CN102182142A - Box girder opening structure at main tower of concrete box girder cable-stayed bridge - Google Patents

Box girder opening structure at main tower of concrete box girder cable-stayed bridge Download PDF

Info

Publication number
CN102182142A
CN102182142A CN 201110076574 CN201110076574A CN102182142A CN 102182142 A CN102182142 A CN 102182142A CN 201110076574 CN201110076574 CN 201110076574 CN 201110076574 A CN201110076574 A CN 201110076574A CN 102182142 A CN102182142 A CN 102182142A
Authority
CN
China
Prior art keywords
tower
king
box girder
case beam
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110076574
Other languages
Chinese (zh)
Inventor
王碧波
朱旭初
卫俊
胡涛
汪胜义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CN 201110076574 priority Critical patent/CN102182142A/en
Publication of CN102182142A publication Critical patent/CN102182142A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a box girder opening structure at a main tower of a concrete box girder cable-stayed bridge. An opening section is formed at the position of a box girder corresponding to a main tower column, the upper end of the main tower column passes to the upper part of the box girder through the opening section of the box girder, and the lower end of the main tower column and a tower pier form a tower pier fixed structure and form an arrangement mode of a tower girder separated floating or semi-floating system. By the technical scheme, overall arrangement of the cable-stayed bridge and setting of the structural system are optimized, the deformation of each section of the box girder and the change of the internal pressure can be smooth on the premise of ensuring the structural stress safety of the opening area of the box girder, the stress is uniform, the structure is simple, and the construction is convenient.

Description

Concrete box girder stayed-cable bridge king-tower place case beam open construction
Technical field
The present invention relates to a kind of prestressed concrete box girder cable stayed bridge case beam construction that belongs to bridge construction engineering field, refer in particular to a kind of concrete box girder stayed-cable bridge king-tower place case beam open construction.
Background technology
At present at home in the prestressed concrete box girder cable stayed bridge, when the bridge floor broad adopts box-beam structure, and when being provided with the central reservation, the king-tower direction across bridge adopts only column type bridge tower, is generally tower beam consolidation or just structure system; The characteristics of tower beam consolidation system are with tower beam consolidation and are bearing on the pier that suspension cable becomes elastomeric bearing.The internal force of case beam is directly relevant with the bending stiffness ratio of case beam and Sarasota with amount of deflection.The case beam of this system is general only to be provided with fixed bearing at a king-post place, and all the other be vertically can movable bearing, the shortcoming of this system is the mesopore full load, the case beam causes king-post to tilt at Dun Ding place corner displacement, make cat head produce bigger horizontal movement, thereby increase amount of deflection and end bay hogging moment in the case girder span significantly; Superstructure weight and mobile load counter-force all need to pass to bridge pier by bearing in addition, very large-tonnage bearing need be set, in long span stayed-cable bridge, this bearing even reach ton is given manufacturing and designing and maintenance in the future, changing and all bring bigger difficulty of bearing like this; Just the characteristics of structure system are that tower Liang Dun is fixed mutually, form in the span to have the flexibly mounted firm structure of multiple spot, and advantage is the stability requirement of not only having exempted large-scale bearing but also having satisfied cantilever construction; The integral rigidity of structure is relatively good, and the case beam deflection is little.Shortcoming is that case beam consolidation place hogging moment is big, makes near cross section, fixed place need to strengthen; Moreover, for eliminating thermal stresses, require pier shaft to have certain flexibility when being applied in the double pylon cable stayed bridge, be usually used in the occasion of high pier, to avoid occurring excessive additional internal force.In addition, this system relatively is suitable for single pylon cable stayed bridge.
Summary of the invention
The objective of the invention is at above deficiency, when the only column type bridge tower of a kind of employing is provided, king-post is fixed by case beam opening and tower pier, it is fixed to form the tower pier, constitute the arrangement of floating or half floating system of tower beam separation, the temperature of this system raising middle flask beam, shrink and the internal force of creeping all less, and the variation of the distortion in each cross section of case beam and internal force is milder, and is stressed more even.
For solving the problems of the technologies described above, technical scheme of the present invention is achieved in that a kind of concrete box girder stayed-cable bridge king-tower place case beam open construction, on the position of the corresponding king-tower king-post of case beam, form opening section, king-tower king-post upper end passes case beam top through case beam opening section, it is fixed that king-tower king-post lower end and tower pier form the tower pier, constitutes the arrangement of floating or half floating system of tower beam separation.
Form the solid concrete structure between the case chamber of longitudinally long both sides, limit, described case beam open area and the opening part vertical plate, leave certain space between described king-tower king-post and the case beam to satisfy the vertical of case beam and direction across bridge displacement adjustment requirement.
The vertical bridge in solid concrete zone is bigger to bending rigidity, and case beam internal force distributes according to the rigidity of institute's loading structure, so the internal force of the corresponding king-tower king-post of case beam position sections mainly transmits on the solid concrete structure of both sides, long limit, open area, and it is stressed less in its folded zone, thereby under the prerequisite that guarantees the concrete box girder stressing conditions, can optimize cable stayed bridge general arrangement and structural system setting.
The technique effect that the concrete box girder stayed-cable bridge king-tower place case beam open construction that the present invention relates to reaches is:
1. the present invention is on existing road oblique roller bridge concrete box girder structure foundation, by case beam opening, makes king-post and tower pier fixed, thereby optimizes cable stayed bridge general arrangement and structural system setting;
2. under the prerequisite of guard box beam open area structure stress safety, can make the variation of the distortion in each cross section of case beam and internal force milder, stressed more even;
3. simple in structure, be convenient to construction, reduce cost.
Description of drawings
Accompanying drawing 1 is arranged schematic diagram for case beam open area, king-tower of the present invention place facade;
Accompanying drawing 2 is case beam open area, king-tower of the present invention place sectional elevation schematic diagram;
Accompanying drawing 3 is case beam open area, king-tower of the present invention place flat cutting face schematic diagram;
Among the figure, 1 king-tower king-post, 2 casees beams, 3 tower piers, 4 opening sections, 5 casees chambers, 6 vertical plate.
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present invention is elaborated.
As shown in the figure, shown in Fig. 1 to 4, the concrete box girder stayed-cable bridge king-tower place case beam open construction that the present invention relates to, on the position of case beam 2 corresponding king-tower king-posts 1, form opening section 4, king-tower king-post 1 upper end passes case beam 2 tops through case beam 2 opening sections 4, it is fixed that king-tower king-post 1 lower end and tower pier 3 form the tower pier, constitutes the arrangement of floating or half floating system of tower beam separation.
Form the solid concrete structure between the case chamber 5 of longitudinally long both sides, limit, described case beam open area and the opening part vertical plate 6, leave certain space between described king-tower king-post 1 and the case beam 2 to satisfy the vertical of case beam 2 and direction across bridge displacement adjustment requirement.
The above is a preferred embodiment of the present invention only, is not to be used for limiting to claim of the present invention, and the equivalent structure that all utilizations manual of the present invention and accompanying drawing content are done changes, and all in like manner is contained in the scope of the present invention.

Claims (2)

1. concrete box girder stayed-cable bridge king-tower place case beam open construction, it is characterized in that: on the position of the corresponding king-tower king-post of case beam, form opening section, king-tower king-post upper end passes case beam top through case beam opening section, it is fixed that king-tower king-post lower end and tower pier form the tower pier, constitutes the arrangement of floating or half floating system of tower beam separation.
2. concrete box girder stayed-cable bridge king-tower according to claim 1 place case beam open construction, it is characterized in that, form the solid concrete structure between the case chamber of longitudinally long both sides, limit, described case beam open area and the opening part vertical plate, leave certain space between described king-tower king-post and the case beam to satisfy the vertical of case beam and direction across bridge displacement adjustment requirement.
CN 201110076574 2011-03-29 2011-03-29 Box girder opening structure at main tower of concrete box girder cable-stayed bridge Pending CN102182142A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110076574 CN102182142A (en) 2011-03-29 2011-03-29 Box girder opening structure at main tower of concrete box girder cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110076574 CN102182142A (en) 2011-03-29 2011-03-29 Box girder opening structure at main tower of concrete box girder cable-stayed bridge

Publications (1)

Publication Number Publication Date
CN102182142A true CN102182142A (en) 2011-09-14

Family

ID=44568420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110076574 Pending CN102182142A (en) 2011-03-29 2011-03-29 Box girder opening structure at main tower of concrete box girder cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN102182142A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817314A (en) * 2012-08-31 2012-12-12 中国市政工程西北设计研究院有限公司 Large-wing bridge section
CN106758815A (en) * 2016-12-29 2017-05-31 中铁第四勘察设计院集团有限公司 Bridge floor bridge tower structure is worn in one kind
CN107604804A (en) * 2017-09-27 2018-01-19 中铁第四勘察设计院集团有限公司 A kind of rail-road builds multi pylon cable stayed bridge with laminated
CN110886223A (en) * 2019-11-06 2020-03-17 中国铁路设计集团有限公司 Construction method for concreting steel-concrete combined tower and concrete box girder

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005035875A1 (en) * 2003-10-14 2005-04-21 Aas-Jakobsen As Bridge structure comprising tower, bridge beam, main/suspension cable, suspending bars, and diagonal cable-stays
CN2839363Y (en) * 2005-10-20 2006-11-22 中铁大桥勘测设计院有限公司 Stayed-cable bridge steel-concrete box shape combined bridge girder
CN1916288A (en) * 2006-09-05 2007-02-21 武汉理工大学 Hybrid system for controlling longitudinal vibration reaction of girder of cable stayed bridge in float type

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005035875A1 (en) * 2003-10-14 2005-04-21 Aas-Jakobsen As Bridge structure comprising tower, bridge beam, main/suspension cable, suspending bars, and diagonal cable-stays
CN2839363Y (en) * 2005-10-20 2006-11-22 中铁大桥勘测设计院有限公司 Stayed-cable bridge steel-concrete box shape combined bridge girder
CN1916288A (en) * 2006-09-05 2007-02-21 武汉理工大学 Hybrid system for controlling longitudinal vibration reaction of girder of cable stayed bridge in float type

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《中国优秀硕士学位论文全文数据库》 20101015 李靖 大跨度斜拉桥边塔处主梁开口效应分析 第6页至第7页、第21页至第52页,图1-6,图4-2 1-2 , 第10期 *
《铁道建筑》 20100515 白峰涛等 斜拉桥主梁开口效应分析 第5页至第7页 1-2 , 第5期 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817314A (en) * 2012-08-31 2012-12-12 中国市政工程西北设计研究院有限公司 Large-wing bridge section
CN106758815A (en) * 2016-12-29 2017-05-31 中铁第四勘察设计院集团有限公司 Bridge floor bridge tower structure is worn in one kind
CN106758815B (en) * 2016-12-29 2018-12-14 中铁第四勘察设计院集团有限公司 Bridge floor bridge tower structure is worn in one kind
CN107604804A (en) * 2017-09-27 2018-01-19 中铁第四勘察设计院集团有限公司 A kind of rail-road builds multi pylon cable stayed bridge with laminated
CN107604804B (en) * 2017-09-27 2023-07-04 中铁第四勘察设计院集团有限公司 Multi-tower cable-stayed bridge with common-rail and laminated layers
CN110886223A (en) * 2019-11-06 2020-03-17 中国铁路设计集团有限公司 Construction method for concreting steel-concrete combined tower and concrete box girder

Similar Documents

Publication Publication Date Title
CN204662235U (en) A kind of steel plate combination T beam bridge
CN100585082C (en) Assembled bridge building technique based on three steel tube longeron segments
CN105544373B (en) A kind of steel case Combined concrete girder and construction method for long-span cablestayed bridges
CN202644383U (en) Curved-scissors-shaped frame-type high pier
CN106012842A (en) Standardized movable formwork
CN102182142A (en) Box girder opening structure at main tower of concrete box girder cable-stayed bridge
CN101440598B (en) Steel box-concrete combined box plate arch structure and construction method thereof
CN107604804B (en) Multi-tower cable-stayed bridge with common-rail and laminated layers
CN202626808U (en) Beam-type steel bridge
CN110258300A (en) Part composite girder bridge
CN102140774A (en) Lateral stiffening construction of concrete cable-stayed bridge box girder
CN108166375A (en) Arch bridge in advance
CN207919315U (en) Four line high-speed railway steel truss cable-stayed bridges
CN203923881U (en) The auxiliary cable stayed bridge of a kind of double tower three rope face combined cable
CN104988843A (en) Bridge combined by steel structural box girder and concrete bridge deck panel
CN102191746A (en) Suspension bridge with single main cable
CN212052301U (en) Multi-displacement comb tooth bridge telescopic structure
CN202530365U (en) Half-through type opening box-shaped section steel-concrete composite beam
CN206034272U (en) External prestress steel anchor
CN107574747B (en) Structure system of highway-railway co-construction multi-tower cable-stayed bridge
CN110777680A (en) Method for reinforcing, lifting and transforming beam bridge
CN212688662U (en) Box girder construction that bearing strength is high
CN113863111B (en) Bridge structure
CN101139818B (en) Bridge trackway longitudinal spacer assembly
CN104631305A (en) Truss-type steel diaphragm plate of corrugated steel web cable-stay bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110914