CN102425328A - Special wire fetching hook for assembled electric pole - Google Patents

Special wire fetching hook for assembled electric pole Download PDF

Info

Publication number
CN102425328A
CN102425328A CN2011102848350A CN201110284835A CN102425328A CN 102425328 A CN102425328 A CN 102425328A CN 2011102848350 A CN2011102848350 A CN 2011102848350A CN 201110284835 A CN201110284835 A CN 201110284835A CN 102425328 A CN102425328 A CN 102425328A
Authority
CN
China
Prior art keywords
hook
pole
electric pole
assembled electric
special wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102848350A
Other languages
Chinese (zh)
Inventor
赖小平
匡平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zigong Electric Power Bureau Sichuan Electric Power Corp
Original Assignee
Zigong Electric Power Bureau Sichuan Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zigong Electric Power Bureau Sichuan Electric Power Corp filed Critical Zigong Electric Power Bureau Sichuan Electric Power Corp
Priority to CN2011102848350A priority Critical patent/CN102425328A/en
Publication of CN102425328A publication Critical patent/CN102425328A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention provides a special wire fetching hook for an assembled electric pole, belonging to special wire fetching tools used by wind ropes tied on a pole body in assembled electric pole construction. The special wire fetching hook for the assembled electric pole has the structural characteristics that: an upward-arched upper hook and a downward-arched lower hook are arranged on a vertical pole of a sleeve; and an insulating pole is fixed on the sleeve of the wire fetching hook. The special wire fetching hook is convenient to use, is simple and practical, and is especially suitable for removing three-way wind ropes in the assembled electric pole construction.

Description

The special-purpose line taking hook of group pole erecting
Technical field
The present invention relates to the electric operating construction tool, particularly shaft is the wind employed special-purpose line taking instrument of restricting in the distribution line group pole erecting construction.
Background technology
In the circuit work progress, newly organize pole erecting and need the shaft three parts by the requirement of skill rule to be the wind rope, to guarantee skew not to take place and carry out operation in the upright process of electric pole group by construction requirement.But the upright electric pole of new group is removed tripartite wind and is restricted and just seem extremely unrealistic as use climbers or lifter plate to step on bar by the operating personnel; The one, waste time (go up lower beam), the 2nd, safety factor not high (soil compaction of backfill just maybe be not firm) electric pole might run-off the straight, adjustable stem base again when causing the assembling gold utensil and putting stringing.Therefore, press for and seek a kind of efficient ways, fundamentally solve the problem of removing tripartite wind rope in the vertical rod process.
Summary of the invention
The purpose of this invention is to provide a kind of special-purpose line taking hook of the easy to operate group pole erecting of stringing of putting.
The objective of the invention is to realize like this: a kind of group of special-purpose line taking hook of pole erecting, the line taking hook structure is: the following hook of rising to the bait He arching upward downwards that upwards arches upward is arranged on the montant of sleeve; Insulating bar is fixed on the sleeve of line taking hook.
Above-mentioned insulating bar is bamboo pole or rod or plastic bar.
The present invention has following characteristics and advantage: in the line construction, new group pole erecting finish basic backfilling compaction firmly after, use the special-purpose line taking hook of vertical rod to stand in bar Ji Chu and remove tripartite wind rope (safety, quick).
The invention has the beneficial effects as follows: improve construction safety coefficient and efficient, can effectively improve the safety factor and the efficient (reduce personnel's upper boom frequency, prevent the high-altitude degeneration) of pole operation, focus on solution progress and safe coordinating and unifying relation.
This small tools is easy to use, and is simple to operate, practical flexibly, and good reliability is reusable.
Particularly the upright stage of line construction electric pole group is played good effect to this instrument in safety in production.
Description of drawings
Fig. 1 is the front view of this line taking hook.
The specific embodiment
Fig. 1 illustrates, and the special-purpose line taking hook structure of this group pole erecting is: the following hook 2c who rises to the bait 2b and arch upward downwards that upwards arches upward is arranged on the montant of sleeve 2a; Insulating bar 1 is fixed on the sleeve 2a of line taking hook.Insulating bar 1 is bamboo pole or rod or plastic bar.The section of rising to the bait, descend hook and montant part of line taking hook is circle, can bend (welding together) by round steel (like Φ 16 round steel) again, and the sleeve part can adopt steel pipe or steel sheet to roll, and adopts welding manner that sleeve is welded on above the montant again.

Claims (2)

1. special-purpose line taking hook of group pole erecting is characterized in that the line taking hook structure is: the following hook (2c) of rising to the bait (2b) and arching upward downwards that upwards arches upward is arranged on the montant of sleeve (2a); Insulating bar (1) is fixed on the sleeve (2a) of line taking hook.
2. the according to claim 1 group of special-purpose line taking hook of pole erecting is characterized in that said insulating bar (1) is bamboo pole or rod or plastic bar.
CN2011102848350A 2011-09-23 2011-09-23 Special wire fetching hook for assembled electric pole Pending CN102425328A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102848350A CN102425328A (en) 2011-09-23 2011-09-23 Special wire fetching hook for assembled electric pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102848350A CN102425328A (en) 2011-09-23 2011-09-23 Special wire fetching hook for assembled electric pole

Publications (1)

Publication Number Publication Date
CN102425328A true CN102425328A (en) 2012-04-25

Family

ID=45959353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102848350A Pending CN102425328A (en) 2011-09-23 2011-09-23 Special wire fetching hook for assembled electric pole

Country Status (1)

Country Link
CN (1) CN102425328A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0932351A (en) * 1995-07-14 1997-02-04 Toei Kensetsu Kogyo:Kk Pole for erecting column
CN201137302Y (en) * 2007-12-21 2008-10-22 中天建设集团有限公司 Architecture construction object picker
CN101358489A (en) * 2007-07-30 2009-02-04 大原电机株式会社 Method for installinig an arch-type underbracing on a utility pole for an overhead line by using extendable excavating unit for auger crane
CN201443231U (en) * 2009-05-27 2010-04-28 张新国 Lock-hole fluorescent paste
CN101834416A (en) * 2010-05-21 2010-09-15 安徽省电力公司滁州供电公司 Device and construction method for live repairing of strand-broken overhead earth wire of transmission line
CN201847393U (en) * 2010-10-26 2011-06-01 赵丽纯 Pull rod for telescopic bracket
CN202249107U (en) * 2011-09-23 2012-05-30 四川省电力公司自贡电业局 Wire taking hook special for assembling electric pole

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0932351A (en) * 1995-07-14 1997-02-04 Toei Kensetsu Kogyo:Kk Pole for erecting column
CN101358489A (en) * 2007-07-30 2009-02-04 大原电机株式会社 Method for installinig an arch-type underbracing on a utility pole for an overhead line by using extendable excavating unit for auger crane
CN201137302Y (en) * 2007-12-21 2008-10-22 中天建设集团有限公司 Architecture construction object picker
CN201443231U (en) * 2009-05-27 2010-04-28 张新国 Lock-hole fluorescent paste
CN101834416A (en) * 2010-05-21 2010-09-15 安徽省电力公司滁州供电公司 Device and construction method for live repairing of strand-broken overhead earth wire of transmission line
CN201847393U (en) * 2010-10-26 2011-06-01 赵丽纯 Pull rod for telescopic bracket
CN202249107U (en) * 2011-09-23 2012-05-30 四川省电力公司自贡电业局 Wire taking hook special for assembling electric pole

Similar Documents

Publication Publication Date Title
CN202249107U (en) Wire taking hook special for assembling electric pole
CN202578105U (en) Anti-rattan cover of electric-pole cable-stayed steel rope
CN204040555U (en) A kind of main transformer construction system
CN203044580U (en) Straightening device for ground anchor drill of power transmission line
CN203513079U (en) Multi-segment lifting device for large tower device
CN102425328A (en) Special wire fetching hook for assembled electric pole
CN206982069U (en) A kind of steel reinforcement cage cage bar positions small fixture
CN204735669U (en) Curved traditional thread binding putting
CN104234495B (en) Drawing wire binding tool
CN204912601U (en) Pile head bar straightening spanner
CN203682775U (en) Wire frame
CN203850719U (en) Simple uncoiling frame
CN203782765U (en) Multifunctional shovel for electric power
CN203448469U (en) Aluminum row bending device
CN202455909U (en) Branch bending support
CN104719082A (en) Fruit tree branch pulling tool
CN202455818U (en) Special double-wing harvest shovel for ginger
CN203219768U (en) Cylindrical plant lifter
CN203932830U (en) Center line take-up coaster for a kind of power line construction
CN206367487U (en) Lichee plucks movable frame
CN202401960U (en) Capital construction A-type ladder anti-tipping device of transformer substation
CN206520971U (en) A kind of large-scale potted plant shift unit
CN203083857U (en) Coke test sample setting and preparing platform
CN205110633U (en) Simple and easy reinforcing bar cutting support device
CN205249795U (en) Rice seedling puller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120425