CN102434163A - 综合机械化固体物充填采煤的方法 - Google Patents

综合机械化固体物充填采煤的方法 Download PDF

Info

Publication number
CN102434163A
CN102434163A CN2011103927129A CN201110392712A CN102434163A CN 102434163 A CN102434163 A CN 102434163A CN 2011103927129 A CN2011103927129 A CN 2011103927129A CN 201110392712 A CN201110392712 A CN 201110392712A CN 102434163 A CN102434163 A CN 102434163A
Authority
CN
China
Prior art keywords
coal
mining
solids
filling
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103927129A
Other languages
English (en)
Inventor
史向军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI YANGQUAN YUXIAN DONGPING COAL MINING CO Ltd
Original Assignee
SHANXI YANGQUAN YUXIAN DONGPING COAL MINING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI YANGQUAN YUXIAN DONGPING COAL MINING CO Ltd filed Critical SHANXI YANGQUAN YUXIAN DONGPING COAL MINING CO Ltd
Priority to CN2011103927129A priority Critical patent/CN102434163A/zh
Publication of CN102434163A publication Critical patent/CN102434163A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种综合机械化固体物充填采煤的方法,属于采煤技术领域,涉及采煤方法。包括以下步骤:将固体物经地面运输***送入安装有锥形缓冲器的投料井,其中所述的固体物为矸石、粉煤灰、黄土、石灰,固体物经锥形缓冲器减压后下落并堆积,然后将堆积的固体物运输到已采煤区域进行充填。本发明综合机械化固体物料充填采煤方法,可大大减少或消除地面露天矿排渣场面积,改变矿区生态环境质量,并且可有效控制岩层移动及保证地面建筑物安全使用,最大程度的、高效机械化的回收建筑物下压煤。

Description

综合机械化固体物充填采煤的方法
技术领域
本发明属于采煤技术领域,涉及采煤方法,具体涉及一种综合机械化固体物充填采煤的方法。
背景技术
煤炭作为我国主要的支撑能源,随着我国国民经济的快速发展,位于煤炭下游的电力、钢铁、铁路等行业对煤炭的需求逐年加大,导致近年来煤炭开采速度加快,随着矿井开采年限的延长和采深的延伸,一批资源枯竭矿井逐步进入残采阶段,部分矿井已进入衰退期,有的甚至关井转产。煤矿的“衰老”现象已成为资源型企业的共性问题,对于有衰退倾向的矿井也引起了足够的重视,大多数矿区不得不面对用传统技术无法开采的“三下”(建筑物下、铁路下、水体下)压煤的问题。
几十年来,为了解决“三下”压煤问题,各级地方政府和煤矿企业都做了大量的工作,科技人员也进行了多项技术开发和推广普及工作,使“三下”采煤技术的整体水平有了较大的提高,研究了包括迁村开采、条带开采、限厚开采、协调开采、离层带注浆充填开采、膏体充填开采等多种“三下”开采技术,然而这些技术成本过高,且不能达到高效机械化开采,目前开采出来的建筑物下压煤大约3/4是靠搬迁实现的,但搬迁开采导致了大量采矿塌陷区,造成严重的生态与环境破坏,许多矿区密集建筑群下开采也不适合于搬迁。
同时,露天矿在生产中排放大量的矿渣,传统的方式是直接堆放于地表,形成煤矿特有的地表露天矿排渣场。随着矿井开采,排渣场排渣的运输距离及运输环节也在不断增加,浪费大量人力物力的同时,还造成了环境污染等问题。
因此,研发一种解决建筑群下压煤规模性开采、解决固体废弃物排放等问题的开采技术,是矿区亟待解决的重大科学与工程技术难题。
发明内容
本发明的目的是提供一种综合机械化固体物充填采煤的方法。
本发明是通过以下技术方案实现的:
一种综合机械化固体物充填采煤的方法,包括以下步骤:
将固体物经地面运输***送入安装有锥形缓冲器的投料井,其中所述的固体物为矸石、粉煤灰、黄土、石灰,固体物经锥形缓冲器减压后下落并堆积,然后将堆积的固体物运输到已采煤区域进行充填。
本发明综合机械化固体物料充填采煤方法,可大大减少或消除地面露天矿排渣场面积,改变矿区生态环境质量,并且可有效控制岩层移动及保证地面建筑物安全使用,最大程度的、高效机械化的回收建筑物下压煤,该技术的研究具有以下重要意义:
(1)提高矿井煤炭采出率,延长矿井服务年限:研发的建筑物下固体废弃物充填综采技术可实现建筑物下压煤工作面采出率在85%以上,延长了矿井的服务年限,同时,缓减了资源枯竭型矿井带来的人员就业问题,确保了矿区社会的稳定;
(2)实现矿渣等固体废弃物于井下处理,改善矿区周边生态与生存环境:该项技术的成功实施,可解决矿渣等地面排放带来的生态环境破坏问题,改善矿区周边的环境,以及人类的生存与生活环境。
具体实施方式
实施例1
一种综合机械化固体物充填采煤的方法,包括以下步骤:
将固体物矸石和粉煤灰经地面运输***送入安装有锥形缓冲器的投料井,矸石和粉煤灰经锥形缓冲器减压后下落并堆积,然后将堆积的矸石和粉煤灰运输到已采煤区域进行充填。
实施例2
一种综合机械化固体物充填采煤的方法,包括以下步骤:
将固体物矸石、粉煤灰、和经地面运输***送入安装有锥形缓冲器的投料井,固体物经锥形缓冲器减压后下落并堆积,然后将堆积的固体物运输到已采煤区域进行充填。
实施例3
将固体物矸石、石灰、和黄土经地面运输***送入安装有锥形缓冲器的投料井,固体物经锥形缓冲器减压后下落并堆积,然后将堆积的固体物运输到已采煤区域进行充填。

Claims (1)

1.一种综合机械化固体物充填采煤的方法,其特征是包括以下步骤:
将固体物经地面运输***送入安装有锥形缓冲器的投料井,其中所述的固体物为矸石、粉煤灰、黄土、石灰,固体物经锥形缓冲器减压后下落并堆积,然后将堆积的固体物运输到已采煤区域进行充填。
CN2011103927129A 2011-12-01 2011-12-01 综合机械化固体物充填采煤的方法 Pending CN102434163A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103927129A CN102434163A (zh) 2011-12-01 2011-12-01 综合机械化固体物充填采煤的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103927129A CN102434163A (zh) 2011-12-01 2011-12-01 综合机械化固体物充填采煤的方法

Publications (1)

Publication Number Publication Date
CN102434163A true CN102434163A (zh) 2012-05-02

Family

ID=45982484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103927129A Pending CN102434163A (zh) 2011-12-01 2011-12-01 综合机械化固体物充填采煤的方法

Country Status (1)

Country Link
CN (1) CN102434163A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720532A (zh) * 2012-06-20 2012-10-10 鄂托克前旗长城煤矿有限责任公司 矿用喷浆料立式输料管输送方法
CN102865100A (zh) * 2012-09-20 2013-01-09 河北煤炭科学研究院 一种煤矿采空区充填的方法
CN102889097A (zh) * 2012-09-20 2013-01-23 河北煤炭科学研究院 一种煤矿固体充填材料投料***
CN103758568A (zh) * 2014-02-14 2014-04-30 中国矿业大学 露天煤矿端帮充填开采方法
CN103936344A (zh) * 2014-01-24 2014-07-23 天地科技股份有限公司 黄土粉煤灰基的煤矿充填材料及其填充方法
CN103939102A (zh) * 2014-04-14 2014-07-23 中国矿业大学 一种固体充填回收露天矿终帮下压煤的采煤方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1273222A (zh) * 1999-05-06 2000-11-15 北京市高水矿山工程与材料研究所 全砂土固结充填材料、生产及使用方法
US6688702B1 (en) * 2002-12-16 2004-02-10 Grigori A. Abramov Borehole mining method
CN101586460A (zh) * 2009-06-02 2009-11-25 中国矿业大学 一种采煤固体物充填方法
CN201412180Y (zh) * 2009-06-02 2010-02-24 中国矿业大学 一种充填采煤的大垂深固体投料***
CN101725352A (zh) * 2009-12-04 2010-06-09 中国矿业大学 一种固体充填综采回收房式煤柱方法
CN101845965A (zh) * 2010-05-11 2010-09-29 中国矿业大学 一种投料井防堵仓排压方法
CN101915100A (zh) * 2010-08-24 2010-12-15 霍州煤电集团有限责任公司 煤矿井下黄土充填采煤方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1273222A (zh) * 1999-05-06 2000-11-15 北京市高水矿山工程与材料研究所 全砂土固结充填材料、生产及使用方法
US6688702B1 (en) * 2002-12-16 2004-02-10 Grigori A. Abramov Borehole mining method
CN101586460A (zh) * 2009-06-02 2009-11-25 中国矿业大学 一种采煤固体物充填方法
CN201412180Y (zh) * 2009-06-02 2010-02-24 中国矿业大学 一种充填采煤的大垂深固体投料***
CN101725352A (zh) * 2009-12-04 2010-06-09 中国矿业大学 一种固体充填综采回收房式煤柱方法
CN101845965A (zh) * 2010-05-11 2010-09-29 中国矿业大学 一种投料井防堵仓排压方法
CN101915100A (zh) * 2010-08-24 2010-12-15 霍州煤电集团有限责任公司 煤矿井下黄土充填采煤方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720532A (zh) * 2012-06-20 2012-10-10 鄂托克前旗长城煤矿有限责任公司 矿用喷浆料立式输料管输送方法
CN102865100A (zh) * 2012-09-20 2013-01-09 河北煤炭科学研究院 一种煤矿采空区充填的方法
CN102889097A (zh) * 2012-09-20 2013-01-23 河北煤炭科学研究院 一种煤矿固体充填材料投料***
CN102865100B (zh) * 2012-09-20 2015-04-15 河北煤炭科学研究院 一种煤矿采空区充填的方法
CN103936344A (zh) * 2014-01-24 2014-07-23 天地科技股份有限公司 黄土粉煤灰基的煤矿充填材料及其填充方法
CN103758568A (zh) * 2014-02-14 2014-04-30 中国矿业大学 露天煤矿端帮充填开采方法
CN103939102A (zh) * 2014-04-14 2014-07-23 中国矿业大学 一种固体充填回收露天矿终帮下压煤的采煤方法
CN103939102B (zh) * 2014-04-14 2016-09-28 中国矿业大学 一种固体充填回收露天矿终帮下压煤的采煤方法

Similar Documents

Publication Publication Date Title
CN102155261B (zh) 一种利用矿山固体废弃物的膏体联合充填方法
CN102434163A (zh) 综合机械化固体物充填采煤的方法
CN106321103B (zh) 一种固体充填协同人工矿柱回收房式煤柱方法
CN102705002B (zh) 沿空留巷巷旁适量让压不等强组合充填结构及施工方法
CN101586460B (zh) 一种采煤固体物充填方法
CN102086765B (zh) 一种极薄铜矿体高分段多分层采矿方法
CN101792291B (zh) 膨胀充填材料
CN102603241A (zh) 利用煤矸石制做的煤矿采空区充填材料
CN102101790B (zh) 尾矿基流体膨胀充填材料
CN105370279A (zh) 一种高初始强度充填采煤方法
CN105736045A (zh) 一种控制采空区底板突水的袋式充填***及其充填方法
CN102432266A (zh) 一种免烧煤矸石混凝土的制作方法及应用
Xuan et al. Backfill mining practice in China coal mines
CN102775105A (zh) 一种利用建筑废弃物制备矿用膏体充填骨料及制备方法
CN101158285A (zh) 一种铜矿的地下开采方法
CN105971605A (zh) 一种井下矿山无废开采方法
CN202325670U (zh) 综合机械化固体物充填采煤装置
CN112267885A (zh) 一种两步骤分条回采嗣后废石胶结充填的开采方法
CN101338675A (zh) 露天矿边帮下压覆有益矿物露井联合开采方法
CN203783634U (zh) 一种地下矿粉矿回收结构
CN202467923U (zh) 一种利用建筑废弃物制备矿用膏体连续搅拌充填装置
CN111485883B (zh) 基于膏体-多介质协同充填的高地应力环境低成本采矿方法
CN202745931U (zh) 煤矿地面矸石井下回填运输***
CN205002133U (zh) 一种方便清理煤灰的锅炉
Wei et al. A novel clean mining technology involving the underground disposal of waste rock in coal mines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120502