CN102407288A - High-efficiency lost foam casting production line - Google Patents

High-efficiency lost foam casting production line Download PDF

Info

Publication number
CN102407288A
CN102407288A CN2011103872198A CN201110387219A CN102407288A CN 102407288 A CN102407288 A CN 102407288A CN 2011103872198 A CN2011103872198 A CN 2011103872198A CN 201110387219 A CN201110387219 A CN 201110387219A CN 102407288 A CN102407288 A CN 102407288A
Authority
CN
China
Prior art keywords
section track
sandbox
track
cast
ferry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103872198A
Other languages
Chinese (zh)
Other versions
CN102407288B (en
Inventor
周祚超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110387219 priority Critical patent/CN102407288B/en
Publication of CN102407288A publication Critical patent/CN102407288A/en
Application granted granted Critical
Publication of CN102407288B publication Critical patent/CN102407288B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Escalators And Moving Walkways (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The invention discloses a high-efficiency lost foam casting production line. Sand boxes are arranged on a sand box circulation loop system in a stepping circulation mode, a casting machine casts the sand boxes which are stepped to casting section rails of the sand box circulation loop system, stop section rails are parallel to the casting section rails of the sand box circulation system, and the middle parts of the casting section rails and the stop section rails are connected through ferry trolleys; the sand boxes are subjected to handover operation on the casting section rails and the stop section rails; and the movable casting machine is arranged on a casting machine rail parallel to the casting section rails and performs movable casting back and forth, so that two sections of sand boxes are alternately cast by one movable casting machine on one straight rail. Molding and casting cannot influence each other on the production line.

Description

Efficient lost foam casting production line
Technical field
The present invention relates to a kind of casting system, especially a kind of efficient lost foam casting production line.
Background technology
At present, in the lost foam casting industry, generally use crane allocation and transportation pouring ladle pouring cast part.But the lost foam casting production line that each bar is advanced is equipped with the technological increasing of a portable casting machine cast.Because the lost foam casting sandbox generally will be poured into a mould under negative pressure state, just need extract the air in the inner sand grains of the sandbox gap out a part, make the sandbox internal pressure be lower than external air pressure; Promptly form negative pressure, be called as vacuum-assist pouring, generally fix on the ground owing to take out the pipeline of negative pressure; And the joint that docks with sandbox can move a very little distance; Be adjacent to sealed butt joint with the negative pressure interface of taking out on the sandbox, take out vacuum-assist pouring after the butt joint, sandbox can not move.This is the current techique of lost foam casting.Use the production line of portable casting machine that following several kinds of situation are arranged: first kind of lost foam casting production line, the sandbox circulation has only " mouth " font loop, and this is modal a kind of lost foam casting production line.This production line is poured into a mould taking out under the situation of negative pressure, and in time a few minutes before the casting solidification, the sandbox that has just been poured can not move during cast or behind the casting complete.Therefore, all sandboxes all can not move in stepping.Moulding must hocket with cast.Can only realize being interrupted moulding.Second kind of lost foam casting production line; The sandbox cyclic design has become " day " font, has two closed circuits, and cast can be carried out at two row sandboxes arranged side by side; Though can realize moulding and cast does not influence; But each portable casting machine can only be accomplished the cast of a row sandbox, and another row sandbox also will dispose a casting machine or pour into a mould with the crane for hoisting pouring ladle.The third lost foam casting production line, having designed a kind of negative pressure device of taking out can be when the sandbox stepping and the same moved further of sandbox, and casting machine is followed the tracks of sandbox and is accomplished cast.Though can realize the uninterrupted moulding of production line like this,, this specification requirement is taken out the pipe joint and the sandbox of negative pressure and is wanted same moved further, and casting machine and sandbox are also wanted same moved further.This is just higher to the requirement of equipment, makes equipment more complicated, and because sandbox and casting machine are followed the tracks of multiple reasons such as bad synchronously, often causes cast to be interrupted, and brings influence to casting quality, even scraps.Therefore, be difficult to obtain implement.
Summary of the invention
The technical problem that the present invention will solve has provided a kind of efficient lost foam casting production line of continuously-running; Two sandbox closed circuits have been adopted; Two sections cast section tracks are located along the same line; Only adopt a packaged type casting machine on the straight line track, to move, just can accomplish whole cast.Realize that moulding, cast, mould turnover are independent of each other.
For solving the problems of the technologies described above; The technical scheme that the present invention taked is: its step cycle in sandbox closed circuit system has sandbox; Casting machine is poured into a mould the sandbox on the cast section track that steps to sandbox closed circuit system; It is characterized in that: the cast section track of the said sandbox circulatory system is set side by side with stops the section track, and cast section track is realized being connected through the ferry-boat dolly with the middle part of stopping the section track; Described sandbox is at cast section track and stop handing-over operation on the section track; Described casting machine moves forward and backward cast along the casting machine track.
After adopting above-mentioned structure, sandbox just has two running routes at a cast section track and a stop section track: 1, cast section track leading portion-ferry-boat dolly-stop section track back segment; 2, stop section track leading portion-ferry-boat dolly-cast section track back segment.When casting machine is poured into a mould the sandbox on cast section track leading portion or the back segment like this (sandbox of being poured into a mould remains static), the stepping that can not influence another running route cope is moved.
The sandbox circulatory system of the present invention is enclosed by moulding section track 4, cast section track 8,13 and stop section track 20,16, the first ferry-boat dolly 14, cooling section track 19 and the second ferry-boat dolly 23 and forms; Described moulding section track 4 is the single channel structure; Cast section track (8,13) with stop a section track (20,16) and form two line structures, moulding section track 4 and cast section track (8,13) join through the 3rd ferry-boat dolly 7 and the 4th dolly 11 of ferrying joins with stopping between the section track (20,16).
On the casting machine track 12 that casting machine 9 section of being arranged on and pouring into a mould tracks 8,13 of the present invention laterally arrange.
Cooling section track 19 of the present invention is the single channel structure.
Sandbox closed circuit of the present invention system realizes that by pushing away case apparatus 1,6,10,15,18,22 steppings of sandbox in sandbox closed circuit system move.
A cast section track 8,13 of the present invention and a stop section track 20,16 all can be arranged 10~30 sandboxes are set.
Adopt the beneficial effect that technique scheme produced to be: the present invention can realize that the moulding of whole lost foam casting production line, cast do not pin down mutually.Only use a portable casting machine to go up two sections sandboxes are replaced cast respectively at straight line track (casting machine track).When the sandbox section of being poured into a mould remains static, and another closed circuit sandbox can be realized mould turnover, the stepping of moulding pusher case, realizes block sequences.Realized that mould turnover, moulding, cast are independent of each other.Only improve one times nearly than present with the efficient of the lost foam casting production line of a portable casting machine cast.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further detailed explanation.
Fig. 1 is the structural representation of first kind of circulation route of the present invention;
Fig. 2 is the structural representation of second kind of circulation route of the present invention.
Reference numeral is: push away case apparatus 1; Sandbox 2; Turnover machine 3; Moulding section track 4; Moulding machine 5; Push away case apparatus 6; The 3rd ferry-boat dolly 7; The first cast section track 8; Casting machine 9; Push away case apparatus 10; The 4th ferry-boat dolly 11; Casting machine track 12; The second cast section track 13; The first ferry-boat dolly 14; Push away case apparatus 15; Second stops section track 16; Second negative pressure device 17; Push away case apparatus 18; Cooling section track 19; First stops section track 20; First negative pressure device 21; Push away case apparatus 22; The second ferry-boat dolly 23.
The specific embodiment
Fig. 1, shown in Figure 2, this efficient lost foam casting production line by the sandbox circulatory system, sandbox 2, push away case apparatus 1,6,10,15,18,22, ferry- boat dolly 14,23,11,7, moulding machine 5, negative pressure device 17,21, casting machine 9, turnover machine 3 and control system and form.
The sandbox circulatory system of the present invention is enclosed by moulding section track 4, cast section track 8,13 and stop section track 20,16, the first ferry-boat dolly 14, cooling section track 19 and the second ferry-boat dolly 23 and forms; Described moulding section track 4 is the single channel structure, pours into a mould section track 8,13 and stops section track 20,16 a formation pair line structure, and moulding section track 4 joins through the 3rd ferry-boat dolly 7 with cast section track 8 and stop section track 20.Said cast section track 13 is realized being connected through the 4th ferry-boat dolly 11 with the middle part of stopping section track 16; The 4th ferry-boat dolly 11 is divided into first a cast section track 8 (a cast section track leading portion) and second a cast section track 13 (a cast section track back segment) with pour into a mould section track, and the 4th ferry-boat dolly 11 is divided into first with stops section track and stops a section track 20 (stopping a section track leading portion) and second a stop section track 16 (a stop section track back segment).
This efficient described sandbox 2 of lost foam casting production line stepping in sandbox closed circuit system is moved; In sandbox closed circuit system, forming two closed circuits constitutes: process moulding section track 4, the 3rd ferry-boat dolly 7, first are stopped section track 20 to (1) sandbox 2 successively, the 4th ferry-boat dolly 11, second gets into moulding section tracks 4 after pouring into a mould section track 13, the first ferry-boat dolly 14, cooling track sandbox 19 and the second ferry-boat dolly 23, form closed article one circulation route; (2) sandbox 2 is stopped section track 16, the first ferry-boat dolly 14, cooling track sandbox 19 and the second ferry-boat dolly, 23 backs and is got into moulding section tracks 4 through moulding section track 4, the 3rd ferry-boat dolly 7, the first cast section track 8, the 4th ferry-boat dolly 11, second successively, forms closed second circulation route.
This efficient described sandbox 2 of lost foam casting production line is realized sandbox 2 step cycle in whole sandbox closed circuit system through the cooperation that pushes away case apparatus and ferry-boat dolly; Described push away case apparatus comprise be arranged on the first ferry-boat dolly 14 and cooling track sandbox 19 handing-over ends push away case apparatus 15; The second ferry-boat dolly 23 and moulding section track 4 handing-over ends push away case apparatus 1; The 3rd ferry-boat dolly 7 and 8 handing-over of the first cast section track are held pushes away case apparatus 6; The 3rd ferry-boat dolly 7 and first stops that 20 handing-over of section track hold pushes away case apparatus 22; The 4th ferry- boat dolly 11 and 13 handing-over of the second cast section track are held pushes away case apparatus 10; The 4th ferry-boat dolly 11 and second stops that 16 handing-over of section track hold pushes away case apparatus 18.The described first cast section track 8 of this efficient lost foam casting production line, the second cast section track 13, first are stopped section track 20 and second and are stopped a section track 16 and all can arrange 5~15 sandboxes are set, i.e. whole piece cast section track and whole piece are stopped a section track and all can be arranged 10~30 sandboxes are set.
Fig. 1, shown in Figure 2, the moulding machine 5 of this efficient lost foam casting production line and the 4 corresponding settings of moulding section track, turnover machine 3 are arranged on the mould turnover station of moulding section track 4.On the casting machine track 12 that described portable casting machine 9 section of being arranged on and pouring into a mould parallel tracks are provided with, can control casting machine 9 like this and on casting machine track 12, move, realize cast the first cast section track 8 and the second cast section track, 13 copes.This efficient lost foam casting production line is provided with first negative pressure device 21 in the first cast section track, 8 correspondences, is provided with second negative pressure device 17 in the second cast section track, 13 correspondences.
The moulding machine of this efficient lost foam casting production line, the action that pushes away case apparatus, ferry-boat dolly, turnover machine etc. are preferably near setting in motion under the instruction of switched electrical signal or stop; Article two, the switching of circulation route can adopt automatic control or manual work to send the completion of the instruction signal of telecommunication; Negative pressure device, casting machine adopt Artificial Control, driving, completion to incline and wrap cast.
This efficient lost foam casting production line article one circulation route; Its moulding, push away case, take out negative pressure, the operating procedure of cast, mould turnover is: shown in Figure 1; The second ferry-boat dolly 23 is delivering cooled sandbox and is moving to the left side that pushes away case apparatus 1 and stop; Push away case apparatus 1 the cooled sandbox of second ferry-boat on the dolly 23 advanced the distance of a sandbox left, make this sandbox get into the ranks of moulding section track 4.At this moment, the sandbox that moulding section track 4 front ends have been made type is pulled on the 3rd ferry-boat dolly 7.Push away case apparatus 1 and second the ferry-boat dolly 23 automatically reset.At this moment, accomplish following operation simultaneously: turnover machine 3 beginning mould turnovers, moulding machine 5 beginning moulding.The 3rd ferry-boat dolly 7 is transported to sandbox in the precalculated position, left side that pushes away case apparatus 22.Next coming in order are accomplished: push away case apparatus 22 sandbox on the 3rd ferry-boat dolly 7 advanced the distance of a sandbox left, make this sandbox get into first stop section track 20 ranks, first stop section track 20 high order ends a sandbox is pulled on the 4th ferry-boat dolly 11.Push away case apparatus 22 and the 3rd the ferry-boat dolly 7 automatically reset.At this moment; The 4th ferry-boat dolly 11 receive first stop a section track 20 and made the sandbox of type after; The 4th ferry-boat dolly 11 moves to the precalculated position, left side that pushes away case apparatus 10 to be stopped; Push away case apparatus 10 sandbox of the 4th ferry-boat on the dolly 11 advanced the distance of a sandbox left, this sandbox gets into the ranks of the second cast section track 13, and the sandbox that has poured of the second cast section track, 13 high order ends is pulled on the first ferry-boat dolly 14.Push away case apparatus 10 and the 4th the ferry-boat dolly 11 automatically reset.The first ferry-boat dolly 14 is transported to the precalculated position that pushes away case apparatus 15 right sides with sandbox to be stopped.Push away will ferry sandbox on the dolly 14 of case apparatus 15 and advance the distance of a sandbox to the right, this sandbox gets into the ranks of cooling section track 19, pushes away case apparatus 15 and first dolly 14 of ferrying and automatically resets; Simultaneously, the second ferry-boat dolly 23 is received the cooled sandbox from cooling section track 19.So far, accomplish a sandbox cyclic process.Repeat top action continuously, when the second cast section sandbox that track 13 ranks pour all was replaced into the sandbox of the type of having made, the first circulation route operation temporarily stopped.The sandbox circulatory system begins to switch to the operation of second circulation route.In said process carried out, the sandbox that is in the first cast section track 8 was taken out negative pressure by negative pressure device 21, accomplished cast by casting machine 9 from left to right one by one along casting machine track 12, finished up to this pouring practice, switched to 13 cast of the second cast section track then.
This efficient lost foam casting production line second circulation route; Its moulding, push away case, take out negative pressure, the operating procedure of cast, mould turnover is: shown in Figure 2; The second ferry-boat dolly 23 is delivering cooled sandbox and is moving to the left side that pushes away case apparatus 1 and stop; Push away case apparatus 1 the cooled sandbox of second ferry-boat on the dolly 23 advanced the distance of a sandbox left, make this sandbox get into the ranks of moulding section track 4.At this moment, the sandbox that moulding section track front end has been made type is pulled on the 3rd ferry-boat dolly 7.Push away case apparatus 1 and second the ferry-boat dolly 23 automatically reset.At this moment, accomplish following operation simultaneously: turnover machine 3 beginning mould turnovers, moulding machine 5 beginning moulding.The 3rd ferry-boat dolly 7 is transported to sandbox in the precalculated position, left side that pushes away case apparatus 6.Next coming in order are accomplished: push away case apparatus 6 sandbox on the 3rd ferry-boat dolly 7 is advanced the distance of a sandbox left, make this sandbox get into the ranks of the first cast section track 8, the sandbox of the first cast section track, 8 high order ends is pulled on the 4th ferry-boat dolly 11.Push away case apparatus 6 and the 3rd the ferry-boat dolly 7 automatically reset.At this moment; After the 4th ferry-boat dolly 11 is received the sandbox that the first cast section track 8 pours; The 4th ferry-boat dolly 11 is transported to the precalculated position, left side that pushes away case apparatus 18 with sandbox to be stopped; Push away case apparatus 18 with the sandbox of the 4th ferry-boat on the dolly 11 advance left the distance of a sandbox, this sandbox get into second stop section track 16 ranks, second stop section track 16 high order ends a sandbox is pulled on the first ferry-boat dolly 14.Push away case apparatus 18 and the 4th the ferry-boat dolly 11 automatically reset.The first ferry-boat dolly 14 is transported to the precalculated position that pushes away case apparatus 15 right sides with sandbox to be stopped.Push away will ferry sandbox on the dolly 14 of case apparatus 15 and advance the distance of a sandbox to the right, this sandbox gets into the ranks of cooling section track 19, pushes away case apparatus 15 and first dolly 14 of ferrying and automatically resets; Simultaneously, the second ferry-boat dolly 23 is received the cooled sandbox from cooling section track 19.So far, accomplish a sandbox cyclic process.Repeat top action continuously, when the first cast section sandbox that track 8 ranks pour all was replaced into the sandbox of the type of having made, the operation of second circulation route temporarily stopped.The sandbox circulatory system begins to switch to the operation of article one circulation route.In said process carried out, the sandbox that is in the second cast section track 13 was taken out negative pressure by negative pressure device 17, accomplished cast by casting machine 9 from left to right one by one along casting machine track 12, finished up to this pouring practice, switched to 8 cast of the first cast section track then.
This efficient lost foam casting production line adopts two circulation routes, only adopts a casting machine just can realize serialization production, and moulding, pours into a mould and be independent of each other.

Claims (6)

1. efficient lost foam casting production line; Its step cycle in sandbox closed circuit system has sandbox (2); Casting machine (9) is poured into a mould the sandbox (2) on the cast section track (8,13) that steps to sandbox closed circuit system; It is characterized in that: the cast section track (8,13) of the said sandbox circulatory system is set side by side with stops section track (20,16), and cast section track is realized being connected through ferry-boat dolly (11) with the middle part of stopping the section track; Described sandbox (2) is at cast section track (8,13) and stop upward handing-over operation of section track (20,16); Described casting machine (9) moves forward and backward cast along casting machine track (12).
2. efficient lost foam casting production line according to claim 1 is characterized in that: the described sandbox circulatory system is enclosed by moulding section track (4), cast section track (8,13) and a stop section track (20,16), the first ferry-boat dolly (14), cooling section track (19) and the second ferry-boat dolly (23) and forms; Described moulding section track (4) is the single channel structure; Pour into a mould section track (8,13) and stop a section track (20, a 16) formation pair line structure, join through the 3rd ferry-boat dolly (7) and the 4th ferry-boat dolly (11) between moulding section track (4) and cast section track (8,13) and the stop section track (20,16).
3. efficient lost foam casting production line according to claim 1 is characterized in that: on the casting machine track (12) that described casting machine (9) section of being arranged on and pouring into a mould track (8,13) laterally arranges.
4. efficient lost foam casting production line according to claim 1 is characterized in that: described cooling section track (19) is the single channel structure.
5. efficient lost foam casting production line according to claim 1 is characterized in that: described sandbox closed circuit system realizes that by pushing away case apparatus (1,6,10,15,18,22) stepping of sandbox in sandbox closed circuit system move.
6. according to the described any efficient lost foam casting production line of claim 1-4, it is characterized in that: a described cast section track (8,13) and a stop section track (20,16) all can be arranged 10~30 sandboxes are set.
CN 201110387219 2011-11-29 2011-11-29 High-efficiency lost foam casting production line Expired - Fee Related CN102407288B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110387219 CN102407288B (en) 2011-11-29 2011-11-29 High-efficiency lost foam casting production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110387219 CN102407288B (en) 2011-11-29 2011-11-29 High-efficiency lost foam casting production line

Publications (2)

Publication Number Publication Date
CN102407288A true CN102407288A (en) 2012-04-11
CN102407288B CN102407288B (en) 2013-10-02

Family

ID=45909804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110387219 Expired - Fee Related CN102407288B (en) 2011-11-29 2011-11-29 High-efficiency lost foam casting production line

Country Status (1)

Country Link
CN (1) CN102407288B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102921886A (en) * 2012-10-10 2013-02-13 安徽红星阀门有限公司 Process for casting black area model of lost foam
CN103878309A (en) * 2014-03-22 2014-06-25 辽阳顺通机械制造有限公司 Lost foam casting production line
CN104338900A (en) * 2014-10-21 2015-02-11 河北瑞欧消失模科技有限公司 Method for electrically controlling discrete lost foam casting production line
CN104815945A (en) * 2015-03-31 2015-08-05 安徽惠明机械制造有限公司 Sand treatment technology for high nickel austenite nodular cast iron
CN105964953A (en) * 2016-07-14 2016-09-28 成都桐林铸造实业有限公司 Casting and automatic modeling line of no-bake furan resin sand
CN110238378A (en) * 2019-07-10 2019-09-17 河南华腾重工科技有限公司 A kind of foundry production line
CN112496313A (en) * 2020-11-17 2021-03-16 江苏沙钢集团有限公司 Novel automatic box overturning system and method for automatic lost foam sand box

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0297761A2 (en) * 1987-06-29 1989-01-04 Vulcan Engineering Co. Lost foam casting system
CN101837445A (en) * 2009-03-18 2010-09-22 新东工业株式会社 Foundry production line and sand removing method
CN102248126A (en) * 2011-07-08 2011-11-23 刘宁 Lost foam automatic line
CN202291253U (en) * 2011-11-29 2012-07-04 周祚超 Efficient lost foam casting production line

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0297761A2 (en) * 1987-06-29 1989-01-04 Vulcan Engineering Co. Lost foam casting system
CN101837445A (en) * 2009-03-18 2010-09-22 新东工业株式会社 Foundry production line and sand removing method
CN102248126A (en) * 2011-07-08 2011-11-23 刘宁 Lost foam automatic line
CN202291253U (en) * 2011-11-29 2012-07-04 周祚超 Efficient lost foam casting production line

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102921886A (en) * 2012-10-10 2013-02-13 安徽红星阀门有限公司 Process for casting black area model of lost foam
CN103878309A (en) * 2014-03-22 2014-06-25 辽阳顺通机械制造有限公司 Lost foam casting production line
CN103878309B (en) * 2014-03-22 2016-06-22 辽阳顺通机械制造有限公司 A kind of Lost Form Casting Production Line
CN104338900A (en) * 2014-10-21 2015-02-11 河北瑞欧消失模科技有限公司 Method for electrically controlling discrete lost foam casting production line
CN104815945A (en) * 2015-03-31 2015-08-05 安徽惠明机械制造有限公司 Sand treatment technology for high nickel austenite nodular cast iron
CN105964953A (en) * 2016-07-14 2016-09-28 成都桐林铸造实业有限公司 Casting and automatic modeling line of no-bake furan resin sand
CN105964953B (en) * 2016-07-14 2017-11-21 成都桐林铸造实业有限公司 A kind of furan no-bake resin sand casts automatic mo(u)lding line
CN110238378A (en) * 2019-07-10 2019-09-17 河南华腾重工科技有限公司 A kind of foundry production line
CN110238378B (en) * 2019-07-10 2021-05-18 河南华腾重工科技有限公司 Casting production line
CN112496313A (en) * 2020-11-17 2021-03-16 江苏沙钢集团有限公司 Novel automatic box overturning system and method for automatic lost foam sand box

Also Published As

Publication number Publication date
CN102407288B (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN102407288B (en) High-efficiency lost foam casting production line
CN106513658B (en) Aluminium alloy lost foam foundry production line
CN203972766U (en) A kind of separate type Lost Form Casting Production Line
CN103100706A (en) Metal mold gravity casting automatic production line
CN202291253U (en) Efficient lost foam casting production line
CN105945240B (en) One kind penetrates the sand accurately automatic core shooter of double
CN104338900A (en) Method for electrically controlling discrete lost foam casting production line
CN107030277A (en) A kind of pulsating production line for conveying molding sand
CN104369266A (en) Automatic excrement leaking plate production line and production technology thereof
CN102248126B (en) Lost foam automatic line
JP2009050910A (en) Cooling line for green sand mold poured with molten metal
EP3283248B1 (en) Method and system for indexing moulds
CN105174263B (en) Continuous demolding mechanism and automatic casting molding assembly line comprising same
CN104625041A (en) Automatic casting moulding assembly line
CN108907119A (en) Double-station horizontal automatic moulding machine
CN205341839U (en) Casting moulding line and casting production line
CN210132046U (en) Automatic production line for clutch castings
CN104107883A (en) Novel molding cooling system
CN209424541U (en) A kind of mo(u)lding line transition car and driving means
CN203751280U (en) Vertical parting molding machine
CN102078943A (en) Sand box transfer trolley for static pressure molding line
CN215824211U (en) Moulding line
CN204430261U (en) Automation moulding by casting streamline
CN113102745B (en) Three-dimensional roller bed production line based on sand box technology
CN103182488A (en) One-machine-two-stream type slab casting machine and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131002

Termination date: 20201129