CN102355190B - 电力***电压调节器参数整定方法 - Google Patents

电力***电压调节器参数整定方法 Download PDF

Info

Publication number
CN102355190B
CN102355190B CN 201110256675 CN201110256675A CN102355190B CN 102355190 B CN102355190 B CN 102355190B CN 201110256675 CN201110256675 CN 201110256675 CN 201110256675 A CN201110256675 A CN 201110256675A CN 102355190 B CN102355190 B CN 102355190B
Authority
CN
China
Prior art keywords
voltage
unit
voltage regulator
system voltage
psvr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110256675
Other languages
English (en)
Other versions
CN102355190A (zh
Inventor
陈新琪
俞鸿飞
卢嘉华
王超
顾益磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ELECTRIC POWER RESEARCH INSTITUTE OF ZHEJIANG ELECTRIC POWER Co
Zhejiang Electric Power Test And Research Institute Technical Service Center
State Grid Corp of China SGCC
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201110256675 priority Critical patent/CN102355190B/zh
Publication of CN102355190A publication Critical patent/CN102355190A/zh
Application granted granted Critical
Publication of CN102355190B publication Critical patent/CN102355190B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

本发明涉及一种电力***电压调节器参数整定方法。目前,发电机励磁调节器都是以控制发电机机端电压为目标,在电网故障需要更多无功功率以提高***电压稳定性方面存在不足。本发明引入***电压,其通过电压调节器参与发电机励磁控制,所述的电压调节器由***电压测量单元、***电压给定单元、综合比较单元、超前滞后放大单元、输出限幅单元和投入退出控制单元组成,电压调节器参数整定的内容如下:相位补偿时间常数的整定、放大倍数KPSVR的整定和输出限幅值的整定。本发明充分发挥发电机的潜在无功功率,提高***电压稳定性,提高电网电压质量,减少事故引发的稳定性破坏事故。

Description

电力***电压调节器参数整定方法
技术领域
本发明涉及电力***中的参数整定,具体地说是一种电力***电压调节器参数整定方法。
背景技术
目前,发电机励磁调节器都是以控制发电机机端电压为目标,在电网故障需要更多无功功率以提高***电压稳定性方面存在不足。若引入***电压(如发电机主变高压侧电压)参与发电机励磁调节器的控制,以控制发电机机端外某一点(如高压母线或升压变压器某一内点)的电压为目标,可以补偿发电机升压变压器的电抗使发电厂高压侧母线电压(又称***电压)维持在较高水平,增大发电机输出的无功功率极限值,达到提高电力***电压稳定性的目的。
发明内容
本发明所要解决的技术问题是克服上述现有技术存在的问题,提供一种电力***电压调节器参数整定方法,其将***电压通过电压调节器参与发电机励磁调节器的控制,以达到提高电力***电压稳定性的目的。
为此,本发明采用如下的技术方案:电力***电压调节器参数整定方法,其特征在于所述的电压调节器由***电压测量单元、***电压给定单元、综合比较单元、超前滞后放大单元、输出限幅单元和投入退出控制单元组成,通过***电压测量单元获得***电压Us,通过***电压给定单元获得的***电压给定值Usgd,通过综合比较单元将***电压Us与***电压给定值Usgd作比较,得到电压差Usgd-Us,该电压差Usgd-Us经超前滞后放大单元后得到输出信号,再经输出限幅单元后输出限幅结果Upsvr,最后经投入退出控制单元后输出限幅结果Upsvr至励磁调节器控制励磁电流,使***电压维持在稳定运行范围,***电压通过电压调节器参与发电机励磁控制,用来提高***电压的稳定性,电压调节器(以下简称PSVR)参数整定的内容如下:
1)相位补偿时间常数的整定
分别以发电机机端电压和***电压(发电机主变高压侧母线电压)作为反馈测量对于PSS输出信号的频率响应特性,测量在有、无PSVR情况下励磁***滞后特性,
通过调整PSVR和电力***稳压器(简称PSS)相位补偿,使发电机振荡频率的力矩向量滞后Δω轴在0°~30°之间;在0.3~2.0Hz频率的力矩向量滞后Δω轴在超前20°~滞后45°之间;当有低于0.2Hz频率要求时,最大的超前角不得大于40°,同时PSVR投入或退出前后不应引起阻尼力矩明显削弱而导致阻尼比大幅减少;
2)放大倍数KPSVR的整定
在负载额定工况下,投入PSVR,逐渐增大KPSVR,当KPSVR接近临界放大倍数时,PSVR输出信号电压将发生持续振荡,PSVR放大倍数可取临界放大倍数的1/4~1/7;
3)输出限幅值的整定
电压调节器输出限幅值的范围为±0.05p.u.~±0.10p.u.。
本发明的PSVR参数整定是否恰当可以采用以下二种方法进行验证:
1)通过负载电压阶跃响应法来验证PSVR参数(包括放大倍数和相位补偿时间常数)整定是否恰当。
2)进行无功冲击和切除无功试验,在PSVR投入或退出情况下,观察发电机机端电压、无功功率和***电压对扰动的响应,验证PSVR参数(包括放大倍数和相位补偿时间常数)整定是否恰当。
本发明用安全有效的方法完成电力***电压调节器相位补偿时间常数、放大倍数和输出限幅值等参数的整定,充分发挥发电机的潜在无功功率,提高***电压稳定性,提高电网电压质量,减少事故引发的稳定性破坏事故;并显著增加远距离输电***的输电功率,提高电力***静态稳定极限。
下面结合说明书附图和具体实施方式对本发明作进一步说明。
附图说明
图1为本发明含有电力***电压调节器的励磁调节器数学模型图(上面的虚线框内表示电压调节器的模型,下面的虚线框内表示励磁调节器的模型)。
图2为本发明电压调节器的原理图。
图3为PSVR退出时机组无功功率响应曲线。
图4为PSVR投入时机组无功功率响应曲线。
图5为PSVR退出时机组***电压(Us)响应曲线。
图6为PSVR投入时机组***电压(Us)响应曲线。
图中,Ug-发电机电压,Ugd-发电机机端电压给定值,Us-***电压,Usgd-***电压给定值,UUEL-低励限制输出,V/Hz_out为V/Hz限制输出,Utc-调差环节输出,Utest-阶跃试验输入,USS-电力***稳定器输出,UOEL-过励限制输出,UPSVR-电力***电压调节器输出,Kavr-自动方式控制放大倍数,KPSVR-电力***电压调节器放大倍数。S为复频变量,Ts1、Ts2、Ts3为电力***电压调节器相位补偿时间常数,TA1、TA2、TA3、TA4为励磁调节器超前滞后时间常数。
具体实施方式
如图1-2所示,所述的电压调节器由***电压测量单元1、***电压给定单元2、综合比较单元3、超前滞后放大单元4、输出限幅单元5和投入退出控制单元6组成,通过***电压测量单元获得***电压Us,通过***电压给定单元获得的***电压给定值Usgd,通过综合比较单元将***电压Us与***电压给定值Usgd作比较,得到电压差Usgd-Us,该电压差Usgd-Us经超前滞后放大单元后得到输出信号,再经输出限幅单元后输出限幅结果Upsvr,最后经投入退出控制单元后输出限幅结果Upsvr至励磁调节器控制励磁电流,使***电压维持在稳定运行范围。
电压调节器参数整定的具体内容如下:
1)相位补偿时间常数的整定
分别在有、无电压调节器情况下测量励磁控制***的无补偿频率特性,无补偿频率特性为无PSS时励磁调节产生的力矩分量Te2对于PSS输出信号Us的频率响应特性ΔTe2/ΔUs,工程上常用机端电压Ut代替力矩分量Te2,即用ΔUt/ΔUs来表述。ΔUs为在PSS输出信号嵌入点加入的激励信号。
通过调整电压调节器和电力***稳定器相位补偿参数,使发电机振荡频率的力矩向量滞后Δω轴在0°~30°之间;在0.3~2.0Hz频率的力矩向量滞后Δω轴在超前20°~滞后45°之间;当有低于0.2Hz频率要求时,最大的超前角不得大于40°,同时电压调节器投入或退出前后不应引起阻尼力矩明显削弱而导致阻尼比大幅减少;
2)放大倍数KPSVR的整定
在负载额定工况下,投入电压调节器,逐渐增大KPSVR,当KPSVR接近临界放大倍数时,电压调节器输出信号电压将发生持续振荡,电压调节器放大倍数取临界放大倍数的1/4~1/7;
3)输出限幅值的整定
电压调节器输出限幅值的范围为±0.05p.u.~±0.10p.u.。
图3~图6分别为***电压变化0.2%情况下,PSVR退出与投入情况下机组无功功率和***电压响应曲线,从图3和图4可知PSVR投入后#3~#6机组无功功率比PSVR退出情况下大幅减少,从图5和图6可知PSVR投入后***电压更稳定。

Claims (2)

1.电力***电压调节器参数整定方法,其特征在于所述的电压调节器由***电压测量单元、***电压给定单元、综合比较单元、超前滞后放大单元、输出限幅单元和投入退出控制单元组成,通过***电压测量单元获得***电压Us,通过***电压给定单元获得的***电压给定值Usgd,通过综合比较单元将***电压Us与***电压给定值Usgd作比较,得到电压差Usgd-Us,该电压差Usgd-Us经超前滞后放大单元后得到输出信号,再经输出限幅单元后输出限幅结果Upsvr,最后经投入退出控制单元后输出限幅结果Upsvr至励磁调节器控制励磁电流,使***电压维持在稳定运行范围,电压调节器参数整定的内容如下:
1)相位补偿时间常数的整定
在有、无电压调节器情况下测量励磁调节器的滞后特性,
通过调整电压调节器和电力***稳定器相位补偿,使发电机振荡频率的力矩向量滞后Δω轴在0°~30°之间;在0.3~2.0Hz频率的力矩向量滞后Δω轴在超前20°~滞后45°之间;当有低于0.2Hz频率要求时,最大的超前角≤40°,同时电压调节器投入或退出前后不应引起阻尼力矩明显削弱而导致阻尼比大幅减少;
2)放大倍数KPSVR的整定
在负载额定工况下,投入电压调节器,逐渐增大KPSVR,当KPSVR接近临界放大倍数,电压调节器输出信号电压发生持续振荡时,电压调节器放大倍数取临界放大倍数的1/4~1/7;
3)输出限幅值的整定
电压调节器输出限幅值的范围为±0.05p.u.~±0.10p.u.。
2.根据权利要求1所述的电力***电压调节器参数整定方法,其特征在于通过负载电压阶跃响应法或进行无功冲击和切除无功试验方法,在电压调节器投入或退出情况下,观察发电机机端电压、无功功率和***电压对扰动的响应,验证电压调节器参数整定是否恰当。
CN 201110256675 2011-09-01 2011-09-01 电力***电压调节器参数整定方法 Active CN102355190B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110256675 CN102355190B (zh) 2011-09-01 2011-09-01 电力***电压调节器参数整定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110256675 CN102355190B (zh) 2011-09-01 2011-09-01 电力***电压调节器参数整定方法

Publications (2)

Publication Number Publication Date
CN102355190A CN102355190A (zh) 2012-02-15
CN102355190B true CN102355190B (zh) 2013-03-13

Family

ID=45578709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110256675 Active CN102355190B (zh) 2011-09-01 2011-09-01 电力***电压调节器参数整定方法

Country Status (1)

Country Link
CN (1) CN102355190B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102857168A (zh) * 2012-09-21 2013-01-02 上海艾都能源科技有限公司 可连续调压的发电机
CN109390952B (zh) * 2018-11-08 2023-02-07 中国电力科学研究院有限公司 一种风电机组广域快速电压控制器及控制方法
CN110138295A (zh) * 2019-04-29 2019-08-16 中国电力科学研究院有限公司 一种测量自并励励磁***电压控制环静态放大倍数的方法及***
CN111585276B (zh) * 2020-05-18 2021-08-17 国网重庆市电力公司电力科学研究院 一种pss参数在线整定方法、装置及可读存储介质

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5977731A (en) * 1998-07-31 1999-11-02 Mitsubishi Denki Kabushiki Kaisha Power system stabilizer and power system stabilization method
CN101447670A (zh) * 2008-05-27 2009-06-03 中国电力科学研究院 一种电力***稳定器参数整定算法
CN102157933A (zh) * 2011-03-02 2011-08-17 华北电力大学 一种电力***稳定器设计方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1080198A (ja) * 1996-09-06 1998-03-24 Hitachi Ltd 発電機励磁制御装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5977731A (en) * 1998-07-31 1999-11-02 Mitsubishi Denki Kabushiki Kaisha Power system stabilizer and power system stabilization method
CN101447670A (zh) * 2008-05-27 2009-06-03 中国电力科学研究院 一种电力***稳定器参数整定算法
CN102157933A (zh) * 2011-03-02 2011-08-17 华北电力大学 一种电力***稳定器设计方法

Non-Patent Citations (11)

* Cited by examiner, † Cited by third party
Title
《机组PSS参数整定及其抑制***低频振荡的效果》;赵斌等;《云南水力发电》;20061231;第22卷(第2期);91-96,100 *
《洪江水电厂电力***稳定器(PSS)的电厂试验及投入运行》;王芳;《大电机技术》;20061231(第3期);65-68 *
《电力***电压调节器PSVR》;李基成;《水电厂自动化》;20011031(第4期);1-7 *
《电力***电压调节器参数整定》;陈新琪等;《中国电力》;20040731;第37卷(第7期);12-15 *
《电力***稳定器调参现状与研究》;刘杨名等;《华东电力》;20070131;第35卷(第1期);12-16 *
JP特开平10-80198A 1998.03.24
刘杨名等.《电力***稳定器调参现状与研究》.《华东电力》.2007,第35卷(第1期),12-16.
李基成.《电力***电压调节器PSVR》.《水电厂自动化》.2001,(第4期),1-7.
王芳.《洪江水电厂电力***稳定器(PSS)的电厂试验及投入运行》.《大电机技术》.2006,(第3期),65-68.
赵斌等.《机组PSS参数整定及其抑制***低频振荡的效果》.《云南水力发电》.2006,第22卷(第2期),91-96,100.
陈新琪等.《电力***电压调节器参数整定》.《中国电力》.2004,第37卷(第7期),12-15.

Also Published As

Publication number Publication date
CN102355190A (zh) 2012-02-15

Similar Documents

Publication Publication Date Title
AU2013289385B2 (en) Method for controlling an electric generator
DK178459B1 (en) System og fremgangsmåde til spændingsstyring af vindgeneratorer
CN102355190B (zh) 电力***电压调节器参数整定方法
EP2859638B1 (en) Wind-power-plant control upon low-voltage grid faults
JP5391598B2 (ja) 分散型電源の安定化制御方式
KR101727087B1 (ko) 이종 발전 장치 간의 병렬 운전 제어 방법 및 제어 시스템
JP2017163838A (ja) ウインドパークを制御する方法
CN103140671B (zh) 风电场和用于运行风电场的方法
CN110476314A (zh) 用于启动能量生成网的方法
US8508197B2 (en) Static compensator and method for controlling thereof
US20190237968A1 (en) Energy storage enhanced generator block loading
US8314588B2 (en) Control system for battery charge maintenance in a power system with main AC generator control
CN103684021A (zh) 逆变器并联控制***
CN108377006A (zh) 一种发电机组无功调差系数优化方法及装置
CN104821757A (zh) 基于实时状态内电势控制的同步电机励磁***控制方法
US8692521B2 (en) Method and apparatus for controlling torque on the shaft of a generator
KR101673057B1 (ko) 다수의 에너지 저장 장치로 구성된 전력 제어 시스템 및 그 운영 방법
CN104124696B (zh) 电力***电压稳定控制方法及其***
CN102280887B (zh) 电力***电压调节器投入退出方法
US11990754B2 (en) Power-system stabilization system and power-system stabilization method
CN104065087A (zh) 配电变压器无功补偿方法
CN113228454A (zh) ***互连装置及服务器
CN106099935A (zh) 母线电压偏差自动补偿的下垂控制方法与下垂控制器
CN102386826A (zh) 一种基于储能型动态电压恢复器的自并励励磁***
WO2019197211A1 (en) Method for connecting a power transformer to an electrical grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHEJIANG ELECTRIC POWER TESTING + RESEARCH INSTITU

Free format text: FORMER OWNER: ZHEJIANG ELECTRIC POWER TESTING + RESEARCH INSTITUTE TECHNOLOGY SERVICE CENTER

Effective date: 20121101

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant after: Electric Power Research Institute of Zhejiang electric power company

Applicant after: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant before: ZHEJIANG ELECTRIC POWER TEST AND Research Institute

Applicant before: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ZHEJIANG ELECTRIC POWER TEST AND RESEARCH INSITITUTE TO: ZHEJIANG ELECTRIC POWER RESEARCH INSTITUTE OF ZHEJIANG ELECTRIC POWER CORPORATION

TA01 Transfer of patent application right

Effective date of registration: 20121101

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant after: Electric Power Research Institute of Zhejiang electric power company

Applicant after: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

Applicant after: State Grid Corporation of China

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant before: Electric Power Research Institute of Zhejiang electric power company

Applicant before: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

C14 Grant of patent or utility model
GR01 Patent grant