CN102286927A - Integral mounting construction method of bridge pier column bent cap reinforcement cage - Google Patents

Integral mounting construction method of bridge pier column bent cap reinforcement cage Download PDF

Info

Publication number
CN102286927A
CN102286927A CN2011102458063A CN201110245806A CN102286927A CN 102286927 A CN102286927 A CN 102286927A CN 2011102458063 A CN2011102458063 A CN 2011102458063A CN 201110245806 A CN201110245806 A CN 201110245806A CN 102286927 A CN102286927 A CN 102286927A
Authority
CN
China
Prior art keywords
bent cap
hanging beam
reinforcing cage
cap reinforcing
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102458063A
Other languages
Chinese (zh)
Inventor
邓新
龚应明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING XINKE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
CHONGQING XINKE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING XINKE CONSTRUCTION ENGINEERING Co Ltd filed Critical CHONGQING XINKE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2011102458063A priority Critical patent/CN102286927A/en
Publication of CN102286927A publication Critical patent/CN102286927A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an integral mounting construction method of a bridge pier column bent cap reinforcement cage, and the method comprises the following steps: 1) erecting a hanging frame on the ground according to the design requirements; 2) lofting the embedded bar on a pier column onto the ground; 3) binding a bent cap steel bar onto the hanging frame to form a bent cap reinforcement cage, and reinforcing through spot welding; 4) transversely penetrating at least two secondary hanging beams through the inner cavity of the bent cap steel bar, and connecting the secondary hanging beam with a primary hanging beam transversely arranged above the bent cap reinforcement cage by use of a primary hanging beam steel wire rope respectively and tensioning, wherein the upper end of the primary hanging beam is hung on a crane through a steel wire rope; 5) hoisting the bent cap reinforcement cage to the embedded bar position on the pier column by use of the crane, and dismantling the hanging frame; and 6) after mounting, sequentially removing the secondary hanging beam and the primary hanging beam, and binding the embedded bars on other pier columns. The construction method of the bent cap reinforcement cage disclosed by the invention can be used for improving the construction safety, guaranteeing the personal safety of workers, improving the operation efficiency, lowering the construction cost and improving the binding quality.

Description

Bridge pier column bent cap reinforcing cage integral installation job practices
Technical field
The present invention relates to the viaduct technical field of construction, be specially the job practices of a kind of bridge pier column bent cap reinforcing cage integral installation.
 
Background technology
In existing bridge construction, the construction of pier stud bent cap is that emphasis also is a difficult point, the construction of bent cap at present mainly is to adopt the full framing method, comprise steps such as stencil design, scaffold building, bent cap reinforcing bar binding, template installation and disturbing concrete, but there is following shortcoming in this method: the cycle of 1, setting up is longer; 2, labor intensive is bigger; 3, floor space is bigger, is subjected to the orographic condition restriction comparatively serious.For addressing the above problem, publication number is that the Chinese patent of CN101922143 discloses " a kind of construction method of bent cap ", it is characterized in that elder generation is at installation on ground when assembled formwork, the mode template system that assembly unit is good by lifting is installed on the bracket of column then.Though this mounting method has solved the problem when template is installed, but, but can not solve the dangerous big problem of bent cap reinforcing bar binding process high and medium operation, carry out work high above the ground on the bracing frame that at present when the bent cap reinforcing bar binding, relies on the workman setting up fully, because the set-up time of reinforcing bar is longer, labour intensity is higher, and the danger during workman's operation is bigger, and the also bad control of the quality of colligation moulding, the installation effect is unsatisfactory.
 
Summary of the invention
At above-mentioned deficiency of the prior art, main purpose of the present invention is to solve big, the dangerous high problem of colligation difficulty at bridge construction middle cover beam steel, and a kind of safe, job practices of bridge pier column bent cap reinforcing cage integral installation efficiently is provided.
Technical scheme of the present invention: bridge pier column bent cap reinforcing cage integral installation job practices comprises the steps:
1), sets up the suspension bracket that is used for colligation bent cap reinforcing cage on the ground according to designing requirement;
2) according to the pre-buried muscle constructional drawing of bridge pier, on the ground with the pre-buried muscle position setting-out on two pier studs of reinforcing cage to be installed;
3) with reference to working design scheme and step 2) described in the position of setting-out, colligation bent cap reinforcing bar makes it form the bent cap reinforcing cage on suspension bracket, and reinforces with the junction of spot welding to the bent cap reinforcing bar;
4) at least two hanging beams are horizontally through from formed bent cap reinforcing cage inner chamber, and by main hanging beam wire rope inferior hanging beam is connected with the main hanging beam that is horizontally set at bent cap reinforcing cage top respectively and strains, make time hanging beam contact with the upper bottom surface of bent cap reinforcing cage, the upper end of described main hanging beam hangs on the crane by wire rope;
5) lift by crane the bent cap reinforcing cage to the pre-buried muscle of pier stud position with crane, and the bent cap reinforcing cage is placed on the bent cap bed die that finishes of constructing, remove suspension bracket then;
6) behind the installation in position, remove time hanging beam and main hanging beam, the pre-buried muscle on all the other pier studs of colligation then successively.
The present invention has adopted the mode of bent cap reinforcing bar in ground colligation moulding, before installation, reserved the pre-buried muscle of pier stud position, and install by crane, mechanization degree and operating efficiency have been improved, working strength of workers and work high above the ground danger have been alleviated, and the colligation of bent cap reinforcing cage can parallelly be carried out with the construction of pier stud, thereby has shortened the set-up time of bent cap reinforcing cage, and ground colligation moulding can more effective control reinforcing bar binding quality.
Further technical scheme all is equipped with batten plate on described hanging beam and main hanging beam.Described batten plate is existing plate, can make by shaped steel, by the shaped steel stability that batten plate can strengthen time hanging beam and main hanging beam is set, prevent from hoisting process, to cause distortion among the present invention, can strengthen the force intensity that is subjected to of hanging beam owing to the hanging beam local pressure is excessive.
Further technical scheme, described time hanging beam is two and all vertical with main hanging beam.
With respect to prior art, the present invention has following beneficial effect:
1, improved working security: the present invention has avoided the long work high above the ground of workman by lifting again after the moulding of ground colligation bent cap reinforcing bar, has reduced danger, has ensured workman's personal safety;
2, improved operating efficiency: saved set-up time of bent cap reinforcing bar in the ground assembling reinforcement, improved mechanized degree and operating efficiency, helped accelerating construction progress, reduced construction cost;
3, help improving the colligation quality: because colligation on the ground, working strength of workers obviously reduces, and therefore can effectively improve laid reinforcement binding intensity, thereby improves the construction quality of bent cap integral body.
 
Description of drawings
Fig. 1 is for adopting the scheme of installation of bridge pier column bent cap reinforcing cage integral installation job practices of the present invention;
Fig. 2 is the left view of Fig. 1.
Among the figure, 1-bent cap reinforcing cage, 2-inferior hanging beam, 3-main hanging beam wire rope, 4-main hanging beam, 5-wire rope, 6-batten plate.
 
The specific embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments.
As depicted in figs. 1 and 2, the job practices of a kind of bridge pier column bent cap reinforcing cage integral installation, it carries out according to following steps:
1. according to designing requirement, set up the suspension bracket that is used for colligation bent cap reinforcing cage 1 on the ground earlier, described suspension bracket is an existing equipment, is used for supporting the bent cap reinforcing bar of process of binding.Because traditional bent cap reinforcing cage is after having set up pier stud when installing, the pier stud two ends in the air are provided with suspension bracket again, and are so not only dangerous high, and the difficulty that the workman aloft operates is very big, and colligation speed is very slow, and the quality of colligation also is difficult to guarantee.Therefore, the present invention is located at building of suspension bracket on the ground, thereby has at one stroke solved the problems referred to above, still, for the bent cap reinforcing cage of colligation on the ground can be complementary with the pier stud construction size, therefore also need take further operation.
2. according to the pre-buried muscle constructional drawing of bridge pier, on the ground with the pre-buried muscle position setting-out on two pier studs of reinforcing cage to be installed.So can make colligation comparatively accurate with reference to setting-out during colligation bent cap reinforcing cage 1 on the ground, improve construction quality.
3. with reference to working design scheme and step 2. described in the position of setting-out, colligation bent cap reinforcing bar makes it form bent cap reinforcing cage 1 on suspension bracket, and reinforces with the junction of spot welding to the bent cap reinforcing bar.
4. two hanging beams 2 are horizontally through from formed bent cap reinforcing cage 1 inner chamber, and respectively by main hanging beam wire rope 3(jack line) inferior hanging beam 2 is connected with the main hanging beam 4 that is horizontally set at bent cap reinforcing cage top and strains, make time hanging beam 2 contact with the upper bottom surface of bent cap reinforcing cage 1, the upper end of described main hanging beam 3 hangs on the crane by wire rope 5.Here the effect of time hanging beam and main hanging beam is the bent cap reinforcing cage that ties up is sling, and adopts mechanical operation more laborsaving, and on inferior hanging beam and main hanging beam batten plate 6 is installed all, can prevent hanging beam local pressure excessive deformation.
5. lift by crane bent cap reinforcing cage 1 to the pre-buried muscle of pier stud position with crane, and bent cap reinforcing cage 1 is placed on the bent cap bed die that finishes of constructing, remove suspension bracket then.
6. behind the installation in position, remove time hanging beam 2 and main hanging beam 4, the pre-buried muscle on all the other pier studs of colligation then successively.
The quantity of the bent cap reinforcing bar of the concrete shape of bent cap reinforcing cage 1 of the present invention, physical dimension, needs and shape etc. all by concrete technological parameter decision, to the bridge pier column of different model, need the bent cap reinforcing cage of respective model; More than can be used as prior art, do not give unnecessary details at this.
Need to prove at last, above embodiment is only in order to illustrate technical scheme of the present invention but not the restriction technologies scheme, although the applicant has been described in detail the present invention with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, the modification that those carry out technical scheme of the present invention or be equal to replacement, and do not break away from the aim and the scope of the technical program, all should be encompassed in the middle of the claim scope of the present invention.

Claims (3)

1. bridge pier column bent cap reinforcing cage integral installation job practices is characterized in that, comprises the steps:
1), sets up the suspension bracket that is used for colligation bent cap reinforcing cage on the ground according to designing requirement;
2) according to the pre-buried muscle constructional drawing of bridge pier, on the ground with the pre-buried muscle position setting-out on two pier studs of reinforcing cage to be installed;
3) with reference to working design scheme and step 2) described in the position of setting-out, colligation bent cap reinforcing bar makes it form the bent cap reinforcing cage on suspension bracket, and reinforces with the junction of spot welding to the bent cap reinforcing bar;
4) at least two hanging beams are horizontally through from formed bent cap reinforcing cage inner chamber, and by main hanging beam wire rope inferior hanging beam is connected with the main hanging beam that is horizontally set at bent cap reinforcing cage top respectively and strains, make time hanging beam contact with the upper bottom surface of bent cap reinforcing cage, the upper end of described main hanging beam hangs on the crane by wire rope;
5) lift by crane the bent cap reinforcing cage to the pre-buried muscle of pier stud position with crane, and the bent cap reinforcing cage is placed on the bent cap bed die that finishes of constructing, remove suspension bracket then;
6) behind the installation in position, remove time hanging beam and main hanging beam, the pre-buried muscle on all the other pier studs of colligation then successively.
2. bridge pier column bent cap reinforcing cage integral installation job practices according to claim 1 is characterized in that, on described hanging beam and main hanging beam batten plate is installed all.
3. bridge pier column bent cap reinforcing cage integral installation job practices according to claim 1 is characterized in that, described time hanging beam is two and all vertical with main hanging beam.
CN2011102458063A 2011-08-25 2011-08-25 Integral mounting construction method of bridge pier column bent cap reinforcement cage Pending CN102286927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102458063A CN102286927A (en) 2011-08-25 2011-08-25 Integral mounting construction method of bridge pier column bent cap reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102458063A CN102286927A (en) 2011-08-25 2011-08-25 Integral mounting construction method of bridge pier column bent cap reinforcement cage

Publications (1)

Publication Number Publication Date
CN102286927A true CN102286927A (en) 2011-12-21

Family

ID=45333657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102458063A Pending CN102286927A (en) 2011-08-25 2011-08-25 Integral mounting construction method of bridge pier column bent cap reinforcement cage

Country Status (1)

Country Link
CN (1) CN102286927A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061265A (en) * 2013-01-05 2013-04-24 广东省基础工程公司 Construction method for lifting combined reinforcement cages
CN104894954A (en) * 2015-04-10 2015-09-09 成军 Overall mounting and constructing method of pier stud reinforcing steel bars of urban bridge
CN107700362A (en) * 2017-09-30 2018-02-16 中国建筑土木建设有限公司 Hoisting method of continuous beam segment web plate reinforcing steel bar
CN108382993A (en) * 2018-04-28 2018-08-10 上海二十冶建设有限公司 The method of control deformation when steel reinforcement cage transverse direction handling
CN110629663A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Pier body construction method and pier body construction device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201240771Y (en) * 2008-07-25 2009-05-20 中铁十局集团有限公司 System for hoisting reinforcement cage
CN101665211A (en) * 2009-08-25 2010-03-10 中国第二冶金建设有限责任公司 Lifting appliance for installing last furnace shell
CN201574391U (en) * 2009-12-31 2010-09-08 上海广联建设发展有限公司 Manufacturing device of large-diameter cast-in-place pile reinforcing cage
CN101929249A (en) * 2010-08-10 2010-12-29 中铁一局集团有限公司 Double line stream-line type round end entity pier cap steel bar overall binding construction method
CN102070071A (en) * 2011-01-17 2011-05-25 化学工业岩土工程有限公司 Steel reinforcement cage hoisting method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201240771Y (en) * 2008-07-25 2009-05-20 中铁十局集团有限公司 System for hoisting reinforcement cage
CN101665211A (en) * 2009-08-25 2010-03-10 中国第二冶金建设有限责任公司 Lifting appliance for installing last furnace shell
CN201574391U (en) * 2009-12-31 2010-09-08 上海广联建设发展有限公司 Manufacturing device of large-diameter cast-in-place pile reinforcing cage
CN101929249A (en) * 2010-08-10 2010-12-29 中铁一局集团有限公司 Double line stream-line type round end entity pier cap steel bar overall binding construction method
CN102070071A (en) * 2011-01-17 2011-05-25 化学工业岩土工程有限公司 Steel reinforcement cage hoisting method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王健: "京张高速公路戴家营1号特大桥预应力盖梁施工", 《铁道建筑技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061265A (en) * 2013-01-05 2013-04-24 广东省基础工程公司 Construction method for lifting combined reinforcement cages
CN104894954A (en) * 2015-04-10 2015-09-09 成军 Overall mounting and constructing method of pier stud reinforcing steel bars of urban bridge
CN107700362A (en) * 2017-09-30 2018-02-16 中国建筑土木建设有限公司 Hoisting method of continuous beam segment web plate reinforcing steel bar
CN108382993A (en) * 2018-04-28 2018-08-10 上海二十冶建设有限公司 The method of control deformation when steel reinforcement cage transverse direction handling
CN110629663A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Pier body construction method and pier body construction device

Similar Documents

Publication Publication Date Title
CN102286927A (en) Integral mounting construction method of bridge pier column bent cap reinforcement cage
CN102134910B (en) Method for constructing barrel-shaped concrete structure by adopting reverse moulds
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN206513015U (en) The aluminum alloy mould plate mechanism that building floor is constructed is used for based on BIM technology
CN216277017U (en) Steel column installation tool for cup-rim type foundation
CN106499173A (en) Based on the aluminum alloy mould plate mechanism that BIM technology is used for building floor construction
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN213804905U (en) Bailey beam suspension structure
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN204876526U (en) Instrument formula girder steel of encorbelmenting
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN110526153A (en) Jack-assisted pile foundation reinforcement cage hoisting structure and construction method thereof
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN114439253A (en) Hanging construction method for wrapping concrete on peripheral part of steel beam
CN210482242U (en) Cylindrical tail water surge chamber impedance plate concrete pouring combined supporting system
CN102383376A (en) Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member
CN112359860A (en) Construction method for non-support type open caisson capping
CN217378638U (en) Splicing seam adjusting device for mounting prefabricated box channel and box culvert
CN202689494U (en) Elevator shaft template support
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN205296804U (en) Protective cage structure in elevator shaft
CN215626104U (en) Auxiliary device for integral hoisting of bent cap steel bars
CN216616565U (en) Constructional column
CN216583828U (en) Combination turnover type vertical steel member mounting platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111221