CN102140800B - Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile - Google Patents

Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile Download PDF

Info

Publication number
CN102140800B
CN102140800B CN 201110024826 CN201110024826A CN102140800B CN 102140800 B CN102140800 B CN 102140800B CN 201110024826 CN201110024826 CN 201110024826 CN 201110024826 A CN201110024826 A CN 201110024826A CN 102140800 B CN102140800 B CN 102140800B
Authority
CN
China
Prior art keywords
pile
tendon
anchor cable
construction
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110024826
Other languages
Chinese (zh)
Other versions
CN102140800A (en
Inventor
王桢
杨秀梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Research Institute Co Ltd of CREC
Original Assignee
Northwest Research Institute Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Research Institute Co Ltd of CREC filed Critical Northwest Research Institute Co Ltd of CREC
Priority to CN 201110024826 priority Critical patent/CN102140800B/en
Publication of CN102140800A publication Critical patent/CN102140800A/en
Application granted granted Critical
Publication of CN102140800B publication Critical patent/CN102140800B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a quick, safe and environment-friendly method for constructing a non-excavated anti-slide pile, which comprises the following steps of: (1) paying off and positioning according to the conventional anti-slide pile, leveling an operative surface which passes through a pile row, and marking the point position of a tendon in the pile; (2) constructing a vertical tendon at the point position where the tendon in the pile is marked and ensuring that the tendon is 0.8 to 1.0m higher than the operative surface at an orifice; (3) after the vertical tendon is constructed, constructing an oblique anchor rope; (4) constructing a transverse connecting beam on the top of the pile, and reserving an anchor rope hole in a reinforcing cage of the connecting beam so as to tension the anchor rope; and (5) after concrete of the connecting beam reaches design strength, tensioning and locking the anchor rope on the top of the pile, and finishing construction. By the method, the non-excavated anti-slide pile is formed under the combined action of a plurality of vertical tendons, the oblique anchor rope, the transverse connecting beam and a peripheral soil body. Compared with the conventional anti-slide pile, the non-excavated anti-slide pile has the advantages of reducing emission and the like, is quick, safe and environment-friendly, and has a wide application prospect in landslide control engineering.

Description

A kind of non-excavation type anti-slide pile construction method of environmental protection fast and safely
Technical field
The invention belongs to the geotechnical engineering technical field, be specially a kind of fast, the non-excavation type anti-slide pile construction method of safety, environmental protection.
Background technology
Antislide pile is a kind of steel concrete stanchion that sliding mass gets into the good ground certain depth that passes; Utilize the pile body drag that the good ground ground provides under the embedding sliding surface to come the balance Thrust of Landslide; Play the anti-sliding support effect; Antislide pile occupies an important position in the landslide control of countries in the world as effective engineering measure of administering the landslide.Since the nineteen thirties invention, use gradually maturation and increasingly extensive, become a kind of effective anti-sliding support structure commonly used at present, in landslide control, take on the effect of main force.For making antislide pile stressed more reasonable, a retaining effect is more reliable, has developed combining structure forms such as campshed, anchor cable antislide pile, stake board wall.
But there is following defective in antislide pile at present commonly used: 1. the stake well depends on the hand excavation entirely, excavate one section, protects one section, and is long in time limit, efficient is low, and the emergency repair engineering does not suit; 2. during hand excavated pile lifting dregs and reinforcing bar were gone into the well process in place, potential safety hazard was big, accident takes place frequently; 3. the dregs that from stake, digs out need be laid with putting, if stacking is improper, the lighter can destroy the blue mountains and green waters environment, and weight person will bring out mud-rock flow, landslide grade dried rhizome of rehmannia matter disaster; 4. pouring into a mould pile concrete needs constructional materialss such as a large amount of cement, sand, stone, and the production of these materials needs fried mountain to get stone at the cost of the environment usually, and the utmost point is unfavorable for low-carbon environment-friendly; 5. stake well digging process weakens the drag of sliding mass own to some extent, when especially digging the following hard and steady of sliding bed stratum, needs explosion usually, and this disturbance to the stratum is big; Particularly those are in the landslide of development of deformation in the stage, explosion has more aggravated its unstability and construction risk, and the safety in village was difficult to guarantee especially around the constructor reached.
Summary of the invention
The purpose of this invention is to provide a kind of fast, the non-excavation type anti-slide pile construction method of safety, environmental protection, make its effect that can play traditional antislide pile, can effectively increase work efficiency again, avoid the many security incidents that occur in traditional antislide pile digging process.
For realizing above-mentioned purpose, the technical scheme that the present invention takes is:
A kind of non-excavation type anti-slide pile construction method of environmental protection fast and safely; Adopt machine drilling; With passing some vertical reinforcement bundles of sliding zone, oblique anchor cable; Connect to a space antiskid system through the horizontal linking beam of face of land steel concrete, resist Thrust of Landslide jointly, specifically realize through following steps:
1. unwrapping wire is located: according to the landslide actual conditions, according to the layout of traditional antislide pile, carry out the row of piles unwrapping wire, the smooth operating surface that goes out to connect this row of piles is confirmed pile spacing, stake long axis direction and stake length limit size, the some position of tendon in the sign stake;
2. vertical reinforcement bundle construction: place, the some position of tendon in indicating stake, settle the rig vertical drilling, the thickness of the degree of depth and sliding mass that boring must be passed sliding zone entering stablizing rock stratum is suitable; In boring, insert tendon and the Grouting Pipe of making, tendon exceeds 0.8~1.0 meter of operating surface in the aperture; From at the bottom of the hole to the aperture pressure injection cement mortar, accomplish the construction of each all tendon points positions successively;
3. oblique anchor cable construction: after the construction of vertical reinforcement bundle; On the smooth operating surface that goes out, carry out oblique anchor cable construction; Oblique 2~4 hole prestress anchorage cables that are provided with at stake position place, 20 °~35 ° at anchor cable inclination angle, anchor cable must pass sliding zone and stretch into the degree of depth of stablizing the rock stratum and be not less than 10 meters;
4. laterally linking beam construction: after vertical reinforcement bundle and oblique anchor cable construction are accomplished; On the smooth operating surface that goes out, carry out the horizontal linking beam construction in stake top, the tendon colligation stirrup that earlier each pile crown is exposed links up each pile crown through horizontal link bar again; Constitute the linking beam reinforcing cage; On completed oblique anchor cable, pvc pipe is installed then, is begun to pour into a mould the linking beam concrete, thereby form the antiskid barrier one; The pvc pipe of installing on the anchor cable is in order in the linking beam reinforcing cage, to reserve the anchor cable hole, so that anchorage cable stretching;
5. tensioning fixation: after treating that the linking beam concrete reaches design strength, oblique anchor cable is pushed up in stake carry out tensioning fixation, accomplish the construction of non-excavation type antislide pile.
The tendon that boring is inserted in the step 2 substitutes with steel pipe, shaped steel or anchor cable.
When tendon was constructed, sliding zone place, landslide set up stiffener or shearing steel pipe, with the skid resistance of further reinforcement non-excavation type antislide pile in the step 2.
When tendon slip casting, the place is provided with stop grouting plug at sliding zone in the step 2, through high-pressure slip-casting, cement mortar is squeezed in the geotechnical body be seeped into around the sliding zone, reinforces and the effect of improvement sliding zone rock mechanical character further to play.
Provided by the invention above-mentioned fast, the non-excavation type anti-slide pile construction method of safety, environmental protection; Utilize several vertical reinforcement bundles, oblique anchor cable, laterally linking beam and geotechnical body acting in conjunction on every side; Form a kind of " non-excavation type antislide pile ", play the effect of similar traditional antislide pile.This method has does not need the hand excavation, can adopt the mechanization full-scale construction, and the duration is short, efficient is high, security risk is little; Do not need a large amount of excavation wastes of handling, do not need a large amount of concrete fills, little to environmental hazard; Need not excavate explosion yet, little to ground disturbance.Compare with traditional antislide pile, its maximum advantage be fast, environmental protection, reduction of discharging, safety, have remarkable economic efficiency and social benefit.Be suitable for rockslide and sand shale alternating layers landslide control, be particularly suitable for railway, highway or disaster area emergency repair engineering, in the preventing land slide engineering, have special advantages and wide application prospect.
Description of drawings
Fig. 1: the layout sketch map of non-excavation type anti-slide pile construction method.
The A partial enlarged drawing of Fig. 2: Fig. 1.
Fig. 3: the sectional schematic diagram of non-excavation type anti-slide pile construction method.
Among the figure: 1. tendon, 2. geotechnical body, 3. reinforcing rib, 4. linking beam, 5. anchor cable.
The specific embodiment
For further set forth technological means and the technique effect that the present invention is adopted when realizing being scheduled to purpose, the present invention is described further below in conjunction with specific embodiment and accompanying drawing thereof:
To shown in Figure 3, technical scheme practical implementation step of the present invention is following like Fig. 1:
(1) unwrapping wire location: according to the landslide actual conditions, according to the layout of traditional antislide pile, carry out the row of piles unwrapping wire, the smooth operating surface that goes out to connect this row of piles is confirmed pile spacing, stake long axis direction and stake length limit size, indicates the some position of tendon 1 in the stake.Compare with traditional excavation type antislide pile, because the facility of mechanization full-scale construction, non-excavation type antislide pile pile spacing can be slightly less than traditional antislide pile pile spacing, general about 4 meters; Non-excavation type antislide pile stake sectional dimension can be slightly larger than traditional antislide pile stake sectional dimension 20%~40%.
(2) vertical reinforcement bundle construction: place, the some position of tendon 1 in indicating stake; Settle the rig vertical drilling; Boring aperture generally is not less than 130 millimeters; Boring must be passed sliding zone and got into and stablize the rock stratum certain depth, and to pass the thickness of the degree of depth and sliding mass of sliding zone entering stablizing rock stratum suitable in boring usually; In boring, insert tendon 1 and the Grouting Pipe of making, tendon 1 exceeds 0.8~1.0 meter of operating surface in the aperture, and the tendon 1 that inserts in the boring also can be substituted by steel pipe, shaped steel or anchor cable.Consider that maximal bending moment and shearing appear near the sliding zone,, when tendon 1 construction, be positioned at sliding zone place, landslide and set up reinforcing rib 3 or shearing steel pipe for further strengthening the skid resistance of non-excavation type antislide pile.Simultaneously, in order further to improve the local Shear Strength Index of sliding zone, when tendon 1 slip casting; Can stop grouting plug be set at the sliding zone place; Through high-pressure slip-casting, the not little 1MPa of grouting pressure, strength of cement mortar are not less than M30, from carry out the pressure injection cement mortar at the bottom of the hole to the aperture; Cement mortar is squeezed in the geotechnical body 2 be seeped into around the sliding zone, reinforce and the effect of improvement sliding zone rock mechanical character to play.Accomplish the construction of each all 1 position of tendon successively.
(3) oblique anchor cable construction: after vertical reinforcement bundle 1 construction is accomplished, on the smooth operating surface that goes out, carry out oblique anchor cable 5 constructions.Oblique 2~4 hole prestress anchorage cables 5 that are provided with at stake position place, anchor cable 5 inclination angles are 20 °~35 °, and anchor cable 5 must pass sliding zone and stretch into and stablize the rock stratum certain depth, and anchor cable passes the degree of depth of stablizing the rock stratum and generally is not less than 10 meters.
(4) laterally linking beam construction: after vertical reinforcement bundle 1 is accomplished with oblique anchor cable 5 constructions, on the smooth operating surface that goes out, carry out the construction of the horizontal linking beam 4 in stake top.The tendon 1 colligation stirrup that earlier each pile crown is exposed; Through horizontal link bar each pile crown is linked up again, constitute the linking beam reinforcing cage, on completed oblique anchor cable, pvc pipe is installed then; Begin to pour into a mould the linking beam concrete, thereby form antiskid barrier-horizontal linking beam 4 one.The pvc pipe of installing on the oblique anchor cable 5 is in order in the linking beam reinforcing cage, to reserve the anchor cable hole, so that the stretch-draw of oblique anchor cable 5.
(5) tensioning fixation: after treating that the linking beam concrete reaches design strength; Oblique anchor cable 5 is pushed up in stake carry out tensioning fixation; Accomplish the construction of non-excavation type antislide pile; Be about to pass some vertical reinforcement bundles 1, the oblique anchor cable 5 of sliding zone, connect to a space antiskid system through the horizontal linking beam 4 of face of land steel concrete.
Compare with traditional antislide pile; " stake " that this method forms can be played the anti-sliding support effect; Can effectively increase work efficiency and avoid the generation of many security incidents of occurring in traditional antislide pile stake well digging process again, for the antislide pile construction provide a kind of fast, the job practices of environmental protection, reduction of discharging, safety, have remarkable economic efficiency and social benefit; Be suitable for rockslide and sand shale alternating layers landslide control, be particularly suitable for railway, highway or disaster area emergency repair engineering.
In the preceding text, illustrating and describing practical implementation method of the present invention, is not to be used for limiting the invention.Those skilled in the art can understand; Under situation without departing from the spirit and scope of the present invention; Under teachings provided by the present invention; Can also specific embodiments of the invention make other equivalent variations and improvement, these changes and replacement all drop in claims of the present invention institute restricted portion.

Claims (4)

1. the non-excavation type anti-slide pile construction method of an environmental protection fast and safely; It is characterized in that: adopt machine drilling; With passing some vertical reinforcement bundles of sliding zone, oblique anchor cable; Connect to a space antiskid system through the horizontal linking beam of face of land steel concrete, resist Thrust of Landslide jointly, specifically realize through following steps:
1. unwrapping wire is located: according to the landslide actual conditions, according to the layout of traditional antislide pile, carry out the row of piles unwrapping wire, the smooth operating surface that goes out to connect this row of piles is confirmed pile spacing, stake long axis direction and stake length limit size, the some position of tendon in the sign stake;
2. vertical reinforcement bundle construction: place, the some position of tendon in indicating stake, settle the rig vertical drilling, the thickness of the degree of depth and sliding mass that boring must be passed sliding zone entering stablizing rock stratum is suitable; In boring, insert tendon and the Grouting Pipe of making, tendon exceeds 0.8~1.0 meter of operating surface in the aperture; From at the bottom of the hole to the aperture pressure injection cement mortar, accomplish the construction of each all tendon points positions successively;
3. oblique anchor cable construction: after the construction of vertical reinforcement bundle; On the smooth operating surface that goes out, carry out oblique anchor cable construction; Oblique 2~4 hole prestress anchorage cables that are provided with at stake position place, 20 °~35 ° at anchor cable inclination angle, anchor cable must pass sliding zone and stretch into the degree of depth of stablizing the rock stratum and be not less than 10 meters;
4. laterally linking beam construction: after vertical reinforcement bundle and oblique anchor cable construction are accomplished; On the smooth operating surface that goes out, carry out the horizontal linking beam construction in stake top, the tendon colligation stirrup that earlier each pile crown is exposed links up each pile crown through horizontal link bar again; Constitute the linking beam reinforcing cage; On completed oblique anchor cable, pvc pipe is installed then, is begun to pour into a mould the linking beam concrete, thereby form the antiskid barrier one; The pvc pipe of installing on the anchor cable is in order in the linking beam reinforcing cage, to reserve the anchor cable hole, so that anchorage cable stretching;
5. tensioning fixation: after treating that the linking beam concrete reaches design strength, oblique anchor cable is pushed up in stake carry out tensioning fixation, accomplish the construction of non-excavation type antislide pile.
2. non-excavation type anti-slide pile construction method according to claim 1 is characterized in that: described step 2. in, when tendon was constructed, sliding zone place, landslide set up stiffener or shearing steel pipe, with the skid resistance of further reinforcement non-excavation type antislide pile.
3. non-excavation type anti-slide pile construction method according to claim 1 and 2; It is characterized in that: described step 2. in; When tendon slip casting, the place is provided with stop grouting plug at sliding zone, through high-pressure slip-casting; Cement mortar is squeezed in the geotechnical body be seeped into around the sliding zone, reinforce and the effect of improvement sliding zone rock mechanical character further to play.
4. non-excavation type anti-slide pile construction method according to claim 1 is characterized in that: described step 2. in, the tendon that boring is inserted is alternative with steel pipe, shaped steel or anchor cable.
CN 201110024826 2011-01-24 2011-01-24 Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile Expired - Fee Related CN102140800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110024826 CN102140800B (en) 2011-01-24 2011-01-24 Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110024826 CN102140800B (en) 2011-01-24 2011-01-24 Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile

Publications (2)

Publication Number Publication Date
CN102140800A CN102140800A (en) 2011-08-03
CN102140800B true CN102140800B (en) 2012-10-03

Family

ID=44408578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110024826 Expired - Fee Related CN102140800B (en) 2011-01-24 2011-01-24 Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile

Country Status (1)

Country Link
CN (1) CN102140800B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747738A (en) * 2012-07-25 2012-10-24 中国水电顾问集团西北勘测设计研究院 Method for adopting high-pressure grouting steel pipe pile to perform covering layer side slope treatment
CN102953389B (en) * 2012-11-07 2015-08-12 宁波大学 A kind of slope supporting anchor draws antislide pile
CN103541368A (en) * 2013-11-18 2014-01-29 贵州正业工程技术投资有限公司 Rock-mass skidding resisting deep-layer shearing resisting device and method for manufacturing same
CN104196014A (en) * 2014-09-11 2014-12-10 中南大学 Combined rock-embedded anchor cable slide-resistant pile where round steel is implanted and construction method thereof
CN105544565A (en) * 2016-01-14 2016-05-04 广西大学 Side slope anti-sliding supporting structure
CN105887948B (en) * 2016-04-15 2017-08-22 中铁西北科学研究院有限公司西南分院 A kind of friction pile, which is tilted, resets correction and reinforcement means
CN106841573A (en) * 2017-04-12 2017-06-13 中铁西北科学研究院有限公司 A kind of debris flows simulation experimental rig and test method
CN108487270A (en) * 2018-06-15 2018-09-04 华东交通大学 A kind of friction pile and construction method
CN110593277A (en) * 2019-03-14 2019-12-20 中铁二院工程集团有限责任公司 Abrupt slope antiskid reinforced structure and construction method
CN110004943A (en) * 2019-03-27 2019-07-12 河海大学 Forced miniature steel pipe pile-anchor cable joint soil-slope supporting construction and construction method
CN111119208A (en) * 2020-01-17 2020-05-08 中铁二院工程集团有限责任公司 Hole anchor pile protection structure and construction method thereof
CN113186842A (en) * 2021-05-08 2021-07-30 四川省交通勘察设计研究院有限公司 Treatment method capable of permanently preventing top of open cut tunnel from being overloaded
CN113389220B (en) * 2021-07-02 2022-07-19 中国电建集团成都勘测设计研究院有限公司 Rock slope non-excavation road shoulder retaining wall and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1292448A (en) * 2000-11-17 2001-04-25 中国科学院地质研究所 Prestressed slip-resisting pile for reinforcing side slope and its method
KR20030029073A (en) * 2003-02-21 2003-04-11 (주)현이앤씨 Method and apparatus of large size stiffness passive pile with dewatering and soil reinforcement
CN101067301A (en) * 2007-02-14 2007-11-07 中铁西北科学研究院有限公司 Multi-anchoring point antisliding pile adapted to multilayer slide surface and deep sliding face
CN101230577A (en) * 2007-12-28 2008-07-30 中国科学院水利部成都山地灾害与环境研究所 Construction method for vertical prestressed anchor rope friction pile slope-sliding prevention and treatment
CN101806150A (en) * 2010-03-13 2010-08-18 中铁西北科学研究院有限公司 Effective and safe anti-slide pile construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1292448A (en) * 2000-11-17 2001-04-25 中国科学院地质研究所 Prestressed slip-resisting pile for reinforcing side slope and its method
KR20030029073A (en) * 2003-02-21 2003-04-11 (주)현이앤씨 Method and apparatus of large size stiffness passive pile with dewatering and soil reinforcement
CN101067301A (en) * 2007-02-14 2007-11-07 中铁西北科学研究院有限公司 Multi-anchoring point antisliding pile adapted to multilayer slide surface and deep sliding face
CN101230577A (en) * 2007-12-28 2008-07-30 中国科学院水利部成都山地灾害与环境研究所 Construction method for vertical prestressed anchor rope friction pile slope-sliding prevention and treatment
CN101806150A (en) * 2010-03-13 2010-08-18 中铁西北科学研究院有限公司 Effective and safe anti-slide pile construction method

Also Published As

Publication number Publication date
CN102140800A (en) 2011-08-03

Similar Documents

Publication Publication Date Title
CN102140800B (en) Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile
CN101349064B (en) Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN104533446B (en) Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs
CN110374633B (en) Tunnel opening section construction method for tunnel to pass through loose body
CN204000901U (en) The vertical high slope prestressing anchor support of a kind of massif device
CN104213509B (en) A kind of cable hoisting anchor cable formula anchorage construction method
CN106401645A (en) Pressure-relief support coordination control method for deep high-stress tunnel based on borehole pressure relief
CN103742158B (en) The advance support in inclination tunnel and method for digging
CN101666081A (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN103352477A (en) Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
CN105908625A (en) Construction method for adding frame bridge under existing railway line based on dragging method
CN105065037A (en) Double-layer arch center support construction method for highway soft rock tunnel
CN104196014A (en) Combined rock-embedded anchor cable slide-resistant pile where round steel is implanted and construction method thereof
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN102979039A (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN107288046A (en) Especially big high-order mud-rock flow Self-resetting power consumption is blocked structure and implementation
CN110106889A (en) A kind of deep basal pit perfusion slope protection pile adds cable bolting construction
CN103696774A (en) Development method of blind shaft frame for surface and underground parallel construction
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN105804097A (en) Cantilever structure way for treating landslides in cooperation with h-shaped anti-sliding piles and construction method of cantilever structure way
CN100513705C (en) Underground Beam-Pile Frame Structure for Slope Reinforcement
CN104196036B (en) Foundation pit supporting structure and method based on old underground outdoor wall structure
CN107859532B (en) A kind of discarded shaft of vertical well processing method of the coal seam stope above and below short distance
CN106948347A (en) Pile extracting method and pile pulling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003