CN102378214A - Switching testing method and system and evolved Node B (eNB) - Google Patents

Switching testing method and system and evolved Node B (eNB) Download PDF

Info

Publication number
CN102378214A
CN102378214A CN2010102608460A CN201010260846A CN102378214A CN 102378214 A CN102378214 A CN 102378214A CN 2010102608460 A CN2010102608460 A CN 2010102608460A CN 201010260846 A CN201010260846 A CN 201010260846A CN 102378214 A CN102378214 A CN 102378214A
Authority
CN
China
Prior art keywords
enb
mme
message
switching
handoff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102608460A
Other languages
Chinese (zh)
Other versions
CN102378214B (en
Inventor
李伟
李海涛
张先锋
李郜伟
王斌
吴鹏程
程凯
尹倩
由县卫
王钊
赵博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201010260846.0A priority Critical patent/CN102378214B/en
Publication of CN102378214A publication Critical patent/CN102378214A/en
Application granted granted Critical
Publication of CN102378214B publication Critical patent/CN102378214B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a switching testing method, a switching testing system and an evolved Node B (eNB), and belongs to the field of wireless communication. The method comprises the following steps of: setting a source eNB and an objective eNB to be the same eNB, and performing S1 port switching testing on eNB and a mobility management entity (MME). The system comprises the source eNB, the objective eNB, and the MME; the source eNB and the objective eNB are the same eNB, and the eNB and the MME are subjected to S1 port switching testing. The eNB comprises a request information sending unit which is used for sending switching request information to MME, an objective switching unit which is used for sending confirmation information of switching request receiving to the MME, and a source switching unit is used for finishing the switching process of the source eNB according to the switching command information which is sent by the MME. By using only one eNB, the switching testing of an S1 port is finished. Testing cost is reduced and testing efficiency is improved.

Description

A kind of handoff testing method, system and evolved base station eNB
Technical field
The present invention relates to cordless communication network, particularly the handoff testing method of S1 interface, system and eNB.
Background technology
At LTE (Long Term Evolution; Long Term Evolution) in the network; Need need two eNB systems at least to the test of switching flow on the S1 interface between eNB (Evolved Node B, evolved base station) and mobility management unit MME (Mobility Management Entity).Wherein, one as the eNB that switch to initiate, i.e. source eNB, and another is as the purpose eNB of handoff procedure, i.e. target eNB.
In realizing process of the present invention, the inventor finds that there is following problem at least in prior art:
Under some environment, through two eNB, carry out the test of S1 switching flow, very poor efficiency and cost are higher.For example, environment is opened at the scene of some construction, and the distance between eNB is far, and the tester need test respectively on two eNB.Again such as, under some environment, have only an eNB, this moment can't realize test to the S1 handoff functionality of eNB, thereby can't confirm the S1 handoff functionality of eNB.
In addition, in order to test eNB as the function of source eNB with as the function of target eNB, need carry out twice test, promptly eNB is as source eNB and target eNB, and test once respectively.This does not also comprise the consideration to unusual scrnario testing.Testing efficiency is low, influences product delivery time or engineering delivery time.
Summary of the invention
In order to reduce testing cost and to improve testing efficiency, the embodiment of the invention provides a kind of handoff testing method.Said technical scheme is following: this method comprises: source eNB and purpose eNB are set to same eNB; Carry out S1 interface switch test between said eNB and the mobility management unit MME.
Further embodiment of this invention provides a kind of switch test system; This system comprises source eNB, purpose eNB and mobility management unit MME; Said source eNB and purpose eNB are same eNB, carry out S1 interface switch test between said eNB and the mobility management unit MME.
Further embodiment of this invention provides a kind of eNB that is used for switch test, and said eNB comprises: the request message transmitting element, be used for sending handoff request message to MME, and the target eNB sign in the said handoff request message is identical with source eNB sign; The purpose switch unit is used for the switching invitation message according to the MME transmission, accomplishes the switching of said purpose eNB and prepares, and send the affirmation message of receiving that switching is invited to said MME; The source switch unit is used for the switching command message according to the MME transmission, accomplishes the handoff procedure of source eNB.
The beneficial effect that the technical scheme that the embodiment of the invention provides is brought is: proposed a kind of S1 interface switching flow method of testing and system based on single eNB, only with an eNB, just can accomplish the switching flow test of S1 interface.Not only reduced testing cost, and, testing efficiency improved.Through a flow testing, just can accomplish the source eNB function of eNB system and the test of target eNB function, testing efficiency is doubled.
Description of drawings
Fig. 1 is a kind of handoff testing method step sketch map of the embodiment of the invention 1;
Fig. 2 is the structural representation of a kind of switch test system of the embodiment of the invention 2;
Fig. 3 is a kind of structural representation that is used for the eNB of switch test of the embodiment of the invention 3;
Fig. 4 is a kind of handoff testing method schematic flow sheet of the embodiment of the invention 1;
Fig. 5 is the sketch map of a kind of handoff functionality testing process example of the embodiment of the invention 1.
Embodiment
For making the object of the invention, technical scheme and advantage clearer, will combine accompanying drawing that embodiment of the present invention is done to describe in detail further below.
Embodiment 1
The embodiment of the invention provides a kind of handoff testing method.Referring to Fig. 1, this method may further comprise the steps:
Step 101: source eNB and purpose eNB are set to same eNB;
Step 102: carry out S1 interface switch test between said eNB and the mobility management unit MME.
In step 101; The eNB decision is initiated to be used for test based on handoff procedure between the eNB of S1 interface, and at first eNB sends handoff request message to MME; Carry parameters such as target eNB sign in the handoff request message; Identify target eNB, extend this as this eNB sign, source eNB and purpose eNB are set to same eNB thus;
In step 102, carry out switch test through the S1 interface between said eNB and the mobility management unit MME.Referring to Fig. 4, the concrete realization as follows:
At first, after the handoff request message of MME according to the eNB that receives, if the target eNB in the handoff request message is designated this eNB itself, then select the target eNB of this eNB, and send the switching invitation message to this eNB for switching.
Afterwards, after eNB receives the switching invitation message of MME transmission, accomplish the switching of said purpose eNB and prepare, and after switching is ready to complete, receive the affirmation message of switching invitation to the MME loopback.
Then, MME sends switching command message to eNB after receiving the affirmation message that the switching of eNB invites, and starts eNB notice UE, carries out handoff procedure, to accomplish the handoff procedure of source eNB.
The process of in embodiments of the present invention, carrying out S1 interface switch test between said eNB and the mobility management unit MME can also comprise following process:
After UE successfully was synchronized to Target cell, eNB sent handoff notification message to MME; After MME receives the handoff notification message of eNB, send request bearer update message to gateway, carry out bearer update to SGW.After this gateway is accomplished bearer update, to the response message of said MME echo request bearer update.
MME sends the command messages that discharges said UE correlated resources to eNB, and eNB receives the command messages from the said UE correlated resources of the release of said MME, and the related resource of UE before initiating is switched in request eNB deletion.After eNB accomplishes the resource deletion, send the message of accomplishing the release correlated resources to the MME loopback.
Referring to Fig. 5, Fig. 5 is the sketch map of the concrete example that realizes of said process, and detailed step is following:
1.eNB decision is initiated to be used for test based on handoff procedure between the eNB of S1 interface;
2.eNB send handoff request message to MME, that is, Handover Required message is carried target eNB sign parameters such as (TargetID), simultaneously, identifies target eNB, extends this as this eNB sign;
3.MME after the Handover Required message according to the eNB that receives, if the sign of the target eNB in the message for this eNB itself, is then selected this eNB, be the target eNB of switching, and send the switching invitation message to this eNB, that is, and Handover Request message;
3a.eNB after receiving the Handover Request message of MME transmission, accomplish to switch and prepare, and after switching is ready to complete, switch the invitation acknowledge message to the MME loopback, that is, and Handover Request Acknowledge message;
4.MME after receiving the Handover Request Acknowledge message of eNB, send switching command message to eNB, that is, Handover Command message starts eNB notice UE, carries out handoff procedure;
5.UE after successfully being synchronized to Target cell, eNB sends handoff notification message to MME, that is, and and Handover Notify message;
6.ME after receiving the Handover Notify message of eNB, send the bearer update request message to SGW, that is, Modify Bearer Request message is carried out bearer update;
6a. behind the completion bearer update, loopback bearer update request message, that is, and Modify Bearer Response message;
7. send release UE correlated resources command messages to eNB, that is, UE context release command message, deletion eNB switches the resource of the UE association before initiating;
7a. after accomplishing the resource deletion, accomplish release UE correlated resources message to the MME loopback, that is, and UEcontext release complete.
The beneficial effect that the technical scheme that the embodiment of the invention provides is brought is: proposed a kind of S1 interface switching flow method of testing based on single eNB, only with an eNB, just can accomplish the switching flow test of S1 interface.Not only reduced testing cost, and, testing efficiency improved.Through a flow testing, just can accomplish the source eNB function of eNB system and the test of target eNB function, testing efficiency is doubled.
Embodiment 2
The embodiment of the invention provides a kind of switch test system; Referring to Fig. 2, this system comprises source eNB, purpose eNB and mobility management unit MME; Said source eNB and purpose eNB are same eNB, carry out S1 interface switch test between said eNB and the mobility management unit MME.
Preferably, eNB comprises request message transmitting element 201: purpose switch unit 202 and source switch unit 203.MME comprises and switch to invite unit 210, really receives message sink unit 211 and change-over command unit 212.
Wherein request message transmitting element 201 is used for sending handoff request message to MME, and the target eNB sign in the handoff request message is identical with source eNB sign; Purpose switch unit 201 is used for the switching invitation message according to the MME transmission, accomplishes the switching of said purpose eNB and prepares, and send the affirmation message of receiving that switching is invited to said MME; Source switch unit 203 is used for the switching command message according to the MME transmission, accomplishes the handoff procedure of source eNB;
Wherein switch the handoff request message of inviting unit 210 to receive, and send the switching invitation message to said eNB from said eNB; Really receive message sink unit 211 and be used to receive the affirmation message of receiving switching invitation of sending from said eNB; Change-over command unit 212 is used for sending switching command message to said eNB.
Preferably, said eNB also comprises switching notice transmitting element, release command receiving element and discharges completion report unit.MME also comprises: bearer update unit, release command unit and the receiving element that discharges the completion report.
Wherein the switching notice transmitting element is used for sending handoff notification message to said MME, so that MME sends request bearer update message to gateway; The release command transmitting element is used for after said gateway response bearer update, receiving the message of the said UE correlated resources of release of said MME transmission, discharges and accomplishes the completion message that the report unit is used for sending to said MME release UE correlated resources.
Wherein the bearer update unit is used for sending request bearer update message to gateway, and receives the response message of the bearer update of gateway transmission; The release command unit is used for discharging to the said eNB request of sending the command messages of the correlated resources of said UE; Discharge the receiving element of accomplishing report and be used to receive completion message from the release UE correlated resources of said eNB.
Embodiment 3
The embodiment of the invention provides a kind of eNB that is used for switch test.Referring to Fig. 3, this eNB comprises request message transmitting element 301: purpose switch unit 302 and source switch unit 303.
Wherein request message transmitting element 301 is used for sending handoff request message to MME, and the target eNB sign in the handoff request message is identical with source eNB sign; Purpose switch unit 302 is used for the switching invitation message according to the MME transmission, accomplishes the switching of said purpose eNB and prepares, and send the affirmation message of receiving that switching is invited to said MME; Source switch unit 303 is used for the switching command message according to the MME transmission, accomplishes the handoff procedure of source eNB.
Preferably, said eNB also comprises switching notice transmitting element, release command receiving element and discharges completion report unit.
Wherein the switching notice transmitting element is used for after said UE successfully is synchronized to Target cell, sends handoff notification message to said MME, so that MME sends request bearer update message to gateway; The release command receiving element is used for after said gateway bearer update response, receiving the command messages of the said UE correlated resources of release of said MME transmission; Discharge and accomplish the completion message that the report unit is used for sending to said MME release UE correlated resources.
All or part of content in the technical scheme that above embodiment provides can realize that through software programming its software program is stored in the storage medium that can read, storage medium for example: the hard disk in the computer, CD or floppy disk.
The above is merely preferred embodiment of the present invention, and is in order to restriction the present invention, not all within spirit of the present invention and principle, any modification of being done, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. a handoff testing method is characterized in that, this method comprises:
Source eNB and purpose eNB are set to same eNB;
Carry out S1 interface switch test between said eNB and the mobility management unit MME.
2. method according to claim 1 is characterized in that, carries out S1 interface switch test between said eNB and the MME and specifically comprises:
Said eNB sends handoff request message to MME, and the target eNB sign in the said handoff request message is identical with source eNB sign;
Said eNB accomplishes the switching of said purpose eNB and prepares, and send the affirmation message of receiving that switching is invited to said MME according to the switching invitation message that MME sends;
The switching command message that said eNB sends according to MME, the handoff procedure of completion source eNB.
3. method according to claim 2 is characterized in that, in the switching command message that said eNB sends according to MME, accomplishes after the handoff procedure of source eNB, and said method also comprises:
Said eNB sends handoff notification message to said MME, so that MME sends request bearer update message to gateway;
After said gateway response request bearer update message, said eNB receives the command messages from the release UE correlated resources of said MME;
Said eNB sends and accomplishes the message that correlated resources discharges.
4. switch test system, this system comprises source eNB, purpose eNB and MME, it is characterized in that, said eNB and purpose eNB are same eNB, carry out S1 interface switch test between said eNB and the MME.
5. system according to claim 4 is characterized in that, said eNB specifically comprises:
The request message transmitting element is used for sending handoff request message to MME, and the target eNB sign in the said handoff request message is identical with source eNB sign;
The purpose switch unit is used for the switching invitation message according to the MME transmission, accomplishes the switching of said purpose eNB and prepares, and send the affirmation message of receiving that switching is invited to said MME;
The source switch unit is used for the switching command message according to the MME transmission, accomplishes the handoff procedure of source eNB;
Said MME specifically comprises:
Switch and invite the unit, receive handoff request message, and send the switching invitation message to said eNB from said eNB;
Really receive the message sink unit, be used to receive the affirmation message of receiving switching invitation of sending from said eNB;
Change-over command unit is used for sending switching command message to said eNB.
6. system according to claim 5 is characterized in that, said eNB also comprises:
The switching notice transmitting element is used for sending handoff notification message to said MME, so that MME sends request bearer update message to gateway;
The release command receiving element is used for after said gateway response request bearer update message, receiving the command messages of the release UE correlated resources of said MME;
Discharge and accomplish the report unit, be used for sending the message that completion discharges the UE correlated resources to said MME;
Said MME also comprises:
The bearer update unit is used for sending request bearer update message to gateway, and receives the response message of the bearer update of gateway transmission;
The release command unit is used for the command messages to the correlated resources of said eNB transmission request release UE;
Discharge the receiving element of accomplishing report, be used to receive the message that discharges the UE correlated resources from the completion of said eNB.
7. an evolved base station eNB who is used for switch test is characterized in that, said eNB comprises:
The request message transmitting element is used for sending handoff request message to MME, and the target eNB sign in the said handoff request message is identical with source eNB sign;
The purpose switch unit is used for the switching invitation message according to the MME transmission, accomplishes the switching of said purpose eNB and prepares, and send the affirmation message of receiving that switching is invited to said MME;
The source switch unit is used for the switching command message according to the MME transmission, accomplishes the handoff procedure of source eNB.
8. eNB according to claim 7 is characterized in that, said eNB also comprises:
The switching notice transmitting element sends handoff notification message to said MME, so that MME sends request bearer update message to gateway;
The release command receiving element is used for after said gateway response request bearer update message, receives the command messages of the release UE correlated resources of said MME transmission;
Discharge and accomplish the report unit, be used for sending the message that completion discharges the UE correlated resources to said MME.
CN201010260846.0A 2010-08-23 2010-08-23 Switching testing method and system and evolved Node B (eNB) Active CN102378214B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010260846.0A CN102378214B (en) 2010-08-23 2010-08-23 Switching testing method and system and evolved Node B (eNB)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010260846.0A CN102378214B (en) 2010-08-23 2010-08-23 Switching testing method and system and evolved Node B (eNB)

Publications (2)

Publication Number Publication Date
CN102378214A true CN102378214A (en) 2012-03-14
CN102378214B CN102378214B (en) 2014-05-07

Family

ID=45796024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010260846.0A Active CN102378214B (en) 2010-08-23 2010-08-23 Switching testing method and system and evolved Node B (eNB)

Country Status (1)

Country Link
CN (1) CN102378214B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103428787A (en) * 2012-05-17 2013-12-04 大唐移动通信设备有限公司 Base station switching method and device
CN104854908A (en) * 2013-05-27 2015-08-19 华为技术有限公司 Mobility management method, device and system
CN105376792A (en) * 2014-08-19 2016-03-02 ***通信集团山西有限公司 Monitoring method and apparatus for context management of S1 interface user equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0535714B1 (en) * 1988-06-14 2001-04-18 Telefonaktiebolaget Lm Ericsson Method of operating a mobile radio system
US20090135783A1 (en) * 2005-07-20 2009-05-28 Mohamed Khalil FMIPv6 Intergration with Wimax
CN101516121A (en) * 2009-04-02 2009-08-26 华为技术有限公司 Method for transmitting switching information of base station, system and device thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0535714B1 (en) * 1988-06-14 2001-04-18 Telefonaktiebolaget Lm Ericsson Method of operating a mobile radio system
US20090135783A1 (en) * 2005-07-20 2009-05-28 Mohamed Khalil FMIPv6 Intergration with Wimax
CN101516121A (en) * 2009-04-02 2009-08-26 华为技术有限公司 Method for transmitting switching information of base station, system and device thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103428787A (en) * 2012-05-17 2013-12-04 大唐移动通信设备有限公司 Base station switching method and device
CN103428787B (en) * 2012-05-17 2016-02-10 大唐移动通信设备有限公司 A kind of base station switch method and device
CN104854908A (en) * 2013-05-27 2015-08-19 华为技术有限公司 Mobility management method, device and system
CN104854908B (en) * 2013-05-27 2018-05-29 华为技术有限公司 Motion management method, equipment and system
CN105376792A (en) * 2014-08-19 2016-03-02 ***通信集团山西有限公司 Monitoring method and apparatus for context management of S1 interface user equipment
CN105376792B (en) * 2014-08-19 2019-10-08 ***通信集团山西有限公司 A kind of S1 Interface User device context management monitoring method and device

Also Published As

Publication number Publication date
CN102378214B (en) 2014-05-07

Similar Documents

Publication Publication Date Title
EP3477994B1 (en) Handover method, base station, and communication system
CN102369759B (en) Handover method, device and system
CN102123460B (en) Method for realizing group calling service handover in trunked mobile communication system
CN102076036B (en) Core network equipment and HNB, and method thereof for processing LIPA connection
CN102007794B (en) Communication system, network handover process method and apparatus
US20230247505A1 (en) Telecommunications system, terminal device, infrastructure equipment and methods
CN102014449B (en) User equipment switching method and home evolved base station
MX2012015140A (en) Switch method, communications device and communications system.
KR101960562B1 (en) Methods and apparatus for controlling circuit switched fall back of a mobile station from e-utran to utran/geran in a full-multi-operator core network
US9860794B2 (en) Information acquiring method and base station
CN101686563A (en) Method for releasing resources in mobile communication system
CN107306455B (en) Dual-connection operation method, base station, UE (user Equipment) and MME (mobility management entity)
CN102333352B (en) Method for reducing handover delay in LTE (long term evolution) system
CN106937347B (en) Group call switching method and system of cross-cluster core network
US20150031371A1 (en) Plmn selection method, mobile terminal, bsc and core network device
CN101646212A (en) Cell switching control method, device and communication system
WO2016045297A1 (en) Method and device for processing service continuity of terminal
CN102026308A (en) Method and equipment for determining type of base station
CN102170670A (en) Method, system and device for cell switch and close subscriber group information sending
CN105792292B (en) Base station switching method, system and related device
CN102378214B (en) Switching testing method and system and evolved Node B (eNB)
CN114095874B (en) Multicast/broadcast service mode processing method, device and storage medium
CN102843741A (en) Source side switching communication device, objective side switching communication device, communication system and calling switching method
CN102186157A (en) Method and equipment for transmitting CSG (Content Service Gateway) information
CN101835221B (en) Subdistrict switching method and base station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant