CN102367581A - Multifunctional crown block breaking head - Google Patents

Multifunctional crown block breaking head Download PDF

Info

Publication number
CN102367581A
CN102367581A CN2011103243406A CN201110324340A CN102367581A CN 102367581 A CN102367581 A CN 102367581A CN 2011103243406 A CN2011103243406 A CN 2011103243406A CN 201110324340 A CN201110324340 A CN 201110324340A CN 102367581 A CN102367581 A CN 102367581A
Authority
CN
China
Prior art keywords
temperature
tempering
attacking head
multifunction crane
room temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103243406A
Other languages
Chinese (zh)
Inventor
朱润发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU BAIYUN PLATEAU FASTENER CO Ltd
Original Assignee
GUIZHOU BAIYUN PLATEAU FASTENER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU BAIYUN PLATEAU FASTENER CO Ltd filed Critical GUIZHOU BAIYUN PLATEAU FASTENER CO Ltd
Priority to CN2011103243406A priority Critical patent/CN102367581A/en
Publication of CN102367581A publication Critical patent/CN102367581A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention provides a multifunctional crown block breaking head of which the material is Crl2MoV. The preparation method of the breaking head comprises the following steps of: preheating twice, quenching at 1000-1100 DEG C, tempering at 400-500 DEG C, keeping the temperature for 2-3 hours, cooling to the room temperature, tempering at 180-240 DEG C again, keeping the temperature for 3-4 hours, and cooling to the room temperature to ensure that the hardness of the product reaches HRC58-62. The multifunctional crown block breaking head has higher strength, hardness and rigidity and better heat resistance, wear resistance and fatigue resistance; and when in use, the breaking head is difficult to bend or break and the service life of the breaking head is higher.

Description

A kind of multifunction crane attacking head
Technical field
The present invention relates to a kind of multifunction crane attacking head, belong to the multifunction crane equipment technical field.
Background technology
The multifunction crane attacking head is one of three big parts of multifunction crane crust breaker, and its crust breaking work is frequent, and environment is abominable, and failure rate is high, and work-ing life is short.Attacking head directly bears hitting power in hitting broken aluminum hull process, its collapse mode is mainly bending or fracture, and the attacking head duration of service that has is very short just to fracture; Section is macromeritic, belongs to brittle rupture, mainly is that attacking head thermal treatment intensity, hardness are too high; Crystal grain is thick to be caused, and has in use for some time, ruptures; Be not normal wear out failure, major cause is that material is selected improper or tempering heat treatment is insufficient, and tissue does not have refinement; Bending is because material hardness is too low, due to rigidity is not enough.
Summary of the invention
The present invention is in order to overcome the deficiency of prior art, a kind of multifunction crane attacking head to be provided, and when improving intensity, hardness and the rigidity of attacking head, improves its thermotolerance, wear resistance and fatigue performance, has increased substantially the work-ing life of attacking head.
Multifunction crane attacking head of the present invention, its each several part is of a size of: L is 350mm, L 1Be 180mm, L 2Be 70mm, L 3Be 75mm, L 4Be 25mm, L 5Be 56mm, φ 1Be 60mm, φ 2Be 70mm, φ 3Be 50mm.
Described multifunction crane attacking head material material is Crl2MoV.
Multifunction crane attacking head thermal treatment process step of the present invention is:
1, part that roughing is good is packed into and is carried out the secondary preheating in the heat treatment furnace, for the first time preheating temperature: 300~500 ℃, and preheating temperature for the second time: 840~860 ℃;
The part that 2, will pass through the secondary preheating carries out quenching heat treatment, and quenching temperature is 1000~1100 ℃, is incubated 20~30 minutes;
3, carry out oil quenching, heat-eliminating medium: machine oil, medium temperature: 20~60 ℃, be cooled to the oil temperature, subsequently, air cooling is to room temperature, HRC=62~65;
4, part is carried out double tempering, 400~500 ℃ of tempering once, be incubated 2~3 hours, be cooled to room temperature, and then carry out the tempering second time, 180~240 ℃ of tempering temperatures are incubated 3~4 hours, and postcooling is to room temperature, and hardness reaches HRC58-62;
5, part is carried out ground.
Beneficial effect of the present invention:
Multifunction crane attacking head intensity of the present invention, hardness and rigidity are high, and thermotolerance, wear resisting property and fatigue performance are good, in hot environment, use not yielding, long service life.
Description of drawings
Be illustrated as the structural representation of multifunction crane attacking head of the present invention.
Embodiment
Below in conjunction with accompanying drawing the present invention is done further detailed description:
Among the figure: the each several part of multifunction crane attacking head of the present invention is of a size of: L is 350mm, L 1Be 180mm, L 2Be 70mm, L 3Be 75mm, L 4Be 25mm, L 5Be 56mm, φ 1Be 60mm, φ 2Be 70mm, φ 3Be 50mm.
Described multifunction crane attacking head material material is Crl2MoV.
Multifunction crane attacking head thermal treatment process step of the present invention is:
1, part that roughing is good is packed into and is carried out the secondary preheating in the heat treatment furnace, for the first time preheating temperature: 300~500 ℃, and preheating temperature for the second time: 840~860 ℃;
The part that 2, will pass through the secondary preheating carries out quenching heat treatment, and quenching temperature is 1000~1100 ℃, is incubated 20~30 minutes;
3, carry out oil quenching, heat-eliminating medium: machine oil, medium temperature: 20~60 ℃, be cooled to the oil temperature, subsequently, air cooling is to room temperature, HRC=62~65;
4, part is carried out double tempering, 400~500 ℃ of tempering once, be incubated 2~3 hours, be cooled to room temperature, and then carry out the tempering second time, 180~240 ℃ of tempering temperatures are incubated 3~4 hours, and postcooling is to room temperature, and hardness reaches HRC58-62;
5, part is carried out ground.

Claims (3)

1. multifunction crane attacking head, it is characterized in that: it is 350mm that the each several part of said multifunction crane attacking head is of a size of L, L 1Be 180mm, L 2Be 70mm, L 3Be 75mm, L 4Be 25mm, L 5Be 56mm, φ 1Be 60mm, φ 2Be 70mm, φ 3Be 50mm.
2. multifunction crane attacking head as claimed in claim 1 is characterized in that: said multifunction crane attacking head material material is Crl2MoV.
3. the thermal treatment process step of the described multifunction crane attacking head of preparation claim 1 is:
(1), the part that roughing is good packs into and carries out the secondary preheating in the heat treatment furnace, preheating temperature for the first time: 300~500 ℃, preheating temperature for the second time: 840~860 ℃;
(2), the part that will pass through the secondary preheating carries out quenching heat treatment, quenching temperature is 1000~1100 ℃, is incubated 20~30 minutes;
(3), carry out oil quenching, heat-eliminating medium: machine oil, medium temperature: 20~60 ℃, be cooled to the oil temperature, subsequently, air cooling is to room temperature, HRC=62~65;
(4), part is carried out double tempering, 400~500 ℃ of tempering once, be incubated 2~3 hours, be cooled to room temperature, and then carry out the tempering second time, 180~240 ℃ of tempering temperatures are incubated 3~4 hours, and postcooling is to room temperature, and hardness reaches HRC58-62;
(5), part is carried out ground.
CN2011103243406A 2011-10-21 2011-10-21 Multifunctional crown block breaking head Pending CN102367581A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103243406A CN102367581A (en) 2011-10-21 2011-10-21 Multifunctional crown block breaking head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103243406A CN102367581A (en) 2011-10-21 2011-10-21 Multifunctional crown block breaking head

Publications (1)

Publication Number Publication Date
CN102367581A true CN102367581A (en) 2012-03-07

Family

ID=45760170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103243406A Pending CN102367581A (en) 2011-10-21 2011-10-21 Multifunctional crown block breaking head

Country Status (1)

Country Link
CN (1) CN102367581A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105039657A (en) * 2015-06-29 2015-11-11 江苏金基特钢有限公司 Method for improving wear-resisting performance of carbon steel
CN107739783A (en) * 2017-11-28 2018-02-27 湖北工程职业学院 A kind of heat treatment quenching process of high carbon and chromium tool steel
CN107815521A (en) * 2017-11-28 2018-03-20 湖北工程职业学院 A kind of heat treatment quenching process of high-carbon chrome molybdenum bubbing steel precision component
CN114231701A (en) * 2021-12-10 2022-03-25 吉林省齐智科技有限公司 Non-standard hardness heat treatment method for XW-42 die steel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105039657A (en) * 2015-06-29 2015-11-11 江苏金基特钢有限公司 Method for improving wear-resisting performance of carbon steel
CN107739783A (en) * 2017-11-28 2018-02-27 湖北工程职业学院 A kind of heat treatment quenching process of high carbon and chromium tool steel
CN107815521A (en) * 2017-11-28 2018-03-20 湖北工程职业学院 A kind of heat treatment quenching process of high-carbon chrome molybdenum bubbing steel precision component
CN114231701A (en) * 2021-12-10 2022-03-25 吉林省齐智科技有限公司 Non-standard hardness heat treatment method for XW-42 die steel

Similar Documents

Publication Publication Date Title
CN102367581A (en) Multifunctional crown block breaking head
CN106702295A (en) Method for improving structure and high-temperature smooth fatigue performance of GH4698 disk forge piece
CN103317319B (en) Material is the production and processing method that Cr12Mo1V1 digs that limit is cut
CN102527892B (en) Manufacturing method of martensitic stainless steel forged piece with high electric resistivity and high magnetic conductivity
CN104960024B (en) A kind of manufacture method of disc edge bearing
CN106761421B (en) A kind of protecting against shock drilling tool and its manufacture craft
CN102796954B (en) Low-manganese iron-based shape memory alloy
CN104209720A (en) Manufacturing method of heat-resistant rock drill bit
CN102220459B (en) Heat process capable of lowering ductile-brittle transition temperature and intergranular fracture ratio of turbine blades
CN105993368A (en) Multi-sawtooth disk cutting blade
CN101985683A (en) Quenching process of Cr12MoV roller
CN101914738A (en) Photovoltaic solar strip and preparation method thereof
CN107841678A (en) A kind of ball blast technique pellet and preparation method thereof
CN102912099A (en) Heat treatment method for hard alloy blade
CN103614521A (en) Medium carbon steel material large diesel engine output shaft tempering process
CN102267040A (en) Preparation method for stainless steel bearing steel tube and ferrule
CN105269280A (en) Manufacturing method for engine shaft
CN102719645B (en) Heat treatment method for twist drills
CN103667617A (en) Heat treatment process for improving impact toughness of 1Cr12Ni3Mo2VN turbine blade
CN103882196A (en) Heat treatment technique for normalizing and tempering ZG35Mn steel
CN103882195A (en) Heat treatment technique for normalizing and tempering ZG275-485H steel
CN103014294A (en) Heat treatment technology of bar shearing die blade
CN103060699A (en) Processing method of cold-work die steel
CN102615213A (en) Machining process for multifunctional folding tool shovel blade
CN204171262U (en) A kind of high strength forged shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120307