CN102444064A - Member for coordinating settlement of foundation treated by stirring pile and lightweight foam soil - Google Patents

Member for coordinating settlement of foundation treated by stirring pile and lightweight foam soil Download PDF

Info

Publication number
CN102444064A
CN102444064A CN2011102718342A CN201110271834A CN102444064A CN 102444064 A CN102444064 A CN 102444064A CN 2011102718342 A CN2011102718342 A CN 2011102718342A CN 201110271834 A CN201110271834 A CN 201110271834A CN 102444064 A CN102444064 A CN 102444064A
Authority
CN
China
Prior art keywords
tail pipe
foam soil
lightweight foam
settlement
stirring pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102718342A
Other languages
Chinese (zh)
Inventor
赵振杰
陈磊
吕晓杰
***
李自林
孙承军
李绍刚
安海平
王曦
武海江
蔡月伦
张铁柱
高宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Tianjin Urban Construction College
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Tianjin Urban Construction College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd, Tianjin Urban Construction College filed Critical China Railway Sixth Group Co Ltd
Priority to CN2011102718342A priority Critical patent/CN102444064A/en
Publication of CN102444064A publication Critical patent/CN102444064A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a member for coordinating settlement of a foundation treated by a stirring pile and lightweight foam soil. The member comprises a conical head, a main rod, a tail pipe and a plurality of protrusions; the main rod is cylindrical, and the conical head is connected to the outer part of one end of the main rod; the tail pipe is tubular and sleeved on the outer circumference surface of the other end of the main rod; the plurality of protrusions are arranged on the outer circumference surface of the tail pipe in a radial shape; and the conical head, the main rod, the tail pipe and the plurality of protrusions are steel structures. One end of the member for coordinating settlement of the foundation treated by the stirring pile and the lightweight foam soil passes through the stirring pile, the other end of the member is embedded into a lightweight foam soil layer, so that a rigid connection is formed between the stirring pile and the lightweight foam soil layer; and the member can be well combined together with the lightweight foam soil layer due to the plurality of protrusions thereon, so the stirring pile and the lightweight foam soil layer can be connected into a whole to bear a force together, the post construction settlement consistency of the stirring pile and the lightweight foam soil layer can be ensured, and the settlement quantity of the foundation meets the standard requirement.

Description

Be used to coordinate member through agitation pile and the sedimentation of light foam soil processing groundwork
Technical field
The invention belongs to the railway construction technical field, particularly relate to a kind of member that is used to coordinate through agitation pile and the sedimentation of light foam soil processing groundwork.
Background technology
Because the soft foundation self characteristics determined that its bearing capacity is lower, thus must handle soft foundation when on soft foundation, building railway, so that it can reach the supporting capacity of design code.The soft foundation of railway mainly adopts treatment method of pile foundation at present, and the kind of its king-pile can be divided into agitation pile, cement mortar stake, churning castinplace pile etc., and the most frequently used is agitation pile.Therefore because of agitation pile soft soil foundation economic serviceability is good, has obtained more deep research at home and abroad and applied widely.
But; When underground pipeline intersects with railway; If the soft foundation that adopts agitation pile to handle this place just might damage underground pipeline, the normal in the case method that adopts is that the foundation soil of conduit upper is all excavated to form a foundation ditch, then cement paste and the composite according to a certain percentage light foam soil of blowing agent is cast in the foundation ditch; Dry back forms the light foam soil layer with certain compressive strength; Come underground pipeline is protected with this, and utilize the ground after its reliable compressive strength and adjacent pile foundation are handled stressed jointly, thereby form unified ground.
Though utilize the soft foundation after light foam soil is handled that reliable supporting capacity can be provided, and can protect underground pipeline not to be damaged well, not enough below also existing simultaneously:
Because agitation pile is different with the stress system of light foam soil layer; Agitation pile is through the frictional force that the soil body produced that is in contact with it bearing capacity to be provided; The light foam soil layer then is the bearing capacity pressure-bearing that relies on self; So the settlement after construction that is producing during the ground after both handle is being runed is inconsistent, and railway is very strict to the requirement of settlement of foundation, so can't satisfy instructions for use; Therefore, how to coordinate focus and the difficult point problem that foundation settlement after above two kinds of technical finesses has become this area.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide a kind of simple in structurely, be convenient to construction, and the member through the sedimentation of agitation pile and light foam soil processing groundwork is coordinated in effective being used to.
In order to achieve the above object, provided by the inventionly be used to coordinate comprise conehead, mobile jib, tail pipe and a plurality of convexity through the member that agitation pile and light foam soil are handled the groundwork sedimentation; Wherein mobile jib is the cylinder bodily form, and conehead is connected the end outside of mobile jib; Tail pipe is a tubulose, is sleeved on the other end outer circumference surface of mobile jib; A plurality of convexities are on the radial outer circumference surface that is arranged on tail pipe, and conehead, mobile jib, tail pipe and a plurality of convexity are steel construction piece.
Described a plurality of convexity is the cylinder bodily form, and it evenly distributes on the outer circumference surface of tail pipe, and integrally formed with tail pipe.
Described conehead and mobile jib are integrally formed.
The member that is used to coordinate through agitation pile and the sedimentation of light foam soil processing groundwork provided by the invention is to utilize an end to run through agitation pile; The other end the method in the light foam soil layer of being embedded in makes to form between agitation pile and light foam soil layer and is rigidly connected; A plurality of convexities by on it can make member and light foam soil layer combine well; So can connect into agitation pile and light foam soil layer as a whole; Stressed jointly, so just can guarantee that both settlement after construction reach consistent, thereby can make settlement of foundation reach standard-required.
Description of drawings
Fig. 1 is used to coordinate through agitation pile and the native element structure front view of handling the groundwork sedimentation of light foam for provided by the invention.
Fig. 2 is used to coordinate through agitation pile and the native member right view of handling the groundwork sedimentation of light foam for provided by the invention.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the member that is used to coordinate through agitation pile and the sedimentation of light foam soil processing groundwork provided by the invention is elaborated.
Like Fig. 1-shown in Figure 2, provided by the inventionly be used to coordinate comprise conehead 1, mobile jib 2, tail pipe 3 and a plurality of protruding 4 through the member that agitation pile and light foam soil are handled the groundwork sedimentation; Wherein mobile jib 2 is the cylinder bodily form, and conehead 1 is connected the end outside of mobile jib 2; Tail pipe 3 is a tubulose, is sleeved on the other end outer circumference surface of mobile jib 2; A plurality of protruding 4 are on the radial outer circumference surface that is arranged on tail pipe 3, and conehead 1, mobile jib 2, tail pipe 3 and a plurality of protruding 4 are steel construction piece.
Described a plurality of protruding 4 is the cylinder bodily form, and it evenly distributes on the outer circumference surface of tail pipe 3, and integrally formed with tail pipe 3.
Described conehead 1 is integrally formed with mobile jib 2.
When adopting agitation pile that the soft foundation of desiring to build the railway place is handled; When running into the situation that underground pipeline and railway intersect; At first the foundation soil of underground pipeline top is all excavated and formed a foundation ditch by operating personnel; The outside sets agitation pile according to construction requirement around foundation ditch then; Afterwards before agitation pile final set, be used to coordinate handle conehead 1 horizontal aligument on the member of groundwork sedimentation near an agitation pile of foundation pit side-wall and squeeze into, till conehead 1 runs through this castinplace pile with provided by the invention through agitation pile and light foam soil from foundation pit side-wall; And this moment, tail pipe 3 was still stayed in the foundation ditch with convexity 4, and this member of circle is set around foundation ditch altogether; The placement layer by layer light foam is native in foundation ditch then; Tail pipe 3 will be embedded in the light foam soil with protruding 4 in this process; Finish and form the light foam soil layer until building, at last the light foam soil layer is carried out the Soft Ground process that maintenance can be accomplished this place.

Claims (3)

1. one kind is used to coordinate the member through agitation pile and the sedimentation of light foam soil processing groundwork, and it is characterized in that: described member comprises conehead (1), mobile jib (2), tail pipe (3) and a plurality of convexity (4); Wherein mobile jib (2) is the cylinder bodily form, and conehead (1) is connected the end outside of mobile jib (2); Tail pipe (3) is a tubulose, is sleeved on the other end outer circumference surface of mobile jib (2); A plurality of convexities (4) are on the radial outer circumference surface that is arranged on tail pipe (3), and conehead (1), mobile jib (2), tail pipe (3) and a plurality of convexity (4) are steel construction piece.
2. the member that is used to coordinate handle the groundwork sedimentation according to claim 1 through agitation pile and light foam soil; It is characterized in that: described a plurality of convexities (4) are the cylinder bodily form; It evenly distributes on the outer circumference surface of tail pipe (3), and integrally formed with tail pipe (3).
3. according to claim 1 being used to coordinated the member through agitation pile and the sedimentation of light foam soil processing groundwork, and it is characterized in that: described conehead (1) and mobile jib (2) are integrally formed.
CN2011102718342A 2011-09-14 2011-09-14 Member for coordinating settlement of foundation treated by stirring pile and lightweight foam soil Pending CN102444064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102718342A CN102444064A (en) 2011-09-14 2011-09-14 Member for coordinating settlement of foundation treated by stirring pile and lightweight foam soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102718342A CN102444064A (en) 2011-09-14 2011-09-14 Member for coordinating settlement of foundation treated by stirring pile and lightweight foam soil

Publications (1)

Publication Number Publication Date
CN102444064A true CN102444064A (en) 2012-05-09

Family

ID=46006976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102718342A Pending CN102444064A (en) 2011-09-14 2011-09-14 Member for coordinating settlement of foundation treated by stirring pile and lightweight foam soil

Country Status (1)

Country Link
CN (1) CN102444064A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0468554A (en) * 1990-07-10 1992-03-04 Nec Corp Semiconductor integrated circuit
US5255996A (en) * 1990-12-27 1993-10-26 Kiat Ong S Method of constructing a roadway
JPH09268554A (en) * 1996-03-27 1997-10-14 Nippon Sogo Bosui Kk Construction method of basic pile and device thereof
JP2003049426A (en) * 2001-07-25 2003-02-21 Genkai Ryo Reinforced concrete pile forming device and reinforced concrete pile forming method
CN201158817Y (en) * 2008-06-18 2008-12-03 南京建工集团有限公司 Reinforcing pile
CN201627199U (en) * 2009-11-24 2010-11-10 孔红斌 Pile-forming device for concrete cast-in-site pile with convex edge-shaped immersed tube

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0468554A (en) * 1990-07-10 1992-03-04 Nec Corp Semiconductor integrated circuit
US5255996A (en) * 1990-12-27 1993-10-26 Kiat Ong S Method of constructing a roadway
JPH09268554A (en) * 1996-03-27 1997-10-14 Nippon Sogo Bosui Kk Construction method of basic pile and device thereof
JP2003049426A (en) * 2001-07-25 2003-02-21 Genkai Ryo Reinforced concrete pile forming device and reinforced concrete pile forming method
CN201158817Y (en) * 2008-06-18 2008-12-03 南京建工集团有限公司 Reinforcing pile
CN201627199U (en) * 2009-11-24 2010-11-10 孔红斌 Pile-forming device for concrete cast-in-site pile with convex edge-shaped immersed tube

Similar Documents

Publication Publication Date Title
CN204982864U (en) Insert steel reinforcement cage behind long spiral pore -forming guncreting
CN207005565U (en) A kind of non-excavation rehabilitation caves in the collapsible steel loop of pipeline
CN207727559U (en) A kind of bored concrete pile resistance to plucking tooth bar
CN203284970U (en) Bamboo-plastic composite pipe concrete hollow coupled column
CN203222795U (en) Manual hole digging pile
CN203729298U (en) Recyclable prestressed anchor rod
CN205134343U (en) Steel-pipe pile cofferdam structure
CN204327112U (en) Tunnel hole-exiting advance support system
CN103306431B (en) Concrete reinforced pipe lattice column
CN206220112U (en) Length pulls together to control heavy stiff composite pile system
CN102444064A (en) Member for coordinating settlement of foundation treated by stirring pile and lightweight foam soil
CN208934737U (en) A kind of high intensity tunnel pipe for escaping structure
CN203514337U (en) Large-scale steel-pipe-inserting-type foundation
CN202755362U (en) Prestressed concrete pile
CN205557551U (en) Configuration rebar's offshore wind turbines foundation grouting bushing structure
CN204825924U (en) Square steel tube concrete waist rail
CN208533512U (en) Ground pile and its construction tool
CN210067060U (en) Telescopic observation point embedded part
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN205839990U (en) Staircase built-in fitting
CN103669345A (en) Prestressed concrete pipe pile
CN202865834U (en) Prestressed concrete pipe pile
CN102155015A (en) Barbed implanted steel pipe anchor rod
CN206708547U (en) A kind of parallel type jacking pipe structure
CN206554596U (en) A kind of reinforced concrete pole flange component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120509