CN102421122A - Service processing method and equipment - Google Patents

Service processing method and equipment Download PDF

Info

Publication number
CN102421122A
CN102421122A CN2011103827506A CN201110382750A CN102421122A CN 102421122 A CN102421122 A CN 102421122A CN 2011103827506 A CN2011103827506 A CN 2011103827506A CN 201110382750 A CN201110382750 A CN 201110382750A CN 102421122 A CN102421122 A CN 102421122A
Authority
CN
China
Prior art keywords
carrier
bunch
loaded service
baseband board
carrier wave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103827506A
Other languages
Chinese (zh)
Other versions
CN102421122B (en
Inventor
刘玉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201110382750.6A priority Critical patent/CN102421122B/en
Publication of CN102421122A publication Critical patent/CN102421122A/en
Application granted granted Critical
Publication of CN102421122B publication Critical patent/CN102421122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

An embodiment of the invention discloses a service processing method and equipment. The service processing method comprises the following steps: distributing services borne by different carrier wave clusters to corresponding baseband boards for processing, detecting service capacity borne by a carrier wave cluster, when the service capacity is lower than a first service threshold, transferring the service borne by the carrier wave cluster to other baseband boards for processing, and turning off an idle baseband board. According to a technical scheme provided in the embodiment, power consumption of the baseband boards is reduced with energy saving and environmental protection.

Description

Method for processing business and equipment
Technical field
The present invention relates to communication technical field, be specifically related to a kind of method for processing business and equipment.
Background technology
Along with development of Communication Technique, people require increasingly high to mobile communication, and wherein the base station capacity problem is more and more outstanding.For the capacity that improves the base station need increase the quantity of baseband board, but in the different time section, volume variance is huge.Such as under the situation of nearly no traffic at night, baseband portion circuit full-load operation at present will consume unnecessary power consumption like this, can shorten the life-span of baseband board simultaneously.
Summary of the invention
The embodiment of the invention provides a kind of method for processing business and equipment, realizes the optimization of baseband board Business Processing, reduces the power consumption of baseband board.
On the one hand, the embodiment of the invention provides a kind of method for processing business, comprising:
A first carrier bunch loaded service is distributed to first baseband board to be handled; And second a carrier wave bunch loaded service is distributed to second baseband board handle; Wherein, The carrier wave that the carrier wave that first carrier bunch is formed for the first carrier group of same frequency or different frequent points bunch, second carrier wave bunch are formed for second carrier set of same frequency or different frequent points bunch;
Detect first carrier bunch loaded service amount; Judge whether a said first carrier bunch loaded service amount is lower than the first traffic gate limit value; When a said first carrier bunch loaded service amount is lower than the first traffic gate limit value, a said first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle;
Further detect said first carrier bunch loaded service amount, judge whether the said first carrier bunch loaded service amount that detects is zero, when a said first carrier bunch loaded service amount is zero, turn-offs said first baseband board.
On the other hand, the embodiment of the invention provides a kind of service processing equipment, comprising:
Distribution module; Being used for that a first carrier bunch loaded service is distributed to first baseband board handles; And second a carrier wave bunch loaded service is distributed to second baseband board handle; Wherein, the carrier wave that the carrier wave that first carrier bunch is formed for the first carrier group of same frequency or different frequent points bunch, second carrier wave bunch are formed for second carrier set of same frequency or different frequent points bunch;
Detection module is used to detect first carrier bunch loaded service amount;
First judge module is used to judge whether the detected first carrier of a said detection module bunch loaded service amount is lower than the first traffic gate limit value;
Transferring module is used for when a said first carrier bunch loaded service amount is lower than the first traffic gate limit value, a said first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle;
Second judge module is used for after said transferring module is carried out business migration, judges whether the detected first carrier of detection module bunch loaded service amount is zero;
Processing module is used for when a said first carrier bunch loaded service amount is zero, turn-offing said first baseband board.
Can know by foregoing description; The technical scheme that the embodiment of the invention provides; Different carrier bunch loaded service is assigned to corresponding base station baseband plate handles, detected carrier bunch loaded service amount is when this traffic carrying capacity is lower than the first traffic gate limit value; This carrier wave bunch loaded service is moved to other carrier waves bunch, turn-off corresponding idle baseband board.Technical scheme through the embodiment of the invention provides can realize the optimization of baseband board Business Processing, reduces the power consumption of baseband board.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the invention; The accompanying drawing of required use is done an introduction simply in will describing embodiment below; Obviously, the accompanying drawing in describing below is some embodiments of the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work property, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the schematic flow sheet of method for processing business one embodiment of the present invention;
Fig. 2 is the schematic flow sheet of another embodiment of method for processing business of the present invention;
Fig. 3 is the schematic flow sheet of another embodiment of method for processing business of the present invention;
Fig. 4 is the structural representation of service processing equipment one embodiment of the present invention;
Fig. 5 is the structural representation of another embodiment of service processing equipment of the present invention;
Fig. 6 is the structural representation of another embodiment of service processing equipment of the present invention;
Fig. 7 is the structural representation of another embodiment of service processing equipment of the present invention.
Embodiment
For the purpose, technical scheme and the advantage that make the embodiment of the invention clearer; To combine the accompanying drawing in the embodiment of the invention below; Technical scheme in the embodiment of the invention is carried out clear, intactly description; Obviously, described embodiment is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the present invention's protection.
On the one hand; The embodiment of the invention provides a kind of method for processing business; Comprise: a first carrier bunch loaded service is distributed to first baseband board handle, and second a carrier wave bunch loaded service is distributed to second baseband board handle, wherein; The carrier wave that the carrier wave that first carrier bunch is formed for the first carrier group of same frequency or different frequent points bunch, second carrier wave bunch are formed for second carrier set of same frequency or different frequent points bunch; Detect first carrier bunch loaded service amount; Judge whether a first carrier bunch loaded service amount is lower than the first traffic gate limit value; When a first carrier bunch loaded service amount is lower than the first traffic gate limit value, a first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle; Further detect said first carrier bunch loaded service amount, judge whether the said first carrier bunch loaded service amount that detects is zero, when a first carrier bunch loaded service amount is zero, turn-offs said first baseband board.
On the other hand; The embodiment of the invention provides a kind of service processing equipment, comprising: distribution module is used for that a first carrier bunch loaded service is distributed to first baseband board and handles; And second a carrier wave bunch loaded service is distributed to second baseband board handle; Wherein, the carrier wave that the carrier wave that first carrier bunch is formed for the first carrier group of same frequency or different frequent points bunch, second carrier wave bunch are formed for second carrier set of same frequency or different frequent points bunch; Detection module is used to detect first carrier bunch loaded service amount; First judge module is used to judge whether the detected first carrier of a detection module bunch loaded service amount is lower than the first traffic gate limit value; Transferring module is used for when a first carrier bunch loaded service amount is lower than the first traffic gate limit value, a first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle; Second judge module is used for after transferring module is carried out business migration, judges whether the detected first carrier of detection module bunch loaded service amount is zero; Processing module is used for when a first carrier bunch loaded service amount is zero, turn-offing first baseband board.
With the form of specific embodiment,, be elaborated respectively below in conjunction with accompanying drawing.
Fig. 1 is the schematic flow sheet of method for processing business one embodiment of the present invention, comprising:
Step 10: a carrier wave bunch loaded service is assigned to corresponding baseband board handles;
Carrier wave bunch is set up one-to-one relationship with the baseband board of base station, and the business on the different carrier wave bunch of promptly guaranteeing can be assigned to corresponding baseband board and handle.
Particularly, the embodiment of the invention is not done strict the qualification to the carrier wave bunch and the corresponding relation of baseband board, and any carrier wave bunch can be corresponding with any baseband board.For example first carrier bunch can be corresponding with first baseband board, a first carrier bunch loaded service is assigned to first baseband board handles; Certainly, first carrier bunch also can be corresponding with other baseband board (such as second baseband board), first carrier bunch loaded service is assigned to corresponding baseband board handles.Below mainly with first carrier bunch correspondence first baseband board, second carrier wave bunch correspondence, second baseband board is described.
In addition, it is understandable that the first carrier bunch and second carrier wave bunch are merely general reference, possibly have two or more carrier waves bunch in the system; In like manner, first baseband board and second baseband board also are general references, possibly have two or more baseband boards in the system.
Wherein, above-mentioned carrier wave bunch is set up one-to-one relationship with the baseband board of base station and can be realized by the master control borad control of base station.
Step 11: detect first carrier bunch loaded service amount;
In this step, can be that the master control borad by the base station detects a carrier wave bunch loaded service amount, detection mode can also can detect for not timing for periodically detecting.
Step 12: judge whether a first carrier bunch loaded service amount that detects is lower than the first traffic gate limit value;
In this step, can be the size judgement of carrying out the first carrier bunch loaded service amount and the first traffic gate limit value by the master control borad of base station.Wherein, the first traffic gate limit value can be configured by base station or base station controller or Operation and Maintenance platform, and carries out modify according to the practical business disposition.
When a first carrier bunch loaded service amount is lower than the first traffic gate limit value, execution in step 13.
Further, when a first carrier bunch loaded service amount was not less than the first traffic gate limit value, execution in step 11 continued to detect first carrier bunch loaded service amount.
Step 13: a first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle;
Judged result according to step 12; When a first carrier bunch loaded service amount is lower than the first traffic gate limit value; Then this carrier wave bunch loaded service amount can be thought low traffic, can a first carrier bunch loaded service be moved to second carrier wave bunch pairing second baseband board by the base station master control borad and handle.
In the communication system of different systems, judge that the concrete implementation of magnitude relationship between traffic carrying capacity and the professional thresholding is possible different.Such as global system for mobile communications (Global System of Mobile communication, GSM) in, can utilize Irish number to weigh, when telephone traffic is lower than the Irish number of setting, can think the low traffic state; And UMTS (Universal Mobile Telecommunications System, UMTS) in, can weigh with the channel resource utilance, when channel utilization is lower than the first traffic gate limit value, can think the low traffic state.
Particularly, the carrier wave emigration technology is a prior art, has kinds of schemes optional, repeats no more here.
Step 14: further detect first carrier bunch loaded service amount;
In this step, continuation further detects the first carrier bunch loaded service amount behind the business migration, and detection mode can be referring to step 11.
Step 15: judge whether the first carrier bunch loaded service amount that detects is zero;
In this step, can judge whether the first carrier bunch loaded service amount that detects is zero by the base station master control borad, if a first carrier bunch loaded service amount that detects is zero, execution in step 16.
Further, the first carrier of detection bunch loaded service amount is non-vanishing, execution in step 14.
Step 16: turn-off first baseband board;
When a first carrier bunch loaded service amount is zero, show that first baseband board is in idle condition.In such cases, can send electric operational order down to monitor board by the base station master control borad, monitor board turn-offs first baseband board according to the following electricity operation of down electric operational order execution to first baseband board.
The technical scheme that present embodiment provides; Different carrier bunch loaded service is assigned to corresponding baseband board to be handled; Detected carrier bunch loaded service amount; When this traffic carrying capacity is lower than the first traffic gate limit value, this carrier wave bunch loaded service to be moved to other baseband boards handle, shutoff should the free time baseband board.Owing to can realize the migration of the business of carrier wave bunch through testing mechanism, and realize shutoff, thereby reduce the power consumption of baseband board, energy-conserving and environment-protective to idle baseband board.
In the practice, the power consumption of baseband board is near hectowatt, the technical scheme that adopts the embodiment of the invention to provide, and a base band frame can be saved the power consumption of 500~600W.
Fig. 2 is the schematic flow sheet of another embodiment of method for processing business of the present invention.
In the above-described embodiments, carrier wave bunch is tied to corresponding baseband board, guarantees that carrier wave bunch goes up loaded service and be assigned to before corresponding baseband board handles, can carry out sub-clustering to carrier wave earlier, specifically comprise:
Step 21:, form first carrier bunch with the first carrier group of same frequency or different frequent points;
The mode that carrier wave is formed the mode that first carrier bunch can be through the base station self-configuring or revised the base station configuration file realize.Wherein, the self-configuring of base station can be accomplished by the master control borad of base station.
Further, the carrier wave of forming first carrier bunch can be the carrier wave of a plurality of same frequencies or different frequent points, and first carrier bunch loaded service comprises all business of first sub-district or first cell set (a plurality of sub-district).
For example, in the UMTS system, can form first carrier bunch by the carrier set of same frequency, and first carrier bunch loaded service comprises all business of first sub-district or first cell set (a plurality of sub-district).Such as, supposing the corresponding carrier wave f1 of sub-district M, f2, f3, carrier wave f1, f2, f3 are the carrier wave of identical frequency, then can form one group to carrier wave f1, f2, f3 is the carrier wave bunch of f1/f2/f3, and the f1/f2/f3 carrier wave bunch comprises the business of sub-district M.
In gsm system, can form first carrier bunch by the carrier set of different frequent points, and first carrier bunch loaded service comprises all business of first sub-district or first cell set (a plurality of sub-district).Such as, supposing the corresponding carrier wave A1 of sub-district N, B2, C3, carrier wave A1, B2, C3 are the carrier wave of different frequency, then can form carrier wave A1, B2, C3 the carrier wave bunch of one group of A1/B2/C3, and the A1/B2/C3 carrier wave bunch comprises the business of sub-district N.
Carrier number in the above-mentioned carrier wave cluster-dividing method can be any number, and the carrier wave of sub-clustering does not have specific (special) requirements with real physical carrier, need not carry out sub-clustering according to the order of physical carrier, also need be by the fixed qty sub-clustering etc.
Step 22:, form second carrier wave bunch with second carrier set of same frequency or different frequent points;
The concrete operations mode is consulted step 21.
In the prior art, the carrier wave and the baseband board of bearer service do not have corresponding relation, and the business of carriers carry is assigned randomly to baseband board and handles, and baseband board is in state of activation always, even traffic carrying capacity hour also can't be turn-offed, cause the wasting of resources.
The embodiment of the invention is divided into carrier wave bunch with the carrier wave of bearer service, carrier wave bunch is bound with the corresponding base band plate of base station, when detecting baseband board loaded service amount and be lower than the first traffic gate limit value; This carrier wave bunch loaded service is moved to other carrier waves bunch, and whether further detect this baseband board this moment idle, when this carrier wave bunch loaded service amount is zero; Show that baseband board is idle; Then turn-off this baseband board, reduced the power consumption of baseband board, energy-conserving and environment-protective.
Fig. 3 is the schematic flow sheet of another embodiment of method for processing business of the present invention.
After turn-offing the base station baseband plate, can further write down the turn-off time and the turn-off number of times of the baseband board that is turned off, this record is fed back to the base station.
Further, if when having only first baseband board and second baseband board, when the first baseband board loaded service amount that detects is lower than first threshold value, the first baseband board loaded service is moved to the second base band version.In follow-up shutoff; If exist a plurality of baseband boards to can be used as under the situation of first carrier bunch loaded service migration alternative, can select first carrier bunch loaded service the longest or turn-off the baseband board migration that total degree is maximum or traffic carrying capacity is maximum toward turn-offing total time.The concrete realization as follows:
Step 31: the turn-off time and the turn-off number of times of the baseband board that record is turned off;
As shown in the figure, the turn-off time and the turn-off number of times of the baseband board that can be turned off by monitor board record.Monitor board contains baseband module and base band monitoring and control management software, can utilize like Controller Area Network BUS or other circuit record veneer turn-off time and number of times.
Step 32: shutoff information is sent to the base station master control borad;
In this step, shutoff information can comprise the turn-off time that is turned off baseband board and the information of turn-off number of times.Particularly, can be the turn-off time that is turned off baseband board that will write down of monitor board and turn-off time information and send to the base station master control borad, during follow-up shutoff, the base station master control borad is made according to the shutoff information of the baseband board of storage and is turn-offed instruction.Particularly, can be from a plurality of baseband boards that can be used as first carrier bunch loaded service migration alternative, it is the longest or turn-off total degree is maximum or traffic carrying capacity is maximum baseband board as second baseband board to select to turn-off total time; Then, first carrier bunch loaded service being moved to second baseband board of selecting handles.
The turn-off time and the turn-off number of times information of the baseband board that the embodiment of the invention is turned off through record are made according to this information and to be turn-offed instruction, and that can realize baseband board turn-offs energy-saving and emission-reduction in turn.
Fig. 4 is the structural representation for service processing equipment one embodiment of the present invention.
This equipment is for carrying out the equipment of said method, and this equipment comprises:
Distribution module 41 is used for that a first carrier bunch loaded service is distributed to first baseband board and handles, and second a carrier wave bunch loaded service distributed to second baseband board handle;
Wherein, the carrier wave that the carrier wave that first carrier bunch is formed for the first carrier group of same frequency or different frequent points bunch, second carrier wave bunch are formed for second carrier set of same frequency or different frequent points bunch.
Concrete, can carrier wave bunch be set up one-to-one relationship with the baseband board of base station by distribution module 41, the business on the different carrier wave bunch of promptly guaranteeing can be assigned to the baseband board of correspondence and handle.Particularly, the embodiment of the invention is not done strict the qualification to the carrier wave bunch and the corresponding relation of baseband board, and any carrier wave bunch can be corresponding with any baseband board.For example first carrier bunch can be corresponding with first baseband board, a first carrier bunch loaded service is assigned to first baseband board handles; Certainly, first carrier bunch also can be corresponding with other baseband board (such as second baseband board), first carrier bunch loaded service is assigned to corresponding baseband board handles.Below mainly with first carrier bunch correspondence first baseband board, second carrier wave bunch correspondence, second baseband board is described.In addition, it is understandable that the first carrier bunch and second carrier wave bunch are merely general reference, possibly have two or more carrier waves bunch in the system; In like manner, first baseband board and second baseband board also are general references, possibly have two or more baseband boards in the system.
Wherein, above-mentioned carrier wave bunch is set up one-to-one relationship with the baseband board of base station and can be realized by the master control borad control of base station.
Detection module 42 is used to detect first carrier bunch loaded service amount;
Above-mentioned detection can be periodically to detect, and also can be that not timing detects.
First judge module 43 is used to judge whether detection module 42 a detected first carriers bunch loaded service amount is lower than the first traffic gate limit value.
Transferring module 44 is used for when a first carrier bunch loaded service amount is lower than the first traffic gate limit value, a first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle;
The carrier wave emigration technology is a prior art, has kinds of schemes optional, repeats no more here.
Second judge module 45 is used for after transferring module is carried out business migration, judges whether detection module 42 detected first carriers bunch loaded service amount is zero;
Processing module 46 is used for when a first carrier bunch loaded service amount is zero, turn-offing said first baseband board.
Further, above-mentioned six modules all can be positioned on the master control borad of base station, perhaps other control appliances.What be worth explanation is that the division of above-mentioned module when actual product is realized, can need only and realize above-mentioned functions by above-mentioned module is repartitioned just for convenience.Such as, first judge module 43 and second judge module 45 can also be realized by a judge module.
Present embodiment is assigned to corresponding baseband board through above-mentioned module with different carrier bunch loaded service and handles; Detected carrier bunch loaded service amount; When this traffic carrying capacity is lower than the first traffic gate limit value; This carrier wave bunch loaded service is moved to other baseband boards handle, shutoff should the free time baseband board.The equipment that the embodiment of the invention provides can reduce the power consumption of baseband board, energy-conserving and environment-protective.
Further; Fig. 5 has provided another structural representation of the embodiment of the invention; Among this embodiment, this equipment further comprises selects module 47, is used for existing a plurality of baseband boards to can be used as under the situation of first carrier bunch loaded service migration alternative; From the said a plurality of baseband boards that can be used as first carrier bunch loaded service migration alternative, it is the longest or turn-off total degree is maximum or traffic carrying capacity is maximum baseband board as second baseband board to select to turn-off total time.Accordingly, transferring module 43 is moved to second baseband board of selecting module to select with first carrier bunch loaded service and is handled.
If when having only first baseband board and second baseband board, when the first baseband board loaded service amount that detects is lower than the first traffic gate limit value, the first baseband board loaded service is moved to the second base band version.
Further, Fig. 6 has provided another structural representation of the embodiment of the invention, and among this embodiment, this equipment further comprises logging modle 48, is used to write down the turn-off time and the turn-off number of times of the baseband board that is turned off.This logging modle 48 is positioned at monitor board; The turn-off time and the turn-off number of times of the baseband board that the monitor board record is turned off; With turn-off time that is turned off baseband board of record with turn-off time information and send to the base station master control borad, during follow-up shutoff, the base station master control borad is made according to this information and is turn-offed instruction.
Further, Fig. 7 has provided another structural representation of the embodiment of the invention, and among this embodiment, this equipment further comprises configuration module 49, is used for carrier wave is divided into said first carrier bunch and second carrier wave bunch.This configuration module 49 can be positioned at the base station; The first carrier group of same frequency or different frequent points is formed first carrier bunch; Second carrier set of same frequency or different frequent points is formed second carrier wave bunch; And first carrier bunch loaded service is the business of first sub-district (or first cell set), and second carrier wave bunch loaded service is the business of second sub-district (or second cell set).
In the prior art, the carrier wave and the baseband board of bearer service do not have corresponding relation, and the business of carriers carry is assigned randomly to baseband board and handles, and baseband board is in state of activation always, even traffic carrying capacity hour also can't be turn-offed, cause the wasting of resources.The embodiment of the invention is divided into carrier wave bunch through above-mentioned module with the carrier wave of bearer service; The carrier wave bunch and the corresponding base band plate of base station are bound, be lower than the first traffic gate limit value constantly, this carrier wave bunch loaded service is moved to other carrier waves bunch when detecting baseband board loaded service amount; Whether further detect this baseband board this moment idle; When this carrier wave bunch loaded service amount is zero, show that baseband board is idle, then turn-off this baseband board.The technical scheme that the embodiment of the invention provides can reduce the power consumption of baseband board, energy-conserving and environment-protective.
The technical scheme of the embodiment of the invention also can be applicable to Long Term Evolution, third generation CDMA (Code Division Multiple Access 2000; CDMA2000) and TD SDMA (Time-Division Synchronous Code Division Multiple Access, TD-SCDMA) etc. system's baseband board turn-offs scene.
It is understandable that the reference each other of the correlated characteristic in said method and the equipment.
One of ordinary skill in the art will appreciate that: all or part of step that realizes said method embodiment can be accomplished through the relevant hardware of program command; Aforesaid program can be stored in the computer read/write memory medium; This program the step that comprises said method embodiment when carrying out; And aforesaid storage medium comprises: various media that can be program code stored such as ROM, RAM, magnetic disc or CD.
What should explain at last is: above embodiment is only in order to explaining technical scheme of the present invention, but not to its restriction; Although with reference to previous embodiment the present invention has been carried out detailed explanation, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment put down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these are revised or replacement, do not make the spirit and the scope of the essence disengaging various embodiments of the present invention technical scheme of relevant art scheme.

Claims (10)

1. a method for processing business is characterized in that, comprising:
A first carrier bunch loaded service is distributed to first baseband board to be handled; And second a carrier wave bunch loaded service is distributed to second baseband board handle; Wherein, The carrier wave that the carrier wave that first carrier bunch is formed for the first carrier group of same frequency or different frequent points bunch, second carrier wave bunch are formed for second carrier set of same frequency or different frequent points bunch;
Detect first carrier bunch loaded service amount; Judge whether a said first carrier bunch loaded service amount is lower than the first traffic gate limit value; When a said first carrier bunch loaded service amount is lower than the first traffic gate limit value, a said first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle;
Further detect said first carrier bunch loaded service amount, judge whether the said first carrier bunch loaded service amount that detects is zero, when a said first carrier bunch loaded service amount is zero, turn-offs said first baseband board.
2. method for processing business according to claim 1; It is characterized in that; Exist a plurality of baseband boards to can be used as under the situation of first carrier bunch loaded service migration alternative; A said first carrier bunch loaded service is moved to said second carrier wave bunch pairing second baseband board handles, comprising:
From the said a plurality of baseband boards that can be used as first carrier bunch loaded service migration alternative, it is the longest or turn-off total degree is maximum or traffic carrying capacity is maximum baseband board as second baseband board to select to turn-off total time;
First carrier bunch loaded service is moved to said second baseband board of selecting to be handled.
3. method for processing business according to claim 2 is characterized in that, said method also comprises: after turn-offing certain baseband board, and the turn-off time and the turn-off number of times of the baseband board that record is turned off.
4. according to each described method for processing business of claim 1 to 3, it is characterized in that said method also comprises:
Mode through the base station self-configuring or the mode of revising the base station configuration file are divided into said first carrier bunch and second carrier wave bunch with carrier wave.
5. according to each described method for processing business of claim 1 to 3; It is characterized in that; Said first carrier bunch loaded service is the business of first sub-district or first cell set, and said second carrier wave bunch loaded service is the business of second sub-district or second cell set.
6. a service processing equipment is characterized in that, comprising:
Distribution module; Being used for that a first carrier bunch loaded service is distributed to first baseband board handles; And second a carrier wave bunch loaded service is distributed to second baseband board handle; Wherein, the carrier wave that the carrier wave that first carrier bunch is formed for the first carrier group of same frequency or different frequent points bunch, second carrier wave bunch are formed for second carrier set of same frequency or different frequent points bunch;
Detection module is used to detect first carrier bunch loaded service amount;
First judge module is used to judge whether the detected first carrier of a said detection module bunch loaded service amount is lower than the first traffic gate limit value;
Transferring module is used for when a said first carrier bunch loaded service amount is lower than the first traffic gate limit value, a said first carrier bunch loaded service is moved to second carrier wave bunch pairing second baseband board handle;
Second judge module is used for after said transferring module is carried out business migration, judges whether the detected first carrier of detection module bunch loaded service amount is zero;
Processing module is used for when a said first carrier bunch loaded service amount is zero, turn-offing said first baseband board.
7. service processing equipment according to claim 6 is characterized in that, also comprises:
Select module; Be used for existing a plurality of baseband boards to can be used as under the situation of first carrier bunch loaded service migration alternative; From the said a plurality of baseband boards that can be used as first carrier bunch loaded service migration alternative, it is the longest or turn-off total degree is maximum or traffic carrying capacity is maximum baseband board as second baseband board to select to turn-off total time;
Accordingly, said transferring module is used for that first carrier bunch loaded service is moved to second baseband board that said selection module selects and handles.
8. service processing equipment according to claim 6 is characterized in that, also comprises:
Logging modle is used to write down the turn-off time and the turn-off number of times of the baseband board that is turned off.
9. according to each described service processing equipment of claim 6 to 8, it is characterized in that, also comprise:
Configuration module is used for the mode through the base station self-configuring or revises the mode of base station configuration file, and carrier wave is divided into said first carrier bunch and second carrier wave bunch.
10. according to each described service processing equipment of claim 6 to 8, it is characterized in that,
Said first carrier bunch loaded service is the business of first sub-district or first cell set, and said second carrier wave bunch loaded service is the business of second sub-district or second cell set.
CN201110382750.6A 2011-11-26 2011-11-26 Service processing method and equipment Active CN102421122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110382750.6A CN102421122B (en) 2011-11-26 2011-11-26 Service processing method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110382750.6A CN102421122B (en) 2011-11-26 2011-11-26 Service processing method and equipment

Publications (2)

Publication Number Publication Date
CN102421122A true CN102421122A (en) 2012-04-18
CN102421122B CN102421122B (en) 2014-02-26

Family

ID=45945304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110382750.6A Active CN102421122B (en) 2011-11-26 2011-11-26 Service processing method and equipment

Country Status (1)

Country Link
CN (1) CN102421122B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014173358A1 (en) * 2013-07-03 2014-10-30 中兴通讯股份有限公司 Multiple base station collaboration method, system and base station for use in cellular systems
CN105682145A (en) * 2014-11-21 2016-06-15 中兴通讯股份有限公司 Method and device for improving baseband resource utilization rate
WO2017166874A1 (en) * 2016-03-31 2017-10-05 中兴通讯股份有限公司 Baseband board selection method and device
US10348629B2 (en) * 2013-10-17 2019-07-09 Sanechips Technology Co., Ltd. Method and device for processing wireless baseband capable of expanding dynamically
WO2023000303A1 (en) * 2021-07-23 2023-01-26 华为技术有限公司 Chip turn-off dynamic control method and device
CN115915165A (en) * 2021-08-03 2023-04-04 ***通信集团广东有限公司 Method and device for managing baseband board resources

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232659A (en) * 2008-02-20 2008-07-30 中兴通讯股份有限公司 Method for reducing single board power consumption
CN101291206A (en) * 2008-06-20 2008-10-22 中兴通讯股份有限公司 Test device and method for single-board host-slave switching
CN101420256A (en) * 2008-11-18 2009-04-29 中兴通讯股份有限公司 IQ channel allocation method and device
WO2009067956A1 (en) * 2007-11-28 2009-06-04 Huawei Technologies Co., Ltd. An energy-saving method and apparatus for the base station
CN102111800A (en) * 2009-12-23 2011-06-29 北京三星通信技术研究有限公司 Method for realizing energy saving in base station
WO2011085699A1 (en) * 2010-01-18 2011-07-21 华为技术有限公司 Method, apparatus and system for reducing power consumption of service system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009067956A1 (en) * 2007-11-28 2009-06-04 Huawei Technologies Co., Ltd. An energy-saving method and apparatus for the base station
CN101232659A (en) * 2008-02-20 2008-07-30 中兴通讯股份有限公司 Method for reducing single board power consumption
CN101291206A (en) * 2008-06-20 2008-10-22 中兴通讯股份有限公司 Test device and method for single-board host-slave switching
CN101420256A (en) * 2008-11-18 2009-04-29 中兴通讯股份有限公司 IQ channel allocation method and device
CN102111800A (en) * 2009-12-23 2011-06-29 北京三星通信技术研究有限公司 Method for realizing energy saving in base station
WO2011085699A1 (en) * 2010-01-18 2011-07-21 华为技术有限公司 Method, apparatus and system for reducing power consumption of service system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014173358A1 (en) * 2013-07-03 2014-10-30 中兴通讯股份有限公司 Multiple base station collaboration method, system and base station for use in cellular systems
CN105557011A (en) * 2013-07-03 2016-05-04 中兴通讯股份有限公司 Multiple base station collaboration method, system and base station for use in cellular systems
US10348629B2 (en) * 2013-10-17 2019-07-09 Sanechips Technology Co., Ltd. Method and device for processing wireless baseband capable of expanding dynamically
CN105682145A (en) * 2014-11-21 2016-06-15 中兴通讯股份有限公司 Method and device for improving baseband resource utilization rate
WO2017166874A1 (en) * 2016-03-31 2017-10-05 中兴通讯股份有限公司 Baseband board selection method and device
WO2023000303A1 (en) * 2021-07-23 2023-01-26 华为技术有限公司 Chip turn-off dynamic control method and device
CN115915165A (en) * 2021-08-03 2023-04-04 ***通信集团广东有限公司 Method and device for managing baseband board resources

Also Published As

Publication number Publication date
CN102421122B (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN102421122B (en) Service processing method and equipment
CN102668613B (en) Method and apparatus for realizing base band resource pool in lte base station
CN102662754A (en) Multi-field supportable virtual machine dispatching device and multi-field supportable virtual machine dispatching method
CN101437259B (en) Method, apparatus and system for establishing incidence relation between each system of integrated multi-module base station
CN101415179B (en) Method, apparatus and system for automatically switching business
CN103327582B (en) Method for adjustment voltage of power amplifier and base station
CN101389054A (en) Multi-carrier resource allocation method, system and a network side
CN102656936B (en) Implementation method and device for base band resource pool in LTE base station
CN105282831A (en) Base station power saving control method and device
US20140301265A1 (en) Carrier control method and corresponding base station device
CN101640898A (en) Detection method, detection device, detection system and base station
CN104105137A (en) Wireless internetwork load balancing method, apparatus and system
CN103037109A (en) Multicore equipment energy consumption management method and device
CN104572279A (en) Node binding-supporting virtual machine dynamic scheduling method
CN102781042B (en) LTE (long term evolution) load balancing method based on physical cell identity
CN101853185B (en) Blade server and service dispatching method thereof
CN101932020B (en) De-electrification control method, equipment and system of BBU
CN102685858A (en) Radio frequency unit power consumption control method and station system
CN103108398B (en) Uplink control channel transmission method and relevant apparatus
CN102045727B (en) Distribution method of channel code resources and base station
CN102611502A (en) Looped network allocating method and device
CN103686814A (en) Base band unit, base station and base station system
CN104699521A (en) Online migration method, system and device of virtual machine
CN103108365A (en) Primary common pilot channel (PCPICH) transmission control method, relevant equipment and system
CN102137443B (en) Method and device for balancing load across neighboring cells

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant