CN102114902A - Efficient rapid emergency maintenance ship for submarine pipeline - Google Patents
Efficient rapid emergency maintenance ship for submarine pipeline Download PDFInfo
- Publication number
- CN102114902A CN102114902A CN2010100014754A CN201010001475A CN102114902A CN 102114902 A CN102114902 A CN 102114902A CN 2010100014754 A CN2010100014754 A CN 2010100014754A CN 201010001475 A CN201010001475 A CN 201010001475A CN 102114902 A CN102114902 A CN 102114902A
- Authority
- CN
- China
- Prior art keywords
- maintenance
- submarine pipeline
- ship
- lifting
- lifting drive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The invention discloses an efficient rapid emergency maintenance ship for a submarine pipeline, which is used for the maintenance of the submarine pipeline. A ship body, a lifting pile, a ventilating pile, a lifting drive device, a maintenance working cabin, a propeller drive system and a life building form the efficient rapid emergency maintenance ship for the submarine pipeline. The efficient rapid emergency maintenance ship for the submarine pipeline has the main installing mode that the lifting drive device, the propeller drive system and the life building are arranged on the ship body. During the maintenance of the submarine pipeline, the ventilating pile is placed through a drive gear of the lifting drive device to drive the maintenance working cabin to enter underwater until the butt position with the submarine pipeline is completed and then the pipeline maintenance operation is carried out. The propulsion function of the efficient rapid emergency maintenance ship for the submarine pipeline and the liftable technology of the maintenance working cabin ensure that the submarine pipeline is rapidly positioned without using high-cost ships, such as the tug, a floating crane, an auxiliary ship and the like, thus the maintenance period is effectively shortened, the pollution to the marine environment due to crude oil leakage is reduced, the safety production of a sea oil and gas field is ensured and the important economic loss is avoided.
Description
Technical field
What the present invention relates to is the sharp work ship that is used for the submerged pipeline repairing, belongs to mechanical field.
Background technology
Submerged pipeline is the important component part in marine oil gas field, is called as marine economic main artery, more than 60 of the submerged pipeline that China has built up in the coastal waters, and total length surpasses 3000 kilometers, spreads all over waters such as the Bohai Sea, the South Sea and the East Sea.But the thing followed is, environmental pollution, the explosion accident that cause because of sea-bottom oil-gas pipeline breaks at the Bohai Sea, the South Sea are on the increase in recent years, and this has not only cut off marine economic lifeline, need be up to several ten million yuan of rehabilitation expenses, and seriously have influence on local social stability.
The special report first on March 12nd, 2008 " Chinese marine oil newspaper ", it is to be enough to present submerged pipeline present situation is produced worry, write in the literary composition: " 9: 10 on the 6th November in 2007; in Zhanjiang Branch of China National Offshore Oil's east terminal Central Control Room; ... the disembarkation marineline pressure that shows on the computer screen ... 2 second downstream pressure dropped sharply to 0.9 MPa; ... see more than the 50 meter high flame of the enterprising ejaculation in sea in dead ahead, gas clips the constantly blast of water wave ... the gas dragon is died, the inside and outside a slice shock of Hainan Island ... local media is estimated like this: east 1-1 lands the fracture of pipeline, not only affect domestic chemical fertilizer, methyl alcohol market and Hainan people's life, and caused influence in the world ... the governor assistant of Hainan Province Li Guoliang ... for belligerent each side enables to depart in style: ... put one's ass on the line, wholeheartedly, guarantee that pipeline repairs completion early.Repair early? it is easier said than done ... there is not the crane barge ship that to mobilize near the most difficult is.Can only reach the wheel crane that land is used and carry out lifting operation on the auxiliary vessel; on December 30th, 2007 at about 11 pm; the chemical extra large oil in middle sea is built 600,000 tons of methanol devices of flood and is driven successfully ... we are successful in each repairing; can be at every turn we are very extremely awkward, a slight extra large pipe allows these extra large oily engineering technology elite feel exhausted.”
Can find out that from above-mentioned situation China's marine oil presses for a kind of actv. submerged pipeline repairing device that breaks, propose efficient submerged pipeline emergency first-aid repair ship fast for this reason.
The present invention is just for addressing the above problem design-calculated, purpose is to shorten maintenance cycle, reduce the pollution of crude oil leakage to marine environment, for the submerged pipeline repairing provides a kind of workboat effectively and rapidly, the realization submerged pipeline is repaired fast, heavy economic losses is avoided in the safety in production of guarantee offshore oil and gas field.
Summary of the invention
The technical problem to be solved in the present invention provides a workboat rapidly and efficiently that is used for the submerged pipeline repairing, certainly the boat function of this ship and workover module liftable technology, can realize that submerged pipeline locatees fast, need not employ expensive workboat tools such as tugboat, crane barge, support boat, the objective of the invention is provides a safe and reliable sharp work ship for the submerged pipeline repairing.
For addressing the above problem, the present invention is achieved in that the present invention mainly comprises hull, lifting pole, ventilation stake, lifting drive, workover module, propeller driving system and life building.One of its feature is that lifting drive, propeller driving system and life building all are installed on the hull.Two of its feature is that the quantity of lifting pole has 3 at least.Three of its feature is that 1 toothed rack is housed on the lifting pole at least, and tooth bar is meshed with the driven wheel of lifting drive.Four of its feature is in the ventilation stake 1 toothed rack to be housed at least, and tooth bar is meshed with the driven wheel of lifting drive.Five of its feature is that cowling is equipped with in the upper end of ventilation stake, and lower end and workover module connect.
This efficient working process of submerged pipeline emergency first-aid repair ship fast is: the first step is in place from navigating, when the submerged pipeline in a certain marine site breaks, pass through propeller driving system, efficient submerged pipeline emergency first-aid repair ship fast utilizes global position system to adjust the hull job position from the damaged place of the submerged pipeline that navigates.Second step was to promote hull, at first was to transfer lifting pole by the driven wheel of lifting drive, until lifting pole being inserted the seabed certain depth, then hull was promoted to certain altitude on the sea.The 3rd step was to transfer workover module, at first transferred the stake of ventilating by the driven wheel of lifting drive, and then drove workover module and enter under water, docked the location until finishing with submerged pipeline, carried out maintenance activity then.The 4th step was to promote workover module, and after the submerged pipeline maintenance was finished, the driven wheel lifting ventilation stake by lifting drive drove workover module and regains in the hull.The 5th step was to knock off to make a return voyage, and at first hull was reduced to the sea by the driven wheel of lifting drive, then lifting pole was extracted and be retracted to the hull lower end from the seabed, started propeller driving system at last, and efficient submerged pipeline emergency first-aid repair ship is fast maked a return voyage.
The present invention can solve long, the costly difficult problem of present submerged pipeline maintenance time, need not employ expensive workboat tools such as tugboat, crane barge, support boat, and it is simple and reliable for structure that whole boat equipment has, advantage convenient to operation.Workover module liftable technology of the present invention can realize effectively that submerged pipeline locatees fast, has very high application value.
Description of drawings
Fig. 1 is the efficient submerged pipeline emergency first-aid repair ship elevational schematic view fast of the present invention.
Fig. 2 is the efficient submerged pipeline emergency first-aid repair ship plan sketch fast of the present invention.
1 hull, 2 lifting poles, 3 ventilation stakes, 4 tooth bars, 5 lifting drives, 6 driven wheels
7 workover modules, 8 submerged pipelines, 9 propeller driving systems the 10th life buildings
11 cowlings
The specific embodiment
As shown in Figure 1 and Figure 2, the present invention mainly comprises hull 1, lifting pole 2, stake 3, lifting drive 5, workover module 7, propeller driving system 9 and life building 10 ventilate.One of its feature is that lifting drive 5, propeller driving system 9 and life building 10 all are installed on the hull 1.Two of its feature is that the quantity of lifting pole 2 has 3 at least.Three of its feature is that 1 toothed rack 4 is housed on the lifting pole 2 at least, and tooth bar 4 is meshed with the driven wheel 6 of lifting drive 5.Four of its feature is in the ventilation stake 31 toothed rack 4 to be housed at least, and tooth bar 4 is meshed with the driven wheel 6 of lifting drive 5.Five of its feature is that cowling 11 is equipped with in the upper end of ventilation stake 3, and lower end and workover module 7 connect.
As shown in Figure 1 and Figure 2, this efficient working process of submerged pipeline emergency first-aid repair ship fast is: the first step is in place from navigating, when the submerged pipeline 8 in a certain marine site breaks, by propeller driving system 9, efficient submerged pipeline emergency first-aid repair ship fast utilizes global position system to adjust hull 1 job position from navigating submerged pipeline 8 damaged places.Second step was to promote hull 1, at first was to transfer lifting pole 2 by the driven wheel 6 of lifting drive 5, until lifting pole 2 is inserted the seabed certain depth, then hull 1 was promoted to certain altitude on the sea.The 3rd step was to transfer workover module 7, at first transferred the stake 3 of ventilating by the driven wheel 6 of lifting drive 5, and then drove workover module 7 and enter under water, docked the location until finishing with submerged pipeline 8, carried out maintenance activity then.The 4th step was to promote workover module 7, and after submerged pipeline 8 maintenances were finished, the driven wheel 6 lifting ventilation stakes 3 by lifting drive 5 drove workover module 7 and regain in the hull 1.The 5th step was to knock off to make a return voyage, driven wheel 6 by lifting drive 5 is at first reduced to the sea with hull 1, then lifting pole 2 is extracted and be retracted to hull 1 lower end from the seabed, start propeller driving system 9 at last, efficient submerged pipeline emergency first-aid repair ship is fast maked a return voyage.
Claims (5)
1. efficient submerged pipeline emergency first-aid repair ship fast comprises hull (1), lifting pole (2), ventilate stake (3), a lifting drive (5), workover module (7), propeller driving system (9) and life building (10).It is characterized in that lifting drive (5), propeller driving system (9) and life building (10) all are installed on the hull (1).
2. efficient submerged pipeline emergency first-aid repair ship fast according to claim 1 is characterized in that the quantity of lifting pole (2) has 3 at least.
3. efficient submerged pipeline emergency first-aid repair ship fast according to claim 1 is characterized in that being equipped with at least on the lifting pole (2) 1 toothed rack (4), and tooth bar (4) is meshed with the driven wheel (6) of lifting drive (5).
4. efficient submerged pipeline emergency first-aid repair ship fast according to claim 1 is equipped with 1 toothed rack (4) in the stake (3) that it is characterized in that ventilating at least, and tooth bar (4) is meshed with the driven wheel (6) of lifting drive (5).
5. efficient submerged pipeline emergency first-aid repair ship fast according to claim 1 is characterized in that cowling (11) is equipped with in the upper end of ventilation stake (3), and lower end and workover module (7) connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010100014754A CN102114902A (en) | 2010-01-05 | 2010-01-05 | Efficient rapid emergency maintenance ship for submarine pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010100014754A CN102114902A (en) | 2010-01-05 | 2010-01-05 | Efficient rapid emergency maintenance ship for submarine pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102114902A true CN102114902A (en) | 2011-07-06 |
Family
ID=44213858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010100014754A Pending CN102114902A (en) | 2010-01-05 | 2010-01-05 | Efficient rapid emergency maintenance ship for submarine pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102114902A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103925410A (en) * | 2014-04-02 | 2014-07-16 | 浙江海洋学院 | Emergency repair device for submarine pipelines |
CN104030129A (en) * | 2014-05-13 | 2014-09-10 | 浙江海洋学院 | Lifting type underwater sightseeing device |
CN105050935A (en) * | 2013-03-15 | 2015-11-11 | 霍华德.M.钦 | Weather maintenance system for offshore wind turbine maintenance program |
CN112227188A (en) * | 2020-10-07 | 2021-01-15 | 代潇男 | Bridge leg depth limiter suitable for emergency rescue and disaster relief at breach of dam in yellow river water conservancy |
CN114622477A (en) * | 2021-12-27 | 2022-06-14 | 中国船舶重工集团应急预警与救援装备股份有限公司 | Special work ship capable of quickly erecting bridge span and erecting method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5011333A (en) * | 1990-07-03 | 1991-04-30 | Intec Engineering, Inc. | Underwater pipe laying apparatus |
US5044825A (en) * | 1988-11-07 | 1991-09-03 | Allseas Engineering B.V. | Method and installation for laying a pipeline |
CN2589773Y (en) * | 2002-11-16 | 2003-12-03 | 胜利油田胜利石油化工建设有限责任公司三分公司 | Off-shore connecting device for shallow seabed pipeline laying |
CN200972009Y (en) * | 2006-10-26 | 2007-11-07 | 胜利油田胜利工程设计咨询有限责任公司 | Submerged pipiline repair and construction case |
US20100080657A1 (en) * | 2007-03-07 | 2010-04-01 | Saipem S.P.A. | Undersea pipe-laying |
CN201592769U (en) * | 2010-01-05 | 2010-09-29 | 浙江海洋学院 | Efficient fast submarine pipeline emergency repair vessel |
-
2010
- 2010-01-05 CN CN2010100014754A patent/CN102114902A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5044825A (en) * | 1988-11-07 | 1991-09-03 | Allseas Engineering B.V. | Method and installation for laying a pipeline |
US5011333A (en) * | 1990-07-03 | 1991-04-30 | Intec Engineering, Inc. | Underwater pipe laying apparatus |
CN2589773Y (en) * | 2002-11-16 | 2003-12-03 | 胜利油田胜利石油化工建设有限责任公司三分公司 | Off-shore connecting device for shallow seabed pipeline laying |
CN200972009Y (en) * | 2006-10-26 | 2007-11-07 | 胜利油田胜利工程设计咨询有限责任公司 | Submerged pipiline repair and construction case |
US20100080657A1 (en) * | 2007-03-07 | 2010-04-01 | Saipem S.P.A. | Undersea pipe-laying |
CN201592769U (en) * | 2010-01-05 | 2010-09-29 | 浙江海洋学院 | Efficient fast submarine pipeline emergency repair vessel |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105050935A (en) * | 2013-03-15 | 2015-11-11 | 霍华德.M.钦 | Weather maintenance system for offshore wind turbine maintenance program |
US9821984B2 (en) | 2013-03-15 | 2017-11-21 | Howard M. Chin | Weather maintenance system for an offshore wind turbine maintenance program |
US10435274B2 (en) | 2013-03-15 | 2019-10-08 | Howard M. Chin | Seaworthy, watertight, floatable container for an offshore wind turbine maintenance program |
CN103925410A (en) * | 2014-04-02 | 2014-07-16 | 浙江海洋学院 | Emergency repair device for submarine pipelines |
CN104030129A (en) * | 2014-05-13 | 2014-09-10 | 浙江海洋学院 | Lifting type underwater sightseeing device |
CN112227188A (en) * | 2020-10-07 | 2021-01-15 | 代潇男 | Bridge leg depth limiter suitable for emergency rescue and disaster relief at breach of dam in yellow river water conservancy |
CN112227188B (en) * | 2020-10-07 | 2022-03-11 | 代潇男 | Bridge leg depth limiter suitable for emergency rescue and disaster relief at breach of dam in yellow river water conservancy |
CN114622477A (en) * | 2021-12-27 | 2022-06-14 | 中国船舶重工集团应急预警与救援装备股份有限公司 | Special work ship capable of quickly erecting bridge span and erecting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103523183B (en) | Power supply platform on removable half submerged floating Multifunction fishing | |
CN201010891Y (en) | Self-elevating producing and oil-storing platform | |
CN103661801B (en) | The installation ancillary system of ocean engineering underwater propeller and installation method | |
CN202828023U (en) | Rescuing workboat in the shallow seaside area with driving and pulling spud device | |
CN106240744B (en) | The quick-release device of soft rigid arm and mooring leg in a kind of single point mooring system | |
CN105240220A (en) | Electricity generation ship capable of comprehensively utilizing renewable energy sources | |
CN102114902A (en) | Efficient rapid emergency maintenance ship for submarine pipeline | |
CN202807547U (en) | Self-diving and self-floating type underwater oil production and storage device | |
CN205168824U (en) | Whole installing the system that dismantles of marine fixed platform jacket | |
CN103482034B (en) | A kind of floating type gas platforms | |
CN104029798B (en) | Self installation production platform | |
CN203806103U (en) | Offshore buoyancy mounting device for ultra-large module | |
CN201592769U (en) | Efficient fast submarine pipeline emergency repair vessel | |
CN108626078A (en) | A kind of offshore wind turbine Spar types buoyant foundation barge helps fortune to help dress technique | |
CN102963494B (en) | Buoyancy mounting method for blocks | |
CN104376886A (en) | Offshore nuclear power platform with cylindrical foundation bodies | |
CN205770042U (en) | A kind of ocean work platforms | |
CN203497133U (en) | Single-point mooring apparatus of novel inner turret | |
CN106382180A (en) | Floating type buoyancy pendulum wave power generation device | |
CN204189463U (en) | A kind of marine nuclear power platform of bucket foundation | |
CN104369846A (en) | Movable offshore nuclear power platform | |
CN204452860U (en) | A kind of moveable marine nuclear power platform | |
CN113844605B (en) | Semi-submersible type water comprehensive support platform rescue method for large amphibious aircraft | |
CN103925410B (en) | Emergency repair device for submarine pipelines | |
CN203472445U (en) | Walking type semi-submersible amphibious engineering ship |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110706 |