CN102121966A - Measuring method and analytical system for low-voltage ride through capability of wind driven generator - Google Patents

Measuring method and analytical system for low-voltage ride through capability of wind driven generator Download PDF

Info

Publication number
CN102121966A
CN102121966A CN2010100339385A CN201010033938A CN102121966A CN 102121966 A CN102121966 A CN 102121966A CN 2010100339385 A CN2010100339385 A CN 2010100339385A CN 201010033938 A CN201010033938 A CN 201010033938A CN 102121966 A CN102121966 A CN 102121966A
Authority
CN
China
Prior art keywords
aerogenerator
voltage
time
value
capability
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010100339385A
Other languages
Chinese (zh)
Other versions
CN102121966B (en
Inventor
王蓓
雷为民
吴涛
李胜
孙瑜
李善颖
刘辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
North China Grid Co Ltd
Original Assignee
North China Electric Power Research Institute Co Ltd
North China Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power Research Institute Co Ltd, North China Grid Co Ltd filed Critical North China Electric Power Research Institute Co Ltd
Priority to CN 201010033938 priority Critical patent/CN102121966B/en
Publication of CN102121966A publication Critical patent/CN102121966A/en
Application granted granted Critical
Publication of CN102121966B publication Critical patent/CN102121966B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

The invention discloses a measuring method and an analytical system for the low-voltage ride through capability of a wind driven generator in an analogue system. The method comprises the following steps of: inputting a measurement voltage smaller than a standard voltage value into a synchronized network point of the wind driven generator; measuring a synchronized network retaining time of the wind driven generator from input of the measurement voltage to offline of the wind driven generator; and if the synchronized network retaining time is smaller than a preset threshold value time, adjusting a switching time of a crowbar protection circuit of the wind driven generator and/or a shunt resistance value of the crowbar protection circuit, and a low-voltage protection constant value of the wind driven generator, and enabling the synchronized network retaining time to be greater than or equal to the threshold value time. By the method and through the system, the proper switching time and shunt resistance value of the crowbar protection circuit and the proper low-voltage protection constant value of the wind driven generator can be selected for the wind driven generator, and then the wind driven generator has proper low-voltage ride through capability and the power grid is protected.

Description

The measuring method of aerogenerator low voltage ride-through capability and analytic system
Technical field
The present invention relates to measuring method and system that the maintenance of aerogenerator low-voltage is incorporated into the power networks, relate in particular to a kind of measuring method and analytic system of aerogenerator low voltage ride-through capability.
Background technology
Along with development of times, wind-power electricity generation is increasing as clean energy resource shared ratio in electric power energy, and what cause thus is that wind generator system can not be ignored the influence of grid stability.Existing wind generator system is when line voltage is reduced to certain value, just wind power generating set off-grid automatically, if be acceptable in the not high electrical network of wind-powered electricity generation proportion.But for the electric system of wind-powered electricity generation installation large percentage, wind power generating set may cause the collapse of line voltage and frequency from net.Therefore, along with the rapid increase of wind-power electricity generation amount, the automatic off-grid of wind power generating set no longer is suitable for the operation criterion of new electrical network.Therefore must make wind power generating set still can keep being incorporated into the power networks when falling in line voltage moment, promptly wind power generating set has certain low-voltage and passes through service ability.
Low-voltage is just passed through and to be referred to be incorporated into the power networks point voltage when falling at blower fan, and blower fan can keep being incorporated into the power networks, even provides certain reactive power to electrical network, supports power system restoration, and is normal up to power system restoration.Be that the blower fan that is incorporated into the power networks is still kept a kind of specific operation function requirement of being incorporated into the power networks when electric voltage dropping appears in electrical network.
Research wind energy turbine set low voltage ride-through capability is provided with closely related to the influence of electrical network and the protection of wind energy turbine set.Because double-fed induction wind-powered electricity generation facility are equipped with low voltage ride-through capability, off-grid not under failure condition is so provide certain short-circuit current between age at failure.Present wind energy turbine set is sent the route protection definite value and is provided with wind energy turbine set is used as one-end substation setting, when the relay protection configuration is adjusted, does not consider the influence of wind-powered electricity generation to short-circuit current.When the wind energy turbine set capacity acquires a certain degree; the short-circuit current that wind energy turbine set provides just may surpass the short-circuit current that system side provides; this moment, the protection of configuration crow bar was coordinated in the influence that the blower fan low-voltage is passed through in the time of must considering fault when being correlated with relay protection fixed value setting.
The measuring method that does not have the aerogenerator low voltage ride-through capability in the prior art; can't select the switching time of the suitable crow bar holding circuit that requires and the bypass resistance value of crow bar holding circuit to aerogenerator; can't measure transient characterisitics and the short-circuit current characteristic of double-fed wind power generator under electric network fault, can not accurately study its extensive back that networks influences grid stability.
Summary of the invention
The objective of the invention is defective at prior art; a kind of measuring method and analytic system of aerogenerator low voltage ride-through capability are provided; can select the switching time of suitable crow bar holding circuit and the bypass resistance value of crow bar holding circuit for aerogenerator; and the under-voltage protection definite value of aerogenerator; make aerogenerator possess suitable low voltage ride-through capability thus, the safety of protection electrical network.
For achieving the above object, the invention provides a kind of measuring method of aerogenerator low voltage ride-through capability, described method comprises:
To aerogenerator and site input less than the measuring voltage of standard voltage value;
Measuring the maintenance of described aerogenerator till from input test voltage to described aerogenerator off-grid is incorporated into the power networks the time;
Time is less than the default threshold values time if described maintenance is incorporated into the power networks; then adjust the switching time of crow bar holding circuit of described aerogenerator and/or the bypass resistance value of described crow bar holding circuit; and the under-voltage protection definite value of aerogenerator, make described maintenance be incorporated into the power networks the time more than or equal to the described threshold values time.
For achieving the above object, the invention provides a kind of analytic system of aerogenerator low voltage ride-through capability, described system comprises:
Input block, be used for to aerogenerator and site input less than the measuring voltage of standard voltage value;
Measuring unit is used to measure the maintenance of described aerogenerator till from input test voltage to described aerogenerator off-grid and is incorporated into the power networks the time;
Adjustment unit; be incorporated into the power networks the time less than the default threshold values time if be used for described maintenance; then adjust the switching time of crow bar holding circuit of described aerogenerator and/or the bypass resistance value of described crow bar holding circuit; and the under-voltage protection definite value of aerogenerator, make described maintenance be incorporated into the power networks the time more than or equal to the described threshold values time.
The measuring method of aerogenerator low voltage ride-through capability of the present invention and analytic system; can select the switching time of suitable crow bar holding circuit and the bypass resistance value of crow bar holding circuit for aerogenerator; and the under-voltage protection definite value of aerogenerator; make aerogenerator possess suitable low voltage ride-through capability thus, the safety of protection electrical network.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, the accompanying drawing of required use is done to introduce simply in will describing embodiment below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the process flow diagram of the measuring method embodiment one of aerogenerator low voltage ride-through capability of the present invention;
Fig. 2 is the process flow diagram of the measuring method embodiment two of aerogenerator low voltage ride-through capability of the present invention;
Fig. 3 is the circuit diagram of double-fed induction wind driven generator;
Fig. 4 is in the measuring method of aerogenerator low voltage ride-through capability of the present invention, and low voltage ride-through capability requires synoptic diagram;
Fig. 5 is the process flow diagram of the measuring method embodiment three of aerogenerator low voltage ride-through capability of the present invention;
Fig. 6 is the wind energy turbine set synoptic diagram of the measuring method of aerogenerator low voltage ride-through capability of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
Fig. 1 is the process flow diagram of the measuring method embodiment one of aerogenerator low voltage ride-through capability of the present invention, and as shown in the figure, present embodiment specifically comprises the steps:
Step 101, to aerogenerator and site input less than the measuring voltage of standard voltage value;
Because test is the low voltage ride-through capability of aerogenerator, so the measuring voltage of importing in the also site of aerogenerator is necessarily less than the aerogenerator standard voltage value;
Step 102 is measured the maintenance of aerogenerator till from input test voltage to the aerogenerator off-grid and is incorporated into the power networks the time;
Because low voltage ride-through capability has requirement, be exactly under different test voltages, the time of being incorporated into the power networks that aerogenerator needs is different;
Step 103; if keep the time of being incorporated into the power networks less than the default threshold values time; then adjust the switching time of crow bar holding circuit of aerogenerator and/or the bypass resistance value of crow bar holding circuit, and the under-voltage protection definite value of aerogenerator, make to keep being incorporated into the power networks the time more than or equal to the threshold values time.
Time has surpassed or has equaled the threshold values time if keep being incorporated into the power networks; then do not need the switching time of the crow bar holding circuit of aerogenerator and the bypass resistance value of crow bar holding circuit are adjusted; just when keeping the time of being incorporated into the power networks less than the default threshold values time; need adjust; purpose is to make to keep being incorporated into the power networks the time more than or equal to the threshold values time; so just make the low voltage ride-through capability of aerogenerator reach requirement; thereby off-grid at once not when line voltage falls is protected electrical network.
Fig. 2 is the process flow diagram of the measuring method embodiment two of aerogenerator low voltage ride-through capability of the present invention, and as shown in the figure, present embodiment specifically comprises the steps:
Step 201 is set up the electric system Equivalent Model of aerogenerator, transformer, circuit, load and network topology structure, builds the energy measurement computing platform;
Can utilize the actual electric network data, in the digsilent software emulation platform, set up the electric system Equivalent Model of aerogenerator, transformer, circuit, load and network topology structure etc., build the computing platform that can realize low voltage ride-through capability emulation.
Table 1 is the concrete parameter list of aerogenerator
Figure G2010100339385D00041
Figure G2010100339385D00051
Figure G2010100339385D00061
Table 2 is the concrete parameter list of circuit:
Model Rated current (KA) Resistance (ohm/km) Reactance (ohm/km) Susceptance (uS/km)
LGJ-150 0.294 0.21 0.4 1.3
2*LGJ-240 1.22 0.066 0.3493
LGJ-400 0.845 0.07988 0.4076 1.41
2*LGJ-400 1.69 0.03954 0.2996 1.889
Table 3 is the concrete parameter list of transformer:
The 110kV network transformer
Figure G2010100339385D00062
Figure G2010100339385D00071
The 35kV network transformer
Figure G2010100339385D00072
Load parameter is exactly burden with power and load or burden without work, or impedance and reactance.
Step 202 is selected the node aerogenerator of voltage fluctuation greater than predeterminated voltage fluctuation threshold values;
Specifically be exactly that the dynamic response value when obtaining each bar circuit and each bar bus place and respectively three-phase shortcircuit taking place is selected the node aerogenerator of voltage fluctuation greater than predeterminated voltage fluctuation threshold values;
In the under-voltage protection of the low voltage ride-through capability of not considering blower fan, blower fan self with send route protection; obtain system dynamics response (being exactly magnitude of voltage, current value and active power and reactive power) when each bar circuit and each bar bus place respectively three phase short circuit fault take place in the system; observe the voltage stability of main monitoring node, filter out the aerogenerator node that must carry out the low-voltage capabilities setting.
The purpose of this step just is meant to search removes the node aerogenerator that needs to possess low voltage ride-through capability, because some engine is in some node, in any case short trouble is set, system voltage and stability change are very little, so aerogenerator does not just need to have possessed low voltage ride-through capability.
Step 203, the also site input of the aerogenerator in the electric system Equivalent Model of described network topology structure is less than the measuring voltage of standard voltage value;
Fig. 3 is the circuit diagram of double-fed induction wind driven generator, and as shown in the figure, the stator side of aerogenerator directly connects electrical network, and rotor-side connects electrical network by frequency converter.Principal feature is that rotor top-cross orthogonal transducer only needs 25% blower fan rated power; The trend that flows through current transformer has two kinds of possibility directions.Crow bar protection (crowbar) circuit wherein is in the double-fed induction wind driven generator rotor-side crowbar circuit to be housed; for the rotor-side circuit provides bypass; when detecting the network system fault and electric voltage dropping occurs; locking double-fed induction wind driven generator exciter converter; the bypass in input rotor loop simultaneously (releasing energy resistance) protective device; reach the electric current and the superpotential effect of rotor-side transducer of restricted passage exciter converter; keep not off-grid operation of aerogenerator (this moment double-fed induction send out aerogenerator move) with this, and net side frequency converter is connected with the transformer continuation by the induction motor mode.
Based on crow bar protection switching opportunity in the protection of the crow bar of aerogenerator; when promptly arriving electric current sill value (for example 1.5 to 2 times load current value); ability switching when the stand-by period is 0-10ms; the bypass circuit resistance value; be the key parameter such as resistance value of crowbar holding circuit and the typical value of protection definite value, assess each wind-powered electricity generation machine ride-through capability and whether satisfy the low voltage ride-through capability requirement.
Step 204 is measured the maintenance of described aerogenerator till from input test voltage to described aerogenerator off-grid and is incorporated into the power networks the time;
Fig. 4 is in the measuring method of aerogenerator low voltage ride-through capability of the present invention, low voltage ride-through capability requires synoptic diagram, as shown in the figure, ordinate is ratio aerogenerator and the actual measurement voltage of site and load voltage value, horizontal ordinate is the default threshold values time, curve is exactly that aerogenerator need keep the threshold values of the time of being incorporated into the power networks under some ratios of actual measurement voltage and load voltage value among the figure, for example:
When the wind-powered electricity generation unit in the wind energy turbine set has when the point voltage that is incorporated into the power networks falls to 20% rated voltage, can keep the low voltage ride-through capability of the time of being incorporated into the power networks for operation 625ms;
In the wind-powered electricity generation machine is incorporated into the power networks the 3s of point voltage after falling, can return to rated voltage 90% the time, the wind-powered electricity generation unit in the wind energy turbine set keeps being incorporated into the power networks.
Whether step 205 judge keeps the time of being incorporated into the power networks less than the default threshold values time, if execution in step 206 then, otherwise execution in step 207;
If keep the time of being incorporated into the power networks to be greater than or equal to the default threshold values time, illustrate that then aerogenerator meets the requirement as the curve among Fig. 4, the result of test point is below curve, the low voltage ride-through capability that aerogenerator is described is up to standard, if and maintenance is incorporated into the power networks the time less than the default threshold values time, illustrate that then aerogenerator does not meet the requirement as the curve among Fig. 4, above curve, illustrate that the low voltage ride-through capability of aerogenerator is not up to standard;
Step 206, the switching time of the crow bar holding circuit of adjustment aerogenerator and/or the bypass resistance value of crow bar holding circuit, and the under-voltage protection definite value of aerogenerator, execution in step 203;
Change the switching time of crow bar holding circuit and/or the bypass resistance value of crow bar holding circuit, can change the low voltage ride-through capability of aerogenerator like this, carry out 203 once more and test, up to the requirement that meets as the low voltage ride-through capability among Fig. 4;
The switching time can be from the 0-10 millisecond, and the bypass resistance value is the 0-1 per unit value.
Step 207 generates measurement report.
Test report has two kinds; a kind of is test time to judge directly that in step 205 meeting low-voltage passes through under the situation of requirement; comprise measuring voltage each time in the test report that generates; maintenance under this measuring voltage is incorporated into the power networks the time; and the bypass resistance value of the switching time of the crow bar holding circuit of aerogenerator and crow bar holding circuit; and the under-voltage protection definite value of aerogenerator, and the result is that aerogenerator meets low-voltage and passes through requirement.
Another kind is to judge directly that in step 205 not meeting low-voltage passes through requirement; the bypass resistance value of having revised switching time of crow bar holding circuit and/or crow bar holding circuit once or met low-voltage for several times and pass through requirement; measuring voltage when the test report of this moment has comprised test each time; maintenance under this measuring voltage is incorporated into the power networks the time; and the bypass resistance value of the switching time of the crow bar holding circuit of aerogenerator and crow bar holding circuit; end product is under the situation of the bypass resistance value of the switching time of the crow bar holding circuit of which aerogenerator and crow bar holding circuit, and aerogenerator low-voltage up to specification is passed through requirement.
Thus; utilize the measuring method of aerogenerator low voltage ride-through capability of the present invention; can be so that aerogenerator be selected the switching time of suitable crow bar holding circuit and the bypass resistance value of crow bar holding circuit; and the under-voltage protection definite value of aerogenerator; make aerogenerator low-voltage up to specification pass through requirement; thereby make when line voltage falls not off-grid at once of aerogenerator, electrical network is protected.
Fig. 5 is the process flow diagram of the measuring method embodiment three of aerogenerator low voltage ride-through capability of the present invention, and as shown in the figure, present embodiment specifically comprises the steps:
Step 301 is set up wind energy turbine set realistic model shown in Figure 6 on the DigSILENT emulation platform, choose aerogenerator, transformer, circuit, wind energy turbine set model parameter;
Node A among Fig. 6 is that highest level has A1 and two nodes of A2, and the rank of B node is taken second place, and has two of B1 and B2, and the rank of C node is more taken second place, and the D node is minimum node.
Step 302; on the DigSILENT emulation platform, system shown in Figure 6 is carried out big perturbation analysis; during emulation in the taking into account system each circuit and each bus place three phase short circuit fault takes place respectively; research is in the under-voltage protection of the low voltage ride-through capability of not considering blower fan, blower fan self and send the dynamic response of system under the route protection situation; observe the voltage stability of main monitoring point, filter out the node aerogenerator that must carry out the low-voltage capabilities setting.
Simulation study find not consider blower fan low voltage ride-through capability, blower fan self under-voltage protection and send under the route protection situation, system either machine off-grid on a large scale under the GPF (General Protection False action threatens to the security and stability of electrical network.Therefore, for improving the security and stability of electrical network under failure condition, require wind energy turbine set will have certain low voltage ride-through capability.
Step 303; the design of low voltage ride-through capability of wind turbine generator system optimal control policy: take all factors into consideration in the blower fan crow bar protection crow bar protection switching opportunity; the bypass circuit resistance value; and the under-voltage protection definite value of aerogenerator, assess each wind-powered electricity generation machine ride-through capability and whether satisfy relevant the low voltage ride-through capability requirement.For the blower fan that meets the demands, write wind-electricity integration LVRT capability study report, provide the setting of the key parameter that satisfies the blower fan low voltage ride-through capability or suggestion is set; If do not satisfy the LVRT control strategy searching process that changes next step over to.
Step 304; proceed the design of low voltage ride-through capability of wind turbine generator system optimal control policy for the blower fan that does not satisfy the LVRT ability in the previous step process; the span of key parameter and protection definite value in the protection configuration of revision wind energy turbine set circuit and the protection of blower fan crow bar; change the major parameter relevant with low voltage ride-through capability; and carry out contrast simulation, till the low voltage ride-through capability of blower fan can meet the demands.
The requirement of the low voltage ride-through capability of blower fan is based on crow bar holding circuit setting low-voltage and passes through control strategy, and the requirement of blower fan low voltage ride-through capability.
Step 305; the electrical network wind energy turbine set part blower fan of initial system shown in Figure 6 does not have the LVRT ability, and the wind-powered electricity generation unit is after fault takes place, and cutter and electrical network break away under the effect of GPF (General Protection False; the voltage stability of system side and frequency stability descend, and cause other synchrodyne collapse of voltages.
When being applied to wind-powered electricity generation net wind energy turbine set shown in Figure 6 according to the selected wind-powered electricity generation unit LVRT control strategy of above step, to under the same fault situation, wind-powered electricity generation field energy with LVRT ability keeps not off-grid operation between age at failure, provide the voltage support to system side, and can behind failure removal, enter the steady-state operation state fast, guaranteed the stable operation of system.
The analytic system of aerogenerator low voltage ride-through capability of the present invention specifically comprises: input block, be used for to described aerogenerator and site input less than the measuring voltage of standard voltage value; Measuring unit is used to measure the maintenance of described aerogenerator till from input test voltage to described aerogenerator off-grid and is incorporated into the power networks the time; Adjustment unit; be incorporated into the power networks the time less than the default threshold values time if be used for described maintenance; then adjust the switching time of crow bar holding circuit of described aerogenerator and/or the bypass resistance value of described crow bar holding circuit; and the under-voltage protection definite value of aerogenerator, make described maintenance be incorporated into the power networks the time more than or equal to the described threshold values time.
The measuring system that aerogenerator low-voltage maintenance of the present invention is incorporated into the power networks; can select the switching time of suitable crow bar holding circuit and the bypass resistance value of crow bar holding circuit for aerogenerator; and the under-voltage protection definite value of aerogenerator; make aerogenerator possess suitable low voltage ride-through capability thus, the safety of protection electrical network.
The professional should further recognize, the unit and the algorithm steps of each example of describing in conjunction with embodiment disclosed herein, can realize with electronic hardware, computer software or the combination of the two, for the interchangeability of hardware and software clearly is described, the composition and the step of each example described prevailingly according to function in the above description.These functions still are that software mode is carried out with hardware actually, depend on the application-specific and the design constraint of technical scheme.The professional and technical personnel can use distinct methods to realize described function to each specific should being used for, but this realization should not thought and exceeds scope of the present invention.
The method of describing in conjunction with embodiment disclosed herein or the step of algorithm can use the software module of hardware, processor execution, and perhaps the combination of the two is implemented.Software module can place the storage medium of any other form known in random access memory (RAM), internal memory, ROM (read-only memory) (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or the technical field.
Above-described embodiment; purpose of the present invention, technical scheme and beneficial effect are further described; institute is understood that; the above only is the specific embodiment of the present invention; and be not intended to limit the scope of the invention; within the spirit and principles in the present invention all, any modification of being made, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (9)

1. the measuring method of an aerogenerator low voltage ride-through capability is characterized in that, described method comprises:
To aerogenerator and site input less than the measuring voltage of standard voltage value;
Measuring the maintenance of described aerogenerator till from input test voltage to described aerogenerator off-grid is incorporated into the power networks the time;
Time is less than the default threshold values time if described maintenance is incorporated into the power networks; then adjust the switching time of crow bar holding circuit of described aerogenerator and/or the bypass resistance value of described crow bar holding circuit; and the under-voltage protection definite value of aerogenerator, make described maintenance be incorporated into the power networks the time more than or equal to the described threshold values time.
2. method according to claim 1 is characterized in that, the described measuring voltage of importing less than standard voltage value to the also site of described aerogenerator also comprises before: select the node aerogenerator of voltage fluctuation greater than predeterminated voltage fluctuation threshold values.
3. method according to claim 2, it is characterized in that, described selection voltage fluctuation specifically comprises greater than the node aerogenerator of predeterminated voltage fluctuation threshold values: the dynamic response value when obtaining each bar circuit and each bar bus place and respectively three-phase shortcircuit taking place, select the node aerogenerator of voltage fluctuation greater than predeterminated voltage fluctuation threshold values.
4. method according to claim 1, it is characterized in that, also comprise before the node aerogenerator of described selection voltage fluctuation greater than predeterminated voltage fluctuation threshold values: set up the electric system Equivalent Model of aerogenerator, transformer, circuit, load and network topology structure, build the energy measurement computing platform.
5. method according to claim 4, it is characterized in that, the described measuring voltage of importing less than standard voltage value to the also site of described aerogenerator is specially, and the also site input of the aerogenerator in the electric system Equivalent Model of described network topology structure is less than the measuring voltage of standard voltage value.
6. method according to claim 1 is characterized in that, described method also comprises: generate measurement report.
7. method according to claim 6; it is characterized in that described measurement report specifically comprises: switching time and the bypass resistance value of crow bar holding circuit and the under-voltage protection definite value of aerogenerator of described measuring voltage, keep being incorporated into the power networks time, crow bar holding circuit.
8. method according to claim 1 is characterized in that, the switching time of described crow bar holding circuit is the 0-10 millisecond, and the bypass resistance value of described crow bar holding circuit is the 0-1 per unit value.
9. the analytic system of an aerogenerator low voltage ride-through capability is characterized in that, described system comprises:
Input block, be used for to aerogenerator and site input less than the measuring voltage of standard voltage value;
Measuring unit is used to measure the maintenance of described aerogenerator till from input test voltage to described aerogenerator off-grid and is incorporated into the power networks the time;
Adjustment unit; be incorporated into the power networks the time less than the default threshold values time if be used for described maintenance; then adjust the switching time of crow bar holding circuit of described aerogenerator and/or the bypass resistance value of described crow bar holding circuit; and the under-voltage protection definite value of aerogenerator, make described maintenance be incorporated into the power networks the time more than or equal to the described threshold values time.
CN 201010033938 2010-01-07 2010-01-07 Measuring method and analytical system for low-voltage ride through capability of wind driven generator Active CN102121966B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010033938 CN102121966B (en) 2010-01-07 2010-01-07 Measuring method and analytical system for low-voltage ride through capability of wind driven generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010033938 CN102121966B (en) 2010-01-07 2010-01-07 Measuring method and analytical system for low-voltage ride through capability of wind driven generator

Publications (2)

Publication Number Publication Date
CN102121966A true CN102121966A (en) 2011-07-13
CN102121966B CN102121966B (en) 2013-04-10

Family

ID=44250563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010033938 Active CN102121966B (en) 2010-01-07 2010-01-07 Measuring method and analytical system for low-voltage ride through capability of wind driven generator

Country Status (1)

Country Link
CN (1) CN102121966B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102435882A (en) * 2011-09-24 2012-05-02 国网电力科学研究院 Low-voltage ride through detection device of grid-connected photovoltaic converter of passive reactor structure
CN102707230A (en) * 2012-05-09 2012-10-03 东北电力科学研究院有限公司 Method for testing response characteristic of 690V wind turbine generator to transient change of power grid
CN102799722A (en) * 2012-07-05 2012-11-28 中国电力科学研究院 Simulation verification method for low voltage ride through (LVRT) of wind farm
CN103138289A (en) * 2012-11-08 2013-06-05 中国电力科学研究院 Real-time digital simulation modeling method of high permeability wind power plant
CN103178548A (en) * 2013-04-11 2013-06-26 华北电力大学 Symmetrical fault ride-through control method of double-fed wind generator set
CN104348144A (en) * 2014-10-31 2015-02-11 国网宁夏电力公司电力科学研究院 Fault detection method for circuit sent out from wind power plant
CN104459540A (en) * 2014-12-15 2015-03-25 云南电网有限责任公司电网规划研究中心 Power-grid-impact-free detection method for low voltage ride through function of doubly-fed wind turbine generator system
CN104678302A (en) * 2015-03-04 2015-06-03 同济大学 Low voltage ride-through test system and method for wind turbine generator of Boost current transformer
CN106526347A (en) * 2015-09-14 2017-03-22 中国电力科学研究院 Digital-analog hybrid simulation-based photovoltaic inverter low voltage ride through evaluation method
CN113092912A (en) * 2021-04-07 2021-07-09 北京诺约科技有限公司 Calibration method and device for low voltage ride through
WO2022127270A1 (en) * 2020-12-15 2022-06-23 新疆金风科技股份有限公司 Wind generator set, converter, and low-voltage ride-through detection method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101272055A (en) * 2008-05-07 2008-09-24 中国科学院电工研究所 Low voltage traversing control method of wind generator set
US20090058086A1 (en) * 2007-08-30 2009-03-05 Mitsubishi Heavy Industries, Ltd. Wind turbine system for satisfying low-voltage ride through requirement
WO2009082326A1 (en) * 2007-12-21 2009-07-02 2-B Energy Holding B.V. Method, system and device for controlling wind power plants
CN101621204A (en) * 2009-08-14 2010-01-06 清华大学 Method for designing crowbar resistor for passing through low voltage of double-fed type wind generator system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090058086A1 (en) * 2007-08-30 2009-03-05 Mitsubishi Heavy Industries, Ltd. Wind turbine system for satisfying low-voltage ride through requirement
WO2009082326A1 (en) * 2007-12-21 2009-07-02 2-B Energy Holding B.V. Method, system and device for controlling wind power plants
CN101272055A (en) * 2008-05-07 2008-09-24 中国科学院电工研究所 Low voltage traversing control method of wind generator set
CN101621204A (en) * 2009-08-14 2010-01-06 清华大学 Method for designing crowbar resistor for passing through low voltage of double-fed type wind generator system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李欣: "风电机组的短路电流特性及低电压穿越的研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102435882A (en) * 2011-09-24 2012-05-02 国网电力科学研究院 Low-voltage ride through detection device of grid-connected photovoltaic converter of passive reactor structure
CN102707230A (en) * 2012-05-09 2012-10-03 东北电力科学研究院有限公司 Method for testing response characteristic of 690V wind turbine generator to transient change of power grid
CN102799722A (en) * 2012-07-05 2012-11-28 中国电力科学研究院 Simulation verification method for low voltage ride through (LVRT) of wind farm
WO2014005550A1 (en) * 2012-07-05 2014-01-09 国家电网公司 Simulation verification method for low voltage ride-through capability of wind farm
CN103138289A (en) * 2012-11-08 2013-06-05 中国电力科学研究院 Real-time digital simulation modeling method of high permeability wind power plant
CN103138289B (en) * 2012-11-08 2015-05-13 中国电力科学研究院 Real-time digital simulation modeling method of high permeability wind power plant
CN103178548A (en) * 2013-04-11 2013-06-26 华北电力大学 Symmetrical fault ride-through control method of double-fed wind generator set
CN103178548B (en) * 2013-04-11 2015-03-11 华北电力大学 Symmetrical fault ride-through control method of double-fed wind generator set
CN104348144B (en) * 2014-10-31 2017-11-03 国网宁夏电力公司电力科学研究院 A kind of wind power plant sends out the fault detection method of circuit
CN104348144A (en) * 2014-10-31 2015-02-11 国网宁夏电力公司电力科学研究院 Fault detection method for circuit sent out from wind power plant
CN104459540A (en) * 2014-12-15 2015-03-25 云南电网有限责任公司电网规划研究中心 Power-grid-impact-free detection method for low voltage ride through function of doubly-fed wind turbine generator system
CN104459540B (en) * 2014-12-15 2017-02-22 云南电网有限责任公司电网规划研究中心 Power-grid-impact-free detection method for low voltage ride through function of doubly-fed wind turbine generator system
CN104678302B (en) * 2015-03-04 2017-07-28 同济大学 The low-voltage ride-through testing system of wind generating set and method of a kind of Boost current transformers
CN104678302A (en) * 2015-03-04 2015-06-03 同济大学 Low voltage ride-through test system and method for wind turbine generator of Boost current transformer
CN106526347A (en) * 2015-09-14 2017-03-22 中国电力科学研究院 Digital-analog hybrid simulation-based photovoltaic inverter low voltage ride through evaluation method
CN106526347B (en) * 2015-09-14 2019-08-06 中国电力科学研究院 A kind of low voltage ride through of photovoltaic inverter appraisal procedure based on numerical model analysis emulation
WO2022127270A1 (en) * 2020-12-15 2022-06-23 新疆金风科技股份有限公司 Wind generator set, converter, and low-voltage ride-through detection method and device
CN113092912A (en) * 2021-04-07 2021-07-09 北京诺约科技有限公司 Calibration method and device for low voltage ride through
CN113092912B (en) * 2021-04-07 2023-09-12 北京诺约科技有限公司 Low voltage ride through calibration method and device

Also Published As

Publication number Publication date
CN102121966B (en) 2013-04-10

Similar Documents

Publication Publication Date Title
CN102121966B (en) Measuring method and analytical system for low-voltage ride through capability of wind driven generator
Akhmatov et al. Modelling and transient stability of large wind farms
Ahsan et al. Technique to develop auto load shedding and islanding scheme to prevent power system blackout
Zamani et al. Investigations into the control and protection of an existing distribution network to operate as a microgrid: A case study
Tan et al. Impact on the power system of a large penetration of photovoltaic generation
Freitas et al. Comparative analysis between ROCOF and vector surge relays for distributed generation applications
Eissa Protection techniques with renewable resources and smart grids—A survey
Joos Wind turbine generator low voltage ride through requirements and solutions
Akhmatov An aggregated model of a large wind farm with variable-speed wind turbines equipped with doubly-fed induction generators
Noris et al. Power system black-start and restoration with high share of power-electronic converters
Meegahapola et al. Transient stability analysis of a power system with high wind penetration
Zhang et al. Impact of distribution-connected large-scale wind turbines on transmission system stability during large disturbances
Ananthapadmanabha et al. Rotor angle stability analysis of a distributed generator connected to distribution network
Endegnanew et al. Transient stability analysis in multi-terminal VSC-HVDC grids
CN108683182B (en) Regional power distribution network vulnerability assessment method
Bhattarai et al. Impact of distributed energy resource’s ride-through and trip settings on PJM’s footprint
Dong et al. Voltage analysis of distribution systems with DFIG wind turbines
McDonald et al. Effect of distributed generation on regional voltage stability
CN103532520A (en) Reactive power compensation device control method for preventing large-scale chain offline of wind generation sets
Aryani et al. Operation strategy of battery energy storage systems for stability improvement of the Korean power system
Shadaei et al. A comprehensive investigation on performance of distance relays in transmission lines connected to wind farms
Rajapakse et al. Grid integration of renewable energy systems
Eleschová et al. The influence of smart grids on a large synchronous generators operation
Yan et al. Correlation between frequency response and short-circuit performance due to high wind penetration
Elansari et al. Impact of new wind farms on power distribution networks (Derna Wind project case study)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NORTH CHINA GRID CO., LTD. STATE ELECTRIC NET CROP

Free format text: FORMER OWNER: NORTH CHINA GRID CO., LTD.

Effective date: 20131009

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131009

Address after: 100045 Beijing Fuxingmenwai Di Zang an Nan Xiang No.

Patentee after: North China Electrical Power Research Institute LLC

Patentee after: North China Grid Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 100045 Beijing Fuxingmenwai Di Zang an Nan Xiang No.

Patentee before: North China Electrical Power Research Institute LLC

Patentee before: North China Grid Co., Ltd.