CN102192327A - Rubber seal gasket of embedded metal skeleton and manufacturing method thereof - Google Patents

Rubber seal gasket of embedded metal skeleton and manufacturing method thereof Download PDF

Info

Publication number
CN102192327A
CN102192327A CN2010101219997A CN201010121999A CN102192327A CN 102192327 A CN102192327 A CN 102192327A CN 2010101219997 A CN2010101219997 A CN 2010101219997A CN 201010121999 A CN201010121999 A CN 201010121999A CN 102192327 A CN102192327 A CN 102192327A
Authority
CN
China
Prior art keywords
built
rubber sheet
metal skeleton
rubber
metal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010101219997A
Other languages
Chinese (zh)
Inventor
张志龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd
Original Assignee
SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd filed Critical SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd
Priority to CN2010101219997A priority Critical patent/CN102192327A/en
Publication of CN102192327A publication Critical patent/CN102192327A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Gasket Seals (AREA)

Abstract

The invention relates to a rubber seal gasket of an embedded metal skeleton. The rubber seal gasket comprises chlorosulfonated polyethylene rubber, ceramic fiber cloth and a metal skeleton which is arranged in the rubber seal gasket. The manufacturing method of the rubber seal gasket comprises the following steps: A. manufacturing a flange mold B by utilizing a steel plate; B. coating a layer of thin mold release agent (such as an estersil mold release agent) in a mold cavity; C. coating a modulated chlorosulfonated polyethylene rubber coating material at two surfaces of the cut ceramic fiber cloth, putting into a mold cavity, and putting other layers sequentially one by one by adopting the same technology; D. putting the metal skeleton in and positioning after placing the lower layer of coating fiber cloth; E. putting the coating fiber cloth one by one on the metal skeleton; F. closing the upper mold, applying pressure, and carrying out vulcanization typing; and G. dismounting the mold, taking out the manufactured product, trimming the slitter edges and punching a bolt connecting hole. According to the invention, the rubber seal gasket is high-temperature resistant and inflaming retarding, the partial over-burning carbonization phenomenon of the chlorosulfonated polyethylene in the gasket is prevented, the rigidity of the gasket is improved, the gasket is convenient to install and maintain, the seal effect is improved, and the metal skeleton is manufactured by a punching plate.

Description

Rubber sheet gasketing of built-in metal skeleton and preparation method thereof
Technical field
The invention belongs to metallurgical industry field, specifically relate to rubber sheet gasketing of a kind of built-in metal skeleton that is used for annealing furnace and preparation method thereof.
Background technique
At present, in the metallurgy industry cold-reduced sheet production technology, because the flow harden that continuous cold deformation causes improves the intensity of Cold Rolled Sheet Steel volume and hardness, and the tough index of moulding descends punching performance is worsened, therefore continuous annealing furnace is set usually to eliminate flow harden and rolling stress on the production line, makes product reach the mechanical performance index of regulation.Annealing furnace is provided with viewing window and holds concurrently manhole in order to monitor PRODUCTION STATUS, and dismountable in case of necessity window device is so that carry out repair and maintenance when stopping work, and about 320 ℃, extreme temperature can reach 400 ℃ to the temperature of the window's position usually.In order to prevent scorching hot infiltration of overflowing with outside air in the stove, add flange and pad at the window place and carry out seal isolation.
The material of sealing gasket all adopts chlorosulfonated polyethylene rubber and ceramic fiber cloth produced with combination both at home and abroad, adopts the metallic oxide such as the SiO of significant proportion in the prescription of chlorosulfonated polyethylene rubber 2And Sb 2O 3, help improving the flame retardant property of goods, but carbonization can take place in sizing material on whole thickness when meeting with high temperature as 450 ℃.
In view of this, seek rubber sheet gasketing of a kind of built-in metal skeleton and preparation method thereof, become pursuing one's goal of these those skilled in the art.
Summary of the invention
Task of the present invention provides rubber sheet gasketing of a kind of built-in metal skeleton and preparation method thereof, it has solved the existing in prior technology problem, to reach metal frame by rubber sheet gasketing inside, by metal good heat transfer performance the part heat affected zone is enlarged, effectively reduce the purpose of the probability of single position carbonization damage.
Technical solution of the present invention is as follows:
A kind of rubber sheet gasketing of built-in metal skeleton comprises chlorosulfonated polyethylene rubber and ceramic fiber cloth, also comprises being arranged on metal frame in the rubber sheet gasketing.
Described metal frame is the frame type structure that Punched Steel Plate or aluminium sheet are made.
The sheet material of described metal frame is Punched Steel Plate, and its punching rate is 20%~30%.
Described metal frame is a sheet, and its thickness is 0.5~1mm.
The circumferential annular of described chlorosulfonated polyethylene rubber is provided with some bolts hole.
The length of the inner chamber of described metal frame and width are greater than the size of rubber sheet gasketing inner chamber; The length of the profile of described metal frame and width are less than the projection of the peripheral bolt hole of chlorosulfonated polyethylene rubber.
The upper and lower surface of described metal frame is provided with the several layers ceramic fiber cloth, and the shape of described ceramic fiber cloth is identical with the projection of the bolt hole of periphery.
A kind of making method of rubber sheet gasketing of built-in metal skeleton may further comprise the steps:
A, make the flange mould with steel plate;
Apply very thin one deck releasing agent in B, the mold cavity, as adopting the estersil releasing agent;
C, the chloro-sulfonated polyethylene rubber coating that the ceramic fiber cloth coated on both sides that cuts is modulated are put into die cavity, and other number of plies adopts the same process block-by-block to put into successively;
D, put into metal frame and location again after will descending the coating fibre cloth to place;
E, block-by-block is put into the coating fibre cloth again on metal frame;
F, the patrix that closes are exerted pressure, the sulfuration typing;
Goods are taken out in G, form removal, repair except that slitter edge and punching out bolt connecting hole.
In the described steps A, the lower mould inner chamber is the area of contour of making gasket seal, and the patrix of mould cooperates with die cavity and has a free gap.
In the described step e, the quantity of the coating fibre cloth of metal frame upper and lower layers is identical.
The rubber sheet gasketing of built-in metal skeleton of the present invention adopts and places a Metal Flake skeleton in the interlayer central position of pad, when meeting with instantaneous heat, a certain position of pad impacts, when its heat gos deep into pad inside gradually and reaches metal layer, rely on the metal good heat transfer that the part heat affected zone is enlarged, can effectively reduce the probability that the carbonization of single position damages.Another advantage that is built-in with the gasket seal of Metal Flake skeleton of the present invention is, can guarantee the regular of pad boundary dimension and have certain rigidity, helps carrying out apace repair and replacement.
The present invention makes it compared with prior art owing to adopted above technological scheme, and the present invention has following advantage:
1, high temperature resistant, fire-retardant, especially adapted to the occasion of certain moment flame thermal shock, as the application on the annealing furnace.
2, built-in metal sheet skeleton enlarges local heating's point transmission of pad, can prevent the local burning carbonization phenomenon of the chlorosulfonated polyethylene in the pad.
3, built-in metal sheet skeleton has improved the rigidity of pad, is convenient to installation and maintenance.
4, the comprehensive excellent properties of employed chlorosulfonated polyethylene rubber has improved sealing effect effectively.
5, built-in metal sheet skeleton adopts punched-plate to make, and makes the gluing fibre cloth of upper and lower layers bonding more firm.
Description of drawings
Fig. 1 is the sectional drawing of the rubber sheet gasketing of a kind of built-in metal skeleton of the present invention.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the making method of the rubber sheet gasketing of a kind of built-in metal skeleton of the present invention.
Mark among the figure:
1 is rubber sheet gasketing, and 2 is metal frame, and 3 is bolt hole, and L1 is a rubber sheet gasketing external form length, and W1 is rubber sheet gasketing 1 an external form width, and L2 is a cavity length in the rubber sheet gasketing 1, and W2 is rubber sheet gasketing 1 an inner chamber width.
Embodiment
Below in conjunction with drawings and Examples the present invention is elaborated.
Referring to Fig. 1 and Fig. 2, the rubber sheet gasketing of a kind of built-in metal skeleton of the present invention mainly is made up of chlorosulfonated polyethylene rubber and ceramic fiber cloth and metal frame 2, and metal frame 2 is arranged in the rubber sheet gasketing 1.
As shown in fig. 1, rubber sheet gasketing 1 has external form length L 1, external form width W 1, inner chamber length L 2 and inner chamber width W 2.
Metal frame 2 is the frame type structure that Punched Steel Plate or aluminium sheet are made.Preferably, the sheet material of metal frame 2 is Punched Steel Plate, and its punching rate is 20%~30%.Metal frame 2 is a sheet, and its thickness is 0.5~1mm.
The circumferential annular of chlorosulfonated polyethylene rubber is provided with some bolts hole 3.
The length of the inner chamber of metal frame 2 and width are greater than the size (L2 and W2) of rubber sheet gasketing 1 inner chamber.The length of the profile of metal frame 2 and width are less than the projection of the peripheral bolt hole 3 of chlorosulfonated polyethylene rubber.
The upper and lower surface of metal frame 2 is provided with the several layers ceramic fiber cloth, and the shape of ceramic fiber cloth is identical with the projection of the bolt hole 3 of periphery.
Referring to Fig. 3, press the making method of the rubber sheet gasketing of a kind of built-in metal skeleton of the present invention, may further comprise the steps:
A, make the flange mould with steel plate, the lower mould inner chamber is the area of contour of making gasket seal, and the patrix of mould cooperates with die cavity, has certain free gap.
Apply very thin one deck releasing agent in B, the mold cavity, as adopting the estersil releasing agent.
C, the chloro-sulfonated polyethylene rubber coating that the ceramic fiber cloth coated on both sides that cuts is modulated are put into die cavity, and other number of plies can adopt the same process block-by-block to put into successively.
D, put into metal frame 2 and location again after will descending the coating fibre cloth to place.
E, on metal frame 2 more as stated above block-by-block put into the coating fibre cloth, the quantity of the coating fibre cloth of metal frame 2 upper and lower layers is identical.
F, the patrix that closes are exerted pressure, the sulfuration typing.
Goods are taken out in G, form removal, repair except that slitter edge and punching out bolt connecting hole.
In the present embodiment, the chloro-sulfonated polyethylene rubber coating that rubber sheet gasketing adopted of built-in metal skeleton of the present invention can add metallic oxide such as SiO by a certain percentage 2, Sb 2O 3Deng, be covered with the several layers ceramic fiber cloth up and down respectively at Metal Flake skeleton, the shape of cloth is pressed the area of contour cutting of flange, quantity is decided according to the total thickness of pad, as top two layers, below two layers.Metal Flake skeleton adopts Punched Steel Plate or aluminium sheet to make frame type structure, generally selects for use 20%~30% punching rate sheet material to make thickness 0.5~1mm, and cavity length and width are slightly larger than the goods inner chamber in it.The external dimension of frame should be convenient to the later stage punching out in flange bolt hole less than flange bolt hole home record.
The working process of the rubber sheet gasketing of built-in metal skeleton of the present invention is as follows:
Make the flange mould with steel plate, the lower mould inner chamber is the area of contour of making gasket seal, and the patrix of mould cooperates with die cavity, has certain free gap.Apply very thin one deck releasing agent in the mold cavity, as adopting the estersil releasing agent.The chloro-sulfonated polyethylene rubber coating that the ceramic fiber cloth coated on both sides that cuts modulates is put into die cavity, and other number of plies can adopt the same process block-by-block to put into successively.Put into Metal Flake skeleton and location after will descending the coating fibre cloth to place again.On Metal Flake skeleton more as stated above block-by-block put into the coating fibre cloth, its number of plies is identical with the lower floor number of plies.The patrix that closes is exerted pressure, the sulfuration typing.Goods are taken out in form removal, repair except that slitter edge and punching out bolt connecting hole to get final product.
In sum, it is high temperature resistant, fire-retardant that the present invention has, prevent the local burning carbonization phenomenon of the chlorosulfonated polyethylene in the pad, improve pad rigidity, be convenient to installation and maintenance, improve sealing effect, built-in metal sheet skeleton adopts punched-plate to make the bonding advantage such as more firm of the gluing fibre cloth that makes upper and lower layers.
Certainly, those skilled in the art in the present technique field will be appreciated that, the foregoing description only is to be used for illustrating the present invention, and be not as limitation of the invention, as long as in connotation scope of the present invention, all will drop in the scope of claim of the present invention the variation of the foregoing description, modification etc.

Claims (10)

1. the rubber sheet gasketing of a built-in metal skeleton comprises chlorosulfonated polyethylene rubber and ceramic fiber cloth, it is characterized in that: also comprise being arranged on metal frame in the rubber sheet gasketing.
2. the rubber sheet gasketing of built-in metal skeleton as claimed in claim 1 is characterized in that: described metal frame is the frame type structure that Punched Steel Plate or aluminium sheet are made.
3. the rubber sheet gasketing of built-in metal skeleton as claimed in claim 2 is characterized in that: the sheet material of described metal frame is Punched Steel Plate, and its punching rate is 20%~30%.
4. the rubber sheet gasketing of built-in metal skeleton as claimed in claim 1 is characterized in that: described metal frame is a sheet, and its thickness is 0.5~1mm.
5. the rubber sheet gasketing of built-in metal skeleton as claimed in claim 1 is characterized in that: the circumferential annular of described chlorosulfonated polyethylene rubber is provided with some bolts hole.
6. the rubber sheet gasketing of built-in metal skeleton as claimed in claim 5 is characterized in that: the length of the inner chamber of described metal frame and width are greater than the size of rubber sheet gasketing inner chamber; The length of the profile of described metal frame and width are less than the projection of the peripheral bolt hole of chlorosulfonated polyethylene rubber.
7. the rubber sheet gasketing of built-in metal skeleton as claimed in claim 5 is characterized in that: the upper and lower surface of described metal frame is provided with the several layers ceramic fiber cloth, and the shape of described ceramic fiber cloth is identical with the projection of the bolt hole of periphery.
8. the making method of the rubber sheet gasketing of a built-in metal skeleton is characterized in that: may further comprise the steps:
A, make the flange mould with steel plate;
Apply very thin one deck releasing agent in B, the mold cavity, as adopting the estersil releasing agent;
C, the chloro-sulfonated polyethylene rubber coating that the ceramic fiber cloth coated on both sides that cuts is modulated are put into die cavity, and other number of plies adopts the same process block-by-block to put into successively;
D, put into metal frame and location again after will descending the coating fibre cloth to place;
E, block-by-block is put into the coating fibre cloth again on metal frame;
F, the patrix that closes are exerted pressure, the sulfuration typing;
Goods are taken out in G, form removal, repair except that slitter edge and punching out bolt connecting hole.
9. the making method of the rubber sheet gasketing of built-in metal skeleton as claimed in claim 8 is characterized in that: in the described steps A, the lower mould inner chamber is the area of contour of making gasket seal, and the patrix of mould cooperates with die cavity and has a free gap.
10. the making method of the rubber sheet gasketing of built-in metal skeleton as claimed in claim 8 is characterized in that: in the described step e, the quantity of the coating fibre cloth of metal frame upper and lower layers is identical.
CN2010101219997A 2010-03-11 2010-03-11 Rubber seal gasket of embedded metal skeleton and manufacturing method thereof Pending CN102192327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101219997A CN102192327A (en) 2010-03-11 2010-03-11 Rubber seal gasket of embedded metal skeleton and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101219997A CN102192327A (en) 2010-03-11 2010-03-11 Rubber seal gasket of embedded metal skeleton and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN102192327A true CN102192327A (en) 2011-09-21

Family

ID=44600969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101219997A Pending CN102192327A (en) 2010-03-11 2010-03-11 Rubber seal gasket of embedded metal skeleton and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN102192327A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808950A (en) * 2012-07-26 2012-12-05 苏州柏德纳科技有限公司 Gasket
CN102977483A (en) * 2012-10-31 2013-03-20 蚌埠凯盛工程技术有限公司 Chlorosulfonated polyethylene rubber/EPDM rubber gasket and preparation method thereof
CN102993584A (en) * 2012-10-31 2013-03-27 蚌埠凯盛工程技术有限公司 Nano celestite powder modified chlorosulfonated polyethylene rubber gasket and preparation method thereof
CN104006160A (en) * 2014-05-21 2014-08-27 太仓荣南密封件科技有限公司 Rectangular sealing part manufacturing method
CN105473910A (en) * 2013-08-20 2016-04-06 奥迪股份公司 Sealing assembly, flat gasket for a sealing assembly and method for mounting a sealing assembly
CN107216475A (en) * 2017-07-04 2017-09-29 五河富强鑫金属制品有限公司 A kind of preparation method of the double-layer seal cushion rubber of the outer glue of interior metal
CN108790015A (en) * 2018-04-23 2018-11-13 中国航发哈尔滨东安发动机有限公司 A kind of processing method of metallic framework rubber sheet gasket
CN111421903A (en) * 2020-04-08 2020-07-17 马鞍山市麦克英孚机械科技有限公司 Three-layer sealing gasket and assembly method thereof
CN112879568A (en) * 2021-03-30 2021-06-01 安吉藤仓橡胶有限公司 Fuel control valve sealing element and preparation method and processing device thereof
CN113442340A (en) * 2021-07-16 2021-09-28 株洲时代新材料科技股份有限公司 Upper cover plate non-indentation vulcanization mold, method and product

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2038577U (en) * 1988-03-14 1989-05-31 地方国营浙江慈溪密封材料厂 Compound spacer between relatively fixed surface
CN2116124U (en) * 1992-02-20 1992-09-16 沈阳市新城子区新光密封件厂 Seal packing for high pressure less-oil-breaker oil drain hole
US5303937A (en) * 1991-07-31 1994-04-19 Westinghouse Air Brake Company Seal having a metallic insert
DE19712109A1 (en) * 1997-03-22 1998-09-24 Greiner Gmbh Rubber mould seal having several mounting openings for e.g. vehicle sump seal
CN2611688Y (en) * 2003-03-21 2004-04-14 哈林 Composite gasket
CN201069024Y (en) * 2007-06-26 2008-06-04 刘秀英 composite gasket
CN101524880A (en) * 2009-02-27 2009-09-09 航天材料及工艺研究所 Metal-rubber composite gland bush molding die and molding method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2038577U (en) * 1988-03-14 1989-05-31 地方国营浙江慈溪密封材料厂 Compound spacer between relatively fixed surface
US5303937A (en) * 1991-07-31 1994-04-19 Westinghouse Air Brake Company Seal having a metallic insert
CN2116124U (en) * 1992-02-20 1992-09-16 沈阳市新城子区新光密封件厂 Seal packing for high pressure less-oil-breaker oil drain hole
DE19712109A1 (en) * 1997-03-22 1998-09-24 Greiner Gmbh Rubber mould seal having several mounting openings for e.g. vehicle sump seal
CN2611688Y (en) * 2003-03-21 2004-04-14 哈林 Composite gasket
CN201069024Y (en) * 2007-06-26 2008-06-04 刘秀英 composite gasket
CN101524880A (en) * 2009-02-27 2009-09-09 航天材料及工艺研究所 Metal-rubber composite gland bush molding die and molding method thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808950A (en) * 2012-07-26 2012-12-05 苏州柏德纳科技有限公司 Gasket
CN102977483A (en) * 2012-10-31 2013-03-20 蚌埠凯盛工程技术有限公司 Chlorosulfonated polyethylene rubber/EPDM rubber gasket and preparation method thereof
CN102993584A (en) * 2012-10-31 2013-03-27 蚌埠凯盛工程技术有限公司 Nano celestite powder modified chlorosulfonated polyethylene rubber gasket and preparation method thereof
CN102993584B (en) * 2012-10-31 2015-03-04 蚌埠凯盛工程技术有限公司 Nano celestite powder modified chlorosulfonated polyethylene rubber gasket and preparation method thereof
CN105473910B (en) * 2013-08-20 2017-12-29 奥迪股份公司 Sealing arrangement structure, flat sealed unit and its assembly method for it
CN105473910A (en) * 2013-08-20 2016-04-06 奥迪股份公司 Sealing assembly, flat gasket for a sealing assembly and method for mounting a sealing assembly
US9726289B2 (en) 2013-08-20 2017-08-08 Audi Ag Sealing assembly, flat gasket for a sealing assembly and method for mounting a sealing assembly
CN104006160A (en) * 2014-05-21 2014-08-27 太仓荣南密封件科技有限公司 Rectangular sealing part manufacturing method
CN107216475A (en) * 2017-07-04 2017-09-29 五河富强鑫金属制品有限公司 A kind of preparation method of the double-layer seal cushion rubber of the outer glue of interior metal
CN108790015A (en) * 2018-04-23 2018-11-13 中国航发哈尔滨东安发动机有限公司 A kind of processing method of metallic framework rubber sheet gasket
CN111421903A (en) * 2020-04-08 2020-07-17 马鞍山市麦克英孚机械科技有限公司 Three-layer sealing gasket and assembly method thereof
CN112879568A (en) * 2021-03-30 2021-06-01 安吉藤仓橡胶有限公司 Fuel control valve sealing element and preparation method and processing device thereof
CN113442340A (en) * 2021-07-16 2021-09-28 株洲时代新材料科技股份有限公司 Upper cover plate non-indentation vulcanization mold, method and product

Similar Documents

Publication Publication Date Title
CN102192327A (en) Rubber seal gasket of embedded metal skeleton and manufacturing method thereof
CN103517882A (en) Methods and apparatus for reforming a glass sheet
CN104630610B (en) Super wear-resisting compound vertical grinding roll cover and preparation method thereof
CN1820923A (en) Full steel wire heavy load radial tire movable mould
CN104044304B (en) Anti-dross compound coating
CN201723712U (en) Rubber sealing gasket of built-in metal framework
CN105731792B (en) A kind of lubricant for abros hot extrusion and preparation method thereof
CN206308248U (en) A kind of glass heats graphite jig
RU2653385C2 (en) Method of producing frictional articles
CN111392317A (en) Hard alloy rubber lining and processing method thereof
CN103438700B (en) For the heating furnace of hot forming production line
CN203766165U (en) Ceramic composite vacuum plate
CN101708653A (en) Bent pipe forming technology of heavy-caliber PVDF pipe
CN104806133A (en) Steel heat insulation type fireproof window
WO2014067218A1 (en) Method, mould and system for manufacturing mechanical part
CN101007453A (en) Fluoroplastic compound product and its making method
CN201217676Y (en) Water-sealed device of ball circular cooler
CN211145186U (en) Automobile brake drum
CN112935161A (en) Method for forming large flat die forging
CN109482835B (en) Manufacturing method of annular casting blank with different thicknesses of outer alloy steel and inner aluminum alloy
CN104291705A (en) Glass composite vacuum plate and preparing method thereof
CN206974175U (en) A kind of energy saving temperature controlling industrial furnace
CN101328412B (en) Clean type heat reclamation coke furnace door flexible sealing method
CN202799235U (en) Induction coil inner liner
CN105602523A (en) High heat load tolerant frictional material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110921