CN102182400A - Double-guide-rail drill wagon for coal mine - Google Patents

Double-guide-rail drill wagon for coal mine Download PDF

Info

Publication number
CN102182400A
CN102182400A CN2010101355243A CN201010135524A CN102182400A CN 102182400 A CN102182400 A CN 102182400A CN 2010101355243 A CN2010101355243 A CN 2010101355243A CN 201010135524 A CN201010135524 A CN 201010135524A CN 102182400 A CN102182400 A CN 102182400A
Authority
CN
China
Prior art keywords
frame
rack
rail
oil cylinder
support arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101355243A
Other languages
Chinese (zh)
Other versions
CN102182400B (en
Inventor
武国胜
陈长河
张国旺
冯宝兴
李永占
赵玉凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiefulai Equipment Manufacturing Group Co.,Ltd.
Original Assignee
PINGDINGSHAN TIEFULAI ELECTRONIC AND MECHANICAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PINGDINGSHAN TIEFULAI ELECTRONIC AND MECHANICAL EQUIPMENT CO Ltd filed Critical PINGDINGSHAN TIEFULAI ELECTRONIC AND MECHANICAL EQUIPMENT CO Ltd
Priority to CN2010101355243A priority Critical patent/CN102182400B/en
Publication of CN102182400A publication Critical patent/CN102182400A/en
Application granted granted Critical
Publication of CN102182400B publication Critical patent/CN102182400B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a double-guide-rail drill wagon for a coal mine and relates to a drill wagon for gas pumping drainage of the coal mine. The double-guide-rail drill wagon for the coal mine comprises a travelling device and a rack, wherein a rotary disk is arranged at a connecting end of the travelling device and the rack; the rack can rotate 360 DEG by the rotary disk; two drilling rig guide rails are symmetrically arranged on the rack; the drilling rig guide rails are hung on a sliding frame; the sliding frame is arranged on a supporting arm; one end of the supporting arm is connected with a lifting oil cylinder, while the other end of the supporting arm is connected with a lifting bracket; an angular adjustment oil cylinder is arranged at the connecting end of the supporting arm and the lifting bracket; the lifting bracket is connected with the rack respectively by a movable pull rod and a movable supporting rod which are arranged at ends; the drilling rig guide rails slide back and forth on the supporting arm along with the sliding frame; up and down angular adjustment of 45 DEG can be carried out; and top plate supporting columns are symmetrically arranged at two ends of the rack. The drill wagon is novel in structure; the position and angle of a drilling hole can be adjusted flexibly, and a distance between a horizontal guide rail and an excavation working surface is adjusted as required; the frequent adjustment of the position of a body is avoided; and working efficiency can be greatly improved.

Description

The two guide rail drill carriages in a kind of colliery
Technical field
The present invention relates to the drill carriage that a kind of colliery pump drainage gas is used, the two guide rail drill carriages in specifically a kind of colliery.
Background technology
In order to eliminate the permeable and gas accident hidden danger in colliery, ensure the safety of Coal Production, prevent that because of major accident permeable and that gas is outstanding, country is decided to be rigid measure with the colliery outstanding work of anti-permeable anti-gas.Gas drainage under suction and the remote water of visiting are the essential measures of administering coal mine gas and water leak accident.The drill carriage that uses is owing to complex structure, poor stability, fault rate height at present, bore angle is adjusted underaction, drilling efficiency is low, and can't adjust the distance of borer rail and getting working face under the situation of mobile body not, can not satisfy the demand of down-hole drilling operation.
Summary of the invention
Technical problem to be solved by this invention provides the high colliery of a kind of novel structure, drilling efficiency with two guide rail drill carriages, can adjust the distance of borer rail and getting working face under the situation of mobile body not.
The present invention is the deficiency that solves the problems of the technologies described above, the technical scheme that is adopted is: the two guide rail drill carriages in a kind of colliery, comprise running gear and frame, link in running gear and frame is provided with rotary disk, frame can 360 ° of rotations by rotary disk, on frame, be arranged with two borer rails, borer rail is hung on travelling carriage, travelling carriage is arranged on the support arm, one end of support arm is connected with hoist cylinder, the other end is connected with lifting support, link at support arm and lifting support also is provided with the angle adjustment oil cylinder, and lifting support is connected with frame respectively with movable branching rod by the active pull rod that is arranged on the end, and borer rail is followed travelling carriage front and back on support arm and slided, can carry out 45 adjustment up and down, also be arranged with top plate stanchions at the two ends of frame.
Also be provided with the telescopic oil cylinder that is connected with travelling carriage on the described support arm.
Described frame, its two ends are respectively equipped with bottom plate stanchions.
Described borer rail is provided with the rig seat and advances oil cylinder in its rail groove.
Described rig seat is provided with rig, and rig is provided with drilling rod.
The invention has the beneficial effects as follows: the drill carriage novel structure, the flexible drive telescopic arm by hoist cylinder makes its rising or reduction, to adjust the height of borer rail.The flexible angle that can adjust lifting support and support arm of angle adjustment oil cylinder, thereby the angle of adjustment borer rail.Frame can rotate freely on running gear by rotary disk, thereby adjusts the direction of creeping into.Can adjust the position and the angle of boring flexibly by above setting.In the telescopic arm both sides borer rail is set respectively, two drilling rods are holed simultaneously, can increase work efficiency greatly.As back support, front end makes its structure more stable by the unique way that hoist cylinder supports, and greatly reduces maintenance rate by the different movable branching rod of length and active pull rod in employing.Borer rail stretches out with the travelling carriage on the telescopic arm or regains, and adjusts the distance of borer rail and getting working face as required flexibly, avoids frequently adjusting the body position, has saved the working time greatly.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the structural representation of support arm among the present invention.
Fig. 4 is the structural representation of travelling carriage among the present invention.
Mark among the figure: 1, running gear, 2, frame, 3, rotary disk, 4, rig seat, 5, borer rail, 6, lifting support, 7, hoist cylinder, 8, movable branching rod, 9, active pull rod, 10, angle adjustment oil cylinder, 11, travelling carriage, 12, support arm, 13, telescopic oil cylinder, 14, advance oil cylinder, 15, rig, 16, drilling rod, 17, top plate stanchions, 18, bottom plate stanchions.
The specific embodiment
As shown in the figure, a kind of colliery comprises running gear 1, frame 2, borer rail 5, rig 15 and drilling rod 16 with two guide rail drill carriages.Running gear 1 can use cterpillar drive.Be provided with rotary disk 3 on running gear 1, frame 2 is arranged on the rotary disk 3, can carry out 360 ° of rotations.Rig 15 is arranged on the rig seat 4 in the rail groove of borer rail 5, and be connected with a end of propelling oil cylinder 14 in the borer rail 5, move forward and backward along borer rail 5 by the flexible drive rig 15 that advances oil cylinder 14, creep into, continue to creep into after returning the continued access drilling rod then so that drive drilling rod 16.Be provided with drilling rod 16 on rig 15, drilling rod 16 centers are provided with through hole, can ventilate or water flowing, are used for the row's powder or the cooling drill bit of boring procedure.Be arranged with two borer rails 5 on frame 2, borer rail 5 is hung on travelling carriage 11, and two cover rigs can be installed, and boring is increased work efficiency greatly simultaneously.Travelling carriage 11 is arranged on the support arm 12, and an end of support arm 12 is connected with hoist cylinder 7, and the other end is connected with lifting support 6.Link at support arm 12 and lifting support 6 also is provided with angle adjustment oil cylinder 10, thereby can adjust the angle that support arm 12 and the angle of lifting support 6 are adjusted borer rail 5 by angle adjustment oil cylinder 10, makes it can carry out 45 adjustment up and down.Lifting support 6 is connected with frame 2 respectively with movable branching rod 8 by the active pull rod 9 that is arranged on the end, and the length of movable branching rod 8 is 1/2~2/3 of active pull rod 9 length.The two ends of movable branching rod 8 and active pull rod 9 are rotationally connected with lifting support 6 and frame 2 respectively, so that can adjust support angle flexibly when lifting support 6 is adjusted height.Hoist cylinder 7 is arranged on the frame 2, can adjust the height that support arm 12 lifts by hoist cylinder 7.On support arm 12, also be provided with the telescopic oil cylinder 13 that is connected with travelling carriage 11, the telescopic oil cylinder 13 flexible borer rails 5 that can drive are followed travelling carriage 11 front and back slip on support arm 12, thereby adjust the length that borer rail 5 stretches out, to adapt to the getting working face of different distance.Described frame two ends are arranged with top plate stanchions 17 and bottom plate stanchions 18.Top plate stanchions 17 is a support column, is provided with hydraulic cylinder at its top, and the hydraulic cylinder bottom is supported by baffle plate.Bottom plate stanchions 18 can be selected hydraulic cylinder for use, and hydraulic cylinder is fixed on the frame 2, and its flexible end is provided with downwards, can support ground when elongation.Top plate stanchions 17 and bottom plate stanchions 18 are respectively applied for top board and the base plate that supports coal mine roadway, and the balance of drill carriage is stable during with the maintenance bore operation.Described top plate stanchions 17 can respectively be provided with one at the two ends of frame 2.Described bottom plate stanchions 18 can respectively be provided with two at the two ends of frame 2, promptly four foundation plate pillars 18 are separately positioned on four angles of frame 2.

Claims (5)

1. a colliery is with two guide rail drill carriages, comprise running gear (1) and frame (2), link in running gear (1) and frame (2) is provided with rotary disk (3), frame (2) can 360 ° of rotations by rotary disk (3), it is characterized in that: on frame (2), be arranged with two borer rails (5), borer rail (5) is hung on travelling carriage (11), travelling carriage (11) is arranged on the support arm (12), one end of support arm (12) is connected with hoist cylinder (7), the other end is connected with lifting support (6), link at support arm (12) and lifting support (6) also is provided with angle adjustment oil cylinder (10), lifting support (6) is connected with frame (2) respectively with movable branching rod (8) by the active pull rod (9) that is arranged on the end, borer rail (5) is followed travelling carriage (11) and is slided before and after support arm (12) is gone up, can carry out 45 adjustment up and down, also be arranged with top plate stanchions (17) at the two ends of frame (2).
2. a kind of colliery according to claim 1 is characterized in that: also be provided with the telescopic oil cylinder (13) that is connected with travelling carriage (11) on the described support arm (12) with two guide rail drill carriages.
3. the two guide rail drill carriages in a kind of colliery according to claim 1, it is characterized in that: described frame (2), its two ends are respectively equipped with bottom plate stanchions (18).
4. the two guide rail drill carriages in a kind of colliery according to claim 1 is characterized in that: described borer rail (5) is provided with rig seat (4) and advances oil cylinder (14) in its rail groove.
5. the two guide rail drill carriages in a kind of colliery according to claim 4, it is characterized in that: described rig seat (4) is provided with rig (15), and rig (15) is provided with drilling rod (16).
CN2010101355243A 2010-03-30 2010-03-30 Double-guide-rail drill wagon for coal mine Active CN102182400B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101355243A CN102182400B (en) 2010-03-30 2010-03-30 Double-guide-rail drill wagon for coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101355243A CN102182400B (en) 2010-03-30 2010-03-30 Double-guide-rail drill wagon for coal mine

Publications (2)

Publication Number Publication Date
CN102182400A true CN102182400A (en) 2011-09-14
CN102182400B CN102182400B (en) 2012-04-18

Family

ID=44568678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101355243A Active CN102182400B (en) 2010-03-30 2010-03-30 Double-guide-rail drill wagon for coal mine

Country Status (1)

Country Link
CN (1) CN102182400B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359348A (en) * 2011-11-08 2012-02-22 石家庄中煤装备制造股份有限公司 Hole-pitch-adjustable drilling device
CN104884728A (en) * 2012-12-29 2015-09-02 哈利伯顿能源服务公司 Downhole drilling assembly having a hydraulically actuated clutch and method for use of same
CN106401472A (en) * 2016-08-26 2017-02-15 陕西斯达煤矿安全装备有限公司 All-dimensional deep hole drilling machine
CN106401469A (en) * 2016-08-26 2017-02-15 陕西斯达防爆安全科技股份有限公司 Omnibearing longhole drilling machine
CN106437534A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 Drilling machine amplitude varying bearing device
CN106437505A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-dimensional deep hole drilling machine
CN106437507A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 Amplitude variation rolling friction drilling machine component
CN106437536A (en) * 2016-08-26 2017-02-22 陕西斯达煤矿安全装备有限公司 Variable-amplitude bearing device of drilling machine
CN106437506A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-dimensional deep hole drilling machine
CN106437503A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-dimensional deep hole drilling machine
CN106437504A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-orientation deep hole drilling machine
CN108798512A (en) * 2018-08-02 2018-11-13 中煤科工集团重庆研究院有限公司 Multi-angle walking device for coal mine drilling machine
CN109162638A (en) * 2018-10-12 2019-01-08 东华理工大学 A kind of intelligent rock drilling equipment for geological prospecting
CN110130887A (en) * 2019-04-30 2019-08-16 贵州芭田生态工程有限公司 A kind of Mars Miner with support device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2276786A1 (en) * 1998-06-29 1999-12-29 Hydro Power Engineering (Proprietary) Limited Drill boom support for a drill rig
ZA995150B (en) * 1998-08-03 2000-02-17 Hydro Power Engineering Propri Drill rig for underground mining operations.
DE10206646C1 (en) * 2002-02-15 2003-07-24 Prime Drilling Gmbh Horizontal drilling rig displaced longitudinally relative to tracked transport vehicle between horizontal transport position and angled working position
CN1601055A (en) * 2004-10-08 2005-03-30 山西晋城无烟煤矿业集团有限责任公司寺河矿 Caterpillar chain stepped type drilling machine
CN201209459Y (en) * 2008-06-20 2009-03-18 浦国树 Abnormal protrusion mine coal road digging anti- protrusion jumbo loader
CN201258687Y (en) * 2008-09-08 2009-06-17 浙江杭钻机械制造股份有限公司 Complete hydraulic tunnel drilling rig moving platform
CN201326382Y (en) * 2008-12-30 2009-10-14 陈长河 Hydraulic outburst prevention drilling machine for coal seam gas drainage

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2276786A1 (en) * 1998-06-29 1999-12-29 Hydro Power Engineering (Proprietary) Limited Drill boom support for a drill rig
ZA995150B (en) * 1998-08-03 2000-02-17 Hydro Power Engineering Propri Drill rig for underground mining operations.
DE10206646C1 (en) * 2002-02-15 2003-07-24 Prime Drilling Gmbh Horizontal drilling rig displaced longitudinally relative to tracked transport vehicle between horizontal transport position and angled working position
CN1601055A (en) * 2004-10-08 2005-03-30 山西晋城无烟煤矿业集团有限责任公司寺河矿 Caterpillar chain stepped type drilling machine
CN201209459Y (en) * 2008-06-20 2009-03-18 浦国树 Abnormal protrusion mine coal road digging anti- protrusion jumbo loader
CN201258687Y (en) * 2008-09-08 2009-06-17 浙江杭钻机械制造股份有限公司 Complete hydraulic tunnel drilling rig moving platform
CN201326382Y (en) * 2008-12-30 2009-10-14 陈长河 Hydraulic outburst prevention drilling machine for coal seam gas drainage

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359348A (en) * 2011-11-08 2012-02-22 石家庄中煤装备制造股份有限公司 Hole-pitch-adjustable drilling device
CN104884728A (en) * 2012-12-29 2015-09-02 哈利伯顿能源服务公司 Downhole drilling assembly having a hydraulically actuated clutch and method for use of same
CN104884728B (en) * 2012-12-29 2017-12-22 哈利伯顿能源服务公司 Downhole drill component and its application method with hydraulic actuated clutch
CN106437507A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 Amplitude variation rolling friction drilling machine component
CN106437534A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 Drilling machine amplitude varying bearing device
CN106437505A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-dimensional deep hole drilling machine
CN106401469A (en) * 2016-08-26 2017-02-15 陕西斯达防爆安全科技股份有限公司 Omnibearing longhole drilling machine
CN106437536A (en) * 2016-08-26 2017-02-22 陕西斯达煤矿安全装备有限公司 Variable-amplitude bearing device of drilling machine
CN106437506A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-dimensional deep hole drilling machine
CN106437503A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-dimensional deep hole drilling machine
CN106437504A (en) * 2016-08-26 2017-02-22 陕西斯达防爆安全科技股份有限公司 All-orientation deep hole drilling machine
CN106401472A (en) * 2016-08-26 2017-02-15 陕西斯达煤矿安全装备有限公司 All-dimensional deep hole drilling machine
CN108798512A (en) * 2018-08-02 2018-11-13 中煤科工集团重庆研究院有限公司 Multi-angle walking device for coal mine drilling machine
CN109162638A (en) * 2018-10-12 2019-01-08 东华理工大学 A kind of intelligent rock drilling equipment for geological prospecting
CN110130887A (en) * 2019-04-30 2019-08-16 贵州芭田生态工程有限公司 A kind of Mars Miner with support device

Also Published As

Publication number Publication date
CN102182400B (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN102182400B (en) Double-guide-rail drill wagon for coal mine
CN201635652U (en) Double-guide rail drill carriage for coalmine
CN101812967B (en) Deep hole drilling machine for mining
CN201883938U (en) Multidirectional hydraulic deep hole drill carriage
CN201671540U (en) Mining deep hole drill rig
CN106194022A (en) A kind of Portable drilling device for fully-mechanized mining working passing fault and using method
CN204754953U (en) Railway tunnel stock platform truck and drilling device thereof
CN203271588U (en) Wheel type truck-mounted drilling rig
CN103758464A (en) Mining drill support
CN102031930B (en) Multidirectional hydraulic drill rig with floating rotary device
CN206158574U (en) A portable drilling equipment for combining adopt working face and cross fault
CN103277046A (en) Wheel type truck-mounted drilling rig
CN203655172U (en) Support for drilling machine for mining
CN103774986A (en) Ninety-degree all-dimensional hydraulic drill carriage for coal-mine gas control end-located drainage roadway
CN202031476U (en) Multi-boom drill jumbo
CN203050529U (en) Drilling machine rack
CN201747267U (en) Operation mechanism of mine deep-hole drilling carriage
CN109763770B (en) High-efficient directional drilling machine
CN202325266U (en) Mining large-dip angle cross drainage drilling machine
CN104727747A (en) Omnibearing crawler-type hydraulic drilling machine for coal mine
CN203925282U (en) Crawler type deep foundation ditch anchoring rig
CN106089041A (en) A kind of from the steady platform flatcar of movable base plate armature boring
CN202767895U (en) Lifting device used for deep drill rig
CN202266196U (en) Drill arm device of dual-arm top bolt-anchor construction drill carriage
CN202064985U (en) Temporary support device for two-arm top slope anchor rod and anchor cable construction drill carriage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 467000, Henan, Pingdingshan Province, North Ring Road, South Xinhua District Industrial Park

Patentee after: HENAN TIEFULAI EQUIPMENT MANUFACTURING CO., LTD.

Address before: 467000, Henan, Pingdingshan Province, North Ring Road, South Xinhua District Industrial Park

Patentee before: Pingdingshan Tiefulai Electronic and Mechanical Equipment Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 467000 Industrial Park, South Xinhua District, North Ring Road, Pingdingshan City, Henan Province

Patentee after: Tiefulai Equipment Manufacturing Group Co.,Ltd.

Address before: 467000 Industrial Park, South Xinhua District, North Ring Road, Pingdingshan City, Henan Province

Patentee before: HENAN TIEFULAI EQUIPMENT MANUFACTURING Co.,Ltd.