CN102182463A - 斜井冻结保温方法 - Google Patents
斜井冻结保温方法 Download PDFInfo
- Publication number
- CN102182463A CN102182463A CN2011100923342A CN201110092334A CN102182463A CN 102182463 A CN102182463 A CN 102182463A CN 2011100923342 A CN2011100923342 A CN 2011100923342A CN 201110092334 A CN201110092334 A CN 201110092334A CN 102182463 A CN102182463 A CN 102182463A
- Authority
- CN
- China
- Prior art keywords
- freezing
- shaft
- inclined shaft
- freezing pipe
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明涉及一种斜井的冻结保温方法,包括下列步骤:①钻冻结孔:在地面沿斜井走向打多排冻结孔,均穿过井筒底板4-6米,在待挖斜井两侧各施工1-2排冻结孔,穿过井筒断面的1-4排;②安装冻结管:依次焊接下放下冻结管、下接头、保温管、中接头、上冻结管、上接头、非冻结管,当保温管处在待挖斜井的井筒位置时,即安装到位。可以有效地解决井筒断面也被冻实的缺点,易于施工。
Description
技术领域
本发明涉及一种斜井的冻结保温方法。
背景技术
斜井冻结的原理与立井相同,即利用制冷技术,将待开挖地下空间周围土体的水冻结成冰并与土体胶结在一起,形成一个符合设计要求并具有一定强度和厚度的冻土围墙或密封的冻土体,用以抵抗土体压力和隔绝地下水,在冻结壁的保护下,进行地下工程施工的一种岩土特殊施工方法。
目前,斜井冻结的施工工艺同立井冻结施工工艺既有相似之处又有区别之处,相似处是:均采用地面打垂直孔的施工方案,有所不同的是斜井冻结采用分段钻孔分段冻结工艺,关键在于:①布孔形式的不同,立井冻结根据冻结壁设计厚度的要求,在井筒周围设置一圈或多圈冻结孔;而斜井是沿着井筒走向施工多排冻结孔。②形成冻结壁的形式不同,立井冻结因为是在井筒周围布孔,冻结壁是在井筒周围形成一个密封的、不透水的圆筒体,而斜井冻结壁是在井筒断面范围形成一个矩形体。③冻结的效果不同,立井冻结壁形成后在相当的时间内可保证冻土不进入井筒荒径,从而使井筒掘进施工“挖糖心”,保证井筒施工速度;而斜井冻结要根据井筒掘进宽度,1~3排冻结孔需从井筒断面通过,如不采取局部保温技术,井筒断面也全部冻实,不仅消耗大量能源,同时也给掘进施工带来很大难度。
发明内容
为了克服现有技术的缺点,本发明提供一种斜井冻结保温方法,可以有效地解决井筒断面也被冻实的缺点,易于施工。
本发明包括下列步骤:①、钻冻结孔1,直径为Φ171-190毫米:在待挖斜井上方钻五排冻结孔1,其中待挖斜井的井筒两侧各1排,穿过井筒断面的冻结孔3排,每个冻结孔1的深度超过所在井筒位置的深度4-6米,如图1、2所示;②、安装冻结管:首先下下冻结管8;下冻结管8的上端焊接下接头7,下接头7的上端焊接保温管6;保温管6的上端焊中接头5,中接头5的上端焊接上冻结管4;上冻结管4的上端焊接上接头3,上接头3的上端焊接非冻结管2;当保温管6处在待挖斜井的井筒位置时,即安装到位。
所述的非冻结管和保温管的直径比冻结段的冻结管小。
所述保温管的长度与待挖斜井的井筒高度相当。
本发明可以有效地解决井筒断面也被冻实的缺点,易于施工,大大缩短施工工期。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为本发明主视图;
图2为本发明俯视图;
图3为本发明冻结管示意图。
具体实施方式
待挖斜井的井筒尺寸:宽度为6.6米,高度为5.4米。
包括下列步骤:①、钻冻结孔1,直径为Φ171-190毫米:在待挖斜井上方钻五排冻结孔1,其中待挖斜井的井筒两侧各1排,穿过井筒断面的冻结孔3排,每个冻结孔1的深度超过所在井筒位置的深度4-6米,如图1、2所示;②、安装冻结管:首先下下冻结管8;下冻结管8的上端焊接下接头7,下接头7的上端焊接保温管6;保温管6的上端焊接中接头5,中接头5的上端焊接上冻结管4;上冻结管4的上端焊接上接头3,上接头3的上端焊接非冻结管2;当保温管6处在待挖斜井的井筒位置时,即安装到位。
所述非冻结管2和保温管6的直径为Φ89毫米,壁厚为5毫米。保温管的长度为5.4米。
所述上、下冻结管的长度为4-6米,直径为133毫米。
Claims (3)
1.一种斜井冻结保温方法,其特征在于:包括下列步骤:①、钻冻结孔(1),直径为Φ171-190毫米:在待挖斜井上方钻五排冻结孔(1),其中待挖斜井的井筒两侧各1排,穿过井筒断面的冻结孔3排,每个冻结孔(1)的深度超过所在井筒位置的深度4-6米;②、安装冻结管:首先下置冻结管(8);下冻结管(8)的上端焊接下接头(7),下接头(7)的上端焊接保温管(6);保温管(6)的上端焊接中接头(5),中接头(5)的上端焊接上冻结管(4);上冻结管(4)的上端焊接上接头(3),上接头(3)的上端焊接非冻结管(2);当保温管(6)处在待挖斜井的井筒位置时,即安装到位。
2.根据权利要求1所述的斜井冻结保温方法,其特征在于:所述的非冻结管(2)和保温管(6)的直径比上、下冻结管(4、8)小。
3.根据权利要求1所述的斜井冻结保温方法,其特征在于:所述上冻结管(4)的长度为5-8米,下冻结管(8)的长度为4-6米;保温管(6)的长度与待挖斜井的井筒高度相当。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110092334 CN102182463B (zh) | 2011-04-12 | 2011-04-12 | 斜井冻结保温方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110092334 CN102182463B (zh) | 2011-04-12 | 2011-04-12 | 斜井冻结保温方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102182463A true CN102182463A (zh) | 2011-09-14 |
CN102182463B CN102182463B (zh) | 2013-01-16 |
Family
ID=44568741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110092334 Active CN102182463B (zh) | 2011-04-12 | 2011-04-12 | 斜井冻结保温方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102182463B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758631A (zh) * | 2012-08-02 | 2012-10-31 | 兖矿集团有限公司 | 一种斜井冻结壁的冻结方法 |
CN104268365A (zh) * | 2014-07-25 | 2015-01-07 | 中煤西安设计工程有限责任公司 | 厚砂层缓坡斜井明挖法与暗挖法的临界开挖长度确定方法 |
CN108386228A (zh) * | 2018-02-09 | 2018-08-10 | 西安科技大学 | 一种斜井冻结法施工长期监测巷壁应力的方法 |
CN108798678A (zh) * | 2018-05-30 | 2018-11-13 | 中煤第建设有限公司 | 穿巷道冻结孔施工工艺 |
CN109441453A (zh) * | 2018-11-28 | 2019-03-08 | 中煤邯郸特殊凿井有限公司 | 斜井井筒内局部冻结施工方法 |
CN109751052A (zh) * | 2018-11-30 | 2019-05-14 | 陕西中能煤田有限公司 | 斜井冻结大高差盐水循环减压装置 |
CN111852483A (zh) * | 2020-07-30 | 2020-10-30 | 中煤第一建设有限公司 | 斜井冻结施工工艺以及斜井冻结*** |
CN113356858A (zh) * | 2021-07-13 | 2021-09-07 | 中煤第一建设有限公司 | 一种非等强复合冻结壁冻结方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05230824A (ja) * | 1992-02-20 | 1993-09-07 | Seiken:Kk | 限定凍結工法及びそれに使用する凍結管 |
JPH06173571A (ja) * | 1992-12-11 | 1994-06-21 | Kajima Corp | 熱電対による地盤凍結方法及び凍結筒 |
RU2223403C1 (ru) * | 2002-10-18 | 2004-02-10 | Московский государственный горный университет | Способ подготовки массива многолетнемерзлых и обводненных горных пород для проходки выработок |
CN2898535Y (zh) * | 2006-05-16 | 2007-05-09 | 中国矿业大学 | 柔性冻结管连接装置 |
CN101694160A (zh) * | 2009-10-22 | 2010-04-14 | 中煤第一建设公司第四十九工程处 | 深厚表土层大直径立井井筒冻结法凿井快速施工方法 |
CN101696572A (zh) * | 2009-09-27 | 2010-04-21 | 北京中煤矿山工程有限公司 | 一种具有导气结构的冻结器 |
CN102383414A (zh) * | 2011-09-08 | 2012-03-21 | 同济大学 | 具有多供液管的液氮冻结器 |
-
2011
- 2011-04-12 CN CN 201110092334 patent/CN102182463B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05230824A (ja) * | 1992-02-20 | 1993-09-07 | Seiken:Kk | 限定凍結工法及びそれに使用する凍結管 |
JPH06173571A (ja) * | 1992-12-11 | 1994-06-21 | Kajima Corp | 熱電対による地盤凍結方法及び凍結筒 |
RU2223403C1 (ru) * | 2002-10-18 | 2004-02-10 | Московский государственный горный университет | Способ подготовки массива многолетнемерзлых и обводненных горных пород для проходки выработок |
CN2898535Y (zh) * | 2006-05-16 | 2007-05-09 | 中国矿业大学 | 柔性冻结管连接装置 |
CN101696572A (zh) * | 2009-09-27 | 2010-04-21 | 北京中煤矿山工程有限公司 | 一种具有导气结构的冻结器 |
CN101694160A (zh) * | 2009-10-22 | 2010-04-14 | 中煤第一建设公司第四十九工程处 | 深厚表土层大直径立井井筒冻结法凿井快速施工方法 |
CN102383414A (zh) * | 2011-09-08 | 2012-03-21 | 同济大学 | 具有多供液管的液氮冻结器 |
Non-Patent Citations (4)
Title |
---|
《地层冻结工程技术和应用--中国地层冻结工程40年论文集》 19951230 伍期建等 深表土斜井冻结设计和施工 第408页至第417页 1-3 , * |
《矿山建设工程技术新进展--2008全国矿山建设学术会议文集(上)》 20081230 郭永富等 郓城煤矿副井冻结施工技术 第337页至第342页 1-3 , * |
伍期建等: "深表土斜井冻结设计和施工", 《地层冻结工程技术和应用——中国地层冻结工程40年论文集》 * |
郭永富等: "郓城煤矿副井冻结施工技术", 《矿山建设工程技术新进展——2008全国矿山建设学术会议文集(上)》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758631A (zh) * | 2012-08-02 | 2012-10-31 | 兖矿集团有限公司 | 一种斜井冻结壁的冻结方法 |
CN104268365A (zh) * | 2014-07-25 | 2015-01-07 | 中煤西安设计工程有限责任公司 | 厚砂层缓坡斜井明挖法与暗挖法的临界开挖长度确定方法 |
CN104268365B (zh) * | 2014-07-25 | 2017-04-12 | 中煤西安设计工程有限责任公司 | 厚砂层缓坡斜井明挖法与暗挖法的临界开挖长度确定方法 |
CN108386228A (zh) * | 2018-02-09 | 2018-08-10 | 西安科技大学 | 一种斜井冻结法施工长期监测巷壁应力的方法 |
CN108798678A (zh) * | 2018-05-30 | 2018-11-13 | 中煤第建设有限公司 | 穿巷道冻结孔施工工艺 |
CN109441453A (zh) * | 2018-11-28 | 2019-03-08 | 中煤邯郸特殊凿井有限公司 | 斜井井筒内局部冻结施工方法 |
CN109751052A (zh) * | 2018-11-30 | 2019-05-14 | 陕西中能煤田有限公司 | 斜井冻结大高差盐水循环减压装置 |
CN109751052B (zh) * | 2018-11-30 | 2024-05-24 | 陕西中能煤田有限公司 | 斜井冻结大高差盐水循环减压装置 |
CN111852483A (zh) * | 2020-07-30 | 2020-10-30 | 中煤第一建设有限公司 | 斜井冻结施工工艺以及斜井冻结*** |
CN113356858A (zh) * | 2021-07-13 | 2021-09-07 | 中煤第一建设有限公司 | 一种非等强复合冻结壁冻结方法 |
CN113356858B (zh) * | 2021-07-13 | 2023-02-28 | 中煤第一建设有限公司 | 一种非等强复合冻结壁冻结方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102182463B (zh) | 2013-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102182463B (zh) | 斜井冻结保温方法 | |
US10577891B2 (en) | Using horizontal directional drilling and liquid nitrogen cyclic freeze-thaw process to improve permeability in gas drainage | |
CN104265354B (zh) | 一种低透气性煤层水力相变致裂强化瓦斯抽采方法 | |
CN107524459B (zh) | 一种地铁暗挖车站竖井和横通道的冻结止水结构和方法 | |
CN104806253B (zh) | 一种矩形顶管通道之间开洞的施工方法 | |
CN105239585A (zh) | 一种深层地下空间的桩内冻结结构及施工方法 | |
CN105239606A (zh) | 一种深层地下空间的桩间冻结结构及施工方法 | |
CN105134219A (zh) | 软岩地层冻结井筒井壁施工工艺 | |
CN102758631A (zh) | 一种斜井冻结壁的冻结方法 | |
CN108825247B (zh) | 一种用于8导洞pba工法的外倾侧壁水平造底盆形冻结止水工法 | |
CN111945704A (zh) | 倾斜布置多排冻结管对富水粉砂地层加固的方法 | |
CN105951860A (zh) | 一种暗挖基坑内部及侧面斜向的冻结造底止水结构及方法 | |
CN208396715U (zh) | 一种区间隧道的先行导洞冻结止水结构 | |
CN109557128B (zh) | 一种用于冻结施工的模拟试验箱 | |
CN109594994A (zh) | 既有建筑物下的暗挖方法 | |
CN102678058B (zh) | 物探专用钻头 | |
CN209780896U (zh) | 冷冻法开挖隧道用的冷冻装置 | |
CN204524328U (zh) | 顶管注浆孔制作工装 | |
CN105951861A (zh) | 一种城市敏感区域暗挖基坑侧向冻结造底止水结构及方法 | |
CN106013166A (zh) | 辐条式冻结向外扩挖式开挖超深基坑的施工方法 | |
CN208329012U (zh) | 一种用于4/6/8导洞pba工法的先行导洞竖直侧壁水平造底盆形冻结止水结构 | |
CN205260039U (zh) | 一种盾构隧道端头半球形冻结壁加固结构 | |
CN116066157A (zh) | 一种用于pba工法的冻结止水方法 | |
CN208329011U (zh) | 一种用于4/6导洞pba工法的桩管协同竖直侧壁水平造底盆形冻结止水结构 | |
JPH05280278A (ja) | シールドトンネルの接続工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |