CN102174796A - Cantilever casting construction cradle with underlaid main truss - Google Patents
Cantilever casting construction cradle with underlaid main truss Download PDFInfo
- Publication number
- CN102174796A CN102174796A CN 201110084759 CN201110084759A CN102174796A CN 102174796 A CN102174796 A CN 102174796A CN 201110084759 CN201110084759 CN 201110084759 CN 201110084759 A CN201110084759 A CN 201110084759A CN 102174796 A CN102174796 A CN 102174796A
- Authority
- CN
- China
- Prior art keywords
- main truss
- casting construction
- cantilever casting
- suspension bracket
- basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 238000005266 casting Methods 0.000 title claims abstract description 22
- 239000000725 suspension Substances 0.000 claims description 49
- 210000001364 upper extremity Anatomy 0.000 claims description 15
- 239000003643 water by type Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 abstract description 2
- 238000005096 rolling process Methods 0.000 abstract 1
- 230000003014 reinforcing effect Effects 0.000 description 9
- 238000004873 anchoring Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000003044 adaptive effect Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100847599A CN102174796B (en) | 2011-04-06 | 2011-04-06 | Cantilever casting construction cradle with underlaid main truss |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100847599A CN102174796B (en) | 2011-04-06 | 2011-04-06 | Cantilever casting construction cradle with underlaid main truss |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102174796A true CN102174796A (en) | 2011-09-07 |
CN102174796B CN102174796B (en) | 2012-07-25 |
Family
ID=44518017
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100847599A Active CN102174796B (en) | 2011-04-06 | 2011-04-06 | Cantilever casting construction cradle with underlaid main truss |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102174796B (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104562938A (en) * | 2014-12-16 | 2015-04-29 | 贵州科润华机电设备有限公司 | Bridge climbing turnover formwork and hanging basket integrated device |
CN106192778A (en) * | 2016-09-18 | 2016-12-07 | 中国铁建大桥工程局集团有限公司 | A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket |
CN106758868A (en) * | 2016-12-18 | 2017-05-31 | 中铁二十局集团第五工程有限公司 | End bay cast-in-place section construction structure and construction method based on Hanging Basket Yu truss-like nose girder |
CN107747399A (en) * | 2017-11-10 | 2018-03-02 | 湖南联智智能科技有限公司 | A kind of Hanging Basket running gear and its method of work |
CN108867406A (en) * | 2018-06-14 | 2018-11-23 | 中铁三局集团有限公司 | A kind of construction method for being applicable in base-supporting Hanging Basket closure segment and quickly positioning |
CN109653103A (en) * | 2018-11-21 | 2019-04-19 | 中国电建集团成都勘测设计研究院有限公司 | Free cantilever erection reinforcing bar basket structure |
CN109667228A (en) * | 2019-01-24 | 2019-04-23 | 中铁十六局集团第五工程有限公司 | A kind of straight beam formula Hanging Basket and continuous beam cantilever pouring construction method |
CN114541279A (en) * | 2022-03-31 | 2022-05-27 | 中国建筑第四工程局有限公司 | Novel forward moving construction method for hanging basket |
CN115341486A (en) * | 2022-08-30 | 2022-11-15 | 湖南中铁五新模板工程服务有限公司 | Bridge fabrication machine for cantilever pouring construction |
CN115787487A (en) * | 2022-11-28 | 2023-03-14 | 中铁四局集团有限公司 | Construction method of continuous beam variable cross-section bridge fabrication machine |
CN115787513A (en) * | 2022-11-28 | 2023-03-14 | 中铁四局集团有限公司 | Continuous beam cantilever bridge fabrication machine walking device and walking method |
CN115821769A (en) * | 2022-11-28 | 2023-03-21 | 中铁四局集团有限公司 | Variable cross-section intelligent bridge fabrication machine |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2306258Y (en) * | 1997-09-17 | 1999-02-03 | 铁道部大桥工程局第五桥梁工程处 | Bottom running type construction basket |
JP2994222B2 (en) * | 1995-01-20 | 1999-12-27 | 株式会社ピー・エス | Construction method of cast-in-place slab of precast concrete girder and its formwork |
KR100568430B1 (en) * | 2004-03-11 | 2006-04-07 | 엠에스아시아 주식회사 | Construction method for bridge using a form traveller |
CN1916289A (en) * | 2006-08-28 | 2007-02-21 | 杨秋利 | Diamond shaped cradle in truss type |
JP2007218029A (en) * | 2006-02-20 | 2007-08-30 | Yokogawa Bridge Corp | Girder lifting erection method and girder erection joint structure |
CN201610522U (en) * | 2010-01-13 | 2010-10-20 | 徐州徐工随车起重机有限公司 | Descending working platform system of truss-type bridge detection operation car |
CN101929130A (en) * | 2010-09-19 | 2010-12-29 | 中铁十二局集团有限公司 | Hanging basket device for closure construction of continuous box girders |
CN202000269U (en) * | 2011-04-06 | 2011-10-05 | 湖南中铁五新钢模有限责任公司 | Suspended casting construction hanging basket with underneath type main trusses |
-
2011
- 2011-04-06 CN CN2011100847599A patent/CN102174796B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2994222B2 (en) * | 1995-01-20 | 1999-12-27 | 株式会社ピー・エス | Construction method of cast-in-place slab of precast concrete girder and its formwork |
CN2306258Y (en) * | 1997-09-17 | 1999-02-03 | 铁道部大桥工程局第五桥梁工程处 | Bottom running type construction basket |
KR100568430B1 (en) * | 2004-03-11 | 2006-04-07 | 엠에스아시아 주식회사 | Construction method for bridge using a form traveller |
JP2007218029A (en) * | 2006-02-20 | 2007-08-30 | Yokogawa Bridge Corp | Girder lifting erection method and girder erection joint structure |
CN1916289A (en) * | 2006-08-28 | 2007-02-21 | 杨秋利 | Diamond shaped cradle in truss type |
CN201610522U (en) * | 2010-01-13 | 2010-10-20 | 徐州徐工随车起重机有限公司 | Descending working platform system of truss-type bridge detection operation car |
CN101929130A (en) * | 2010-09-19 | 2010-12-29 | 中铁十二局集团有限公司 | Hanging basket device for closure construction of continuous box girders |
CN202000269U (en) * | 2011-04-06 | 2011-10-05 | 湖南中铁五新钢模有限责任公司 | Suspended casting construction hanging basket with underneath type main trusses |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104562938A (en) * | 2014-12-16 | 2015-04-29 | 贵州科润华机电设备有限公司 | Bridge climbing turnover formwork and hanging basket integrated device |
CN106192778A (en) * | 2016-09-18 | 2016-12-07 | 中国铁建大桥工程局集团有限公司 | A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket |
CN106758868A (en) * | 2016-12-18 | 2017-05-31 | 中铁二十局集团第五工程有限公司 | End bay cast-in-place section construction structure and construction method based on Hanging Basket Yu truss-like nose girder |
CN107747399A (en) * | 2017-11-10 | 2018-03-02 | 湖南联智智能科技有限公司 | A kind of Hanging Basket running gear and its method of work |
CN108867406A (en) * | 2018-06-14 | 2018-11-23 | 中铁三局集团有限公司 | A kind of construction method for being applicable in base-supporting Hanging Basket closure segment and quickly positioning |
CN109653103A (en) * | 2018-11-21 | 2019-04-19 | 中国电建集团成都勘测设计研究院有限公司 | Free cantilever erection reinforcing bar basket structure |
CN109667228B (en) * | 2019-01-24 | 2024-02-02 | 中铁十六局集团第五工程有限公司 | Straight beam type hanging basket and continuous beam cantilever pouring construction method |
CN109667228A (en) * | 2019-01-24 | 2019-04-23 | 中铁十六局集团第五工程有限公司 | A kind of straight beam formula Hanging Basket and continuous beam cantilever pouring construction method |
CN114541279A (en) * | 2022-03-31 | 2022-05-27 | 中国建筑第四工程局有限公司 | Novel forward moving construction method for hanging basket |
CN115341486A (en) * | 2022-08-30 | 2022-11-15 | 湖南中铁五新模板工程服务有限公司 | Bridge fabrication machine for cantilever pouring construction |
CN115341486B (en) * | 2022-08-30 | 2024-03-01 | 湖南中铁五新模板工程服务有限公司 | Bridge fabrication machine for cantilever pouring construction |
CN115787513A (en) * | 2022-11-28 | 2023-03-14 | 中铁四局集团有限公司 | Continuous beam cantilever bridge fabrication machine walking device and walking method |
CN115821769A (en) * | 2022-11-28 | 2023-03-21 | 中铁四局集团有限公司 | Variable cross-section intelligent bridge fabrication machine |
CN115787513B (en) * | 2022-11-28 | 2023-10-13 | 中铁四局集团有限公司 | Running device and running method of continuous beam cantilever bridge fabrication machine |
WO2023198217A1 (en) * | 2022-11-28 | 2023-10-19 | 中铁四局集团有限公司 | Variable cross-section intelligent bridge-building machine |
CN115787487B (en) * | 2022-11-28 | 2023-11-14 | 中铁四局集团有限公司 | Construction method of continuous beam variable cross-section bridge fabrication machine |
CN115787487A (en) * | 2022-11-28 | 2023-03-14 | 中铁四局集团有限公司 | Construction method of continuous beam variable cross-section bridge fabrication machine |
Also Published As
Publication number | Publication date |
---|---|
CN102174796B (en) | 2012-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102174796B (en) | Cantilever casting construction cradle with underlaid main truss | |
CN103074854B (en) | Rear supporting point triangular bracket hanging basket and bridge construction method using same | |
CN104746883B (en) | A kind of arcuate space truss lifts construction method of installation with three machines | |
CN201169749Y (en) | Simple pin-connected triangular hanging basket | |
CN102094392B (en) | Lower supported hanging basket in bridge construction and application thereof | |
CN208815424U (en) | A kind of bridge descending hanging basket | |
CN202000269U (en) | Suspended casting construction hanging basket with underneath type main trusses | |
CN102758404B (en) | Front fulcrum hanging basket travelling device of spatial V-shaped cable-stayed bridge | |
CN109610330A (en) | A kind of Bridge Erector passing method | |
CN103754800A (en) | Crane type multi-directional horizontal-movement multifunctional hydraulic lifting construction method | |
CN202544854U (en) | Lining trolley for subway station | |
CN201056836Y (en) | Dual-function jack climbing formwork system | |
CN203049471U (en) | Rear fulcrum triangular bracket hanging basket | |
CN103362074B (en) | Bridge cantilever box girder construction hanging basket pre-pressing loading device | |
CN202577150U (en) | Pier top lifting frame | |
CN202073046U (en) | Main truss system of downward hanging basket | |
CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
CN206233120U (en) | Folding shape steel web continuous box girder jenny mould bases cantilever structure | |
CN203129025U (en) | Suspension fixing device for hanging basket | |
CN205442393U (en) | Posture that falls suspension system | |
CN201972099U (en) | Through type hanging basket in bridge construction | |
CN201826320U (en) | Assembling and sinking device for double wall steel cofferdam | |
CN205663175U (en) | Adjustable reinforcing pull rod formula scaffold frame of encorbelmenting | |
CN2742026Y (en) | One gap type top guide beam moving mould frame bridge making machine | |
CN201236098Y (en) | Combined pressure bar sling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Cantilever casting construction cradle with underlaid main truss Effective date of registration: 20140826 Granted publication date: 20120725 Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd. Registration number: 2014430000015 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20150917 Granted publication date: 20120725 Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd. Registration number: 2014430000015 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Cantilever casting construction cradle with underlaid main truss Effective date of registration: 20150923 Granted publication date: 20120725 Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd. Registration number: 2015430000025 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20161111 Address after: 418000 Industrial Economy Bureau of China County, Hunan Province, room 114 Patentee after: HUNAN WUXIN FORMWORK Co.,Ltd. Address before: 410100 No. 205, Xingsha Avenue, Changsha, Hunan Patentee before: Hunan China Railway Wuxin Steel Mould Co.,Ltd. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20171128 Granted publication date: 20120725 Pledgee: Bank of Beijing Limited by Share Ltd. Changsha branch Pledgor: Hunan China Railway Wuxin Steel Mould Co.,Ltd. Registration number: 2015430000025 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Cantilever casting construction cradle with underlaid main truss Effective date of registration: 20191211 Granted publication date: 20120725 Pledgee: China Co. truction Bank Corp Huaihua branch Pledgor: HUNAN WUXIN FORMWORK Co.,Ltd. Registration number: Y2019980000993 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230427 Granted publication date: 20120725 Pledgee: China Co. truction Bank Corp Huaihua branch Pledgor: HUNAN WUXIN FORMWORK Co.,Ltd. Registration number: Y2019980000993 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240221 Address after: 418000 Xiangshang culture and Technology Industrial Park in Zhongfang County, Huaihua City, Hunan Province (east of Huaiqian Road, west of Ziyang Road, south of Wuxi East Road, north of Fengxiang Road) Patentee after: Hunan Wuxin Intelligent Technology Co.,Ltd. Country or region after: China Address before: 418000 Room 114, Industrial and Economic Bureau of Zhongfang County, Hunan Province Patentee before: HUNAN WUXIN FORMWORK Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right |