CN102444117A - Construction method of reinforced concrete protection pile in loess areas - Google Patents

Construction method of reinforced concrete protection pile in loess areas Download PDF

Info

Publication number
CN102444117A
CN102444117A CN201110274975XA CN201110274975A CN102444117A CN 102444117 A CN102444117 A CN 102444117A CN 201110274975X A CN201110274975X A CN 201110274975XA CN 201110274975 A CN201110274975 A CN 201110274975A CN 102444117 A CN102444117 A CN 102444117A
Authority
CN
China
Prior art keywords
concrete
fender pile
construction
loess
job practices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110274975XA
Other languages
Chinese (zh)
Inventor
吴东
晏军
李小和
赵新益
丁建荣
陈德平
邬强
刘庆辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201110274975XA priority Critical patent/CN102444117A/en
Publication of CN102444117A publication Critical patent/CN102444117A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method of a reinforced concrete protection pile in loess areas, comprising the following steps of: (1) opening holes below the ground by means of a Luoyang shovel having a semicircular end part and a diameter of 150-170 mm; (2) when the external threads of the end part of the Luoyang shovel are in contact with the ground, connecting an extension rod with one end provided with a threaded hole and the other end provided with screw threads to the end part of the Luoyang shovel in a threaded connection manner, and continuing digging; (3) when the external threaded of the end part of the extension rod are in contact with the earth layer, connecting other extension rod and continuing digging until the hole is opened to the depth of the protection pile; (4) inserting a reinforcing steel bar having a diameter of 15-17 mm in the hole, and pouring C15 plain concrete into the hole and compacting the concrete; and (5) cutting off the reinforced concrete to expose the head, thereby completing the construction of the concrete protective pile. The construction method is applied to the range of electrified existing lines in the loess areas; the construction method effectively overcomes the disadvantageous effects of a large-sized construction machine on an existing line contact network and avoids the influence on the running of the existing lines; and the construction method is easy for construction and excellent in effect.

Description

Loess area steel concrete fender pile job practices
Technical field
The present invention relates to steel concrete fender pile method, be specifically related to job practices at loess area steel concrete fender pile.
Background technology
The construction of railway existing line roadbed scope must be provided with security protection, and protective equipment must not construct to existing facility formation such as contact net line, facilities network basis security threat.Because the control of high pressure contact netting twine limit for height, big machinery can't be constructed, and therefore, must choose other construction tool and construct at the fender pile of electrochemical existing line.
Loess is regional because its special soil property in the work progress of fender pile, needs investment bigger, and in work progress, inevitable existence is unfavorable to the existing line contact net, and work progress influences the normal operation of existing line.
Summary of the invention
The objective of the invention is to overcome the defective of prior art; Provide a kind of and can overcome large-scale construction equipment unfavorable to the existing line contact net; Can effectively avoid in the work progress influencing influence, be easy to construction, respond well loess area steel concrete fender pile job practices the existing line operation.
For realizing above-mentioned purpose, loess provided by the invention area steel concrete fender pile job practices may further comprise the steps:
1., use the end be semicircular luoyang spade toward the perforate of construction below ground, said luoyang spade handle end has external screw thread;
2., when the external screw thread kiss the earth of luoyang spade end, be that screw, the other end are that the extension bar of screw thread is connected the end of luoyang spade through the mode that is threaded with an end, continue to excavate;
3., when the end of extension bar external screw thread contact stratum, connect another root extension bar, continue to excavate, until perforate to the fender pile degree of depth;
4., in the hole, insert reinforcing bar, and concrete perfusion, the closely knit concrete that pours into;
5., blocking steel concrete appears and accomplishes the construction of concrete protection stake.
Preferably, the end diameter of said luoyang spade is 150mm-170mm.
Further, inserting diameter in the said hole is the reinforcing bar of 15mm-17mm.
Further, the concrete that is poured into is the C15 plain concrete.
Again further, the pile spacing of said fender pile is 0.3m.
Further, in work progress, the regional basic location of loess that facilities network is arranged is encrypted.
The present invention has the following advantages: through the test to the inventive method; Contrast existing boring concrete protection stake (stake footpath 0.5m; Pile spacing 0.75m), the construction technology of rail pile, steel sheet pile, luoyang spade pore-forming of the present invention is simple and easy, the concrete protection stake of holing of steel concrete fender pile is reduced investment outlay more than 75%; Reduce investment outlay more than 60% than rail pile, reduce investment outlay more than 70% than steel sheet pile; Utilization the inventive method has overcome large-scale construction equipment unfavorable to the existing line contact net, has effectively avoided the influence to the existing line operation in the work progress, is easy to construction, and economic effect is good with society.
Description of drawings
Fig. 1 is steel concrete fender pile construction process figure of the present invention;
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is made further detailed description:
Loess area steel concrete fender pile job practices may further comprise the steps, and consults construction process shown in Figure 1:
1., use the end for the luoyang spade semicircle, that diameter is 150mm-170mm toward the perforate of construction below ground, said luoyang spade handle end has external screw thread;
2., when the external screw thread kiss the earth of luoyang spade end, be that screw, the other end are that the extension bar of screw thread is connected the end of luoyang spade through the mode that is threaded with an end, continue to excavate;
3., when the end of extension bar external screw thread contact stratum, connect another root extension bar, continue to excavate, until perforate to the fender pile degree of depth;
4., in the hole, to insert diameter be the reinforcing bar of 15mm-17mm, and perfusion C15 plain concrete, after the perfusion plain concrete is accomplished, the closely knit concrete that pours into;
5., blocking steel concrete appears and accomplishes the construction of concrete protection stake.
In the specific embodiment, selecting the end diameter of luoyang spade for use is 16mm, and inserting diameter in the hole is the reinforcing bar of 16mm, and the pile spacing of fender pile is 0.3m.In work progress, the regional basic location of loess that facilities network is arranged is encrypted.Reach design strength in the concrete protection stake, the soil body before the excavation stake.
Range of application of the present invention: loess area, electrochemical existing line;
Main design parameters: manpower luoyang spade (diameter 160mm) pore-forming is adopted in design, interior slotting ф 16mm reinforcing bar, and perfusion C15 plain concrete in the hole, pile spacing 0.3m encrypts location, facilities network basis is arranged.
The present invention adopts manpower luoyang spade pore-forming, inserts reinforcing bar, and the concrete perfusion fender pile becomes electrochemical existing line construction pattern and can be widely used in the interim protection design of Existing Railway Line construction with the design controlling parameter.Because existing line roadbed scope construction in road must be provided with security protection, and protective equipment must not construct to existing facility formation such as contact net line, facilities network basis security threat.Because the control of high pressure contact netting twine limit for height, big machinery can't be constructed, and therefore, adopts manpower luoyang spade pore-forming effectively to avoid above-mentioned problem.
Through this achievement in research, the design of contrast boring concrete protection stake (stake footpath 0.5m, pile spacing 0.75m), rail pile, steel sheet pile; The concrete protection stake of holing of the simple and easy steel concrete fender pile of manpower luoyang spade pore-forming is reduced investment outlay more than 75%; Reduce investment outlay more than 60% than rail pile; Reduce investment outlay more than 70% than steel sheet pile; Use this achievement to overcome large-scale construction equipment unfavorable to the existing line contact net, construction avoids influencing the existing line operation, is easy to construction, and is respond well.
The present invention is applied to the scope of loess area, electrochemical existing line, has effectively overcome large-scale construction equipment unfavorable to the existing line contact net, has avoided the influence to the existing line operation, is easy to construction, and is respond well.
The content that this manual is not done to describe in detail belongs to this area professional and technical personnel's known prior art.

Claims (6)

1. loess area steel concrete fender pile job practices is characterized in that may further comprise the steps:
1., use the end be semicircular luoyang spade toward the perforate of construction below ground, said luoyang spade handle end has external screw thread;
2., when the external screw thread kiss the earth of luoyang spade end, be that screw, the other end are that the extension bar of screw thread is connected the end of luoyang spade through the mode that is threaded with an end, continue to excavate;
3., when the end of extension bar external screw thread contact stratum, connect another root extension bar, continue to excavate, until perforate to the fender pile degree of depth;
4., in the hole, insert reinforcing bar, and concrete perfusion, the closely knit concrete that pours into;
5., blocking steel concrete appears and accomplishes the construction of concrete protection stake.
2. loess according to claim 1 area steel concrete fender pile job practices, it is characterized in that: the end diameter of said luoyang spade is 150mm-170mm.
3. loess according to claim 2 area steel concrete fender pile job practices, it is characterized in that: inserting diameter in the said hole is the reinforcing bar of 15mm-17mm.
4. loess according to claim 3 area steel concrete fender pile job practices, it is characterized in that: the concrete of perfusion is the C15 plain concrete.
5. loess according to claim 4 area steel concrete fender pile job practices, it is characterized in that: the pile spacing of said fender pile is 0.3m.
6. loess according to claim 5 area steel concrete fender pile job practices is characterized in that: in work progress, the regional basic location of loess that facilities network is arranged is encrypted.
CN201110274975XA 2011-09-16 2011-09-16 Construction method of reinforced concrete protection pile in loess areas Pending CN102444117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110274975XA CN102444117A (en) 2011-09-16 2011-09-16 Construction method of reinforced concrete protection pile in loess areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110274975XA CN102444117A (en) 2011-09-16 2011-09-16 Construction method of reinforced concrete protection pile in loess areas

Publications (1)

Publication Number Publication Date
CN102444117A true CN102444117A (en) 2012-05-09

Family

ID=46007027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110274975XA Pending CN102444117A (en) 2011-09-16 2011-09-16 Construction method of reinforced concrete protection pile in loess areas

Country Status (1)

Country Link
CN (1) CN102444117A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1096839A (en) * 1993-06-21 1994-12-28 中国有色金属工业长沙勘察院 Method for boring and making piles with motor luoyang spade
EP0796948A1 (en) * 1994-12-05 1997-09-24 Shogen Okawa Pile head treating tool for cast-in-place pile, pile head treating method, and cast-in-place piling method
CN2918541Y (en) * 2006-04-20 2007-07-04 胡永奎 Piling apparatus
CN101718098A (en) * 2009-11-09 2010-06-02 中国电力科学研究院 Micro-pile combined dug composite foundation and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1096839A (en) * 1993-06-21 1994-12-28 中国有色金属工业长沙勘察院 Method for boring and making piles with motor luoyang spade
EP0796948A1 (en) * 1994-12-05 1997-09-24 Shogen Okawa Pile head treating tool for cast-in-place pile, pile head treating method, and cast-in-place piling method
CN2918541Y (en) * 2006-04-20 2007-07-04 胡永奎 Piling apparatus
CN101718098A (en) * 2009-11-09 2010-06-02 中国电力科学研究院 Micro-pile combined dug composite foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN106958208A (en) A kind of novel reinforced method of double curvature arched bridge
CN205742175U (en) A kind of steel construction protection wall of bored pile
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN107574834A (en) A kind of old basic transformation reinforcement means of power machine
CN209444334U (en) A kind of glass fiber-reinforced polymer mesoporous stake for the maintenance cleaning of cutter head of shield machine front
CN204898672U (en) Discard device of pulling out of pile foundation
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN104563147A (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN106049563B (en) Earthquake is damaged pier footing reinforcing system
CN207333947U (en) A kind of oil-gas pipeline protective device
JP6370645B2 (en) Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements
CN210918893U (en) Drill bit for rapidly repairing wall of pile hole
CN102444117A (en) Construction method of reinforced concrete protection pile in loess areas
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN204098024U (en) A kind of secondary grouting concrete pipe pile construction device
CN208734111U (en) A kind of rotary digging stake sealing hole grid
CN202706971U (en) Bit fisher
CN202099795U (en) Crushed stone pile for reinforcing extremely soft soil foundation
CN105525765B (en) Laminated concrete member and construction structure and construction method thereof
CN210791564U (en) Tool for positioning tunnel segment opening
CN203924043U (en) A kind of bamboo concrete stake
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN206887984U (en) A kind of photovoltaic generation support steel bar concrete reinforcement steel pipe pile foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120509