高压输电线路改造方法。
为实现上述目的,本发明采用的技术方案如下:
本发明的高压输电线路改造方法,输电线路导线A、B、C相和避雷线左、右相通过第一跨越错层塔提升输电线路的高度,跨越一定距离后,通过第二跨越错层塔降回到原来的高度,所述的高压输电线路跨越错层塔,包括塔身和塔头,在塔身上设有下横担和上横担,导线A相连接至下横担的结点A1,由上横担的结点A2连接输出回路;导线B相连接至下横担的结点B1,由上横担的结点B2连接输出回路;导线C相连接至下横担的结点C1,由上横担的结点C2连接输出回路;避雷线左相连接至上横担的结点E1,由塔头的结点E2连接输出回路,避雷线右相连接至上横担的结点F1,由塔头的结点F2连接输出回路。
在下横担的结点A1和上横担的结点A2之间设有悬垂串。
在下横担的结点B1和上横担的结点B2之间设有悬垂串。
在下横担的结点C1和上横担的结点C2之间设有悬垂串。
本发明的高压输电线路改造方法需要使用一对跨越错层塔,即输电线路经过第一跨越错层塔提高线路的高度,线路通过高速公路后,通过第二跨越错层塔将输电线路降到原来高度。第二跨越错层塔的结构和工作原理和第一跨越错层塔的结构和原理基本相似,不同的是输电线路先连接塔头和上横担,经过越错层塔降低到原来的高度。
由于采用的上述技术方案,能够满足对高速路和220kv线的对地安全距离;线路结构简单,路径较短,便于施工作业和日常维护,整体工程造价较低;线路改造长度约0.75公里,占地面积小,对路边农作物或建筑损坏较低。
附图说明
图1是本发明中所用的跨越错层塔的结构示意图;
图2是图1的左视图。
具体实施方式
下面以河南省濮阳市濮阳市至范县高速公路施工为例对本发明作详细说明。
因濮阳至范县高速公路与110千伏Ⅰ振清线交叉于#26-#28杆之间,造成原有线路对地安全距离不足,为确保高速公路建设必须对线路改造。该工程改造地段高速公路宽度53.5米,路面高度4.44米,交叉角150度,高速公路南边路基距离110千伏Ⅰ振清线26#杆150米,高速公路北边路基距离110千伏Ⅰ振清线28#杆180米。改造段长约0.75千米。
在高速公路施工前,将110千伏Ⅰ振清线第26号杆的第28号杆的输电线路铁塔更换为跨越错层塔,包括塔身7和塔头1,在塔身7上设有下横担6和上横担2。110千伏Ⅰ振清线输电线路经过第26号杆即第一越错层塔时,导线A相连接至下横担6的结点A1,由上横担2的结点A2连接输出回路;导线B相连接至下横担6的结点B1,由上横担2的结点B2连接输出回路;导线C相连接至下横担6的结点C1,由上横担2的结点C2连接输出回路;避雷线左相连接至上横担2的结点E1,由塔头1的结点E2连接输出回路,避雷线右相连接至上横担2的结点F1,由塔头1的结点F2连接输出回路。
高压线路经提升高度后跨越一定距离后通过第28号杆即第二跨越错层塔降低到原来的高度。

Claims (4)

1.一种高压输电线路改造方法,其特征在于:输电线路导线A、B、C相和避雷线左、右相通过第一跨越错层塔提升输电线路的高度,跨越一定距离后,通过第二跨越错层塔降回到原来的高度,所述的越错层塔包括塔身和塔头,在塔身上设有下横担和上横担,导线A相连接至下横担的结点A1,由上横担的结点A2连接输出回路;导线B相连接至下横担的结点B1,由上横担的结点B2连接输出回路;导线C相连接至下横担的结点C1,由上横担的结点C2连接输出回路;避雷线左相连接至上横担的结点E1,由塔头的结点E2连接输出回路,避雷线右相连接至上横担的结点F1,由塔头的结点F2连接输出回路。
2.根据权利要求1所述的高压输电线路改造方法,其特征在于:在下横担的结点A1和上横担的结点A2之间设有悬垂串。
3.根据权利要求1或2所述的高压输电线路改造方法,其特征在于:在下横担的结点B1和上横担的结点B2之间设有悬垂串。
4.根据权利要求3所述的高压输电线路改造方法,其特征在于:在下横担的结点C1和上横担的结点C2之间设有悬垂串。
CN2010105223648A 2010-10-28 2010-10-28 高压输电线路改造方法 Pending CN102457035A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105223648A CN102457035A (zh) 2010-10-28 2010-10-28 高压输电线路改造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105223648A CN102457035A (zh) 2010-10-28 2010-10-28 高压输电线路改造方法

Publications (1)

Publication Number Publication Date
CN102457035A true CN102457035A (zh) 2012-05-16

Family

ID=46039862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105223648A Pending CN102457035A (zh) 2010-10-28 2010-10-28 高压输电线路改造方法

Country Status (1)

Country Link
CN (1) CN102457035A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084352A (ja) * 1994-06-21 1996-01-09 Kema:Nv ケーブルマスト
JPH08214439A (ja) * 1995-02-06 1996-08-20 Suzuka Seisakusho:Kk 高圧線鉄塔用回線標識
CN201193410Y (zh) * 2008-03-14 2009-02-11 江苏省电力公司无锡供电公司 紧凑型窄基塔
CN201297055Y (zh) * 2008-11-07 2009-08-26 浙江省电力设计院 同塔三回输电线路干字型耐张转角塔
CN201486201U (zh) * 2009-06-26 2010-05-26 中国电力工程顾问集团公司 一种特高压耐张塔

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084352A (ja) * 1994-06-21 1996-01-09 Kema:Nv ケーブルマスト
JPH08214439A (ja) * 1995-02-06 1996-08-20 Suzuka Seisakusho:Kk 高圧線鉄塔用回線標識
CN201193410Y (zh) * 2008-03-14 2009-02-11 江苏省电力公司无锡供电公司 紧凑型窄基塔
CN201297055Y (zh) * 2008-11-07 2009-08-26 浙江省电力设计院 同塔三回输电线路干字型耐张转角塔
CN201486201U (zh) * 2009-06-26 2010-05-26 中国电力工程顾问集团公司 一种特高压耐张塔

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《河南电力报》 20090904 王存华 "吉祥三保"破危局 "保发展 精益生产抠电量" 1-4 , *
王存华: ""吉祥三保"破危局", 《河南电力报》 *

Similar Documents

Publication Publication Date Title
CN203412348U (zh) 一种y形横担布置的双回路单侧回路开断输电钢管杆
CN103362343B (zh) 一种同塔六回路杆塔
CN103603536B (zh) 多回路十字交跨钢管杆
CN202586236U (zh) 可防止输电线路风偏放电的输电线路铁塔
CN104901255A (zh) 一种高压架空线路交叉钻越的方法及安全距离间隔装置
CN103001165B (zh) 同塔双回路单线换位塔
CN104196301B (zh) 一种交叉换位塔
CN203352105U (zh) 一种导线排列方式转换杆
CN204497701U (zh) 一种用于各种电压等级中送电线路的单回路穿越式钻越杆
CN210622429U (zh) 一种110千伏钻跨两用耐张塔
CN204886018U (zh) 建筑电气工程管内穿带丝装置
CN102457035A (zh) 高压输电线路改造方法
CN201635469U (zh) 500kV紧凑型输电线路直线小转角塔
CN201406865Y (zh) 66kv架空输电线路双回水平穿越铁塔
CN203412350U (zh) 一种双回路单侧回路电缆方式开断的输电钢管杆
CN201826586U (zh) 高压输电线路跨越错层塔
CN206071191U (zh) 110kV同塔双回路钻越塔
CN205724627U (zh) 一种适用于变电站330kV GIS的立体紧凑型出线结构
CN205445086U (zh) 一种适用于交叉线路改t新型钢管杆
CN203412349U (zh) 一种双回路单侧开断输电线路杆塔
CN103022951B (zh) 同塔双回路内绕跳换位塔
CN203412351U (zh) F形窄基三角钢管塔
CN208473420U (zh) 一种电缆终端与跨越桥架一体式塔
CN206267615U (zh) 一种110kV架空输电线路双回门型钢管杆塔
CN201943415U (zh) 一种方伞形横担四管塔

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120516