CN102383618B - Device and method for permanently strengthening old building - Google Patents

Device and method for permanently strengthening old building Download PDF

Info

Publication number
CN102383618B
CN102383618B CN201010273408.8A CN201010273408A CN102383618B CN 102383618 B CN102383618 B CN 102383618B CN 201010273408 A CN201010273408 A CN 201010273408A CN 102383618 B CN102383618 B CN 102383618B
Authority
CN
China
Prior art keywords
pilaster
old building
wall
bearing frame
tension rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010273408.8A
Other languages
Chinese (zh)
Other versions
CN102383618A (en
Inventor
朱启华
卢文胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Original Assignee
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd filed Critical SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority to CN201010273408.8A priority Critical patent/CN102383618B/en
Publication of CN102383618A publication Critical patent/CN102383618A/en
Application granted granted Critical
Publication of CN102383618B publication Critical patent/CN102383618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a device for permanently strengthening an old building. The device comprises a bearing frame, a plurality of pilasters and binding bars, wherein the bearing frame is arranged in the old building; the pilasters are respectively adhered to inner walls of the old building and are connected to the bearing frame; and the binding bars are used for connecting the walls to the pilasters. The invention also discloses a method for permanently strengthening the old building. The bearing frame and the pilasters are arranged in the old building for enhancing a bearing strength and the binding bars are used for pulling, binding and fixing the walls, thereby reducing the damage to the walls, keeping an original appearance of outer vertical walls of the old building and achieving an excellent permanently strengthening function.

Description

Permanent reinforcing device for old buildings and method
Technical field
The present invention relates to old building reinforcing technique, more particularly, relate to a kind of permanent reinforcing device for old buildings and method.
Background technology
Due to of the remote past, body of wall is aging, causes old building overall structure weakness, in order to protect better old building, need to carry out permanent reinforcing to old building.At present, conventional reinforcing mode is first the body of wall of old building to be chiseled, and then the structural column newly doing and structural beams is embedded in body of wall, thereby is formed for the entirety of reinforcing.But which is larger to the destruction of old building body of wall, be also unfavorable for keeping the original appearance of the outer facade of old building body of wall simultaneously.
Therefore, how can either old building effectively be reinforced, can reduce again the destruction to old building wall body structure, keeping to greatest extent its original appearance is current building engineering field urgent problem.
Summary of the invention
For the above-mentioned shortcoming existing in prior art, the object of this invention is to provide a kind of permanent reinforcing device for old buildings and method, in order to old building is carried out to permanent reinforcing, reduce the destruction to its body of wall.
For achieving the above object, the present invention adopts following technical scheme:
This permanent reinforcing device for old buildings, comprising:
Load-bearing frame, is located at old building inside;
Several pilasters, are attached at respectively on old building body of wall inwall, and are connected and fixed integral with load-bearing frame;
Tension rib, one end is implanted in body of wall fixing, and the other end anchors in pilaster.
Between described pilaster and body of wall inwall, scribble anti-water base cement sand bed.
Described pilaster and load-bearing frame adopt steel concrete to make.
Described tension rib adopts and is the chemical bolt that plum blossom-shaped is arranged, and weld mutually with the reinforcing cage in pilaster the one end anchoring in pilaster.
The concrete steps of this reinforcement means are as follows:
A. on the inwall of old building body of wall, implant tension rib;
B. set up the reinforcing cage of pilaster at the body of wall inwall place that is implanted with tension rib, and weld mutually with the tension rib other end;
C. pour into a mould pilaster, and the tension rib other end is cast in pilaster;
D. at the load-bearing frame of the inner casting reinforced concrete of old building, and by load-bearing frame and each pilaster pour into a mould be connected and fixed integral.
Between described step B, C, before being also included in cast pilaster, on the corresponding inwall of body of wall, be coated with the step of anti-water base cement mortar.
In described steps A, select chemical bolt as tension rib, and be plum blossom-shaped implantation body of wall inwall.
In technique scheme, permanent reinforcing device for old buildings of the present invention comprises to be located at the load-bearing frame of old building inside, to be attached at several pilasters of being connected on old building body of wall inwall and with load-bearing frame, tension rib for connecting wall and pilaster respectively.Reinforcement means of the present invention is included in old building body of wall inwall and implants tension rib, sets up pilaster reinforcing cage, the cast pilaster welding mutually with tension rib and the load-bearing frame being connected with pilaster in the inner cast of old building.Owing to adopting in old building inside by load-bearing frame being set and pilaster is reinforced load, and carry out body of wall drawknot by tension rib and fix, thereby reduce the destruction to body of wall, and kept the original appearance of the outer facade of old building body of wall, played good permanent reinforcement effect.
Brief description of the drawings
Fig. 1 is the partial top view of the permanent reinforcing device of being located at old building inside of the present invention;
Fig. 2 is the sectional view along A-A line in Fig. 1;
Fig. 3 is the flow chart of the permanent reinforcement means of old building of the present invention.
Detailed description of the invention
Further illustrate technical scheme of the present invention below in conjunction with drawings and Examples.
Shown in Fig. 1,2, permanent reinforcing device for old buildings 100 of the present invention comprises load-bearing frame 110, several pilaster 120 and tension rib 130, and load-bearing frame 110 is located at old building inside; Pilaster 120 is attached at respectively on the inwall of old building body of wall 1, the distributing position of pilaster 120 considers the force request of old building internal framework and needs body of wall 1 node location of reinforcing to distribute, as in the middle of body of wall 1, the position that needs reinforcement of body of wall 1 turning and body of wall 1 other weakness, and be connected and fixed integral with load-bearing frame 110; Tension rib 130, it is interior fixing that body of wall 1 is implanted in one end, and the other end anchors in pilaster 120, and meets anchorage length requirement, and for the drawknot between body of wall 1 and pilaster 120 and fixing, and the implantation end of tension rib 130 does not penetrate body of wall 1 outer wall.It should be noted that at this, load-bearing frame 110 all can adopt steel concrete pouring type to make with pilaster 120, and tension rib 130 can be selected the chemical bolt that is plum blossom-shaped layout, and in the time making the reinforcing cage of pilaster 120, the other end of tension rib 130 and reinforcing cage are welded together, can tension rib 130 is fixing with pilaster 120 by cast.Corrode body of wall 1 for the concrete alkali lye of the pilaster 120 that prevents from being affixed with body of wall 1 exosmoses, can coat anti-water base cement sand bed 140 in the contact site between pilaster 120 and body of wall 1 inwall, thereby play the effect of protecting interface.
Please, again in conjunction with shown in Fig. 3, the concrete steps of the permanent reinforcement means of this old building are as follows:
A. on the inwall of old building body of wall 1, implant tension rib 130;
B. set up the reinforcing cage of pilaster 120 at the body of wall 1 inwall place that is implanted with tension rib 130, and weld mutually with tension rib 130 other ends;
C. pour into a mould pilaster 120, and tension rib 130 other ends are cast in pilaster 120;
D. at the load-bearing frame 110 of the inner casting reinforced concrete of old building, and load-bearing frame 110 and each pilaster 120 cast are connected and fixed integral.
Between step B, C, before being also included in cast pilaster 120, on the corresponding inwall of body of wall 1, be coated with the step of anti-water base cement mortar, thereby protect interface together with forming between body of wall 1 and pilaster 120.
In steps A, can select chemical bolt as tension rib 130, and be plum blossom-shaped implantation body of wall 1 inwall.
It should be noted that at this, a part that also can be using pilaster 120 as whole load-bearing frame 110, is that load-bearing frame 110 contacts with body of wall 1 part being connected, and therefore pilaster 120 and the reinforcing cage of load-bearing frame 110 can be set up simultaneously to cast simultaneously.
Permanent reinforcing device for old buildings 100 of the present invention and method, by adopting in old building inside by load-bearing frame 110 being set and pilaster 120 is reinforced load, and carry out body of wall 1 drawknot by tension rib 130 and fix, whole old building body of wall 1 is connected with bracing means 100, and bracing means 100 is protected old building body of wall 1 from inner support just as a structure inner bag, thereby play effective reinforcement effect, and carry out insert structure post without chiseling in a large number body of wall 1, therefore greatly reduced the destruction to body of wall 1, and keep the original appearance of old building body of wall 1 outer facade, play good permanent reinforcement effect, be conducive to keep the original appearance of old building body of wall 1 outer facade simultaneously, effect is very remarkable.
Those of ordinary skill in the art will be appreciated that, above embodiment is only for the present invention is described, and be not used as limitation of the invention, as long as within the scope of connotation of the present invention, variation, modification to the above embodiment all will drop within the scope of claims of the present invention.

Claims (6)

1. a permanent reinforcing device for old buildings, is characterized in that,
Comprise:
Load-bearing frame, is located at old building inside;
Several pilasters, are attached at respectively on old building body of wall inwall, and are connected and fixed integral with load-bearing frame;
Tension rib, one end is implanted in body of wall fixing, and the other end anchors in pilaster;
Between described pilaster and body of wall inwall, scribble anti-water base cement sand bed.
2. permanent reinforcing device for old buildings as claimed in claim 1, is characterized in that:
Described pilaster and load-bearing frame adopt steel concrete to make.
3. permanent reinforcing device for old buildings as claimed in claim 2, is characterized in that:
Described tension rib adopts and is the chemical bolt that plum blossom-shaped is arranged, and weld mutually with the reinforcing cage in pilaster the one end anchoring in pilaster.
4. the permanent reinforcement means of old building, is characterized in that,
The concrete steps of this reinforcement means are as follows:
A. on the inwall of old building body of wall, implant tension rib;
B. set up the reinforcing cage of pilaster at the body of wall inwall place that is implanted with tension rib, and weld mutually with the tension rib other end;
C. pour into a mould pilaster, and the tension rib other end is cast in pilaster;
D. at the load-bearing frame of the inner casting reinforced concrete of old building, and by load-bearing frame and each pilaster pour into a mould be connected and fixed integral.
5. the permanent reinforcement means of old building as claimed in claim 4, is characterized in that:
Between described step B, C, before being also included in cast pilaster, on the corresponding inwall of body of wall, be coated with the step of anti-water base cement mortar.
6. the permanent reinforcement means of old building as claimed in claim 5, is characterized in that:
In described steps A, select chemical bolt as tension rib, and be plum blossom-shaped implantation body of wall inwall.
CN201010273408.8A 2010-09-03 2010-09-03 Device and method for permanently strengthening old building Active CN102383618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010273408.8A CN102383618B (en) 2010-09-03 2010-09-03 Device and method for permanently strengthening old building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010273408.8A CN102383618B (en) 2010-09-03 2010-09-03 Device and method for permanently strengthening old building

Publications (2)

Publication Number Publication Date
CN102383618A CN102383618A (en) 2012-03-21
CN102383618B true CN102383618B (en) 2014-09-10

Family

ID=45823418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010273408.8A Active CN102383618B (en) 2010-09-03 2010-09-03 Device and method for permanently strengthening old building

Country Status (1)

Country Link
CN (1) CN102383618B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603509B (en) * 2013-12-10 2016-08-17 山东双得利建设科技有限公司 Use carbon cloth reinforced reinforced beam and reinforcement means
CN103993755B (en) * 2014-05-20 2016-01-13 东南大学 A kind of ruggedized construction and method strengthening the connection of ancient houses building wall column
CN104878950A (en) * 2015-06-02 2015-09-02 华侨大学 Peripheral concrete frame reinforcing structure and method
CN106677431A (en) * 2015-11-05 2017-05-17 中国华冶科工集团有限公司 Outer wall modeling column construction method
CN114687371A (en) * 2022-03-31 2022-07-01 成都建工第二建筑工程有限公司 Assembled prefabricated brick forming die inclined construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3437904B2 (en) * 1996-12-24 2003-08-18 株式会社熊谷組 Seismic isolation method and seismic isolation device for existing buildings
KR20050122151A (en) * 2004-06-23 2005-12-28 계룡산업 주식회사 Structural strengthening methods by shear walls used small precast concrete blocks, and its productions
CN201554237U (en) * 2009-11-05 2010-08-18 上海市第一建筑有限公司 Seismic strengthening structure of retained exterior wall
CN201786038U (en) * 2010-09-03 2011-04-06 上海天演建筑物移位工程有限公司 Permanent reinforcing device for old buildings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3437904B2 (en) * 1996-12-24 2003-08-18 株式会社熊谷組 Seismic isolation method and seismic isolation device for existing buildings
KR20050122151A (en) * 2004-06-23 2005-12-28 계룡산업 주식회사 Structural strengthening methods by shear walls used small precast concrete blocks, and its productions
CN201554237U (en) * 2009-11-05 2010-08-18 上海市第一建筑有限公司 Seismic strengthening structure of retained exterior wall
CN201786038U (en) * 2010-09-03 2011-04-06 上海天演建筑物移位工程有限公司 Permanent reinforcing device for old buildings

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
廖水泉等.石结构的抗震性能及加固改造.《山西建筑》.2010,第36卷(第9期),第46-47页.
石结构的抗震性能及加固改造;廖水泉等;《山西建筑》;20100331;第36卷(第9期);第46-47页 *

Also Published As

Publication number Publication date
CN102383618A (en) 2012-03-21

Similar Documents

Publication Publication Date Title
CN102383618B (en) Device and method for permanently strengthening old building
CN101613995B (en) Psc bridge pier assembled with precast concrete segments having steel duct and steel pipe, and constructing method thereof
CN203514336U (en) Embedded foundation of composite wallboard
CN111699292A (en) Base for wind turbine
KR20110103000A (en) Precast bridge joint structure with composite hollow concrete filled tube and a construction method for the same
KR100993777B1 (en) Rahmen structure construction method using precast segment
JP2022509698A (en) Base for wind turbine tower
KR100909277B1 (en) Pier foundation with steel pipe and assembly structure
CN104594193B (en) A kind of Hollow Slab Beam Bridge superstructure and construction method thereof
CN103510530A (en) Embedded foundation of composite wallboard and implementation method thereof
KR100787119B1 (en) Pier having Precast Concrete Pipe
KR200424776Y1 (en) Pier having Precast Concrete Pipe
KR101582599B1 (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
CN101492918B (en) Beam column node for base pit engineering of topdown construction method
KR20060096706A (en) Deck suspension top-down method of sub-structure
KR20140125754A (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
CN201786038U (en) Permanent reinforcing device for old buildings
KR20090118722A (en) Precast foundation and pile connection structure between precast foundation and pile
JP2008075449A (en) Rigid-frame viaduct construction method
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
KR101004747B1 (en) Pillar construction method by layer-built and frame construction method adapting the same
KR100860422B1 (en) Mold device for horizontal, vertical all style concrete construction
KR20020011270A (en) Arch structure of subway or common duct in excavating process of constructing and method of constructing the same
CN212077957U (en) Improved crown beam and foundation pit support structure
KR101641837B1 (en) Section formation method for weight reduction at section building of bridge lower structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant