CN102242635B - Embedding construction method of orifice pipe - Google Patents

Embedding construction method of orifice pipe Download PDF

Info

Publication number
CN102242635B
CN102242635B CN 201110203754 CN201110203754A CN102242635B CN 102242635 B CN102242635 B CN 102242635B CN 201110203754 CN201110203754 CN 201110203754 CN 201110203754 A CN201110203754 A CN 201110203754A CN 102242635 B CN102242635 B CN 102242635B
Authority
CN
China
Prior art keywords
orifice
orifice tube
borehole
orifice pipe
pipeline section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110203754
Other languages
Chinese (zh)
Other versions
CN102242635A (en
Inventor
朱兴明
张克付
方明
鲍谊祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TONGGUAN MINE CONSTRUCTION CO., LTD. OF TONGLING NONFERROUS METALS GROUP CO., LTD.
Original Assignee
TONGLING ZHONGDU MINING CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TONGLING ZHONGDU MINING CONSTRUCTION CO Ltd filed Critical TONGLING ZHONGDU MINING CONSTRUCTION CO Ltd
Priority to CN 201110203754 priority Critical patent/CN102242635B/en
Publication of CN102242635A publication Critical patent/CN102242635A/en
Application granted granted Critical
Publication of CN102242635B publication Critical patent/CN102242635B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses an embedding construction method of an orifice pipe. The method comprises the following steps: a. drilling a horizontal or upward orifice pipe section borehole according to the outer diameter of the orifice pipe; b. drilling a small-caliber borehole at a certain angel at the open side of the orifice pipe section borehole by utilizing a handheld pneumatic rock drill on the pregrouting working surface, communicating the small-caliber borehole with the orifice pipe section borehole and installing a grouting mouth; c. simply and easily fixing one end of a small-diameter plastic flexible pipe with the length larger than the length of the orifice pipe in the inner port of the orifice pipe; enabling the other end to be exposed out of the outer exposed end of the orifice pipe; transferring the orifice pipe into the orifice pipe section borehole to be fixed in the definite position; maintaining the plastic flexible pipe to be positioned in the highest point at the bottom of the borehole at one end in the borehole; d. filling waste cotton yarn in the annular gap between the outer exposed end of the orifice pipe and the wall of the borehole and the inner cavity of the orifice pipe; and e. carrying out the mud jacking solidification of the orifice pipe. The technical scheme in the invention can effectively solve the problems of difficult embedding construction of pregrouting and water-plugging the upward or horizontal borehole orifice on the working surface of a roadway or a tunnel, thereby conveniently, rapidly and effectively carrying out the embedding construction of the borehole.

Description

A kind of embedding construction method of orifice pipe
Technical field
The present invention relates to a kind of embedding construction method of orifice pipe, be applicable to underground mine tunnel and subterranean tunnel pre grouting from the working face water blockoff and look up or horizontal drilling orifice tube burial and construction.
Background technology
In mine or construction of tunnel pre grouting from the working face plug water construction, orifice tube is as the crucial equipment of slip casting operation, its security reliability of burying underground is directly connected to boring and discloses the aquifer when water burst occurring, can orifice tube itself close orifice valves and satisfy behind the door the basic demand that seepage does not occur proposing drilling tool, the more important thing is that simultaneously can when slip casting operation orifice tube satisfy withstand voltage impervious needs under at least 2 ~ 4 times of hydrostatic pressures even the higher grouting pressure.The angle of inlet well is different because of the slip casting work plane.In the pre-slip casting of Shaft Stopes, hole as lower to upright opening with overlook inclined hole.And in the pre-slip casting in gallery, inclined gallery or tunnel front, there is again lateral aperture in the existing low-angle hole of overlooking of holing and looks up the hole.For burying underground of pre-inlet well orifice tube, its program is that the first Drilling degree of depth generally surpasses the orifice tube of burying underground and enters boring about hole depth 0.1m.Then bore diameter adopts clear water that rock dust in the hole is rinsed well to be advisable than the large 2 ~ 4mm of orifice tube external diameter.After finishing above-mentioned work, carry out orifice tube and bury underground.On method for embedding, for lower to upright opening with overlook inclined hole, common way is in advance to the interior cement injection mortar of boring or cement paste, again orifice tube is sent into also to locate in the hole and fixed, after cement mortar or cement paste maintenance certain hour reach certain intensity, adopt rig that the slurries calculus body in the orifice tube is bored except and use grouting pump to adopt 1.2 times of design final grouting pressures to carry out withstand voltage impermeability test, could formal boring disclose the aquifer after qualified.And for level and look up orifice tube, can not adopt in the hole cement injection mortar or cement paste method pre-buried.Existing document does not have ripe technology report yet.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of embedding construction method of orifice pipe, can be convenient, fast, effectively carry out that the pre-grouting for water blocking in tunnel or tunnel front is looked up or horizontal drilling orifice tube burial and construction.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of embedding construction method of orifice pipe may further comprise the steps: a, according to the external diameter Drilling level of orifice tube or look up aperture pipeline section boring; B, at pre-slip casting work plane hand-held air rock drill, at the side direction of the perforate of aperture pipeline section boring at a certain angle Drilling small diameter hole and aperture pipeline section boring perforation and installation grouting nozzle; C, with a length greater than the simple and easy orifice tube inner port that is fixed in of minor diameter plastic flexible pipe one end of orifice tube length, the other end exposes to the exposed junction of orifice tube; Orifice tube is sent in the boring of aperture pipeline section to determining that the position fixes, and an end that keeps plastic flexible pipe to be positioned at boring is in peak at the bottom of the drilling hole; D, with the inner chamber of the exposed junction of orifice tube and the annular space between the drill hole wall and orifice tube with the filling of waste cotton yarn; E, carry out the consolidation grouting of orifice tube.
Drilling level or when looking up the boring of aperture pipeline section, aperture pipeline section bore diameter are with than the large 2 ~ 4mm of orifice tube external diameter, and aperture pipeline section drilling depth generally surpasses the orifice tube of burying underground and enters about hole depth 0.1m.
When carrying out the orifice tube consolidation grouting, adopt grouting pump to be pressed in the annular space between orifice tube and drill hole wall by grouting nozzle with low discharge (5 liters ~ 10 liters of per minutes) in the dense fast setting cement slurry for preparing; Cotton yarn the bleeding increase occurs and reaches when stablizing within occurring the filling cotton yarn between cement paste outflow, orifice tube exposed junction and drill hole wall in the stack and managing, and mud jacking can finish.The water/binder ratio (quality) of described dense fast setting cement slurry is preferably 0.5:1 to 1:1.
Adopt this technical scheme, can solve effectively that the pre-grouting for water blocking in tunnel or tunnel front is looked up or a difficult problem that horizontal drilling orifice tube burial and construction exists, thus convenient, fast, carry out the orifice tube burial and construction efficiently.
The specific embodiment
The below elaborates to the specific embodiment of the present invention.
A kind of embedding construction method of orifice pipe of the present invention may further comprise the steps: a, according to the external diameter Drilling level of orifice tube or look up aperture pipeline section boring; B, at pre-slip casting work plane hand-held air rock drill, at the side direction of the perforate of aperture pipeline section boring at a certain angle Drilling small diameter hole and aperture pipeline section boring perforation and installation grouting nozzle; C, with a length greater than the simple and easy orifice tube inner port that is fixed in of minor diameter plastic flexible pipe one end of orifice tube length, the other end exposes to the exposed junction of orifice tube; Orifice tube is sent in the boring of aperture pipeline section to determining that the position fixes, and an end that keeps plastic flexible pipe to be positioned at boring is in peak at the bottom of the drilling hole; D, with the inner chamber of the exposed junction of orifice tube and the annular space between the drill hole wall and orifice tube with the filling of waste cotton yarn; E, carry out the consolidation grouting of orifice tube.
Drilling level or when looking up the boring of aperture pipeline section, aperture pipeline section bore diameter are with than the large 2 ~ 4mm of orifice tube external diameter, and aperture pipeline section drilling depth generally surpasses the orifice tube of burying underground and enters about hole depth 0.1m.
When carrying out the orifice tube consolidation grouting, adopt grouting pump to be pressed in the annular space between orifice tube and drill hole wall by grouting nozzle with low discharge (5 liters ~ 10 liters of per minutes) in the dense fast setting cement slurry for preparing; Cotton yarn the bleeding increase occurs and reaches when stablizing within occurring the filling cotton yarn between cement paste outflow, orifice tube exposed junction and drill hole wall in the stack and managing, and mud jacking can finish.The water/binder ratio (quality) of described dense fast setting cement slurry is preferably 0.5:1 to 1:1.
Technique of the present invention is simple, with low cost, quick construction, reliable in quality, has started that the pre-grouting for water blocking in tunnel or tunnel front is looked up or horizontal drilling orifice tube burial and construction new method.

Claims (4)

1. embedding construction method of orifice pipe is characterized in that may further comprise the steps: a, according to the external diameter Drilling level of orifice tube or look up aperture pipeline section boring; B, at pre-slip casting work plane hand-held air rock drill, at the side direction of the perforate of aperture pipeline section boring at a certain angle Drilling small diameter hole and aperture pipeline section boring perforation and installation grouting nozzle; C, with a length greater than the simple and easy orifice tube inner port that is fixed in of minor diameter plastic flexible pipe one end of orifice tube length, the other end exposes to the exposed junction of orifice tube; Orifice tube is sent in the boring of aperture pipeline section to determining that the position fixes, and an end that keeps plastic flexible pipe to be positioned at boring is in peak at the bottom of the drilling hole; D, with the inner chamber of the exposed junction of orifice tube and the annular space between the drill hole wall and orifice tube with the filling of waste cotton yarn; E, carry out the consolidation grouting of orifice tube.
2. a kind of embedding construction method of orifice pipe according to claim 1, it is characterized in that: Drilling level or when looking up the boring of aperture pipeline section, aperture pipeline section bore diameter is than the large 2 ~ 4mm of orifice tube external diameter, and aperture pipeline section drilling depth generally surpasses the orifice tube of burying underground and enters about hole depth 0.1m.
3. a kind of embedding construction method of orifice pipe according to claim 1 and 2, it is characterized in that: when carrying out the orifice tube consolidation grouting, adopt grouting pump to be pressed in the annular space between orifice tube and drill hole wall by grouting nozzle with the low discharge of 5 liters ~ 10 liters of per minutes in the dense fast setting cement slurry for preparing; Cotton yarn the bleeding increase occurs and reaches when stablizing within occurring the filling cotton yarn between cement paste outflow, orifice tube exposed junction and drill hole wall in the described plastic flexible pipe and managing, and mud jacking can finish.
4. a kind of embedding construction method of orifice pipe according to claim 3 is characterized in that: the water/binder ratio of described dense fast setting cement slurry is 0.5:1 to 1:1.
CN 201110203754 2011-07-20 2011-07-20 Embedding construction method of orifice pipe Active CN102242635B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110203754 CN102242635B (en) 2011-07-20 2011-07-20 Embedding construction method of orifice pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110203754 CN102242635B (en) 2011-07-20 2011-07-20 Embedding construction method of orifice pipe

Publications (2)

Publication Number Publication Date
CN102242635A CN102242635A (en) 2011-11-16
CN102242635B true CN102242635B (en) 2013-04-17

Family

ID=44960859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110203754 Active CN102242635B (en) 2011-07-20 2011-07-20 Embedding construction method of orifice pipe

Country Status (1)

Country Link
CN (1) CN102242635B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674815B (en) * 2015-02-17 2016-08-17 中国水利水电第七工程局成都水电建设工程有限公司 A kind of retention of excessive fluid hole section orifice tube and orifice tube embedding method
CN113863941B (en) * 2021-09-23 2024-01-12 浙江省交通运输科学研究院 Grouting construction method for reducing floating of shield tunnel segment in construction period
CN115263230B (en) * 2022-07-20 2024-06-28 内蒙古平庄煤业(集团)有限责任公司 Double-layer sleeve for upward drilling and grouting pipe fixing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307695A (en) * 2008-07-09 2008-11-19 黎凤岐 Coal mine gas pre-draining borehole sealing method adopting aerated capsule as temporary hole bottom
CN201218073Y (en) * 2008-06-18 2009-04-08 煤炭科学研究总院西安研究院 Drill hole pipe reinforcing device
CN101463717A (en) * 2008-12-22 2009-06-24 中煤第五建设公司 Converse fast hole-sealing method of continuous water exit hole-drilling conduit method
CN201310362Y (en) * 2008-11-28 2009-09-16 中铁隧道集团有限公司 Installing device of high pressure water burst drill hole bore pipe
CN201390949Y (en) * 2009-05-05 2010-01-27 中国水利水电建设集团公司 Grouting machine for large-volume concrete seepage cracks
CN101644150A (en) * 2009-07-30 2010-02-10 中铁二局股份有限公司 After-loading orifice tube and installation method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201218073Y (en) * 2008-06-18 2009-04-08 煤炭科学研究总院西安研究院 Drill hole pipe reinforcing device
CN101307695A (en) * 2008-07-09 2008-11-19 黎凤岐 Coal mine gas pre-draining borehole sealing method adopting aerated capsule as temporary hole bottom
CN201310362Y (en) * 2008-11-28 2009-09-16 中铁隧道集团有限公司 Installing device of high pressure water burst drill hole bore pipe
CN101463717A (en) * 2008-12-22 2009-06-24 中煤第五建设公司 Converse fast hole-sealing method of continuous water exit hole-drilling conduit method
CN201390949Y (en) * 2009-05-05 2010-01-27 中国水利水电建设集团公司 Grouting machine for large-volume concrete seepage cracks
CN101644150A (en) * 2009-07-30 2010-02-10 中铁二局股份有限公司 After-loading orifice tube and installation method thereof

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
井巷工作面注浆孔口管的长度确定与埋设;姜玉松;《矿业研究与开发》;20060630;第26卷(第3期);40-42,76 *
含水量大煤岩层精确测定瓦斯压力法;王庆永;《煤炭技术》;20100630;第29卷(第6期);126-128 *
姜玉松.井巷工作面注浆孔口管的长度确定与埋设.《矿业研究与开发》.2006,第26卷(第3期),
杨备战.别岩槽隧道穿越F1断层帷幕注浆设计与施工.《中小企业管理与科技(上旬刊)》.2011,(第6期), *
王庆永.含水量大煤岩层精确测定瓦斯压力法.《煤炭技术》.2010,第29卷(第6期),

Also Published As

Publication number Publication date
CN102242635A (en) 2011-11-16

Similar Documents

Publication Publication Date Title
CN104747075B (en) Anti-collapsing drilling method for grout spraying of soft coal seam
KR100919628B1 (en) If the excavation where the carbide tip is had excavation bit of the excavation system where the expansion and abridgment are possible
CN102561992B (en) Grouting plugging process adopting deformation water stopper
CN104790873B (en) Soft rock layer jet is oriented to the integrated drilling method of the anti-collapse hole of pore-forming reaming
CN104632075A (en) Drilling detecting integrated system and method for overlying strata fracture detection
CN104141470A (en) Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine
CN103835651A (en) Single-hole directional drilling local grouting raise boring technology
CN104481580A (en) Method and device for repairing downhole coal-bed gas extraction drilled hole
CN102242635B (en) Embedding construction method of orifice pipe
CN201129177Y (en) Drill rod back subsection grouting apparatus
CN103244149B (en) Construction method for repairing tunnel collapse through insertion pipe grouting
KR101851959B1 (en) Grout same time injection apparatus and a method of construction using the same
CN204677155U (en) A kind of down-hole coal bed high strength rapid drilling hole sealing device
KR100722825B1 (en) The multi angle boring machine attached to a excavator and its excavating method of under the ground
CN201165660Y (en) Steel pipe hole bottom grouting apparatus
CN109184565B (en) Hole sealing and pipe fixing method for drainage drill hole of limestone
CN204402406U (en) A kind of down-hole coal bed mash gas pumping drilling prosthetic device
CN103074887B (en) High-pressure vibro-grouting method for processing foundation and specific drilling tool assembly
CN112554839B (en) Integral hose plug-in-free gas hole packer and hole sealing method thereof
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN101251020A (en) Subsection hole-drilling repeatedly slip-casting method
CN201183950Y (en) Self-propelling type anchor rod of seamless steel pipe
CN105019458A (en) Deep and thick sand layer covered karst cave grouting system device and construction method
CN102758443B (en) Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof
CN203476278U (en) Grouting type hole sealing and automatic water discharging device for underground drilling gas extraction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: TONGLING NONFERROUS METALS GROUP TONGGUAN MINE CON

Free format text: FORMER NAME: TONGLING ZHONGDU MINING CONSTRUCTION CO.,LTD.

CP03 Change of name, title or address

Address after: 244000 No. 29 West Beijing Road, Anhui, Tongling

Patentee after: TONGGUAN MINE CONSTRUCTION CO., LTD. OF TONGLING NONFERROUS METALS GROUP CO., LTD.

Address before: Tongguanshan District 244000 Anhui city in Tongling Province, Beijing Road No. 29

Patentee before: Tongling Zhongdu Mining Construction Co.,Ltd.