A kind of ice chest that is furnished with rectifying device
Technical field
The present invention relates to a kind of ice chest that is furnished with rectifying device, belong to energy class air separation ice chest technical field.
Background technology
Along with the large scale development of China's industry, every profession and trade sharply increases the demand of oxygen argon nitrogen, and is also increasing with gas and fluid volume, thereby drives developing towards large-scale and large of rectifying column.The increase of rectifying column height will be to perpendicularity, the flatness of ice chest in manufacture process; Have higher requirement in aspects such as the intensity in the use, rigidity, stability; To the problems referred to above, a large amount of work has been done to aspects such as the material selection of ice chest, organization plan, construction measures by manufacturer under the prerequisite of paying the utmost attention to ice chest steel construction safety; So not only consume great amount of manpower and material resources, but also increased production cost.
Summary of the invention
The objective of the invention is to overcome the deficiency of prior art; And provide a kind of not only can the solution to increase and problem that the ice chest height that causes increases by the rectifying column tower height; And can also reduce the layout of pipeline in the ice chest, simplify the ice chest that is furnished with rectifying device of system flow.
The objective of the invention is to accomplish through following technical scheme; It mainly includes an ice chest body; One rectifying column and two crude argon columns are installed in the ice chest body; It is that the boundary is divided into two sections that the last tower of described rectifying column is taken out mouth with the argon cut; Wherein first crude argon column is installed on the hypomere in the tower as the secondary tower of tower on the hypomere and is connected to a tower body, and tower lands and is arranged in the ice chest body under the main cold-peace of below, and the tower and second crude argon column land respectively and be arranged in the ice chest body on the described epimere; The bottom of tower is communicated with tower on dirty fluid pipeline and the hypomere through cryogenic pump on the described epimere, and tower is connected through tower on uprising gas pipeline and the above-mentioned epimere on the said hypomere; Described second crude argon column is connected with said first crude argon column with dirty fluid pipeline through cryogenic pump, and this first crude argon column then is communicated with said second crude argon column through the uprising gas pipeline.
Described first crude argon column is connected on the hypomere in the tower through a upper cone and constitutes a combination tower body, and tower and second crude argon column are equilateral triangle and are arranged in the ice chest body on the said combined column physical culture epimere.
The present invention be with a crude argon column as the secondary tower of tower on the hypomere and under main cold-peace tower land and be arranged in the ice chest body, tower on the epimere is landed layout separately, to reduce the ice chest height; Reduce line arrangement; Simplify system flow, reduce system pressure drop, not only economical with materials to greatest extent; Play energy-saving and cost-reducing effect, improved security and stability in the ice chest use simultaneously; Therefore the present invention has many characteristics such as energy-saving and cost-reducing, safety and stability, economical rationality.
Description of drawings
Fig. 1 is a rectifying device arrangement sketch map in traditional ice chest.
Fig. 2 is a rectifying device arrangement sketch map in a kind of ice chest of the present invention.
The specific embodiment
Fig. 1 is a rectifying device arrangement sketch map in traditional ice chest, and it comprises tower 11 down, last tower 12; First crude argon column, 13, the second crude argon columns 14, main cold 15; The concrete course of work is following: following tower 11 with main cold 15, go up tower 12 and land and be arranged in the ice chest body 16; First crude argon column 13 hangs on the inwall of ice chest body, and the difference in height between the last tower 12 argon cut phegma mouths is h, and second crude argon column 14 lands and is arranged in the ice chest body.
To combine accompanying drawing that the utility model is made detailed introduction: Fig. 2 below is rectifying device arrangement sketch map in a kind of ice chest according to the invention; It mainly includes an ice chest body 21; One rectifying column and two crude argon columns are installed in the ice chest body 21; It is that the boundary is divided into two sections that the last tower of described rectifying column is taken out mouth with the argon cut; Wherein first crude argon column 22 is installed on the hypomere in the tower 23 as the secondary tower of tower on the hypomere 23 and is connected to a tower body, and lands with following tower 25 with the master cold 24 of below and to be arranged in the ice chest body 21, and the tower 26 and second crude argon column 27 land respectively and be arranged in the ice chest body 21 on the described epimere; The bottom of tower 26 is communicated with through tower 23 on the dirty fluid pipeline 29 of cryogenic pump 28 usefulness and the hypomere on the described epimere, and tower 23 is connected through tower 26 on uprising gas pipeline 30 and the above-mentioned epimere on the said hypomere; Described second crude argon column 27 is connected with said first crude argon column 22 with dirty fluid pipeline through cryogenic pump, and 22 of this first crude argon columns pass through the uprising gas pipeline and are communicated with said second crude argon column 27.
Described first crude argon column 22 is connected on the hypomere in the tower 23 through a upper cone 31 and constitutes a combination tower body, and tower 26 and second crude argon column 27 are equilateral triangle and are arranged in the ice chest body on said combination tower body and the epimere.
The concrete course of work is following: will go up that tower takes out with the argon cut mouthful is that the boundary is divided into two sections; First crude argon column 22 is as the secondary tower of tower on the hypomere 23; And with main cold 24, tower 25 lands and is arranged in the ice chest body 21 down; Tower 26 and independent respectively the landing of second crude argon column 27 are arranged in the ice chest body 21 on the epimere, and three parts are equilateral triangle and distribute.The dirty liquid of tower 26 enters into tower 22 on the described hypomere through cryogenic pump 28 through pipeline on the epimere; The uprising gas of tower 23 enters into tower 26 on the described epimere through a pressure reduction part through pipeline on the said hypomere; Another part directly rises as argon cut steam and enters into first crude argon column 22 and carry out the separation of oxygen argon; The dirty liquid of said second crude argon column 27 enters into described first crude argon column 22 through cryogenic pump through pipeline; Described first crude argon column, 22 uprising gas enter into said second crude argon column 27 through pressure reduction through pipeline, and argon cut phegma is directly through tower 23 on the dirty hypomere that enters into described king-tower of described first crude argon column 22.