CN102235152A - Hole-forming construction method for bored pile on high-strength stabilized soil layer - Google Patents

Hole-forming construction method for bored pile on high-strength stabilized soil layer Download PDF

Info

Publication number
CN102235152A
CN102235152A CN 201010153611 CN201010153611A CN102235152A CN 102235152 A CN102235152 A CN 102235152A CN 201010153611 CN201010153611 CN 201010153611 CN 201010153611 A CN201010153611 A CN 201010153611A CN 102235152 A CN102235152 A CN 102235152A
Authority
CN
China
Prior art keywords
soil layer
pile
hole
high strength
strength reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010153611
Other languages
Chinese (zh)
Inventor
叶平
陆纪东
夏荣荣
陆水良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN 201010153611 priority Critical patent/CN102235152A/en
Publication of CN102235152A publication Critical patent/CN102235152A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a hole-forming construction method for a bored pile on a high-strength stabilized soil layer, comprising the following steps of: determining a pile foundation position to be constructed on the construction ground; drilling into the high-strength stabilized soil layer at the pile foundation position by using a rotary drilling rig to form a pile hole; and drilling into a soft soil layer at the pile hole position by using a bored pile rack to form a hole. In the construction method, the holes are formed on the soil layers with higher strength by using the rotary drilling rig and another holes are formed in the soft soil layer by using a GPS (Global Position System) bored pile rack drill bit. By using the hole forming construction method, the holes can be formed in the soil layers with higher strength, the hole-forming quality can be ensured, the damage to the drill bit of the bored pile is avoided and the engineering quality and the construction efficiency are improved.

Description

High strength reinforcement soil layer drilling pouring pile hole job practices
Technical field
The present invention relates to the engineering construction technical field of construction, and be particularly related to a kind of high strength reinforcement soil layer drilling pouring pile hole job practices.
Background technology
Castinplace pile is meant at engineering site and forms the stake hole by means such as machine drilling, steel pipe soil compaction or manpower excavations in foundation soil, and place reinforcing cage, concrete perfusion within it and the stake of making, according to the hole forming method difference, castinplace pile can be divided into several classes such as tube-sinking cast-in-situ pile, bored pile and digging hole filling pile again.
Bored pile is a kind of type of definition by the piling method classification.Along with industrial expansion and Increase of population, highrise building constantly increases, because the foundation condition in a lot of areas is poor, can not directly bear the pressure that transmits by highrise building, exist the clay layer of very big weak soil of thickness or moderate strength below the face of land, build highrise building as still continuing to use general at that time friction pile, certainly lead to very big sedimentation.So engineers has been used for reference and has been dug well technological invention build the bored pile that steel concrete forms in manually digging hole.Along with the development with rapid changepl. never-ending changes and improvements of science and technology, bored pile is widely used in high level, high-rise building and heavy structure.
Nowadays building generally can adopt bored pile vertically to carry as pile foundation at the soft foundation layer, drilling pouring pile hole is then with utilization direct circulation of GPS pile frame or reverse circulating construction technology drilling and forming hole, and this traditional construction technology is applicable to soft foundation, run into the soil body behind high volume cement stabilization, because soil mass consolidation intensity is higher, the drill bit of bored pile just is difficult to drill this layer soil mass consolidation, if boring by force, can cause speed of fulfiling hole to slow down, become hole perpendicularity not guarantee, even can make the drill bit damage.To this special circumstances, the traditional drilling construction technology of this kind just can not be suitable for.
Summary of the invention
The present invention is intended to solve in the prior art, in bored pile construction, owing to adopt traditional construction technology can't be the constructing of higher-strength soil mass consolidation, and then cause hole quality not high, technical problems such as drill bit failure.
In view of this, the invention provides a kind of high strength reinforcement soil layer drilling pouring pile hole job practices, it is characterized in that, may further comprise the steps:
Measure the pile foundation position that needs construction on construction ground;
Utilize rotary drilling rig in the high strength reinforcement soil body, to creep into and form the stake hole in the pile foundation position;
Utilize bored pile pile frame drilling and forming hole in the weak soil layer in described stake hole site.
Further, described rotary drilling rig vertically passes through the described high strength reinforcement soil body.
Further, the diameter of described rotary drilling rig is identical with the diameter of bored pile.
Further, described rotary drilling rig is the crawler-type traveling mode.
Further, described rotary drilling rig adopts high-strength drill pipe to drive the hydraulic pressure unit head that circles round.
Further, the technology of carrying out pore-forming in described weak soil layer is direct circulation or reverse circulating construction technology.
In sum, high strength reinforcement soil layer drilling pouring pile hole job practices provided by the invention is applicable to the construction technology of pile foundation pore-forming in the high strength soil body behind cement stabilization, has the following advantages:
1, rotary drilling rig is owing to adopt the walking manner of crawler belt, the walking manner of the GPS bored pile pile frame towline of comparing traction, and it is quicker take action, and mobile more convenient, efficient is higher.
2, the stratum of many different soil conditions such as the applicable weak soil of the drill bit that circles round of the high moment of torsion of rotary drilling rig, sandy soil, gravel, be specially adapted in the higher soil layer of intensity, hole, on the speed of pore-forming, guarantee on the hole perpendicularity better than conventional drilling pouring pile hole technology, and reinforce after soil layer removes rotary drilling rig passing through, can bring into play GPS bored pile pile frame drill bit pore-forming advantage of mud off simultaneously in the middle of weak soil again.
Description of drawings
Figure 1 shows that the flow chart of the high strength reinforcement soil layer drilling pouring pile hole job practices that one embodiment of the invention provides;
Fig. 2 A to Fig. 2 E is depicted as the high strength reinforcement soil layer drilling pouring pile hole construction sequence schematic diagram that one embodiment of the invention provides.
The specific embodiment
For technical characterictic of the present invention is become apparent, below in conjunction with accompanying drawing, provide specific embodiment, the present invention will be further described.
See also Fig. 1, it is depicted as the flow chart of the high strength reinforcement soil layer drilling pouring pile hole job practices that one embodiment of the invention provides.
This job practices may further comprise the steps:
S10 measure to need the pile foundation position of construction on construction ground, wherein this construction ground have the higher soil layer of intensity with;
S20 utilizes rotary drilling rig to creep in the high strength reinforcement soil body in the pile foundation position and forms the stake hole;
In embodiments of the present invention, described rotary drilling rig vertically passes through the described high strength reinforcement soil body.
In embodiments of the present invention, the diameter of described rotary drilling rig is identical with the diameter of bored pile.
In embodiments of the present invention, described rotary drilling rig is the crawler-type traveling mode, and it is advanced conveniently, and is quick for installation.
In embodiments of the present invention, described rotary drilling rig adopts high-strength drill pipe to drive the hydraulic pressure unit head that circles round.
S30 utilizes bored pile pile frame drilling and forming hole in the weak soil layer in described stake hole site.
In embodiments of the present invention, the technology of carrying out pore-forming in described weak soil layer is direct circulation or reverse circulating construction technology.
In embodiments of the present invention, its job practices is exactly to adopt the rotary drilling rig identical with the bored pile diameter, utilize its all-hydraulic power head, drive hydraulic pressure unit head that circles round by its high-strength drill pipe, the abrasion drill soil of keeping forging ahead in the middle of the higher soil mass consolidation of intensity, form the stake hole, thereby solved bored pile and crept into problem of difficult at the higher compacted soil of intensity, after the drill bit that circles round drills the reinforcing soil layer, in former one-tenth hole site, the traditional drilling and forming hole technology drilling and forming hole in the middle of weak soil of available pile frame utilization.
The high strength reinforcement soil layer drilling pouring pile hole job practices of utilizing the embodiment of the invention to provide is to utilize rotary drilling rig pore-forming in the higher soil layer of intensity earlier, utilizes GPS bored pile pile frame drill bit pore-forming in the middle of the weak soil layer again.Can be in the higher soil layer of intensity pore-forming and guaranteed the quality of pore-forming, avoided the damage of the drill bit of bored pile, improved the quality of engineering and the efficient of construction.
In order more clearly to explain the present invention, be illustrated below in conjunction with concrete construction sequence.
Please in conjunction with referring to Fig. 2 A to Fig. 2 E.
At first, determine the pile foundation position 4 that needs construction on building hard place level ground face 3, the long scope of this stake has high strength cement to reinforce soil layer 1 and former weak soil soil layer 2 from top to bottom, shown in Fig. 2 A.
Secondly, the rig 5 that circles round needs the pile foundation position 4 of construction in place, ready from walking on building hard place level ground face 3, shown in Fig. 2 B.
Once more, the drill bit that circles round of the rig 5 that circles round is being specified pile foundation position 4 vertical drilling and forming holes 6, and the rig 5 that circles round whenever creeps into once, and the compacted soil 7 that takes out is deposited on the limit, passes through whole reinforcing soil layer 1 until boring, shown in Fig. 2 C.
Then, after cement stabilization soil layer 1 is finished pore-forming 6, remove the rig 5 that circles round, 8 telephone-moving of bored pile pile frame are in place, formed 6 places, hole drilling and forming hole 9 in weak soil soil layer 2 more at the rig 5 that circles round, shown in Fig. 2 D.
At last, this stake is finished in construction, shown in Fig. 2 E.In this step, utilize GPS bored pile pile frame, adopt direct circulation or reverse circulating construction technology, both can bring into play the advantage of GPS bored pile pile frame drill bit pore-forming while mud off in the middle of weak soil.
In sum, the high strength reinforcement soil layer drilling pouring pile hole job practices that the embodiment of the invention provides is to utilize rotary drilling rig pore-forming in the higher soil layer of intensity earlier, utilize GPS bored pile pile frame drill bit pore-forming in the middle of weak soil again, have following useful technique effect compared to prior art:.
1, the stratum of many different soil conditions such as the applicable weak soil of the drill bit that circles round of the high moment of torsion of rotary drilling rig, sandy soil, gravel, be specially adapted in the higher soil layer of intensity, hole, on the speed of pore-forming, guarantee on the hole perpendicularity better than conventional drilling pouring pile hole technology, and reinforce after soil layer removes rotary drilling rig passing through, can bring into play GPS bored pile pile frame drill bit pore-forming advantage of mud off simultaneously in the middle of weak soil again.
2, rotary drilling rig is owing to adopt the walking manner of crawler belt, the walking manner of the GPS bored pile pile frame towline of comparing traction, and it is quicker take action, and mobile more convenient, efficient is higher.
Though the present invention discloses as above with preferred embodiment; right its is not in order to limit the present invention; have in the technical field under any and know the knowledgeable usually; without departing from the spirit and scope of the present invention; when can doing a little change and retouching, so protection scope of the present invention is as the criterion when looking claims person of defining.

Claims (6)

1. a high strength reinforcement soil layer drilling pouring pile hole job practices is characterized in that, may further comprise the steps:
Measure the pile foundation position that needs construction on construction ground;
Utilize rotary drilling rig in the high strength reinforcement soil body, to creep into and form the stake hole in the pile foundation position;
Utilize bored pile pile frame drilling and forming hole in the weak soil layer in described stake hole site.
2. high strength reinforcement soil layer drilling pouring pile hole job practices according to claim 1 is characterized in that described rotary drilling rig vertically passes through the described high strength reinforcement soil body.
3. high strength reinforcement soil layer drilling pouring pile hole job practices according to claim 1 is characterized in that the diameter of described rotary drilling rig is identical with the diameter of bored pile.
4. high strength reinforcement soil layer drilling pouring pile hole job practices according to claim 1 is characterized in that described rotary drilling rig is the crawler-type traveling mode.
5. high strength reinforcement soil layer drilling pouring pile hole job practices according to claim 1 is characterized in that, described rotary drilling rig adopts high-strength drill pipe to drive the hydraulic pressure unit head that circles round.
6. high strength reinforcement soil layer drilling pouring pile hole job practices according to claim 1 is characterized in that the technology of carrying out pore-forming in described weak soil layer is direct circulation or reverse circulating construction technology.
CN 201010153611 2010-04-22 2010-04-22 Hole-forming construction method for bored pile on high-strength stabilized soil layer Pending CN102235152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010153611 CN102235152A (en) 2010-04-22 2010-04-22 Hole-forming construction method for bored pile on high-strength stabilized soil layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010153611 CN102235152A (en) 2010-04-22 2010-04-22 Hole-forming construction method for bored pile on high-strength stabilized soil layer

Publications (1)

Publication Number Publication Date
CN102235152A true CN102235152A (en) 2011-11-09

Family

ID=44886213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010153611 Pending CN102235152A (en) 2010-04-22 2010-04-22 Hole-forming construction method for bored pile on high-strength stabilized soil layer

Country Status (1)

Country Link
CN (1) CN102235152A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644274A (en) * 2012-04-17 2012-08-22 中铁隧道集团三处有限公司 Pile-forming construction method for penetrating through existing structure by fender post
CN102704467A (en) * 2012-05-25 2012-10-03 重庆中设工程设计股份有限公司 Method for forming hole in elastic clay layer by rotary drilling
CN102758430A (en) * 2012-07-31 2012-10-31 中建五局第三建设有限公司 Large-diameter rotary digging pile construction technology for ultra-deep dumped unconsolidated soil bodies
CN107165581A (en) * 2017-06-09 2017-09-15 上海建工二建集团有限公司 A kind of GPS drill bit of drilling machine and GPS rig pile foundation drilling construction method
CN109137957A (en) * 2018-09-19 2019-01-04 上海市机械施工集团有限公司 A kind of pile base construction method
CN109695431A (en) * 2018-12-13 2019-04-30 台州职业技术学院 A kind of tool for salvaging drilling pile drill

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644274A (en) * 2012-04-17 2012-08-22 中铁隧道集团三处有限公司 Pile-forming construction method for penetrating through existing structure by fender post
CN102704467A (en) * 2012-05-25 2012-10-03 重庆中设工程设计股份有限公司 Method for forming hole in elastic clay layer by rotary drilling
CN102704467B (en) * 2012-05-25 2015-04-22 重庆中设工程设计股份有限公司 Method for forming hole in elastic clay layer by rotary drilling
CN102758430A (en) * 2012-07-31 2012-10-31 中建五局第三建设有限公司 Large-diameter rotary digging pile construction technology for ultra-deep dumped unconsolidated soil bodies
CN102758430B (en) * 2012-07-31 2014-07-23 中建五局第三建设有限公司 Large-diameter rotary digging pile construction technology for ultra-deep dumped unconsolidated soil bodies
CN107165581A (en) * 2017-06-09 2017-09-15 上海建工二建集团有限公司 A kind of GPS drill bit of drilling machine and GPS rig pile foundation drilling construction method
CN109137957A (en) * 2018-09-19 2019-01-04 上海市机械施工集团有限公司 A kind of pile base construction method
CN109695431A (en) * 2018-12-13 2019-04-30 台州职业技术学院 A kind of tool for salvaging drilling pile drill

Similar Documents

Publication Publication Date Title
US20210348355A1 (en) Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
CN106121661A (en) A kind of tunnel trunk is by loess separating surface water rich strata construction method
CN102561330A (en) Integrated construction method for artificial dug pile and steel pipe concrete column
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN102235152A (en) Hole-forming construction method for bored pile on high-strength stabilized soil layer
CN107237323A (en) Major diameter super thick boulder bed forming hole method
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN102182399B (en) Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag
CN103726496A (en) Circular deep foundation pit bored secant pile wall supporting construction method
CN107587504A (en) A kind of dry excavation method of the double steel pile casting churning drivens of cast-in-situ bored pile of overpass
CN106703011A (en) Construction method of occlusive piles of water-containing pebble bed and saturated sandstone stratum
CN103266599A (en) Construction method of rotating drilling dry-drilled piles of sand soil interlayer foundation
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN110984133A (en) Construction method for foundation of deep-water shallow-covering-layer trestle
CN103556628B (en) Spiral conical soil compaction pile construction method
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
CN104594371A (en) Reinforcing structure of existing foundation bottom plate and construction method thereof
CN105113492A (en) Construction method of composite pile applicable to cohesive soil, sandy soil and muddy soil foundations
CN105714832B (en) A kind of large size prefabricated building enclosure of deep basal pit and construction method
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN109989346B (en) Bridge large-diameter precast concrete tubular column foundation and construction method thereof
CN104452776B (en) Meet with the one construction Treatment Methods of diaphragm wall during boulder
CN103806444A (en) Soft soil layer rotary excavating pile construction method
CN103334449A (en) Square hole girdling cutter and method for performing holing construction of deep cutting stab-pile wall by utilizing same
CN109113054A (en) A kind of reclaimation area complex geological condition cast-in-situ bored pile multimachine combined construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111109