CN102261904A - 一种高大模板支撑体系立杆变形的测量方法 - Google Patents
一种高大模板支撑体系立杆变形的测量方法 Download PDFInfo
- Publication number
- CN102261904A CN102261904A CN 201110106079 CN201110106079A CN102261904A CN 102261904 A CN102261904 A CN 102261904A CN 201110106079 CN201110106079 CN 201110106079 CN 201110106079 A CN201110106079 A CN 201110106079A CN 102261904 A CN102261904 A CN 102261904A
- Authority
- CN
- China
- Prior art keywords
- transit
- measuring point
- vertical rod
- measuring
- angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
本发明公开了一种高大模板支撑体系立杆变形的测量方法。该方法用两个经纬仪,利用其测水平角的功能,通过测回法测量试验立杆变形前后所测位置的角度变化。具体是根据试验要求和立杆分布情况,选择要测的立杆,并在立杆上均匀分布测点,在测点上做明显标记,使经纬仪能明显看到;建立一平面坐标系,将第一经纬仪安放于坐标原点上,将第二经纬仪分别安放在横轴上的合适位置,使各立杆上的测点都能在经纬仪中看到,用钢尺测量出第一经纬仪和第二经纬仪之间的距离,在试验前通过测回法测出测点和经纬仪之间角度,通过角度计算出测点的坐标;在试验后也通过测回法测出测点和经纬仪的角度,计算出变形后的测点的坐标,最后计算出测点坐标的变化值。
Description
技术领域
本发明属于高大模板支撑体系的设计及研究领域,涉及一种高大模板支撑体系立杆变形的测量方法,特别适用于高大模板支撑体系的受压变形后立杆变形的测量。
背景技术
目前,高大模板支撑体系进设计及研究时,立杆变形的测量方法一般都是在加载结束后,采用简单的工具进行多基面的测量,往往不能做到一次测量就能获得所需要的数据,同时误差可达几毫米到几十毫米,测量所得到的数据准确性很差;而且测量过程中由于模板支架已经失稳,在架体上测量很不安全。
发明内容
为了克服现有的测试方法准确性差的缺点,本发明的目的在于,提供一种高大模板支撑体系立杆变形的测量方法,该方法利用简单的数学知识处理测量数据,实现了立杆变形的精确测量。
为了实现上述目的,本发明采取如下的技术解决方案:
一种高大模板支撑体系立杆变形的测量方法,其特征在于,该方法根据立杆分布情况,采用两个经纬仪对要测量的立杆变形进行测量,具体按下列步骤测量:
1)对于要测量的立杆,在立杆上布置测点,并在测点上做明显标记;
2)根据立杆的分布情况,建立一平面坐标系,将第一经纬仪(1)置于坐标原点,第二经纬仪(2)置于平面坐标系的横轴上,且使第一经纬仪(1)和第二经纬仪(2)都能看到被测立杆上的标记;
3)试验前用钢尺测量出第一经纬仪(1)和第二经纬仪(2)之间的距离,然后通过测回法分别测出测点和第一经纬仪(1)之间角度,以及测点和第二经纬仪(2)之间角度,通过得到的角度计算出被测立杆上标记的坐标,并记录;
4)在试验后也通过测回法测出被测立杆上标记和第二经纬仪(2)的角度,计算出变形后的测点的坐标,最后计算出被测立杆的测点坐标的变化值。
采用本发明的方法,可大幅提高了立杆变形测量的精度,提高了测量效率;同时保证了测量过程中的安全性,节省了测量时间。
附图说明
图1是经纬仪安放位置平面图。
图2是测点坐标计算示意图。
下面结合附图和实施例对本发明进行进一步的详细说明。
具体实施方式
参见图1、图2,本实施例给出一种高大模板支撑体系立杆变形的测量方法,该方法根据试验要求和立杆分布情况,采用两个经纬仪对要测量的立杆变形进行测量,具体按下列步骤测量:
1)对于要测量的立杆,在立杆上分布测点,在测点上做明显标记;使经纬仪能明显看到;
2)根据立杆的分布情况,建立一平面坐标系,将第一经纬仪1安放于坐标原点上,将第二经纬仪2置于平面坐标系的横轴上,如图1所示,使各立杆上的测点都能在第一经纬仪1和第二经纬仪(2)中看到;
3)在试验前通过测回法测出测点和第一经纬仪1、第二经纬仪2之间角度,具体为:首先用第一经纬仪1的望远镜瞄准第二经纬仪2,读数b左,记录数据,顺时针转动照准部,瞄准测点,读数c左,记录数据,计算上半测回的角度值,β左=c左-b左;倒转望远镜,进行盘右观测,瞄准测点,读数c右,记录数据,逆时针转动照准部,瞄准第二经纬仪2,读数b右,记录数据,计算下半测回的角度值,β右=c右-b右,最后取平均值,βA= ;同理用第二经纬仪2测出第一经纬仪1与测点之间的角度βB。
4)由第一经纬仪1、第二经纬仪2和测点组成了三角形,由第一经纬仪1、第二经纬仪2测出两个角βA和βB,用钢尺测量出第一经纬仪1与第二经纬仪2之间的距离S,采用解三角形方法可以解得测点的坐标值(X1,Y1),具体如图2所示。
5)在试验结束立杆变形后,采用以测回法测出变形后的夹角β A和β B,解三角形得出变形后测点的坐标值(X2,Y2),如图2所示,从而得出测点坐标的变化值。
Claims (2)
1.一种高大模板支撑体系立杆变形的测量方法,其特征在于,该方法根据立杆分布情况,采用两个经纬仪对要测量的立杆变形进行测量,具体按下列步骤测量:
1)对于要测量的立杆,在立杆上布置测点,并在测点上做明显标记;
2)根据立杆的分布情况,建立一平面坐标系,将第一经纬仪(1)置于坐标原点,第二经纬仪(2)置于平面坐标系的横轴上,且使第一经纬仪(1)和第二经纬仪(2)都能看到被测立杆上的标记;
3)试验前用钢尺测量出第一经纬仪(1)和第二经纬仪(2)之间的距离,然后通过测回法分别测出测点和第一经纬仪(1)之间角度,以及测点和第二经纬仪(2)之间角度,通过得到的角度计算出被测立杆上标记的坐标,并记录;
4)在试验后也通过测回法测出被测立杆上标记和第二经纬仪(2)的角度,计算出变形后的测点的坐标,最后计算出被测立杆的测点坐标的变化值。
2.如权利要求1所述的方法,其特征在于,所述的测点和第一经纬仪(1)、以及测点和第二经纬仪(2)之间角度的测量方法是:
先用第一经纬仪(1)的望远镜瞄准第二经纬仪(2),读数为b左,并记录数据,然后顺时针转动照准部,使第一经纬仪(1)瞄准测点,读数c左,记录数据,计算上半测回的角度值,β左=c左-b左;倒转望远镜,进行盘右观测,使第一经纬仪(1)瞄准测点,读数c右,记录数据,逆时针转动照准部,使第一经纬仪(1)瞄准第二经纬仪(2),读数b右,记录数据,计算下半测回的角度值,β右=c右-b右,最后取平均值,βA= ;
用同样的方法用第二经纬仪(2)测出第一经纬仪(1)与测点之间的角度βB;
在试验结束立杆变形后,采用以测回法测出立杆变形后的夹角,解三角形得出变形后测点的坐标值,从而得出测点坐标的变化值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110106079A CN102261904B (zh) | 2011-04-27 | 2011-04-27 | 一种高大模板支撑体系立杆变形的测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110106079A CN102261904B (zh) | 2011-04-27 | 2011-04-27 | 一种高大模板支撑体系立杆变形的测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102261904A true CN102261904A (zh) | 2011-11-30 |
CN102261904B CN102261904B (zh) | 2012-09-26 |
Family
ID=45008627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110106079A Expired - Fee Related CN102261904B (zh) | 2011-04-27 | 2011-04-27 | 一种高大模板支撑体系立杆变形的测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102261904B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110595378A (zh) * | 2019-10-17 | 2019-12-20 | 中煤科工集团重庆研究院有限公司 | 基于激光测距原理的地表或边坡变形实时监测装置及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1632461A (zh) * | 2004-12-29 | 2005-06-29 | 西安华腾光电有限责任公司 | 对称闭合激光拱坝变形监测方法 |
JP2006162539A (ja) * | 2004-12-10 | 2006-06-22 | Tadashi Hashimoto | 変位測定方式及び方法 |
DE102008006415A1 (de) * | 2007-02-01 | 2008-08-07 | Grafinger, Helge, Dipl.-Ing. Dr. | Verfahren zur Überwachung der Deformation eines Objektes |
CN102022992A (zh) * | 2009-09-22 | 2011-04-20 | 上海宝钢工业检测公司 | 桥式起重机主梁上拱度测量值的修正方法 |
-
2011
- 2011-04-27 CN CN201110106079A patent/CN102261904B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006162539A (ja) * | 2004-12-10 | 2006-06-22 | Tadashi Hashimoto | 変位測定方式及び方法 |
CN1632461A (zh) * | 2004-12-29 | 2005-06-29 | 西安华腾光电有限责任公司 | 对称闭合激光拱坝变形监测方法 |
DE102008006415A1 (de) * | 2007-02-01 | 2008-08-07 | Grafinger, Helge, Dipl.-Ing. Dr. | Verfahren zur Überwachung der Deformation eines Objektes |
CN102022992A (zh) * | 2009-09-22 | 2011-04-20 | 上海宝钢工业检测公司 | 桥式起重机主梁上拱度测量值的修正方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110595378A (zh) * | 2019-10-17 | 2019-12-20 | 中煤科工集团重庆研究院有限公司 | 基于激光测距原理的地表或边坡变形实时监测装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102261904B (zh) | 2012-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102865862B (zh) | 全站仪免置平自由设站的测量方法 | |
CN104723313B (zh) | 一种大型异形工件的划线测量方法及装置 | |
CN102278970B (zh) | 一种基于全站仪角距差分的定位变形监测技术 | |
CN104483891A (zh) | 一种提高机床空间运动精度的方法 | |
CN107478162A (zh) | 一种台架安装坐标系构建方法 | |
CN106643643A (zh) | 一种非接触式目标坐标的测量方法 | |
CN104408320A (zh) | 采用平面坐标法测定圆形筒体建构筑物中心偏差的方法 | |
CN103471572A (zh) | 全站仪组网测量大型结构件的方法 | |
CN107218909B (zh) | 一种在发动机叶片上贴应变片的方法 | |
CN102207380A (zh) | 一种高精度横轴倾斜误差补偿方法 | |
CN206160901U (zh) | 扇形段对中调整平台测量轨的高度测量辅助工具 | |
CN101586964A (zh) | 水上测量时经纬仪的调校方法 | |
CN102466476A (zh) | 一种测树型超站仪及其使用方法 | |
CN103162676B (zh) | 一种角规量测森林小班蓄积及生物量的精准推估方法 | |
CN102261904B (zh) | 一种高大模板支撑体系立杆变形的测量方法 | |
CN104166985A (zh) | 一种基于区域分割的星敏感器标定方法 | |
CN106979750A (zh) | 一种机床平动轴几何误差的快速测量方法及其装置 | |
CN104330078B (zh) | 一种基于三点后方交会模型的联合测量方法 | |
CN108332784B (zh) | 一种距离测量验证方法 | |
CN106813563B (zh) | 角度测量装置 | |
CN204154252U (zh) | 物探支架角度定位测量仪 | |
CN202974282U (zh) | 一种组合式多功能简易测绘仪 | |
CN104501785B (zh) | 基于电子经纬仪的精测***的磁试验室磁场基准建立方法 | |
CN102564383A (zh) | 基于轴面角确定三轴磁传感器轴间角的方法 | |
CN205300578U (zh) | 一种倾斜角度测量装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120926 Termination date: 20130427 |