CN102097774A - Construction method for ground wiring duct of moveable panel - Google Patents

Construction method for ground wiring duct of moveable panel Download PDF

Info

Publication number
CN102097774A
CN102097774A CN2010105936857A CN201010593685A CN102097774A CN 102097774 A CN102097774 A CN 102097774A CN 2010105936857 A CN2010105936857 A CN 2010105936857A CN 201010593685 A CN201010593685 A CN 201010593685A CN 102097774 A CN102097774 A CN 102097774A
Authority
CN
China
Prior art keywords
wire casing
panel
ground
lead
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105936857A
Other languages
Chinese (zh)
Other versions
CN102097774B (en
Inventor
刘春鹏
杨红岩
丛德心
崔爱珍
亓立刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN 201010593685 priority Critical patent/CN102097774B/en
Publication of CN102097774A publication Critical patent/CN102097774A/en
Application granted granted Critical
Publication of CN102097774B publication Critical patent/CN102097774B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The invention relates to a construction method for a ground wiring duct of a moveable panel, comprising the following steps: fixing the ground wiring duct in a structure facing cushion and space with mortars, wherein the space is reserved for the ground wiring duct during the construction period of a structure facing, and bonding and fixing a decorative rib with the structure facing; covering a layer of panel on a notch of the ground wiring duct, wherein the panel is formed by a plurality of wiring duct panels and a plurality of lead panels in a splicing arrangement mode, and according to a design, adjusting the splicing arrangement positions of the lead panels; and covering a layer of wiring duct facing on the moveable panel. By using the construction method, a user can move the lead panel in accordance with use requirements, thus determining a lead-out point in accordance with a use position, thereby ensuring that lines in a room are hidden, and the whole effect is elegant.

Description

Drop front above-ground route groove construction method
Technical field
The present invention is a kind of drop front above-ground route groove construction method, relates to the sealing, hidden in underground metal raceway form of construction work of the movable adjustment of a kind of panel, and affiliated science and technology field is engineering construction, and affiliated specialty is construction and installation and construction technology.
Background technology
The ground wire casing is a kind of sealing, directly hidden in underground metal raceway, cable transmission electric energy and signaling interfaces such as power supply, phone, TV, computer, microphone can be provided flexibly and easily, its design is a spacing in length and breadth recent according to building and that development need is arranged wire casing, determines the specification and the groove number of wire casing according to radical, cross-sectional area and the technological requirement of threading; In order to reduce project cost, the more room that is provided with the strong and weak electricity circuit is not provided with antistatic floor, be closed in the layout of underground ground wire casing to room strong and weak electricity circuit and adopt, such engineering generally selects for use " closed wire casing+above-ground route box " to lay; Existing closed wire casing is embedded in below ground according to design when building construction in advance, and it is the metal tube of both ends open, and electric wire is arranged in this pipe fitting, and offers fairlead in the appropriate location of this pipeline as required.
But the problem of existing ground wire casing is: it is embedded in below ground fully, just determined the wire casing position period in construction, later stage can't change again, if think to discharge again just ground to be excavated electric wire, the replacement wire casing, quite inconvenience, and the fairlead position is also fixed, and can not determine or the room strong and weak electricity uses the some position often during change when ground, room strong and weak electricity extraction location, adopts traditional " closed wire casing+above-ground route box " system can't solve this moving point position problem.
Summary of the invention
Main purpose of the present invention is: provide a kind of ground wire casing that solves to use the often drop front above-ground route groove construction method of change problem of some position.
For achieving the above object, the invention provides a kind of drop front above-ground route groove construction method, it includes following steps:
The ground wire casing is fixed on structure facing bed course and structure facing with mortar keeps in the space of ground wire casing when the construction period, decorative thread and structure facing bonding is fixing;
Notch loam cake at described ground wire casing is established a deck panels, and wherein: described panel is composed and laid out by plural piece wire casing panel and plural piece lead-in wire panel and formed, and adjusts the position of composing and laying out of described lead-in wire panel according to design;
Establish one deck wire casing facing at described panel loam cake;
Described ground wire casing includes light current wire casing and forceful electric power wire casing, and light current wire casing and forceful electric power wire casing are the E font to be put plugging, and the light current wire casing is connected near electric welding with the forceful electric power wire casing;
Be equipped with rubber strip between described ground wire casing and the wire casing panel, by described screw fixings wire casing panel, rubber strip and ground wire casing; Be equipped with rubber strip between described ground wire casing and the lead-in wire panel, by described screw fixings lead-in wire panel, rubber strip and ground wire casing;
Rubber threading plug is set on the fairlead of described lead-in wire panel;
Described wire casing panel detachably replaces with the lead-in wire panel.
The present invention can provide a kind of can drop front+the ground wire casing of activity lead-in wire panel, the user can be according to using needs, the positions of panels that will go between moves, and determines the position, leading point thereby reach according to the use location, thereby guarantees that circuit is hidden in the room, whole structure is attractive in appearance.
Adopt the ground wire casing of the inventive method construction, following advantage in use arranged:
1. convenient disassembly between panel and the ground wire casing;
2. the lead-in wire panel can arbitrarily replace with the wire casing panel, reaches the function that strong and weak electricity lead-out wire position can arbitrarily be adjusted.
3. the light current wire casing of wire casing panel and ground wire casing, forceful electric power wire casing form a closed metal wire casing, make the extraneous closed cell that forms of strong and weak electricity circuit.
4. between the light current wire casing of wire casing panel and ground wire casing, the forceful electric power wire casing rubber strip is set, wire casing is carried out waterproofing protection.
5. rubber threading plug fairlead, the electric wire that will go between on the panel tightly seals, and the outlet point is carried out waterproofing protection.
Description of drawings
Fig. 1 is strong and weak electricity wire casing arrangement relation figure of the present invention;
Fig. 2 is wire casing panel of the present invention and lead-in wire positions of panels graph of a relation;
Fig. 3 is the sectional view of drop front of the present invention ground wire casing along Fig. 2 A-A position;
Fig. 4 is the sectional view of drop front of the present invention ground wire casing along Fig. 2 B-B position;
Fig. 5 is a fairlead node diagram of the present invention; And
Fig. 6 is ground of the present invention wire casing and wire casing (lead-in wire) panel connected node figure.
Embodiment
As shown in Figure 1, use the ground wire casing 10 of the inventive method construction to include light current wire casing 11 and forceful electric power wire casing 12, light current wire casing 11 is the E font with forceful electric power wire casing 12 to be put plugging, and light current wire casing 11 and forceful electric power wire casing 12 are connected near electric welding;
In conjunction with shown in Figure 2, the of the present invention lid at above-mentioned ground wire casing 10 established a deck panels, and this panel is is mainly composed and laid out with lead-in wire panel 30 by wire casing panel 20 and formed; Described wire casing panel 20 is a rectangle plate body, described lead-in wire panel 30 is one to offer the rectangle plate body of fairlead 31, a plurality of wire casing panels 20 are alignd and compose and lay out with lead-in wire panel 30, lead-in wire panel 30 is adjusted the position of itself and wire casing panel 20 according to actual needs and is positioned, and is connected with strong, weak electricity wire casing 12,11 then;
A kind of drop front above-ground route groove construction method of the present invention specifically includes following steps:
As shown in Figures 3 and 4, structure facing bed course 41 and 42 construction periods of structure facing, reserve the structure slot space of light current wire casing 11, forceful electric power wire casing 12 required sizes thereon, light current wire casing 11, forceful electric power wire casing 12 are the E font to being seated the ground wire casing 10 that is connected to form one by electric welding, then the ground wire casing that fuses 10 is adopted mortars to be fixed in the structure slot space that structure facing bed course 41 and structure facing 42 reserve when the construction period, adopt structure glue and structure facing 42 bondings to fix decorative thread 43;
As shown in Figures 3 and 4, according to a plan lead-in wire point position compose and lay out a plurality of wire casing panels 20 and lead-in wire panel 30, the wire casing panel 20 of composing and laying out, lead-in wire panel 30 are established on the light current wire casing 11 that is fixed on ground wire casing 10, forceful electric power wire casing 12 openings by screw 50 lids; As Fig. 3 and shown in Figure 6, between light current wire casing 11, forceful electric power wire casing 12 and the wire casing panel 20 of described ground wire casing 10, be equipped with rubber strip 70, weak, forceful electric power wire casing 11,12 by screw 50 static line groove face plates 20, rubber strip 70 and ground wire casing 10, make wire casing panel 20 and light current wire casing 11, the forceful electric power wire casing 12 of ground wire casing 10 form the closed metal wire casing, rubber strip 70 is upper thread groove 10 hermetically, and above-ground route groove 10 is carried out waterproofing protection; As shown in Figure 4, be equipped with rubber strip 70 between the light current wire casing 11 of described ground wire casing 10, forceful electric power wire casing 12 and the lead-in wire panel 30, weak, forceful electric power wire casing 11,12 by screw 50 anchor leg panels 30, rubber strip 70 and ground wire casing 10, in conjunction with shown in Figure 5, and on described lead-in wire panel 30, offer fairlead 31 according to plan lead-out wire quantity, rubber threading plug 32 is set on the described fairlead 31, fairlead 31, electric wire that rubber threading plug 32 will go between on the panel 30 tightly seal, and the outlet point is carried out waterproofing protection;
As shown in Figures 3 and 4, according to finishing effect wire casing facing 60 is fixed on wire casing panel 20 and the lead-in wire panel 30 by above-mentioned screw 50 equally, and offer fairlead 61 in rubber threading plug 32 positions of correspondence lead-in wire panel 30, finally make the whole structure on structure facing 42, wire casing facing 60 formation plan ground;
Described wire casing panel 20 is fritter rectangle plate body with lead-in wire panel 30, all be fixed on the ground wire casing 10 by screw 50, so can arrange installation a wire casing panel 20 and lead-in wire panel 30 arbitrarily arbitrarily according to the electricity consumption needs, and when strong and weak electricity uses the some position to change to some extent, can extract screw 50, take out wire casing facing 60, again with wire casing panel 20 and the 30 dismounting transpositions of lead-in wire panel, after the transposition wire casing facing 60 put back to and fix and get final product with screw 50, need not to destroy constructure ground, thereby reach the function that strong and weak electricity lead-out wire position can arbitrarily be adjusted, realize that the ground wire casing is drop front+activity lead-in wire panel, accomplish that really the user can be according to using needs, the positions of panels that will go between moves, reach according to the use location and determine the position, leading point, guarantee that circuit is hidden in the room, whole structure is attractive in appearance.

Claims (5)

1. a drop front above-ground route groove construction method is characterized in that, includes following steps:
The ground wire casing is fixed on structure facing bed course and structure facing with mortar keeps in the space of ground wire casing when the construction period, decorative thread and structure facing bonding is fixing;
Notch loam cake at described ground wire casing is established a deck panels, and wherein: described panel is composed and laid out by plural piece wire casing panel and plural piece lead-in wire panel and formed, and adjusts the position of composing and laying out of described lead-in wire panel according to design;
Establish one deck wire casing facing at described panel loam cake.
2. drop front above-ground route groove construction method according to claim 1, it is characterized in that, described ground wire casing includes light current wire casing and forceful electric power wire casing, and light current wire casing and forceful electric power wire casing are the E font to be put plugging, and the light current wire casing is connected near electric welding with the forceful electric power wire casing.
3. drop front above-ground route groove construction method according to claim 1 is characterized in that, is equipped with rubber strip between described ground wire casing and the wire casing panel, by described screw fixings wire casing panel, rubber strip and ground wire casing; Be equipped with rubber strip between described ground wire casing and the lead-in wire panel, by described screw fixings lead-in wire panel, rubber strip and ground wire casing.
4. drop front above-ground route groove construction method according to claim 1 is characterized in that, rubber threading plug is set on the fairlead of described lead-in wire panel.
5. drop front above-ground route groove construction method according to claim 1 is characterized in that, described wire casing panel detachably replaces with the lead-in wire panel.
CN 201010593685 2010-12-17 2010-12-17 Construction method for ground wiring duct of moveable panel Expired - Fee Related CN102097774B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010593685 CN102097774B (en) 2010-12-17 2010-12-17 Construction method for ground wiring duct of moveable panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010593685 CN102097774B (en) 2010-12-17 2010-12-17 Construction method for ground wiring duct of moveable panel

Publications (2)

Publication Number Publication Date
CN102097774A true CN102097774A (en) 2011-06-15
CN102097774B CN102097774B (en) 2013-04-17

Family

ID=44130694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010593685 Expired - Fee Related CN102097774B (en) 2010-12-17 2010-12-17 Construction method for ground wiring duct of moveable panel

Country Status (1)

Country Link
CN (1) CN102097774B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104967059A (en) * 2015-04-08 2015-10-07 江苏宏强船舶重工有限公司 Hull navigation bridge cable laying method
CN105514894A (en) * 2016-01-22 2016-04-20 北京城建亚泰建设集团有限公司 Adjustable combination support for laying ground decoration integration wiring duct and installing method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2291736Y (en) * 1997-04-15 1998-09-16 江苏省南通市太平洋电器设备有限责任公司 Ground metal wire slot
CN2325905Y (en) * 1997-04-15 1999-06-23 江苏省南通市太平洋电器设备有限责任公司 Moveable type ground line outlet
DE20310430U1 (en) * 2003-07-08 2004-11-11 Reuß GmbH & Co KG Prefabricated glass fibre reinforced concrete service conduit for prefabricated building wall

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2291736Y (en) * 1997-04-15 1998-09-16 江苏省南通市太平洋电器设备有限责任公司 Ground metal wire slot
CN2325905Y (en) * 1997-04-15 1999-06-23 江苏省南通市太平洋电器设备有限责任公司 Moveable type ground line outlet
DE20310430U1 (en) * 2003-07-08 2004-11-11 Reuß GmbH & Co KG Prefabricated glass fibre reinforced concrete service conduit for prefabricated building wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104967059A (en) * 2015-04-08 2015-10-07 江苏宏强船舶重工有限公司 Hull navigation bridge cable laying method
CN104967059B (en) * 2015-04-08 2017-07-25 江苏宏强船舶重工有限公司 A kind of hull driver's cabin cable laying method
CN105514894A (en) * 2016-01-22 2016-04-20 北京城建亚泰建设集团有限公司 Adjustable combination support for laying ground decoration integration wiring duct and installing method thereof
CN105514894B (en) * 2016-01-22 2017-07-04 北京城建亚泰建设集团有限公司 One kind lays ground decoration integrated slot Combined adjustable support and its installation method

Also Published As

Publication number Publication date
CN102097774B (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN206340934U (en) A kind of residential electricity cabling laying structure
CN206346452U (en) A kind of two-wire groove skirting line structure
CN207160407U (en) A kind of toilet's electric pipeline laying structure
CN206360298U (en) Architecture indoor cable system
CN106464200A (en) Solar cell module and roof structure
CN102097774B (en) Construction method for ground wiring duct of moveable panel
CN203654630U (en) Photovoltaic tile for being integrated with roof building
CN204597268U (en) A kind of waterproof distribution box with drawing and pulling type base
CN204456189U (en) Subway station top Pipe rack
CN107883268B (en) Buried LED lamp and construction method
CN201258554Y (en) Groove brick for installing electric wire circuit
CN208874237U (en) A kind of submerged cable bridge device
CN206293847U (en) A kind of adjustable height for being easy to maintenance secretly buries Wire casing boxes
CN208094124U (en) A kind of electrical structure wiring system for assembled architecture
CN203618260U (en) Automatic line single machine electrical cabinet
CN204081098U (en) The waterproof construction of metope butt joint node
CN107332179A (en) Fast curable type putty floor plugging structure for cable
CN101247033A (en) Composite wiring facilities and method of indoor concealed circuit
CN204920034U (en) A solar panel waterproof construction for villa roof
CN205846495U (en) A kind of pre-buried type booth distribution box and the exhibition position electric power system that electrically shallow ridges is constituted
CN208386473U (en) The left side frame section of photovoltaic tile
CN201966543U (en) Comprehensive wire laying structure
CN206389008U (en) Tank unifies power station cabin
CN204212182U (en) The waterproof treatment structure of exterior wall worn by a kind of cable trench
CN205429449U (en) Secretly adorn waterproof block terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

CF01 Termination of patent right due to non-payment of annual fee