CN102218628A - Prestressed pile tip anchor bar welding mould - Google Patents
Prestressed pile tip anchor bar welding mould Download PDFInfo
- Publication number
- CN102218628A CN102218628A CN201110133509XA CN201110133509A CN102218628A CN 102218628 A CN102218628 A CN 102218628A CN 201110133509X A CN201110133509X A CN 201110133509XA CN 201110133509 A CN201110133509 A CN 201110133509A CN 102218628 A CN102218628 A CN 102218628A
- Authority
- CN
- China
- Prior art keywords
- dowel
- anchor bar
- prestressed pile
- slide bar
- prestressed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a prestressed pile tip anchor bar welding mould which is used for welding a prestressed pile tip anchor bar and a pile shoe and relates to the field of construction technologies. The prestressed pile tip anchor bar welding mould comprises a base (3), a bracket (11), a cross beam (12) and an anchor bar fixing device, wherein one end of the bracket (11) is fixedly connected with the base (3), the other end of the bracket (11) is fixedly connected with the cross beam (12); the cross beam (12) is connected with the anchor bar fixing device by virtue of a slide bar; and the base is provided with a pile shoe fixing mount (1). The prestressed pile tip anchor bar welding mould disclosed by the invention has the advantages that the pile shoe and the anchor bar can be conveniently welded by the pile shoe fixing mount and an anchor bar positioning rack, so that a prestressed pile tip rebar framework molded through welding is standard and unified, thereby saving manpower, improving the production efficiency, and greatly lowering the production cost.
Description
Technical field
The present invention relates to the realm of building construction, particularly prestress square pile in manufacturing process, the sharp dowel weld mold of the prestressed pile that uses during the welding of stake sharp dowel and shoe.
Background technology
Along with the development of economy, technology, the appearance of huge variation, particularly prestress square pile has taken place in building trade.Along with the growth requirement of construction market, supply falls short of demand for prestress square pile, but owing to be subject to processing the restriction of method, its output is not greatly improved always.Engineers and technicians are working hard aspect the large-scale production prestress square pile always, and hope can improve the prestress square pile large-scale production.The welding of prestressed pile point dowel and shoe is a very loaded down with trivial details operation always, only wastes time and energy, and operating efficiency is low, does not meet industrial production requirement.
Summary of the invention
The present invention is the deficiency that solves the problems of the technologies described above, and a kind of prestressed pile point dowel weld mold that can improve the production efficiency of prestressed pile point dowel and shoe welding is provided.
The present invention to achieve these goals, the technical scheme that is adopted is: a kind of prestressed pile point dowel weld mold is provided, and described prestressed pile point dowel weld mold comprises base, support, crossbeam, dowel fixture; Described support one end is fixedlyed connected with base, and the other end is fixedlyed connected with crossbeam; Crossbeam is connected by slide bar with the dowel fixture; Described base is provided with the shoe fixed mount.
Described dowel fixture comprises dowel locating rack, spring; Described dowel locating rack center fixation connects slide block, and the dowel locating rack is connected with slide bar by slide block; Described slide bar is provided with the spring link; Described spring one end is connected with the spring link, and the other end is connected with the dowel locating rack.
Described slide bar is provided with the slide bar slideway.
The junction of described crossbeam and slide bar is provided with the slide bar jackscrew.
Described slide block is provided with the slide block jackscrew.
Described shoe fixed mount is connected by axle with base.
Its beneficial effect of prestressed pile point dowel weld mold of the present invention is: prestressed pile point dowel weld mold is very easy to the welding of shoe and dowel by shoe fixed mount, dowel locating rack, make the prestressed pile point framework of steel reinforcement of welding fabrication unified and standard, not only save artificial, and improved production efficiency, greatly reduce production cost.
Description of drawings
Fig. 1 prestressed pile point of the present invention dowel weld mold structural representation.
Among the figure, 1--shoe fixed mount; The 2--axle; 3-base; 4--dowel locating rack; The 5--spring; The 6--slide bar; 7--slide bar slideway; The 8--slide block; 9-spring link; 10--slide bar jackscrew; 11-support; 12-crossbeam.
The specific embodiment
Specify prestressed pile point dowel weld mold of the present invention below in conjunction with accompanying drawing.
A kind of prestressed pile point dowel weld mold, prestressed pile point dowel weld mold comprises base 3, support 11, crossbeam 12, dowel fixture; Support 11 1 ends are fixedlyed connected with base 3, and the other end is fixedlyed connected with crossbeam 12; Crossbeam 12 is connected by slide bar 6 with the dowel fixture; Base 3 is provided with shoe fixed mount 1.
The dowel fixture comprises dowel locating rack 4, spring 5; Dowel locating rack 4 center fixation connect slide block 8, and dowel locating rack 4 is connected with slide bar 6 by slide block 8; Slide bar 6 is provided with spring link 9; Spring 5 one ends are connected with spring link 9, and the other end is connected with dowel locating rack 4.
To both sides instead shoe fixed mount 1 can be convenient to the sharp framework of steel reinforcement of stake and move taking-up after welding is finished by axle 2.
The above; only be the preferable specific embodiment of the present invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to replacement or change according to technical scheme of the present invention and inventive concept thereof, all should be encompassed within protection scope of the present invention.
Claims (6)
1. prestressed pile point dowel weld mold, it is characterized in that: described prestressed pile point dowel weld mold comprises base (3), support (11), crossbeam (12), dowel fixture; Described support (11) one ends are fixedlyed connected with base (3), and the other end is fixedlyed connected with crossbeam (12); Crossbeam (12) is connected by slide bar with the dowel fixture; Described base is provided with shoe fixed mount (1).
2. a kind of prestressed pile point dowel mould according to claim 1, it is characterized in that: described dowel fixture comprises dowel locating rack (4), spring (5); Described dowel locating rack (4) center fixation connects slide block (8), and dowel locating rack (4) is connected with slide bar (6) by slide block (8); Described slide bar (6) is provided with spring link (9); Described spring (5) one ends are connected with spring link (9), and the other end is connected with dowel locating rack (4).
3. a kind of prestressed pile point dowel mould according to claim 1, it is characterized in that: described slide bar (6) is provided with slide bar slideway (7).
4. a kind of prestressed pile point dowel mould according to claim 1, it is characterized in that: described crossbeam (12) is provided with slide bar jackscrew (10) with the junction of slide bar (6).
5. a kind of prestressed pile point dowel mould according to claim 2, it is characterized in that: described slide block is provided with the slide block jackscrew.
6. a kind of prestressed pile point dowel mould according to claim 1, it is characterized in that: described shoe fixed mount (1) is connected by axle with base (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110133509XA CN102218628B (en) | 2011-05-23 | 2011-05-23 | Prestressed pile tip anchor bar welding mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110133509XA CN102218628B (en) | 2011-05-23 | 2011-05-23 | Prestressed pile tip anchor bar welding mould |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102218628A true CN102218628A (en) | 2011-10-19 |
CN102218628B CN102218628B (en) | 2013-11-27 |
Family
ID=44775467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110133509XA Expired - Fee Related CN102218628B (en) | 2011-05-23 | 2011-05-23 | Prestressed pile tip anchor bar welding mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102218628B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104633656A (en) * | 2013-11-12 | 2015-05-20 | 天津振汉机械装备有限公司 | Adjustable multi-tube fired heater |
CN113020850A (en) * | 2021-03-24 | 2021-06-25 | 佛山市缇诺卫浴有限公司 | Wall body embedded structure processing equipment of quick installation |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4034971A (en) * | 1975-10-02 | 1977-07-12 | Eagle Clamp Co., Ltd. | Clamp usable as jig and lifting clamp |
CN87201765U (en) * | 1987-02-07 | 1988-03-09 | 王宪伟 | Air-pressure welding clip for wedge rack-type concrete iron |
CN2034496U (en) * | 1988-01-29 | 1989-03-22 | 陕西省建筑科学研究所 | Slide block damping type connecting jig for reinforcment pneumatic welding machine |
CN2039609U (en) * | 1987-11-25 | 1989-06-21 | 北京市住宅建设总公司 | Clamp for gas pressure welding of reinforcing bar |
JPH0852567A (en) * | 1994-08-11 | 1996-02-27 | Mitsubishi Materials Corp | Jig for welding |
CN2663088Y (en) * | 2003-11-26 | 2004-12-15 | 纬泰机械(上海)有限公司 | Anti-removal structure of F-shape clamp moving arm |
CN201020607Y (en) * | 2007-04-29 | 2008-02-13 | 天津盛泰缘哲科技发展有限公司 | Highly effective bucket welding positioner system |
CN101307597A (en) * | 2008-07-14 | 2008-11-19 | 大连大金马基础建设有限公司 | Prestressing force pipe pile precast pile tip and its production process |
CN101497158A (en) * | 2008-02-02 | 2009-08-05 | 上海谷竹信息科技有限公司 | Thermos flask welding machine |
CN201649078U (en) * | 2010-02-25 | 2010-11-24 | 福建省大地管桩有限公司 | Prestressed concrete heading hollow square pile with pyramid pile tip |
-
2011
- 2011-05-23 CN CN201110133509XA patent/CN102218628B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4034971A (en) * | 1975-10-02 | 1977-07-12 | Eagle Clamp Co., Ltd. | Clamp usable as jig and lifting clamp |
CN87201765U (en) * | 1987-02-07 | 1988-03-09 | 王宪伟 | Air-pressure welding clip for wedge rack-type concrete iron |
CN2039609U (en) * | 1987-11-25 | 1989-06-21 | 北京市住宅建设总公司 | Clamp for gas pressure welding of reinforcing bar |
CN2034496U (en) * | 1988-01-29 | 1989-03-22 | 陕西省建筑科学研究所 | Slide block damping type connecting jig for reinforcment pneumatic welding machine |
JPH0852567A (en) * | 1994-08-11 | 1996-02-27 | Mitsubishi Materials Corp | Jig for welding |
CN2663088Y (en) * | 2003-11-26 | 2004-12-15 | 纬泰机械(上海)有限公司 | Anti-removal structure of F-shape clamp moving arm |
CN201020607Y (en) * | 2007-04-29 | 2008-02-13 | 天津盛泰缘哲科技发展有限公司 | Highly effective bucket welding positioner system |
CN101497158A (en) * | 2008-02-02 | 2009-08-05 | 上海谷竹信息科技有限公司 | Thermos flask welding machine |
CN101307597A (en) * | 2008-07-14 | 2008-11-19 | 大连大金马基础建设有限公司 | Prestressing force pipe pile precast pile tip and its production process |
CN201649078U (en) * | 2010-02-25 | 2010-11-24 | 福建省大地管桩有限公司 | Prestressed concrete heading hollow square pile with pyramid pile tip |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104633656A (en) * | 2013-11-12 | 2015-05-20 | 天津振汉机械装备有限公司 | Adjustable multi-tube fired heater |
CN113020850A (en) * | 2021-03-24 | 2021-06-25 | 佛山市缇诺卫浴有限公司 | Wall body embedded structure processing equipment of quick installation |
CN113020850B (en) * | 2021-03-24 | 2022-05-20 | 佛山市有为科技有限公司 | Wall body embedded structure processing equipment of quick installation |
Also Published As
Publication number | Publication date |
---|---|
CN102218628B (en) | 2013-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102218628B (en) | Prestressed pile tip anchor bar welding mould | |
CN102000776B (en) | Automatic core assembling and setting clamp | |
CN203459806U (en) | Reinforcement cage seam welder | |
CN205184058U (en) | Six axis robot laser -beam drilling machine | |
CN102953549B (en) | Novel quick tensioning construction method for front-blocked jack | |
CN201791909U (en) | Automatic core assembly core setting fixture | |
CN203307931U (en) | Embedded part positioning screw connecting structure | |
CN203110341U (en) | Automatic device for mounting plastic part on round iron rod | |
CN201981706U (en) | Prestressed bellows positioning device | |
CN202388096U (en) | Rack for numerical control flame cutting machine | |
CN202299429U (en) | Circulation adjustable angle iron stiffening system | |
CN202787971U (en) | Stair step reinforcing part | |
CN203650766U (en) | Mold supporting tool | |
CN202324369U (en) | Steel bar positioning clamp for casting plane concrete | |
CN202021441U (en) | Assembly mould for steel frame vertical gusset | |
CN203197492U (en) | Pipe fitting manufacturing tool | |
CN203795454U (en) | Frog-type seat frame used for pre-embedded anchor bolt | |
CN201771189U (en) | Positioning device especially for fixed type steel template | |
CN203401239U (en) | Universal platform combined type installing and welding clamping fixture of heading machine body | |
CN203371505U (en) | Adjustable multi-angle diamond-shaped assembling jig frame | |
CN202291233U (en) | Half-gear top-mounted device | |
CN202527883U (en) | X-shaped frame combination tool fixture | |
CN202787676U (en) | Pipe clamp for hollow high-strength round pipe | |
CN201723160U (en) | Mast of rotary drilling rig | |
CN203484813U (en) | Module support installing and fixing worktable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: 116431 Liaoning city of Dalian province Zhuanghe city Heidao Town, village Patentee after: Dalian Dajinma Basic Construction Co., Ltd. Address before: 116100, Ma Jia village, Dalian street, Jinzhou District, Liaoning, 369 Patentee before: Dalian Dajinma Basic Construction Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131127 Termination date: 20180523 |
|
CF01 | Termination of patent right due to non-payment of annual fee |