CN102107349A - Process for producing modular sleeper beam for railway carriage - Google Patents

Process for producing modular sleeper beam for railway carriage Download PDF

Info

Publication number
CN102107349A
CN102107349A CN 201010555667 CN201010555667A CN102107349A CN 102107349 A CN102107349 A CN 102107349A CN 201010555667 CN201010555667 CN 201010555667 CN 201010555667 A CN201010555667 A CN 201010555667A CN 102107349 A CN102107349 A CN 102107349A
Authority
CN
China
Prior art keywords
sleeper beam
welding
lower cover
sleeper
air spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010555667
Other languages
Chinese (zh)
Other versions
CN102107349B (en
Inventor
张磊
杜彦品
温爱国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Nanjing Puzhen Co Ltd
Original Assignee
CSR Nanjing Puzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Nanjing Puzhen Co Ltd filed Critical CSR Nanjing Puzhen Co Ltd
Priority to CN201010555667A priority Critical patent/CN102107349B/en
Publication of CN102107349A publication Critical patent/CN102107349A/en
Application granted granted Critical
Publication of CN102107349B publication Critical patent/CN102107349B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Railway Tracks (AREA)

Abstract

The invention discloses a process for producing a modular sleeper beam for a railway carriage, which comprises the following steps of: welding a lower cover plate of the sleeper beam, a web plate, an inner clapboard and an air seat into a whole; welding anti-snake movement damper mounting beams at left and right ends of the sleeper beam; welding first and second transverse beams behind the sleeper between the anti-snake movement damper mounting beams on the rear of the sleeper beam; turning the sleeper beam, and welding an air spring base plate, a center plate mounting base plate and a vertical damper seat on the lower cover plate of the sleeper beam; and conveying a sleeper beam module to a ,machining center, and machining an air spring mounting surface, a center plate mounting surface and an anti-snake movement damper mounting surface. The sleeper beam, the first and second transverse beams behind the sleeper and the anti-snake movement damper mounting beams are welded to form an integral module, the integration degree is high, and the production efficiency is improved. After the whole module is subjected to assembly welding, the air spring mounting surface on the lower cover plate of the sleeper beam, the center plate mounting surface and the anti-snake movement damper mounting surface are subjected to unified machining and molding in the sleeper beam machining center; therefore, the machining accuracy of various mounting surfaces is guaranteed.

Description

Passenger train modularization sleeper beam production technology
Technical field
The present invention relates to a kind of passenger train sleeper beam modular structure, belong to passenger train Undercarriage structure technical field.
Background technology
China railways underframe of coach steel construction generally adopts girder construction in the nothing at present, the sleeper beam module only comprises the sleeper beam part, do not form an integral body with pillow floor side member and anti-snakelike damper mounting rail, because anti-snakelike shock absorber bearing installed surface is higher with respect to the Geometrical Tolerance Principle of sleeper beam lower cover, it is higher therefore underframe always to be assembled welding requirements.Simultaneously, because the existence of position longitudinal beam in the car of pillow back, after coupler force is delivered to sleeper beam along draw beam, can not be delivered to the underframe side bar smoothly along sleeper beam, but continue to transmit backward along pillow back car longitudinal beam, thereby cause the terminal corrugated floor stress of longitudinal beam superelevation, and along with the longitudinal beam lengthening constantly transmits backward.For overcoming the above problems, need a kind of brand-new sleeper beam structure and processing technology thereof.
Summary of the invention
Technical problem to be solved by this invention is, overcomes the shortcoming of prior art, and a kind of passenger train modularization sleeper beam production technology is provided, its machining accuracy height, the efficient height is realized the module suffixation of a nonsyllabic "r" of sleeper beam, change the bang path of coupler force, solve the too high problem of pillow back corrugated floor stress.
In order to solve above technical problem, passenger train modularization sleeper beam production technology provided by the invention is characterized in that comprising the steps:
The first step, on the formal dress tire, with sleeper beam lower cover, web, internal partition, gas seat form, assembly welding is integral;
Second goes on foot, welds at two ends, the sleeper beam left and right sides anti-snakelike damper mounting rail;
The 3rd step, at the sleeper beam rear, welding pillow back first crossbeam, pillow back second crossbeam successively between the anti-snakelike damper mounting rail;
The 4th goes on foot, sleeper beam is overturn, and welding air spring backing plate, cartridge are installed the vertical shock absorber bearing of backing plate on the sleeper beam lower cover;
The 5th step, the sleeper beam module that assembly welding is good are delivered to the sleeper beam Mechanical Processing Center, under anti-dress state, air spring backing plate on the sleeper beam lower cover, cartridge are installed backing plate, the unified processing of vertical shock absorber bearing, process air spring installed surface, cartridge installed surface, anti-snakelike shock absorber bearing installed surface.
The present invention is fixing with anti-snakelike damper mounting rail welding with sleeper beam, pillow back first crossbeam, the pillow back second crossbeam three, forms a monoblock type module, and this module can be carried out Assembling Production under car, and modularization, integrated degree height have improved production efficiency.Behind the whole module assembly welding, air spring installed surface, cartridge installed surface, anti-snakelike shock absorber bearing installed surface are unified machine-shaping at the sleeper beam Mechanical Processing Center, thereby are guaranteed the machining accuracy of each installed surface on the sleeper beam lower cover.The modularization sleeper beam that the present invention produces has been cancelled the pillow floor side member, after coupler force is delivered to sleeper beam, disperse to both sides along sleeper beam, anti-snakelike damper mounting rail is delivered to the underframe side bar behind bilateral pillow, change the bang path of coupler force, thereby solved the problem of pillow back corrugated plating stress superelevation, helped the body construction Intensity Design; Simultaneously also reduce underframe weight, helped light-weighted car body design.
As seen, ingenious conception of the present invention, the assembly precision height, the production efficiency height, and can improve body construction intensity.The present invention will be widely used in field of track traffic, have good market prospects.
Description of drawings
The present invention is further illustrated below in conjunction with accompanying drawing.
Fig. 1 is a passenger train modularization sleeper beam structural representation of the present invention.
The specific embodiment
The passenger train modularization sleeper beam production technology of present embodiment comprises the steps:
The first step, on the formal dress tire, sleeper beam lower cover, web, internal partition, gas seat are formed assembly welding are integral;
Second goes on foot, welds at two ends, sleeper beam 1 left and right sides anti-snakelike damper mounting rail 21,22;
The 3rd step, at sleeper beam 1 rear, welding pillow back first crossbeam 3, pillow back second crossbeam 4 successively between the anti-snakelike damper mounting rail 21,22;
The 4th goes on foot, sleeper beam is overturn, and welding air spring backing plate 61,62, cartridge are installed backing plate 7, vertical shock absorber bearing 81,82 on sleeper beam 1 lower cover 5, and vertical shock absorber bearing 81,82 is welded on the sleeper beam lower cover of anti-snakelike damper mounting rail 21,22 belows;
The 5th step, the sleeper beam module that assembly welding is good are delivered to the sleeper beam Mechanical Processing Center, under anti-dress state, air spring backing plate on the sleeper beam lower cover 61,62, cartridge are installed backing plate 7,81, the 82 unified processing of vertical shock absorber bearing, process air spring installed surface, cartridge installed surface, anti-snakelike shock absorber bearing installed surface.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.

Claims (2)

1. passenger train modularization sleeper beam production technology is characterized in that comprising the steps:
The first step, on the formal dress tire, sleeper beam lower cover, web, internal partition, gas seat are formed assembly welding are integral;
Second goes on foot, welds at two ends, the sleeper beam left and right sides anti-snakelike damper mounting rail;
The 3rd step, at the sleeper beam rear, welding pillow back first crossbeam, pillow back second crossbeam successively between the anti-snakelike damper mounting rail;
The 4th goes on foot, sleeper beam is overturn, and welding air spring backing plate, cartridge are installed backing plate, vertical shock absorber bearing on the sleeper beam lower cover;
The 5th step, the sleeper beam module that assembly welding is good are delivered to the sleeper beam Mechanical Processing Center, under anti-dress state, air spring backing plate on the sleeper beam lower cover, cartridge are installed backing plate, the unified processing of vertical shock absorber bearing, process air spring installed surface, cartridge installed surface, anti-snakelike shock absorber bearing installed surface.
2. passenger train modularization sleeper beam production technology according to claim 1 is characterized in that: described vertical shock absorber bearing is welded on the sleeper beam lower cover of anti-snakelike damper mounting rail below.
CN201010555667A 2010-11-23 2010-11-23 Process for producing modular sleeper beam for railway carriage Active CN102107349B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010555667A CN102107349B (en) 2010-11-23 2010-11-23 Process for producing modular sleeper beam for railway carriage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010555667A CN102107349B (en) 2010-11-23 2010-11-23 Process for producing modular sleeper beam for railway carriage

Publications (2)

Publication Number Publication Date
CN102107349A true CN102107349A (en) 2011-06-29
CN102107349B CN102107349B (en) 2012-10-03

Family

ID=44171691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010555667A Active CN102107349B (en) 2010-11-23 2010-11-23 Process for producing modular sleeper beam for railway carriage

Country Status (1)

Country Link
CN (1) CN102107349B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112061167A (en) * 2020-08-21 2020-12-11 来安县山关轨道装备有限公司 Cross beam assembly of motor train unit
CN113291342A (en) * 2021-07-12 2021-08-24 中车长春轨道客车股份有限公司 Rail vehicle and chassis thereof
CN113458673A (en) * 2021-08-06 2021-10-01 南京中车浦镇城轨车辆有限责任公司 Traction and bolster buffering connection device and connection method
EP4137382A4 (en) * 2021-07-05 2023-11-22 Hitachi, Ltd. Rail vehicle and method of producing same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201154430Y (en) * 2007-12-31 2008-11-26 南车长江车辆有限公司 Automatic welding apparatus for sleeper beam
EP2130739A1 (en) * 2008-06-06 2009-12-09 Bombardier Transportation GmbH Rail car underframe assembly and modular car body for a rail vehicle
CN201580395U (en) * 2009-10-30 2010-09-15 青岛四方庞巴迪铁路运输设备有限公司 Stainless steel vehicle body chassis structure of railway vehicle
CN201613905U (en) * 2009-12-24 2010-10-27 南车南京浦镇车辆有限公司 Rail car body bolster convenient for assembly and maintenance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201154430Y (en) * 2007-12-31 2008-11-26 南车长江车辆有限公司 Automatic welding apparatus for sleeper beam
EP2130739A1 (en) * 2008-06-06 2009-12-09 Bombardier Transportation GmbH Rail car underframe assembly and modular car body for a rail vehicle
CN201580395U (en) * 2009-10-30 2010-09-15 青岛四方庞巴迪铁路运输设备有限公司 Stainless steel vehicle body chassis structure of railway vehicle
CN201613905U (en) * 2009-12-24 2010-10-27 南车南京浦镇车辆有限公司 Rail car body bolster convenient for assembly and maintenance

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112061167A (en) * 2020-08-21 2020-12-11 来安县山关轨道装备有限公司 Cross beam assembly of motor train unit
CN112061167B (en) * 2020-08-21 2022-04-15 来安县山关轨道装备有限公司 Cross beam assembly of motor train unit
EP4137382A4 (en) * 2021-07-05 2023-11-22 Hitachi, Ltd. Rail vehicle and method of producing same
CN113291342A (en) * 2021-07-12 2021-08-24 中车长春轨道客车股份有限公司 Rail vehicle and chassis thereof
WO2023284215A1 (en) * 2021-07-12 2023-01-19 中车长春轨道客车股份有限公司 Rail vehicle and underframe thereof
AU2021269415B2 (en) * 2021-07-12 2023-09-28 Crrc Changchun Railway Vehicles Co., Ltd. Railway vehicle and underframe thereof
CN113458673A (en) * 2021-08-06 2021-10-01 南京中车浦镇城轨车辆有限责任公司 Traction and bolster buffering connection device and connection method

Also Published As

Publication number Publication date
CN102107349B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN210822249U (en) High-low floor connecting device of rail vehicle body
CN102107349B (en) Process for producing modular sleeper beam for railway carriage
CN202624228U (en) Installation structure for rail vehicle cab framework and vehicle body
CN101857033B (en) 80km/h speed class B-type subway vehicle bogie
JP5976119B2 (en) Vehicle structure
CN201198321Y (en) Light weight welding framework
CN201863858U (en) Modular sleeper beam structure of passenger train
CN105460033A (en) Traveling device used between adjacent train bodies of motor train unit and capable of reducing floor height
CN106428053B (en) A kind of railroad coach steel structure of car body frame
CN107738659B (en) High-comfort empty rail vehicle bogie
WO2020151230A1 (en) Variable-gauge truck frame and variable-gauge railway truck
CN201932177U (en) Vehicle for railway track-laying and bridge-erecting machine
CN201334026Y (en) Connecting structure for vehicle body without corbel and steering frame
CN102050126B (en) Modular sleeper beam structure for railway train
CN103287451A (en) Traction device for road-rail dual-purpose vehicle
CN103170754A (en) Railway box van dragging beam assembling welding process
CN201506365U (en) B-type urban rail car bogie end beam
CN208760628U (en) A kind of passenger train bogie
CN208376774U (en) A kind of railway vehicle bogie frame and bogie
CN201613907U (en) Integrated structure of independent sleeper beam and coupler box
CN203528483U (en) Integral type driver room
CN205365625U (en) Railway freight car and railway freight car chassis, sleeper beam thereof
CN103003123B (en) Floor pan for high-speed trains
CN201670246U (en) 80 km/h speed class B-type subway vehicle bogie
CN211281021U (en) End part bumper beam and railway vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 210031 Nanjing, Pu Pu North Road, No. 68, Jiangsu

Patentee after: CRRC NANJING PUZHEN CO., LTD.

Address before: 210031 Nanjing, Pu Pu North Road, No. 68, Jiangsu

Patentee before: CSR NANJING PUZHEN Vehicles Co., Ltd.