CN102267176A CN2011101937215A CN201110193721A CN102267176A CN 102267176 A CN102267176 A CN 102267176A CN 2011101937215 A CN2011101937215 A CN 2011101937215A CN 201110193721 A CN201110193721 A CN 201110193721A CN 102267176 A CN102267176 A CN 102267176A
Authority
CN
China
Prior art keywords
hydraulic jack
beam body
bridge beam
constructing device
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101937215A
Other languages
Chinese (zh)
Inventor
梁铭康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011101937215A priority Critical patent/CN102267176A/en
Publication of CN102267176A publication Critical patent/CN102267176A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a bridge beam construction device, which comprises a pedestal and a movable trolley, wherein a plurality of rollers rolling along the longitudinal direction are arranged below the pedestal, and the rollers are connected with a driving mechanism; and the movable trolley is arranged above the pedestal, the movable trolley is connected with a supporting mechanism through a hydraulic driving mechanism, the supporting mechanism comprises an oblique support plate matched with an outside template and at least one upright rod and one cross rod, the cross rod is respectively fixed with the upright rod and the oblique support plate, and the upper part of the upright rod is movably connected with a pull rod seat. Through the device, mechanized and automatic operation of assembly and disassembly of the outside template can be stably realized, heavy physical work of workers is reduced, the manpower consumption is greatly reduced, frequent use of construction machinery and occupation of a construction site are reduced, the production efficiency and the economic benefit are greatly improved, man-made damage of the template in the construction process can be avoided, and the appearance quality of a beam finished product meets high requirements.

Description

The bridge beam body constructing device
Technical field
The present invention relates to the bridge construction constructing device, relate in particular to a kind of bridge beam body constructing device.
Background technology
In highway bridge construction, need be in precast beam field production box beam.Box beam is a kind of of science of bridge building central sill, and inside is hollow shape, and there is the edge of a wing both sides, top, similar chest, thereby gain the name, the sidepiece of box beam also is provided with diaphragm.Box beam all adopts and comprises internal mold, the mould manufacturing that bed die and outboard template are made, during fabrication, the workman cooperates by loop wheel machine, exterior sheathing is installed, with internal mold, bed die forms die cavity, and then with the mould material, as concrete, loading mould cavities such as reinforcing bar are after obtaining the mould material and solidifying, again by manually outboard template being disassembled, thereby finish tee girder, box beam prefabricated, then loop wheel machine moves to the production of carrying out next box beam on another construction pedestal again, this shows, this construction equipment of the prior art, consume great amount of manpower, need the frequent cooperation of loop wheel machine, labor strength is big, production efficiency is low.
Summary of the invention
The technical problem to be solved in the present invention is to overcome the defective that prior art exists, and a kind of bridge beam body constructing device is provided, and realizes the mechanized operation of template installation and removal in the precast beam process, enhances productivity.
A kind of bridge beam body constructing device provided by the invention comprises:
Pedestal, its below is provided with the roller that several longitudinally roll, and described roller is connected with driving mechanism;
Locomotive, be arranged on described pedestal top, described locomotive connects supporting mechanism by a hydraulic drive mechanism, described supporting mechanism comprises a support, described support comprises a bearing diagonal plate that cooperates with outboard template and at least one vertical rod, cross bar, described cross bar is fixed with vertical rod and bearing diagonal plate respectively, and the top of described vertical rod also is connected with a draw-bar seat versatilely; Described hydraulic drive mechanism comprises along substantially vertical reciprocating first hydraulic jack and screw lift structure, described first hydraulic jack and screw lift structure are connected with supporting mechanism respectively, the below of described locomotive is provided with the roller that laterally rolls in some edges, described locomotive is provided with second hydraulic jack that moves reciprocatingly in a generally horizontal direction, and the piston rod of described second hydraulic jack and described locomotive are fixed.
Preferably, the below of described bearing diagonal plate is provided with tie rod hole.
Preferably, described support comprises a vertical rod, two cross bars and a brace, wherein cross bar one end is connected with the cardinal principle middle part of vertical rod, the other end is connected with the cardinal principle middle part of bearing diagonal plate, another root cross bar one end is connected with the lower end of vertical rod, the other end is connected with the lower end of bearing diagonal plate, and described brace one end is connected with the middle part of vertical rod, and the other end is connected with the lower end of bearing diagonal plate.
Preferably, described supporting mechanism also includes corresponding with first hydraulic jack and the screw lift structure respectively support member that is provided with and connects.
Preferably, described hydraulic drive mechanism comprises at least two first hydraulic jacks, and the piston rod part of described first hydraulic jack connects described supporting mechanism.
Preferably, described screw lift structure comprises base that spiral connects and from the base internal cavities screw mandrel of turn up and down, the piston rod of the top of described screw mandrel, first hydraulic jack connects described supporting mechanism.
Preferably, be provided with plane bearing between described base and the screw mandrel.
Preferably, described screw lift structure is arranged on locomotive near the position of second hydraulic jack, and described first hydraulic jack is arranged on the locomotive position away from second hydraulic jack.
Preferably, comprise that also hydraulic control device control comprises:
First reversal valve is controlled first hydraulic jack and is risen, descends;
Second reversal valve is controlled the described second hydraulic jack along continuous straight runs and is moved back and forth.
Preferably, described hydraulic control device is provided with operating desk, which is provided with:
Operated key, the moving direction of wheel is moved in control first;
First control lever is controlled described first reversal valve;
Second control lever is controlled described second reversal valve.
Compared with prior art, the present invention has following advantage:
Bridge beam body constructing device provided by the invention, machinery is set, the locomotive of hydraulic control and pedestal, locomotive can move relative to pedestal, pedestal also can move on the ground, supporting mechanism is set on the locomotive, because supporting mechanism comprises a support, this support is by the structure setting, can provide stable support for outboard template, thereby, the present invention changes the artificial assembly unit outboard template of existing use, the conventional construction method of dismounting outboard template, can stably realize the outboard template installation, the mechanization of dismounting, automation mechanized operation, reduce the heavy manual labor of workman, significantly reduce manpower and consume, reduce the frequent use of construction machinery and taking of construction site, enhance productivity greatly and economic benefit, but also can avoid the artificial phenomenon of damaging template in the work progress, make the presentation quality of beam body finished product satisfy high request.
Description of drawings
Fig. 1 is the structural representation of bridge beam body constructing device one preferred embodiment of the present invention;
Fig. 2 is the structure chart of Fig. 1 medium-height trestle;
Fig. 3 is the user mode figure of Bridge Beam body construction device among Fig. 1;
Fig. 4 is the A-A cutaway view among Fig. 3;
Fig. 5 is the B-B cutaway view among Fig. 3.
The specific embodiment
Basic design of the present invention is, a kind of bridge beam body constructing device is provided, and is used for stably installing, dismantling outboard template, reduces the manpower consumption, enhances productivity.
Below in conjunction with accompanying drawing and specific embodiment bridge beam body constructing device of the present invention is further described.
As shown in Figure 1, the bridge beam body constructing device in the present embodiment comprises pedestal 1 and is arranged on locomotive 2 on the pedestal.Wherein, the transverse width of pedestal 1 is greater than the transverse width of locomotive, so that locomotive can then be unlikely to be stopped by the diaphragm 7 of beam body when being along the longitudinal movement along moving laterally to certain position after using.
Wherein, pedestal 1 below is provided with four rolling 11, and each roller 11 all connects a drive motors 12.By roller 11 and drive motors 12 are set, make pedestal after current construction pedestal construction finishes, can move to next construction pedestal.
Wherein, the reciprocating motion that the piston rod that locomotive 2 is provided with first hydraulic jack 21 and screw mandrel adjustment seat 22, the first hydraulic jacks 21 is vertically done rise, descended, the top of piston rod is provided with connecting portion 21a; Screw mandrel adjustment seat 22 comprise screw mandrel 22a and be arranged on the base 22b of the hollow of screw mandrel 22a below, with the connecting portion 22c of screw mandrel 22a upper articulation, also be provided with the plane bearing (not shown) between screw mandrel and the pedestal.Connecting portion 21a and connecting portion 22c constitute the support portion, for outboard template provides support.
The below of locomotive 2 is provided with four rolling 23, sidepiece also connects one second hydraulic jack 24, the piston rod of second hydraulic jack 24 is connected by a holder 25 with pedestal 1, and the cylinder body along continuous straight runs is reciprocating, promotes locomotive 2 along continuous straight runs and pedestal 1 and relatively moves.Wherein, the screw mandrel adjustment seat is arranged on the locomotive position near second hydraulic jack, and first hydraulic jack 21 is arranged on the locomotive position away from second hydraulic jack.
First hydraulic jack 21 and second hydraulic jack 24 are connected with a hydraulic control device respectively, and this hydraulic control device is provided with a hydraulic operation console, and referring to Fig. 5, this hydraulic operation console is provided with first control lever 14, second control lever 15, controls key.
Referring to Fig. 2, above the screw mandrel adjustment seat and first hydraulic jack, be provided with support 3, this support 3 comprises two cross bars 31, vertical rod 32, a brace 33 and a bearing diagonal plate 34, wherein, vertical rod 32 and cross bar 31 are for being rotatably connected.Wherein a cross bar 31 is positioned at the top, and the one end is connected with the middle part of vertical rod 32, and the other end is connected with bearing diagonal plate 34, and an other cross bar 31 is positioned at the below, and the one end is connected with the lower end of vertical rod 32, and the other end is connected with the lower end of bearing diagonal plate 34; Brace 33 1 ends are connected with the middle part of vertical rod 32, and the other end is connected with the bearing diagonal plate, and brace 33 is about 45 degree with the horizontal plane angulation, and so the support 3 of structure setting can provide stable support.This support 3 is arranged at the top of first hydraulic jack and screw mandrel adjustment seat, and its cross bar 31 that is positioned at the top is connected with the connecting portion 21a of first hydraulic jack and the connecting portion 22c of screw mandrel adjustment seat respectively.Because connecting portion 22c and screw mandrel 22a are hinged, therefore, support 3 can outwards rotate and go back to.The below of bearing diagonal plate 34 is provided with tie rod hole, stretches into and fixes for lower link 34a.Yet be provided with corresponding tie rod hole on the bed die 6.The top of vertical rod 32 also is provided with a draw-bar seat 35, and draw-bar seat 35 is hinged with vertical rod 32, and simultaneously, fixing by a grafting pin again, after pulling up the pin of pegging graft, draw-bar seat 35 can outwards rotate, and is convenient to the demoulding, and after plugging the grafting pin, draw-bar seat and vertical rod are fixed.
First hydraulic jack of the present invention and second hydraulic jack are by hydraulic control device control stroke, hydraulic control device comprises first reversal valve that motor, operating desk, control first hydraulic jack 21 vertically rise, descend, control reciprocating second reversal valve of second hydraulic jack, 24 along continuous straight runs, first reversal valve is by the control of first control lever, and second reversal valve is by the control of second control lever.
Wherein, the hydraulic control device operating desk is provided with energising display lamp, the key that advances, back spacer, motor stop key, electric motor starting key, first control lever, second control lever, and described first control lever is controlled first reversal valve, second control lever is controlled second reversal valve.
Referring to Fig. 3, Fig. 4, Fig. 5, the user mode of bridge beam body constructing device of the present invention is shown, in use, a plurality of constructing devices are arranged on the track 8, support outboard template 5 by draw-bar seat 35 above the bridge beam body constructing device.Track 8 is separately positioned on the both sides of bed die on the construction pedestal, a plurality of bridge beam body constructing device branches are located on the both sides track 8, and corresponding one by one the setting, and the centre is provided with internal mold 4, the below is provided with bed die 6, be fixed with upper connecting rod 35a between the corresponding draw-bar seat that is provided with, the below of corresponding bearing diagonal plate is fixed by a lower link 34a, like this, each template is fixed together, form die cavity, can in die cavity, be filled to mold materials, go into box girder body.After current construction pedestal is finished construction, move on next construction pedestal at the roller drive lower edge of pedestal track 8.
Come the bridge beam body constructing device of present embodiment is described below in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5.
Outboard template is installed:
By loop wheel machine cooperation the carrying out disposable assembly unit of outboard template, connect into overall fixed formula large form, then this large form is installed on the support 3 in the bridge beam body constructing device in the present embodiment, the bridge beam body constructing device places on the rail that is provided with on the construction pedestal, and can move along rail, after the construction of finishing current construction pedestal, move to next construction pedestal.Wherein, in the horizontal difference of height requirement≤10mm of rail, can cause when avoiding the bridge beam body constructing device to be movably walking overstepping the limit and influencing template quality, and cause the outboard template torsional deformation.Can debug after assembling is finished, connect with the mains during debugging, actuating motor spurs second control lever, and second reversal valve can make outboard template 5 push ahead and be close to bed die 6.When outboard template 5 need be adjusted to specified altitude assignment, spur first control lever, first reversal valve can make outboard template 5 arrange the height of appointment, aforesaid operations after hours, with upper connecting rod 35a two ends respectively with the relative bridge beam body constructing device equipment that is arranged on the internal mold both sides on draw-bar seat 35 fixing, the locking upper connecting rod, one lower link 34a is inserted in the tie rod hole of bed die below, two ends respectively with the relative bridge beam body constructing device that is arranged on the internal mold both sides on the tie rod hole of bearing diagonal plate connect, the locking draw-bar seat, make outboard template firm, stable is arranged on by internal mold and the bed die, finish the installation of outboard template this moment, outboard template, internal mold and bed die are formed a die cavity, and beam body material is packed in the die cavity, are frozen into mould.
When needing the demoulding behind the beam body solidification forming, then need outboard template is pulled down, during the outboard template form removal, at first will go up, lower link gets loose, unclamp with draw-bar seat, upper connecting rod is taken off from draw-bar seat, lower link is taken out, then the steady pin on draw-bar seat and the column is taken off, draw-bar seat can outwards rotate, make the reinforcing bar in the beam body deviate from, promote first control lever, first reversal valve vertically descends outboard template 5, promote second control lever, second reversal valve returns outboard template 5 along continuous straight runs, breaks away from the beam body, thereby turns back to initial operating position undetermined.Press the forward key on the hydraulic controller or retreat button, bridge beam body production auxiliary equipment moves on rail, and outboard template is shifted to the construction pedestal of appointment in company with bridge beam body production auxiliary equipment.
After 21 work of first hydraulic jack are risen or are dropped to the height of appointment, first reversal valve is returned to meta, the automatic pressurize of hydraulic control one-way valve makes the oil pressure of oil cylinder no longer descend.As high pressure valve is closed, then effect is better, carries out work once more but work as first hydraulic jack, must open high pressure valve, and first hydraulic jack 21 could be worked.Another purpose that this high pressure valve is set is: when the outboard template height is uneven, can close any one in the high pressure valve, make outboard template reach the balance purpose.
Spur second reversal valve, second hydraulic jack is advanced, advance second reversal valve, the second hydraulic jack reposition.
When asynchronous forward, can regulate any one in the one-way throttle valve as each second hydraulic jack, make it reach synchronous.
Only be preferred implementation of the present invention below, should be pointed out that above-mentioned preferred implementation should not be considered as limitation of the present invention, protection scope of the present invention should be as the criterion with claim institute restricted portion.For those skilled in the art, without departing from the spirit and scope of the present invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1. a bridge beam body constructing device is characterized in that, comprising:
Pedestal, its below is provided with the roller that several longitudinally roll, and described roller is connected with driving mechanism;
Locomotive, be arranged on described pedestal top, described locomotive connects supporting mechanism by a hydraulic drive mechanism, described supporting mechanism comprises a support, described support comprises a bearing diagonal plate that cooperates with outboard template and at least one vertical rod, cross bar, described cross bar is fixed with vertical rod and bearing diagonal plate respectively, and the top of described vertical rod also is connected with a draw-bar seat versatilely; Described hydraulic drive mechanism comprises along substantially vertical reciprocating first hydraulic jack and screw lift structure, described first hydraulic jack and screw lift structure are connected with supporting mechanism respectively, the below of described locomotive is provided with the roller that laterally rolls in some edges, described locomotive is provided with second hydraulic jack that moves reciprocatingly in a generally horizontal direction, and the piston rod of described second hydraulic jack and described locomotive are fixed.
2. bridge beam body constructing device according to claim 1 is characterized in that the below of described bearing diagonal plate is provided with tie rod hole.
3. bridge beam body constructing device according to claim 1, it is characterized in that, described support comprises a vertical rod, two cross bars and a brace, wherein cross bar one end is connected with the cardinal principle middle part of vertical rod, the other end is connected with the cardinal principle middle part of bearing diagonal plate, and another root cross bar one end is connected with the lower end of vertical rod, and the other end is connected with the lower end of bearing diagonal plate, described brace one end is connected with the middle part of vertical rod, and the other end is connected with the lower end of bearing diagonal plate.
4. bridge beam body constructing device according to claim 1 is characterized in that, described first hydraulic jack and screw lift structure are respectively equipped with and are used for the connecting portion that is connected with support.
5. bridge beam body constructing device according to claim 1 is characterized in that, described hydraulic drive mechanism comprises at least two first hydraulic jacks, and the piston rod part of described first hydraulic jack connects described supporting mechanism.
6. bridge beam body constructing device according to claim 1, it is characterized in that, described screw lift structure comprises base that spiral connects and from the base internal cavities screw mandrel of turn up and down, the piston rod of the top of described screw mandrel, first hydraulic jack connects described supporting mechanism.
7. bridge beam body constructing device according to claim 6 is characterized in that, is provided with plane bearing between described base and the screw mandrel.
8. bridge beam body constructing device according to claim 1 is characterized in that, described screw lift structure is arranged on locomotive near the position of second hydraulic jack, and described first hydraulic jack is arranged on the locomotive position away from second hydraulic jack.
9. bridge beam body constructing device according to claim 1 is characterized in that, also comprises a hydraulic control device, comprising:
First reversal valve is controlled first hydraulic jack and is risen, descends;
Second reversal valve is controlled the described second hydraulic jack along continuous straight runs and is moved back and forth.
10. bridge beam body constructing device according to claim 9 is characterized in that, described hydraulic control device is provided with operating desk, which is provided with:
Operated key, the moving direction of wheel is moved in control first;
First control lever is controlled described first reversal valve;
Second control lever is controlled described second reversal valve.
CN2011101937215A 2011-07-12 2011-07-12 Bridge beam construction device Pending CN102267176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101937215A CN102267176A (en) 2011-07-12 2011-07-12 Bridge beam construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101937215A CN102267176A (en) 2011-07-12 2011-07-12 Bridge beam construction device

Publications (1)

Publication Number Publication Date
CN102267176A true CN102267176A (en) 2011-12-07

Family

ID=45049733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101937215A Pending CN102267176A (en) 2011-07-12 2011-07-12 Bridge beam construction device

Country Status (1)

Country Link
CN (1) CN102267176A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130863A (en) * 2018-02-12 2018-06-08 中国建筑第七工程局有限公司 Precast T-Beam hydraulic self-traveling integral mold plate and its construction method
CN108638302A (en) * 2018-08-21 2018-10-12 杜威 A kind of scalable inner template of square chest type concrete component
CN113338617A (en) * 2021-06-29 2021-09-03 中国建筑第二工程局有限公司 One-time pouring template system for roof ultrahigh parapet and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101126223A (en) * 2007-09-17 2008-02-20 中铁二局股份有限公司 Mobile integral construction platform, construction method thereof and special sling for the same
CN101158146A (en) * 2007-11-20 2008-04-09 中铁大桥局集团第二工程有限公司 Cable-stayed bridge main-beam sliding form frame system and construction method
CN101210419A (en) * 2007-12-21 2008-07-02 中铁大桥局股份有限公司 Inside and outside beam system bridge fabrication machine for small radius curve concrete box girder construction and construction method thereof
CN102001131A (en) * 2010-09-17 2011-04-06 梁铭康 Bridge girder body auxiliary production equipment and bridge girder body production system
CN201816135U (en) * 2010-09-17 2011-05-04 梁铭康 Bridge body production auxiliary equipment and bridge body production system
CN202202260U (en) * 2011-07-12 2012-04-25 梁铭康 Constructing device for bridge body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101126223A (en) * 2007-09-17 2008-02-20 中铁二局股份有限公司 Mobile integral construction platform, construction method thereof and special sling for the same
CN101158146A (en) * 2007-11-20 2008-04-09 中铁大桥局集团第二工程有限公司 Cable-stayed bridge main-beam sliding form frame system and construction method
CN101210419A (en) * 2007-12-21 2008-07-02 中铁大桥局股份有限公司 Inside and outside beam system bridge fabrication machine for small radius curve concrete box girder construction and construction method thereof
CN102001131A (en) * 2010-09-17 2011-04-06 梁铭康 Bridge girder body auxiliary production equipment and bridge girder body production system
CN201816135U (en) * 2010-09-17 2011-05-04 梁铭康 Bridge body production auxiliary equipment and bridge body production system
CN202202260U (en) * 2011-07-12 2012-04-25 梁铭康 Constructing device for bridge body

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130863A (en) * 2018-02-12 2018-06-08 中国建筑第七工程局有限公司 Precast T-Beam hydraulic self-traveling integral mold plate and its construction method
CN108638302A (en) * 2018-08-21 2018-10-12 杜威 A kind of scalable inner template of square chest type concrete component
CN113338617A (en) * 2021-06-29 2021-09-03 中国建筑第二工程局有限公司 One-time pouring template system for roof ultrahigh parapet and construction method thereof

Similar Documents

Publication Publication Date Title
CN105057511B (en) A kind of processing method and equipment of reinforcing bar keel
CN207228618U (en) Electrical lift shaft form
CN209408814U (en) A kind of PC track beam form system
CN102001131A (en) Bridge girder body auxiliary production equipment and bridge girder body production system
CN202202260U (en) Constructing device for bridge body
CN201816135U (en) Bridge body production auxiliary equipment and bridge body production system
CN102267176A (en) Bridge beam construction device
CN206264117U (en) The beam prefabricated equipment of T
CN201669775U (en) Internal mold adjusting mechanism of prefabricated U-shaped concrete beam
CN206386132U (en) Tunnel casting concrete quick template supporting stripper apparatus
CN202220326U (en) Bridge beam body construction device
CN106238630A (en) The processing method of cylindricality steel reinforcement cage
CN210525428U (en) Telescopic whole window frame mould
CN102294748A (en) Bridge body construction equipment
CN210525431U (en) Window die adjustment mechanism and window die
CN210066503U (en) Thin-wall hollow pier die of sliding frame lifting die
CN108044789B (en) Pretensioned prestressed concrete track slab production line tensioning system and application thereof
CN111188289A (en) Culvert trolley and construction method thereof
CN216266743U (en) Tension rod dismounting device
CN115749055A (en) Prefabricated edge component and production equipment thereof
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN115816632A (en) Assembling type steel structure building construction formwork's extracting tool
CN115741970A (en) Prefabricated pipe gallery formwork system and construction method thereof
CN205969435U (en) Piping lane mould is assembled in horizontal many storehouses
CN214530530U (en) Gate chamber corridor removes strutting arrangement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111207