CN102108873B - High-polymer grouting method for rapidly disposing percolating water in tunnel - Google Patents

High-polymer grouting method for rapidly disposing percolating water in tunnel Download PDF

Info

Publication number
CN102108873B
CN102108873B CN 200910227697 CN200910227697A CN102108873B CN 102108873 B CN102108873 B CN 102108873B CN 200910227697 CN200910227697 CN 200910227697 CN 200910227697 A CN200910227697 A CN 200910227697A CN 102108873 B CN102108873 B CN 102108873B
Authority
CN
China
Prior art keywords
tunnel
water
high polymer
polymer material
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910227697
Other languages
Chinese (zh)
Other versions
CN102108873A (en
Inventor
王复明
钟燕辉
石明生
张蓓
许建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wang Fuming
Original Assignee
HENAN BOTE ENGINEERING PROTECTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN BOTE ENGINEERING PROTECTION Co Ltd filed Critical HENAN BOTE ENGINEERING PROTECTION Co Ltd
Priority to CN 200910227697 priority Critical patent/CN102108873B/en
Publication of CN102108873A publication Critical patent/CN102108873A/en
Application granted granted Critical
Publication of CN102108873B publication Critical patent/CN102108873B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a high-polymer grouting method for rapidly disposing percolating water in a tunnel. Aiming at the problem of the percolating water in the tunnel, the high-polymer grouting method comprises the following steps: high-polymer materials are injected to water percolating positions, and the high-polymer materials are Non-aqueous reaction type high-polymer materials, rapidly swell in size after reaction and are solidified to rapidly fill and plug gaps of the water percolating positions, thus achieving the purpose of rapidly disposing the defect of the percolating water in the tunnel. Compared with the traditional tunnel defect disposing method, the high-polymer grouting technology developed in the invention for rapidly disposing the defect of the percolating water in a tunnel has the advantages of good disposal effect, quickness in construction, no requirement of maintenance, strong pertinence, good controllability and the like. The high-polymer grouting method is obviously creative in the aspects of technological principle and construction method, provides a novel approach to rapid, durable, economic and practical tunnel maintenance, is successfully applied to the defect disposal of the percolating water in the tunnel, shows great economic and social benefits and has broad development and application prospects.

Description

Tunnel Water Leakage is punished method for grouting polymers fast
Technical field
The invention belongs to the tunnel maintenance maintenance technique, relate in particular to the Tunnel Water Leakage high polymer grouting technology of punishment fast.
Background technology
At present in or the part highway and railway tunnel built built in China, due to reasons such as design and constructions, in various degree exist various diseases, comparatively commonly leak, tunnel lining is come to nothing behind etc.When the tunnel passes or close water bearing ground, be subjected to the osmosis of underground water constantly, as waterproof and the drainage imperfection of lining cutting, underground water will be invaded the tunnel, and the Tunnel Water Leakage disease occurs.Tunnel Water Leakage is stable to the tunnel, facility, traffic safety, surface structures and tunnel ambient water environment produce many harmful effects and even threaten in the hole, affect internal construction and ancillary facility, reduce application life, will jeopardize the operation security of tunnel and underground construction when serious.Therefore the origin cause of formation of correct these diseases of understanding and utilize mature technology and new material, efficient, convenient, good all kinds of diseases of regulation are safely guaranteed the durable, unimpeded of operation tunnel, seem particularly important.
Construction of tunnel percolating water form main manifestations is three kinds of forms, and the seepage of seepage namely, the seepage of seam and face can be divided into slowly again according to the seepage speed and ooze, oozes soon, leaks and water burst.Therefore, the principle that will specifically treat as the case may be of the water leakage defect in tunnel is processed.For water seepage of tunnel several improvement technology commonly used, the ways such as surperficial shutoff, Shallow hole grouting, chemical grouting and pipe laying ejectment are arranged in engineering at present, other engineering solution is all extended from this several method basically.Main Problems is as follows:
(1) when the processing infiltration is not too serious, no matter take which kind of method, be all paste, stifled be main, such processing mode has just solved seepage problem in appearance from the tunnel, the crack of lining cutting and lining cutting back may exist in the problem of coming to nothing and not be resolved, after a period of time, the seepage problem in tunnel can reappear again.
(2) although and traditional grouting method can play the effect that shutoff crack and filling are come to nothing to a certain extent, but be limited by the performance of material, after slip casting a period of time, material meeting solidification shrinkage, the tunnel comes to nothing and can reappear, and this hides some dangers for for later seepage problem recurrence.
(3) improvement method construction technology is more complicated, and the implementation of each scheme needs engineering time of growing, and this can produce the construction in tunnel or normal operation and comparatively seriously influence, and can't carry out shutoff fully for more serious large issue.
(4) owing to after water response class high polymer material chance water, chemical reaction could occuring, be difficult to prove effective in the larger or large water burst situation of hydraulic pressure
Therefore, come the treating tunnel water leakage disease in the urgent need to developing a kind of fast waterproof blocking method.
Non-aqueous reaction class high polymer grouting technology is the foundation rapid reinforcement technology that new development is in recent years got up.This technology is by many component high polymers of injection material in the ground, utilizes the characteristic that volume expands and solidifies rapidly after high polymer material generation chemical reaction, reaches consolidated subsoil, filling is come to nothing or promotes the purpose on floor.At present, non-aqueous reaction class high polymer grouting technology is mainly used in ground stabilization and the road maintenance of industry and civilian construction.Domestic exploitation about Tunnel Water Leakage Defects Treatment high polymer technology at present still is in the starting developing stage, and existing research is confined to water response class high polymer material mostly.Dispose non-aqueous reaction class high polymer grouting technology about treatment technology for tunnel seepage and have no relevant report.
Summary of the invention
The object of the invention is the punishment problem for the Tunnel Water Leakage disease, develops a kind of new non-aqueous reaction class method for grouting polymers, for the Tunnel Water Leakage Defects Treatment provides advanced, efficient, economic, practical technical measures.
The present invention is achieved by the following technical solutions:
A kind of Tunnel Water Leakage is punished method for grouting polymers fast, leakage problem for the tunnel, to percolating water position injection high polymer material, described high polymer material is non-aqueous reaction class high polymer material, this material rapid expansion curing of rear volume that reacts, shutoff is filled rapidly in space, Tunnel Water Leakage position, thereby reach the purpose of quick treating tunnel water leakage disease.
Basic construction technology is:
(1) bore at a certain distance injected hole in the percolating water position, hole depth is determined according to tunnel surrounding and liner structure situation;
(2) lower Grouting Pipe in injected hole, for large water burst mouth, set up geotechnological cloth bag;
(3) by Grouting Pipe to percolating water position injection high polymer material, high polymer material reacts rapidly, volume expansion is solidified, and fills the space, the shutoff infiltration.
When partial points or gap infiltration, concrete implementation step is:
(1) bore injected hole.At the Tunnel Water Leakage position, at the infiltration point, or bore injected hole along the gap of seeping water with a determining deviation, hole depth is according to the structures shape of lining cutting or country rock, and boring is wanted and can be connected with penetrating passage;
(2) lower Grouting Pipe.Lower Grouting Pipe in injected hole, Grouting Pipe can be PPR pipe or metal tube;
(3) carry out high polymer grouting.Inject high polymer material by Grouting Pipe to lining cutting or country rock seepage part, high polymer material generation chemical reaction, expansion curing, fill percolating water space and cavity rapidly, thus quick blocking percolating water.
When sweat, concrete implementation step is:
(1) bore injected hole.On infiltration face, bore injected hole according to vertical and horizontal with a determining deviation, hole depth is according to the structures shape of lining cutting or country rock;
(2) lower Grouting Pipe.Lower Grouting Pipe in injected hole, Grouting Pipe are PPR pipe or metal tube;
(3) carry out high polymer grouting.By Grouting Pipe to percolating water position injection high polymer material, high polymer material generation chemical reaction, expansion curing, fill percolating water space and cavity rapidly, thereby quick blocking percolating water.
When large water burst, concrete implementation step is:
(1) with hoop, geotechnological cloth bag openend is fixed on hollow steel pipe one end;
(2) with adhesive tape or cord, geotechnological cloth bag is bundled into strip;
(3) hold the hollow steel pipe other end, the geotechnological cloth bag of tying up put into the water burst mouth, put into again simultaneously one not with the Grouting Pipe of geotechnological cloth bag at the water burst mouth, Grouting Pipe is put into the water burst mouth degree of depth will exceed geotechnological cloth bag;
(4) inject the multicomponent high polymer material by hollow steel pipe in geotechnological cloth bag, described high polymer material is non-aqueous reaction class high polymer material, and high polymer material expands and solidifies rapidly in geotechnological cloth bag, thus quick blocking water burst mouth;
(5) again by not with the Grouting Pipe of geotechnological cloth bag, inject the multicomponent high polymer material in the water burst passage, high polymer material expands and solidifies rapidly in the water burst passage, thus quick blocking water burst passage.
The diameter of described geotechnological cloth bag and length can produce plurality of specifications according to the design of issue concrete condition; The hollow metal tube diameter is generally 1.6cm, can be fixed according to requirement of engineering, and length is fixed according to requirement of engineering; According to the diameter of steel pipe and geotechnological cloth bag, can select the hoop of different size.
Compare with traditional tunnel defect punishment technology, the Tunnel Water Leakage Defects Treatment high polymer grouting technology of the present invention's exploitation has following advantages:
(1) punishment is effective.The high polymer material reaction of injection is fast, good endurance, and water resistance is good, and has elasticity preferably;
(2) quick construction does not need health.The material injection can form the intensity more than 90%, the traffic of can letting pass in rear 15 minutes.Compare with traditional tunnel defect Treatment Methods, the high polymer grouting technology of the present invention's exploitation can be saved the duration more than 70%;
(3) with strong points, controllability is good.The characteristic of volume self-expansion after patent utilization high polymer material generation chemical reaction of the present invention, reach fill come to nothing, the purpose such as shutoff infiltration, and after material cured, its density and intensity can regulate and control according to requirement of engineering.Therefore, compare with traditional mud jacking method, the high polymer grouting technology of the present invention's exploitation has better specific aim and controllability.
In sum, the Tunnel Water Leakage disease high polymer grouting technology of punishing fast of the present invention's exploitation is compared with traditional tunnel defect Treatment Methods, all has obvious innovation aspect know-why and job practices, started quick, durable, economic, practical Tunnel Repair new way, and be successfully applied to the water leakage defect punishment in tunnel, demonstrate huge economic and social benefits and wide development and application prospect.
Description of drawings
Fig. 1 geotechnique cloth bag is fixed in hollow steel pipe one end schematic diagram;
Fig. 2 geotechnique cloth bag is bundled into the strip schematic diagram;
The geotechnological cloth bag that Fig. 3 will tie up and Grouting Pipe are put into water burst mouth schematic diagram;
Fig. 4 high polymer sealing slip casting shutoff water burst mouth construction schematic diagram;
Water burst passage construction schematic diagram is filled in Fig. 5 high polymer sealing slip casting.
The specific embodiment
Embodiment: the Tunnel Water Leakage of the present invention's exploitation is punished method for grouting polymers fast, leakage problem for the tunnel, to percolating water position injection high polymer material, described high polymer material is non-aqueous reaction class high polymer material, this material rapid expansion curing of rear volume that reacts, shutoff is filled rapidly in space, Tunnel Water Leakage position, thereby reach the purpose of quick treating tunnel water leakage disease;
Basic construction technology is:
(1) bore at a certain distance injected hole in the percolating water position, hole depth is determined according to tunnel surrounding and liner structure situation;
(2) lower Grouting Pipe in injected hole, for large water burst mouth, set up geotechnological cloth bag;
(3) by Grouting Pipe to percolating water position injection high polymer material, high polymer material reacts rapidly, volume expansion is solidified, and fills the space, the shutoff infiltration.
The Specific construction scheme has following several:
(1) when partial points or gap infiltration, concrete implementation step is:
(1) bore injected hole; At the Tunnel Water Leakage position, at the infiltration point, or bore injected hole along the gap of seeping water with a determining deviation, hole depth is according to the structures shape of lining cutting or country rock, and boring is wanted and can be connected with penetrating passage;
(2) lower Grouting Pipe; Lower Grouting Pipe in injected hole, Grouting Pipe can be PPR pipe or metal tube;
(3) carry out high polymer grouting; Inject high polymer material by Grouting Pipe to lining cutting or country rock seepage part, high polymer material generation chemical reaction, expansion curing, fill percolating water space and cavity rapidly, thus quick blocking percolating water.
(2) when sweat, concrete implementation step is:
(1) bore injected hole; On infiltration face, bore injected hole according to vertical and horizontal with a determining deviation, hole depth is according to the structures shape of lining cutting or country rock;
(2) lower Grouting Pipe; Lower Grouting Pipe in injected hole, Grouting Pipe are PPR pipe or metal tube;
(3) carry out high polymer grouting; By Grouting Pipe to percolating water position injection high polymer material, high polymer material generation chemical reaction, expansion curing, fill percolating water space and cavity rapidly, thereby quick blocking percolating water.
(3) when large water burst, concrete implementation step is:
(1) with hoop 2, geotechnological cloth bag 3 openends are fixed on hollow steel pipe 1 one ends, as shown in Figure 1;
(2) with adhesive tape or cord 4, geotechnological cloth bag 3 is bundled into strip, as shown in Figure 2;
(3) hold hollow steel pipe 1 other end, the geotechnological cloth bag 3 of tying up put into water burst mouth 7, put into again simultaneously one not with the Grouting Pipe 5 of geotechnological cloth bag at water burst mouth 7, Grouting Pipe 5 is put into water burst mouth 7 degree of depth will exceed geotechnological cloth bag 3, as shown in Figure 3;
(4) by the past interior injection multicomponent of geotechnological cloth bag 3 high polymer material 9 of hollow steel pipe 1, high polymer material 9 is in the interior rapid expansion of geotechnological cloth bag 3 and curing, water burst 6 is along with the expansion of the interior high polymer material 9 of geotechnological cloth bag 3, flow is decreased to gradually and stops, thereby quick blocking water burst mouth 7, as shown in Figure 4;
(5) again by not with the Grouting Pipe 5 of geotechnological cloth bag, inject multicomponent high polymer material 9 in the water burst passage, high polymer material 9 expands and solidifies rapidly in the water burst passage, thus quick blocking water burst passage, and reinforce infiltration country rock 8, as shown in Figure 5.
The diameter of above-mentioned geotechnological cloth bag 3 and length can produce plurality of specifications according to the design of issue concrete condition; Hollow steel pipe 1 diameter and length are decided according to requirement of engineering; According to the diameter of hollow steel pipe 1 and geotechnological cloth bag 3, can select the hoop 2 of different size.

Claims (4)

1. a Tunnel Water Leakage is punished method for grouting polymers fast, it is characterized in that: for the leakage problem in tunnel, to percolating water position injection high polymer material, described high polymer material is non-aqueous reaction class high polymer material, this material rapid expansion curing of rear volume that reacts, shutoff is filled rapidly in space, Tunnel Water Leakage position, thereby reach the purpose of quick treating tunnel water leakage disease;
Basic construction technology is:
(1) bore at a certain distance injected hole in the percolating water position, hole depth is determined according to tunnel surrounding and liner structure situation;
(2) lower Grouting Pipe in injected hole, for large water burst mouth, set up geotechnological cloth bag;
(3) by Grouting Pipe to percolating water position injection high polymer material, high polymer material reacts rapidly, volume expansion is solidified, and fills the space, the shutoff infiltration.
2. Tunnel Water Leakage according to claim 1 is punished method for grouting polymers fast, it is characterized in that: when partial points or gap infiltration, concrete implementation step is:
(1) bore injected hole: at the Tunnel Water Leakage position, at the infiltration point, or bore injected hole along the gap of seeping water with a determining deviation, hole depth is according to the structures shape of lining cutting or country rock, and boring is wanted and can be connected with penetrating passage;
(2) lower Grouting Pipe: lower Grouting Pipe in injected hole, Grouting Pipe can be PPR pipe or metal tube;
(3) carry out high polymer grouting: inject high polymer material by Grouting Pipe to lining cutting or country rock seepage part, high polymer material generation chemical reaction, expansion curing, fill percolating water space and cavity rapidly, thus quick blocking percolating water.
3. Tunnel Water Leakage according to claim 1 is punished method for grouting polymers fast, it is characterized in that: when sweat, concrete implementation step is:
(1) bore injected hole: on infiltration face, bore injected hole according to vertical and horizontal with a determining deviation, hole depth is according to the structures shape of lining cutting or country rock;
(2) lower Grouting Pipe: lower Grouting Pipe in injected hole, Grouting Pipe is PPR pipe or metal tube;
(3) carry out high polymer grouting: by Grouting Pipe to percolating water position injection high polymer material, high polymer material generation chemical reaction, expansion curing, fill percolating water space and cavity rapidly, thereby quick blocking percolating water.
4. a Tunnel Water Leakage is punished method for grouting polymers fast, it is characterized in that: when large water burst, concrete implementation step is:
1) with hoop, geotechnological cloth bag openend is fixed on hollow steel pipe one end;
2) with adhesive tape or cord, geotechnological cloth bag is bundled into strip;
3) hold the hollow steel pipe other end, the geotechnological cloth bag of tying up put into the water burst mouth, put into again simultaneously one not with the Grouting Pipe of geotechnological cloth bag at the water burst mouth, Grouting Pipe is put into the water burst mouth degree of depth will exceed geotechnological cloth bag;
4) by hollow steel pipe injection multicomponent high polymer material in the geotechnological cloth bag, described high polymer material is non-aqueous reaction class high polymer material, and high polymer material expands and solidifies rapidly in geotechnological cloth bag, thus quick blocking water burst passway;
5) again by not with the Grouting Pipe of geotechnological cloth bag, inject the multicomponent high polymer material in the water burst passage, high polymer material expands and solidifies rapidly in the water burst passage, thus quick blocking water burst passage.
CN 200910227697 2009-12-29 2009-12-29 High-polymer grouting method for rapidly disposing percolating water in tunnel Active CN102108873B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910227697 CN102108873B (en) 2009-12-29 2009-12-29 High-polymer grouting method for rapidly disposing percolating water in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910227697 CN102108873B (en) 2009-12-29 2009-12-29 High-polymer grouting method for rapidly disposing percolating water in tunnel

Publications (2)

Publication Number Publication Date
CN102108873A CN102108873A (en) 2011-06-29
CN102108873B true CN102108873B (en) 2013-11-06

Family

ID=44173144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910227697 Active CN102108873B (en) 2009-12-29 2009-12-29 High-polymer grouting method for rapidly disposing percolating water in tunnel

Country Status (1)

Country Link
CN (1) CN102108873B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536270B (en) * 2011-12-29 2013-12-25 中铁十六局集团北京轨道交通工程建设有限公司 Tunnel seepage protection method for soft soil stratum by existing shield method
CN102877865A (en) * 2012-09-10 2013-01-16 刘清洁 Construction method for treating underground gob or cavity
CN103215952A (en) * 2013-04-11 2013-07-24 河南博特工程防护有限公司 High polymer anchoring grouting method
CN103215960B (en) * 2013-04-11 2015-06-24 郑州安源工程技术有限公司 Grouting method for high polymer vertical support system
CN103821544B (en) * 2014-02-28 2016-04-06 山东大学 Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method
CN103967036B (en) * 2014-05-07 2016-12-07 中国水电顾问集团华东勘测设计研究院有限公司 Stake and sleeve grouting attachment structure and construction method thereof for offshore wind farm
CN104033165B (en) * 2014-05-26 2016-08-31 江苏鼎泰工程材料有限公司 Tunnel defect restorative procedure and reparation slurry
CN104033164B (en) * 2014-05-26 2016-07-06 江苏鼎泰工程材料有限公司 Come to nothing and the harmful method repaired that seeps water to what encircle in tunnel
CN104500108B (en) * 2014-12-11 2017-04-05 中铁十九局集团有限公司 Method for treating tunnel base water return point
CN104631478A (en) * 2015-02-16 2015-05-20 中交一航局第一工程有限公司 Method and device for quick blockage of piping in deep foundation pit
CN104775412B (en) * 2015-03-25 2017-04-19 广州建恒机电设备安装有限公司 Stratum reinforcement PSC construction method
CN108951708B (en) * 2018-06-26 2020-12-18 山东大学 Comprehensive treatment method for underground engineering lining water leakage
CN110805052A (en) * 2019-10-31 2020-02-18 中国二十二冶集团有限公司 Comprehensive treatment method for sudden surge of ultra-deep foundation pit
CN111140264A (en) * 2020-04-02 2020-05-12 中铁工程设计咨询集团有限公司 Method for treating water leakage of cracks of tunnel concrete lining structure
CN111749198B (en) * 2020-05-30 2022-11-25 郑州安源工程技术有限公司 Channel slab underwater grouting stabilizing and lifting method
CN114108545B (en) * 2021-12-01 2023-08-08 重庆艺锦陶瓷有限公司 Plugging machine for sectional closing type piping emergency
CN114525760B (en) * 2022-01-22 2024-05-28 郑州大学 Portable high polymer gushing water plugging device and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033206A (en) * 1988-12-05 1989-05-31 铁道部山海关桥梁工厂 Construction technology of preventing and controlling seepage in buildings
CN1469012A (en) * 2002-07-19 2004-01-21 岩 李 Serial motor for fasting treating piping, sandy soil liquefaction and leakage of underwater structure
CN1546842A (en) * 2003-12-11 2004-11-17 广州市泰利斯固结补强工程有限公司 Construction method of leakage waterstop for shield tunnel concrete structure segments
JP2007291175A (en) * 2006-04-21 2007-11-08 Emulsion Technology Co Ltd Modified asphalt composition, and method for producing the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033206A (en) * 1988-12-05 1989-05-31 铁道部山海关桥梁工厂 Construction technology of preventing and controlling seepage in buildings
CN1469012A (en) * 2002-07-19 2004-01-21 岩 李 Serial motor for fasting treating piping, sandy soil liquefaction and leakage of underwater structure
CN1546842A (en) * 2003-12-11 2004-11-17 广州市泰利斯固结补强工程有限公司 Construction method of leakage waterstop for shield tunnel concrete structure segments
JP2007291175A (en) * 2006-04-21 2007-11-08 Emulsion Technology Co Ltd Modified asphalt composition, and method for producing the same

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
郭成超等.隧道高聚物快速维修技术研究.《筑路机械与施工机械化》.2008,(第12期),60-62页.
隧道高聚物快速维修技术研究;郭成超等;《筑路机械与施工机械化》;20081231(第12期);60-62页 *

Also Published As

Publication number Publication date
CN102108873A (en) 2011-06-29

Similar Documents

Publication Publication Date Title
CN102108873B (en) High-polymer grouting method for rapidly disposing percolating water in tunnel
CN104594348B (en) Enlarged footing bellows anchor pole and construction method thereof
CN104033164A (en) Method for solving disengagement and water seepage of internal arch of tunnel
CN103031836A (en) Method for quickly building road on new reclamation sludge foundation
CN203488189U (en) Tunnel structure for emptying renovation
CN111395263B (en) Leakage treatment method for roller compacted concrete dam body
CN206143827U (en) Underground works crack repairing structure
CN103388338A (en) Novel rapid water stopping and soil mass improving method
CN101560764A (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN105114098A (en) Method for treating unfavorable geological tunnel section of diversion tunnel and large-diameter diversion tunnel structure
CN109236367A (en) A kind of tunnel structure and its frozen construction method with antiseepage drain function
CN204491646U (en) A kind of high water level area fender body device for plugging
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN104652371A (en) Overflow cemented rock-fill dam established based on old dam and construction method thereof
CN112281927A (en) Construction method for treating leakage of independent foundation of frame column
CN103912290B (en) Grouting method used for vibration isolating and denoising outside subway tunnel segments
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN205260042U (en) Annular stabilization by freezing stagnant water structure when shield ventral brush is changed
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN204716253U (en) Circular major diameter diversion tunnel structure
CN104033165A (en) Repairing method and grout for tunnel defects
CN113373962A (en) Combined leaking stoppage construction method for deep foundation pit
CN206753653U (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction
CN112983454A (en) Reverse recovery construction method for jacking pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HENAN BOTE ENGINEERING PROTECTION CO., LTD.

Free format text: FORMER OWNER: ZHENGZHOU YOUTE FOUNDATION ENGINEERING MAINTENANCE CO., LTD.

Effective date: 20130618

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 450016 ZHENGZHOU, HENAN PROVINCE TO: 450000 ZHENGZHOU, HENAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20130618

Address after: Bamboo high tech Development Zone in Henan Province, Zhengzhou City, 450000 street, No. 100 and No. 10 Liyuan Sheng Yuan Building 1 unit 8

Applicant after: Henan Bote Engineering Protection Co., Ltd.

Address before: 450016 A6 villa Green, No. 1369 East navigation road, Zhengzhou economic and Technological Development Zone, Zhengzhou, Henan

Applicant before: Zhengzhou Youte Infrastructure Engineering Maintainance Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160607

Address after: 450000 Zhengzhou province Jinshui District, Henan Cultural Road, building 48, building 39, No. 33

Patentee after: Wang Fuming

Address before: Bamboo high tech Development Zone in Henan Province, Zhengzhou City, 450000 street, No. 100 and No. 10 Liyuan Sheng Yuan Building 1 unit 8

Patentee before: Henan Bote Engineering Protection Co., Ltd.