CN102094581B - Hammer - Google Patents

Hammer Download PDF

Info

Publication number
CN102094581B
CN102094581B CN201010571021.0A CN201010571021A CN102094581B CN 102094581 B CN102094581 B CN 102094581B CN 201010571021 A CN201010571021 A CN 201010571021A CN 102094581 B CN102094581 B CN 102094581B
Authority
CN
China
Prior art keywords
drilling rod
main drilling
tup
air inlet
inlet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010571021.0A
Other languages
Chinese (zh)
Other versions
CN102094581A (en
Inventor
卢丹
李丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201010571021.0A priority Critical patent/CN102094581B/en
Publication of CN102094581A publication Critical patent/CN102094581A/en
Application granted granted Critical
Publication of CN102094581B publication Critical patent/CN102094581B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention provides a hammer comprising a hollow cavity. The hammer is characterized in that the hollow cavity of the hammer is provided with one or more openings at the bottom surface of the hammer, and the one or more openings are arranged eccentrically.

Description

A kind of tup
Technical field
The present invention relates to a kind of crushing mechanism, more specifically, the present invention relates to a kind of hollow tup.
Background technology
In fields such as resource exploitation, engineering infrastructure, geological prospecting, drilling well, geothermal utilizations, need crushing mechanism to carry out hammering to hard thing and pulverize, and mincing of producing cleared up away, traditional tup is solid construction.
In real work, Solid hammer smashes hammering thing, then stops hammering, remove tup, the hammering thing water being crashed to pieces or other modes are diluted to sucking-off, this mechanism is when needs take out the hammering thing being crashed to pieces, tup all will quit work, and operating efficiency is reduced greatly.During hammering, the hammering thing of the most close tup bottom is crashed to pieces at first, the part being crashed to pieces is at first impacted repeatedly owing to not taking out in time, the interlayer that forms " mat " sample in hammering place, has consumed the hammer force suffered compared with distal part position from tup bottom, and useful work ratio is very low.Solid construction makes tup quality heavier, give quit work, the removing of displacement and hammering thing all brings very large difficulty; In addition, solid construction consumption material is many, and waste of material is large, and in use procedure, energy consumption is also large.
In hammering process, need ceaselessly hammering chip to be taken out, so that deep enough the going on of hammering energy, prior art uses the anti-circulation based on centrifugal pump to carry out conventionally, and this method needs the power of pump large, and consumed energy is high, economical not.Because suction journey and the lift of pump itself are limited, limited the degree of depth of removing chip simultaneously.
Existing crushing mechanism adopts wire rope to be directly connected with tup conventionally, Solid hammer weight, and the holding capacity of wire rope is large, and mechanical wear is high, and the application life of whole machinery is low.
Due to probing or hammering along with progress will be deepened, preset main drilling rod can not meet the demands under certain depth, need to increase drilling rod; In addition, if install short scale drilling rod additional between tup and main drilling rod, be convenient to install, safeguard and transportation.
Connection between drilling rod completes with traditional flange, in operation or job site, two flange plates is connected with bolt, needs a plurality of people when connecting, and connects respectively with two spanners, needs fastening bolt want 6-12, time-consuming, take a lot of work.Meanwhile, because flange plate is separated with the member that will be connected, be easy to produce bolt and lose, the problem that flange cannot be connected with the member that will be connected.
Summary of the invention
For overcoming the defect of existing crushing mechanism and tup, the present invention proposes a kind of new crushing mechanism and tup.
According to an aspect of the present invention, provide a kind of tup, this tup comprises hollow chamber, it is characterized in that, the hollow chamber of described tup is divided into one or more opening at tup basal surface, described one or more opening arranged off-centre.
Accompanying drawing explanation
Fig. 1 is according to the structural scheme of mechanism of a kind of crushing engine of the embodiment of the present invention;
Fig. 2 be crushing engine shown in Fig. 1 K to F to schematic diagram;
Fig. 3 is hollow tup and tup schematic surface;
Fig. 4 is short drilling rod connection diagram;
Fig. 5 illustrates two ends and has the short drilling rod with handle flange plate;
Fig. 6 illustrates the flange plate with handle;
Fig. 7 illustrates the flange plate of not being with handle;
Fig. 8 illustrates an anchor ear;
Fig. 9 illustrates another anchor ear;
Figure 10 illustrates the Compress Spring cover being connected with tup, main drilling rod;
Figure 11 illustrates the sectional view of the spring stack in Compress Spring cover;
Figure 12 illustrates the elbow with hoisting ring device;
Figure 13 and Figure 14 illustrate the disk that air inlet pipe segmentation is communicated with;
Figure 15 illustrates the valve mechanism schematic diagram of the main drilling rod connection of air inlet pipe.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, describe the present invention.Be appreciated that structure and layout for hollow tup, flange, Compress Spring cover, air inlet pipe, can be applied in separately in the crushing mechanism that includes but not limited to describe in the first embodiment, or sell or use as an independent product.
In addition, for hollow tup, Compress Spring cover, main drilling rod, hoisting ring device and air inlet pipe can constitute crushing mechanism mutually, for example there is tup, the crushing mechanism of main drilling rod and air inlet pipe, there is hollow tup, main drilling rod, the crushing mechanism of hoisting ring device and air inlet pipe, there is a plurality of short drilling rod that anchor ear flange connects, hollow tup, the crushing mechanism of air inlet pipe and hoisting ring device, according under the instruction of following embodiment, those skilled in the art can combine to realize each function that the present invention mentions to assembly according to the present invention, the various combinations of doing are included in the scope of appended claim, but the composition of crushing mechanism of the present invention is not limited to this according to above-mentioned ingredient.
Fig. 1 illustrates a kind of crushing mechanism according to the first embodiment of the present invention, and as shown in Figure 1, this crushing mechanism comprises hoisting ring device, main drilling rod, air inlet pipe, Compress Spring cover and tup.Hoisting ring device is positioned at the top of crushing mechanism, comprises suspension ring, support and wire rope, and stent support is at well head, the main drilling rod of wire rope tractive, and wire rope lifts main drilling rod by suspension ring, makes winner's drilling rod lifting.The upper end of main drilling rod is connected to elbow, for discharging residue liquid.Air inlet pipe is attached to main drilling rod one side extends from top to bottom, and is communicated with main drilling rod, and the upper end of air inlet pipe connects air compressor (abbreviation air compressor machine), by air compressor machine, air is pressed in main drilling rod through air inlet pipe.Main drilling rod is connected with the top of Compress Spring cover, and the bottom of Compress Spring cover is connected with tup, and described tup is hollow, and main drilling rod, Compress Spring cover and tup form hollow and be communicated with, the opening arranged off-centre of this tup bottom.
In the prior art, tup is generally solid.Although also there is the tup of hollow; but the opening of this tup is usually located at middle part, the advantage that is arranged in middle part is that tup material is evenly distributed, stressed evenly for the hammering of tup; can protect preferably tup; but comparatively speaking, tup when hammering, narrow space; opening is positioned at the tup at middle part; make by hammering, partly to be formed projection below tup, stop up the opening of main drilling rod, and evenly hammering.For overcoming this defect, in the present embodiment, the inside of this tup comprises cavity, rear surface welding or the riveted joint of the upper end face of tup and Compress Spring cover.The lower openings of the Compress Spring cover of tup upper opening is communicated with, and the internal diameter of tup upper opening is equal to or less than the lower openings of Compress Spring cover.
Further, as shown in Figure 2, the cavity of tup is divided into two chambeies in bottom, and the internal diameter of the opening in these two chambeies is all less than the internal diameter of cavity, and more preferably, the cross sectional area of two openings is less than the cross sectional area of cavity.Use two openings that the pressure (suction) of hollow contact site is increased, be convenient to the removing of material, in reset procedure, required drive reduces greatly simultaneously.The shared volume in hollow part is little, and the shared volume in solid position is large, to not causing substantial effect the application life with tup.In one embodiment, be appreciated that, with respect to above-mentioned tup, in bottom, be divided into two openings, the cavity of tup herein can be divided in bottom one or more opening, these openings can be evenly or are not become the basal surface that is distributed in regularly tup, for example, form the annulus of space, form triangular shape of space etc.These one or more openings can arranged off-centre, or part arranged off-centre.These one or more openings can be circle, ellipse, rectangle or other shapes, and their shape can be consistent or inconsistent.For example, a part for these openings is circular, and another part is ellipse or rectangle.Their internal diameter can be also the same, or internal diameter is different mutually.
Fig. 3 illustrates tup basal surface, as shown in Figure 3, and a plurality of grooves that are interconnected of tup sole arrangement, the alloy sheets of a plurality of high rigidity of edge placement of groove or alloy projection.Arrange alloy sheets or the alloy projection of high rigidity, can strengthen the hardness of hammering.Arrange a plurality of grooves that are interconnected, can be so that hammering impurity and fluid can not form bur at tup basal surface.In an example, a plurality of alloy sheets of tup surface distributed, are not arranging the position cutting of alloy sheets, form and are communicated with.The shape of alloy sheets is not limited to circle, can use ellipse or rectangle, and front end is preferably used taper, and the cross sectional area of the front end of alloy sheets is less than the cross sectional area of rear end, and rear end is convenient to embed in tup main body.
In Practical Project, due to going deep into that brill hits, the length of main drilling rod needs to adjust, and the main drilling rod of use standardization length just need to carry a plurality of main drilling rods, and main drilling rod integral body need to be proposed from hammering position in engineering, and change, very not convenient in engineering preparation and replacement.In the present embodiment, between main drilling rod and Compress Spring cover, can add a plurality of drilling rods that are connected with anchor ear by flange, the plurality of short drilling rod can be installed at the upper end of main drilling rod, just the length of main drilling rod can be increased like this in the situation that not needing main drilling rod to propose hammering position.According to actual hammering situation; can stop at any time hammering; a plurality of short drilling rods are attached on main drilling rod temporarily, and shut down, install additional with respect to whole to propose for hammering position the time quite short by crushing mechanism, namely saved the most time-consuming main drilling rod of proposition and the time of tup.
Use existing flange to connect the connection that can realize short drilling rod and main drilling rod, but attended operation is difficult as described in the background art for existing flange, time and effort consuming, and need the good suitability between flange and drilling rod.As shown in Figures 4 and 5, in the present embodiment, short two ends of drill can shift to an earlier date mounting flange sheet, and short two ends of drill can be arranged the flange plate with handle, and arrange not with the flange of handle on the connector of this two ends of drill, the mechanism of flange describes in detail below in conjunction with Fig. 6-9.Or one end of the drilling rod that each is short arranges that the flange plate with handle is arranged in one end not with the flange plate of handle, can realize standardization and connect.Like this, one section that a section of being connected with elbow except upper end of main drilling rod and lower end are connected with Compress Spring cover, can use two ends to be connected with the short drilling rod of flange plate.Between main drilling rod and top elbow, also can adopt such flange mechanism to connect, so just can between main drilling rod and elbow, install arbitrarily drilling rod additional.Such flange mechanism and corresponding short drilling rod convenient transportation, assemble in construction ground, according to the degree of depth, need to adjust at any time, makes to install additional operational standardization, time saving and energy saving.
With reference to figure 6-9, a kind of flange bindiny mechanism is shown, this flange mechanism includes but not limited to installing additional for above-mentioned drilling rod.This flange arrangement comprises two flange plates and two semicircle anchor ears, a slice of flange is circular, another sheet of flange is circular with handle, not identical with external diameter with the flange internal diameter except the part of handle with handle with the flange of handle, two flange plates are fixed to respectively on two pipes that will connect in advance, use the mode that includes but not limited to welding or riveted joint.Fig. 6 illustrates the flange with handle, and its main body is annular, and internal diameter adapts to the internal diameter of institute's connecting tube.On the handle of flange body, leave two symmetrical screws.By these two screws, one end separately of two semicircle anchor ears is connected on the flange with handle.Fig. 7 illustrates the flange of not being with handle, and the internal diameter of this flange adapts to the internal diameter of institute's connecting tube equally.This flange and adaptive with flange shape, the material of handle.On the annulus of the flange plate shown in Fig. 6 and 7, can leave circular hole, so that the tracheae that the pipe fitting connecting is arranged is fixed through flange plate around.Or do not leave circular hole, because the thickness of flange plate itself is not enough to affect tracheae or other pipe fittings depending in main drilling rod surrounding.The end face of a flange has antitorque pin, and the corresponding position of another flange is fluted, prevents that the flange being connected from laterally twisting.This antitorque pin can be cross pin, cotter pilotage.The area of the antitorque pin front end cross section that this end face is arranged is less, and the area of rear end cross section is larger, accordingly, the cross section of the front end of groove is larger, and that the face of the cross section of rear end connects is less, the easy like this flange plate that makes is easily aimed at, and can be that flange plate agrees with.In addition, groove is used circular, and the cross section of front-end and back-end is identical, equals the area of the cross section of pin rear end.
Fig. 8 and 9 illustrates two semicircle anchor ears, and wherein, two semicircle anchor ears are relatively connected to the connecting end surface with the flange of handle by bolt, by bolt, two semicircle anchor ears are fixed in the screw on handle.Two semicircle anchor ears have inside crimping in the outer rim of the one side of the flange away from handle, at flange plate, on time, by crimping, two flanges are tightened up, and prevent that flange from vertically moving.Crimping is apart from equaling with the distance of handle flange plate or being slightly larger than the thickness of not being with handle flange plate, can the flange with handle not be contained with respect to the outstanding flange of pipe fitting by crimping like this, towards band handle flange, tightens up.When crimping is slightly larger than apart from the distance with handle flange plate the thickness of not being with handle flange plate, in order to increase the seal between flange plate, can placement of flexible pad between two flange plates.The ring edge of flange can be set to arc, and the bead designs of corresponding anchor ear is arc, so that progressively fastening according to the abrasion condition using in use.
In addition, anchor ear also has another kind of arrangement, wherein, two semicircle anchor ears can be in upper end open, and there is cross through hole the both sides of opening, and this opening clips on the handle with the flange of handle, screw on this cross through hole and handle is aimed at, and by bolt, anchor ear is connected with band handle flange.The width of opening is greater than the width of handle, by two flange plates fixedly time, can connection opening and the bolt with handle flange on, on the left side or the right of handle, add packing ring, so that anchor ear can or be moved to the left, to tighten up adaptively two flange plates to the right.
As mentioned above, one end of two anchor ears is connected on handle, and the other end of two anchor ears, an anchor ear is equipped with pin, and another anchor ear is equipped with notch, and notch and pin match.After two flanges are aimed at, two anchor ears are encircled to this flange plate, tighten pin, mounting flange connects.In addition as mentioned above, by adjusting two semicircle anchor ears at the connecting bolt of the flange connections with handle, adjust two degrees of tightness between flange.
Figure 10 illustrates the Compress Spring cover being connected with hollow tup, and Figure 11 illustrates the cross section of longitudinal spring post.As shown in figure 10, Compress Spring cover and tup form hollow and are communicated with, and wherein in Compress Spring cover, have the identical and hollow tube that internal diameter is different of external diameter, and air inlet pipe can be connected with the hollow tube in Compress Spring cover.Main drilling rod is connected with the fluted disc on Compress Spring cover top, and the bottom of Compress Spring cover is connected with tup, and the tup that described Compress Spring cover bottom connects rotates with respect to main drilling rod by comprising the spring rotating mechanism of described fluted disc.
Further, with reference to Figure 10 and 11, spring rotating mechanism comprises fluted disc, crossed strip dish, longitudinal spring post; Upper fluted disc is positioned at the inner and upper of Compress Spring cover, and the upper surface of upper fluted disc and main drilling rod directly weld or rivet, and the soffit of upper fluted disc is distributed with gear piece.Longitudinal spring post is connected to the bottom of Compress Spring cover, and crossed strip dish connect to be supported by longitudinal spring post, and the upper surface of crossed strip dish is arranged gear piece, the gear piece on crossed strip dish can with the gear piece interlock of upper fluted disc.The diameter of upper fluted disc is greater than the internal diameter of the upper opening of Compress Spring cover.
Soffit riveted joint or the welding of tup and Compress Spring cover.The under shed internal diameter of Compress Spring cover is greater than the upper shed internal diameter of tup.
When hammering, separated by the lifting of main drilling rod between upper fluted disc and crossed strip dish, the gear piece of crossed strip dish leaves the gear piece of fluted disc, under the support of crossed strip, the upper fluted disc rotation of crossed strip coiling, drives parts and the tup of Compress Spring cover except upper fluted disc around main drilling rod, to rotate together, then next gear piece interlock of the gear piece of crossed strip dish and fluted disc, the corresponding rotation displacement of tup, when winner's drilling rod is declined, the position that hammering is different.
On upper fluted disc, have a plurality of gear pieces, gear piece is wedge or triangle, and the gear piece on crossed strip dish and the quantity of the gear piece on fluted disc are corresponding.The quantity of described gear piece is one of them in 18 to 72, makes the each lifting of winner's drilling rod can cause tup corresponding rotation 5-20 degree, and certainly, the quantity of this gear piece can increase or reduce as required, adjusts the angular dimension of tup rotation.
With further reference to as Fig. 1, air inlet pipe is arranged in main drilling rod one side extends from top to bottom, and the upper end of air inlet pipe is connected to air compressor machine, for air is pressed into air inlet pipe.Air inlet pipe and main drilling rod are communicated with, and via air compressor machine, by air inlet pipe, gas are pressed in main drilling rod.
Usually, air inlet pipe is attached to main drilling rod one side, and in one of them position of 45-55 rice from top to bottom with stretch into main drilling rod, and main drilling rod is communicated with.Through experimental verification, in air inlet pipe, vertically the position pressure of 50 meters is maximum from top to bottom in this position.
Above-mentioned layout is suitable for the fixed position arrangement at main drilling rod, in hammering process, main drilling rod gradually deeply, make the positional interface place of air inlet pipe and main drilling rod can not well be controlled at the pressure spot of expectation.
In the another kind of the application's air inlet pipe connects, described air inlet pipe is communicated with at main drilling rod a plurality of positions and main drilling rod from top to bottom, at the responsive valve of each connectivity part setting pressure.When not reaching desired pressure, pressure valve is tending towards closed condition; When reaching desired pressure point, pressure valve is opened automatically, and ventilation enters main drilling rod, makes the air pressure of realizing desired pressure pass into main drilling rod.Wherein, the opening point of presser sensor valve arranges 45-55 rice, more preferably, is arranged on 5kg point, i.e. 50 meters of hydraulic pressure places.
Be in operation, the downward hammering of main drilling rod, tup is broken by hammering flour, the fluid dilution through passing into of chip, impurity, by hollow tup, Compress Spring cover, enter main drilling rod, air inlet pipe passes into gas by the position being connected with main drilling rod, and this gas upwards promotes the liquid on connecting portion top, through main drilling rod, discharges.And the liquid of connecting portion bottom can not be affected.Like this in hammering, upwards flow the liquid that is mixed with impurity in bottom always, gas always by the liquid in main drilling rod to extrapolation, thereby the impurity of pulverizing is discharged, this process is carried out in hammering, and does not need special shutdown process discharge process.The chip that such gas lift reverse circulation is can be faster and better cleaner under opening a hole, due to buoyancy and the election power of air self, gaslift can just can be lifted heavy strength by little power, and fragment is removed.
For some situation, need to rotate main drilling rod, like this existing problems be exactly the side that air inlet pipe is attached to main drilling rod, but not with main drilling rod one, the rotation of main drilling rod can make air inlet pipe and other pipe fitting that is attached to main drilling rod on main drilling rod, form winding, and causes mechanical breakdown.
In the present invention, by air inlet pipe being divided into two sections, wherein, the epimere of air inlet pipe is along with main drilling rod rotates, and hypomere and main drilling rod keep not rotating.Particularly, the upper outside of main drilling rod arrange cutting respectively two and half on dish and two and half lower walls, coil riveted on two and half and hold main drilling rod tightly, two and half lower wall riveteds are held main drilling rod tightly, four and half form hollow ring between coiling.First dish and second dish press together by platen.First dish is connected with rotating disk, and first dish of driven by rotary disc rotates, and enters and drives main drilling rod to rotate.
Air inlet pipe is divided into two sections by the disk of riveted, and epimere is connected with first dish, and hypomere is connected with second dish.The gas that air inlet pipe passes into enters hollow ring by epimere, and the gas in hollow ring flows into the hypomere of air inlet pipe.Like this, when the rotation of main drilling rod, will not affect air inlet pipe, and also can not make air inlet pipe be wrapped on main drilling rod, can also guarantee the normal ventilation of air inlet pipe.
Hoisting ring device shown in Figure 12, this hoisting ring device is positioned at the top of crushing mechanism, for by support and the main drilling rod of steel wire tractive.By hoisting ring device, drive the hammering of hammer to hammering thing, do up-and-down reciprocating motion, the distance of its motion (or height) by corresponding sensor according to determining after the obtained data analysis of last hammering.
In an embodiment of the present invention, various materials can be used and resistance to wear and high manganese steel or other steel of hardness.
Above total description form each composition of the structure of breaker, but understandable for those skilled in the art, breaker for specific implementation, might not need to have above-mentioned whole ingredient, those skilled in the art can be in conjunction with specific combination separately.In following embodiment, the various composition of breaker has been described, and for above-mentioned feature class like structure, below will not be described in detail, the embodiment of these compositions is only schematic and nonrestrictive.
In the second embodiment of the present invention, a kind of tup is provided, this tup comprises hollow chamber, hollow chamber is divided into one or more opening in tup bottom, described one or more opening arranged off-centre.In the present embodiment, the welding of the rear surface of the upper end face of tup and Compress Spring cover or riveted joint.The lower openings of tup upper opening and Compress Spring cover is communicated with, and the internal diameter of tup upper opening is equal to or less than the lower openings of Compress Spring cover.
As shown in Figure 2, the cavity of tup is divided into two chambeies in bottom, and the internal diameter of the opening in these two chambeies is all less than the internal diameter of cavity.Use two openings that the pressure of hollow contact site is increased, be convenient to the removing of material, in reset procedure, required drive reduces greatly simultaneously.The shared volume in hollow part is little, and the shared volume in solid position is large.In one embodiment, be appreciated that the cavity of tup can be divided in bottom one or more opening, these openings can be evenly or are not become the basal surface that is distributed in regularly tup.As mentioned above, these one or more openings can arranged off-centre, or part arranged off-centre.These one or more openings can be circle, ellipse or rectangle, and their shape can be consistent or inconsistent.For example, a part for these openings is circular, and another part is ellipse or rectangle.Their internal diameter can be also the same, or internal diameter is different mutually.
Fig. 3 illustrates tup basal surface, as shown in Figure 3, and a plurality of grooves that are interconnected of tup sole arrangement, alloying pellet (point) head of a plurality of high rigidity of edge placement of groove.Arrange alloying pellet (point) head of high rigidity, can strengthen the hardness of hammering.Arrange a plurality of grooves that are interconnected, can be so that hammering impurity and fluid can not form bur at tup basal surface.
This hollow tup can be for crushing mechanism, and this crushing mechanism can also comprise hoisting ring device, main drilling rod, air inlet pipe, Compress Spring cover; Wherein, hoisting ring device is used for by support and the main drilling rod of steel wire tractive, and main drilling rod, Compress Spring cover and hollow tup form hollow and be communicated with, and main drilling rod is connected with the top of Compress Spring cover, and the bottom of Compress Spring cover is connected with tup; Air inlet pipe is attached to main drilling rod one side extends from top to bottom, and is communicated with main drilling rod, via air compressor machine, by air inlet pipe, gas is pressed in main drilling rod; The internal diameter of the hollow chamber of described tup is less than the internal diameter of the hollow of main drilling rod.
In the third embodiment of the present invention, as shown in Figure 1, provide a kind of hammer head rotation mechanism, comprising: main drilling rod, Compress Spring cover and hollow tup; Main drilling rod, Compress Spring cover and tup form hollow and are communicated with, main drilling rod is connected with the fluted disc on Compress Spring cover top, the bottom of Compress Spring cover is connected with tup, the opening arranged off-centre of this tup bottom, the tup that described Compress Spring cover bottom connects rotates with respect to main drilling rod by comprising the spring rotating mechanism of described fluted disc.
Figure 10 illustrates the Compress Spring cover being connected with hollow tup, and Figure 11 illustrates the cross section of longitudinal spring post.As shown in figure 10, Compress Spring cover and tup form hollow and are communicated with, and wherein in Compress Spring cover, have the identical and hollow tube that internal diameter is different of external diameter, and air inlet pipe is connected with the hollow tube in Compress Spring cover.Main drilling rod is connected with the fluted disc on Compress Spring cover top, and the bottom of Compress Spring cover is connected with tup.
Further, with reference to Figure 10 and 11, spring rotating mechanism comprises fluted disc, crossed strip dish, longitudinal spring post; Upper fluted disc is positioned at the inner and upper of Compress Spring cover, and the upper surface of upper fluted disc and main drilling rod directly weld or rivet, and the soffit of upper fluted disc is distributed with gear piece.Longitudinal spring post is connected to the bottom of Compress Spring cover, and crossed strip dish connect to be supported by longitudinal spring post, and the upper surface of crossed strip dish is arranged gear piece, the gear piece on crossed strip dish can with the gear piece interlock of upper fluted disc.The diameter of upper fluted disc is greater than the internal diameter of the upper opening of Compress Spring cover.
Soffit riveted joint or the welding of tup and Compress Spring cover.The under shed internal diameter of Compress Spring cover is greater than the upper shed internal diameter of tup.
When hammering, separated by the lifting of main drilling rod between upper fluted disc and crossed strip dish, the gear piece of crossed strip dish leaves the gear piece of fluted disc, under the support of crossed strip, the upper fluted disc rotation of crossed strip coiling, drives parts and the tup of Compress Spring cover except upper fluted disc around main drilling rod, to rotate together, then next gear piece interlock of the gear piece of crossed strip dish and fluted disc, the corresponding rotation displacement of tup, when winner's drilling rod is declined, the position that hammering is different.
On upper fluted disc, have a plurality of gear pieces, gear piece is wedge or triangle, and the gear piece on crossed strip dish and the quantity of the gear piece on fluted disc are corresponding.The quantity of described gear piece is one of them in 18 to 72, makes the each lifting of winner's drilling rod can cause tup corresponding rotation 5-20 degree, and certainly, the quantity of this gear piece can increase or reduce as required, adjusts the angular dimension of tup rotation.Hammer head rotation mechanism also comprises air inlet pipe, and described air inlet pipe is attached to main drilling rod one side extends from top to bottom, and is communicated with main drilling rod, via air compressor machine, by air inlet pipe, gas is pressed in main drilling rod.
In the fourth embodiment of the present invention, a kind of flange bindiny mechanism is provided, this flange arrangement comprises two flange plates and two semicircle anchor ears, a slice of flange is circular, another sheet of flange is circular with handle, not identical with external diameter with the flange internal diameter except the part of handle with handle with the flange of handle, two flange plates are fixed to respectively on two pipes that will connect in advance, use the mode that includes but not limited to welding or riveted joint.Fig. 6 illustrates the flange with handle, and its main body is annular, and internal diameter adapts to the internal diameter of institute's connecting tube.On the handle of flange body, leave two symmetrical screws.By these two screws, one end separately of two semicircle anchor ears is connected on the flange with handle.Fig. 7 illustrates the flange of not being with handle, and the internal diameter of this flange adapts to the internal diameter of institute's connecting tube equally.This flange and adaptive with flange shape, the material of handle.On the annulus of the flange plate shown in Fig. 6 and 7, can leave circular hole, so that the tracheae that the pipe fitting connecting is arranged is fixed through flange plate around.Or do not leave circular hole, because the thickness of flange plate itself is not enough to affect tracheae or other pipe fittings depending in main drilling rod surrounding.The end face of a flange has antitorque pin, and the corresponding position of another flange is fluted, prevents that the flange being connected from laterally twisting.This antitorque pin can be cross pin, cotter pilotage etc.The area of the antitorque pin front end cross section that this end face is arranged is less, and the area of rear end cross section is larger, accordingly, the cross section of the front end of groove is larger, and that the face of the cross section of rear end connects is less, the easy like this flange plate that makes is easily aimed at, and can be that flange plate agrees with.
Fig. 8 and 9 illustrates two semicircle anchor ears, and wherein, two semicircle anchor ears are relatively connected to the connecting end surface with the flange of handle by bolt, that is to say by bolt two semicircle anchor ears are fixed in the screw on handle.Two semicircle anchor ears have inside crimping in the outer rim of the one side of the flange away from handle, at flange plate, on time, by crimping, two flanges are tightened up, and prevent that flange from vertically moving.Crimping is apart from equaling with the distance of handle flange plate or being slightly larger than the thickness of not being with handle flange plate, can the flange with handle not be contained with respect to the outstanding flange of pipe fitting by crimping like this, towards band handle flange, tightens up.When crimping is slightly larger than apart from the distance with handle flange plate the thickness of not being with handle flange plate, in order to increase the seal between flange plate, can placement of flexible pad between two flange plates.
In addition, anchor ear also has another kind of arrangement, wherein, two semicircle anchor ears can be in upper end open, and there is cross through hole the both sides of opening, and this opening clips on the handle with the flange of handle, screw on this cross through hole and handle is aimed at, and by bolt, anchor ear is connected with band handle flange.The width of opening is greater than the thickness of handle, by two flange plates fixedly time, can connection opening and the bolt with handle flange on, on the left side or the right of handle, add packing ring, so that anchor ear can or be moved to the left, to tighten up adaptively two flange plates to the right.
As mentioned above, one end of two anchor ears is connected on handle; And the other end of two anchor ears, an anchor ear is equipped with pin, and another anchor ear is equipped with notch, and notch and pin match.After two flanges are aimed at, two anchor ears are encircled to this flange plate, tighten pin, mounting flange connects.In addition, by adjusting two semicircle anchor ears at the connecting bolt of the flange connections with handle, adjust two degrees of tightness between flange.
This flange mechanism can be used for a kind of crushing mechanism, in this crushing mechanism, uses this flange mechanism that a plurality of drilling rods are linked together, and forms main drilling rod, and wherein, this crushing mechanism comprises: hoisting ring device, main drilling rod, air inlet pipe, Compress Spring cover, tup; Hoisting ring device is used for by support and the main drilling rod of steel wire tractive, and described main drilling rod, Compress Spring cover and tup form hollow and be communicated with, and main drilling rod is connected with the top of Compress Spring cover, and the bottom of Compress Spring cover is connected with tup; Air inlet pipe is attached to main drilling rod one side extends from top to bottom, and is communicated with main drilling rod, via air compressor machine, by air inlet pipe, gas is pressed in main drilling rod; Described tup is hollow, the opening arranged off-centre of this tup bottom; Between described main drilling rod and described Compress Spring cover, also comprise one or more drilling rod that a plurality of flange mechanisms connect.
In the fifth embodiment of the present invention, a kind of broken assembly with air inlet pipe is provided, comprising: main drilling rod, air inlet pipe and hollow tup; Hollow tup is connected to the lower end of main drilling rod, and air inlet pipe is arranged in main drilling rod one side extends from top to bottom, and the upper end of air inlet pipe is connected to air compressor machine, for air is pressed into air inlet pipe.Air inlet pipe and main drilling rod are communicated with, and via air compressor machine, by air inlet pipe, gas are pressed in main drilling rod.
Usually, air inlet pipe is attached to main drilling rod one side, and in one of them position of 45-55 rice from top to bottom with stretch into main drilling rod, and main drilling rod is communicated with.Through experimental verification, in air inlet pipe, vertically the position pressure of 50 meters is maximum from top to bottom in this position.
Above-mentioned layout is suitable for the fixed position arrangement at main drilling rod, in hammering process, main drilling rod gradually deeply, make the positional interface place of air inlet pipe and main drilling rod can not well be controlled at the pressure spot of expectation.
In the another kind of the application's air inlet pipe connects, described air inlet pipe is communicated with at main drilling rod a plurality of positions and main drilling rod from top to bottom, at the responsive valve of each connectivity part setting pressure.When not reaching desired pressure, pressure valve is closed; When reaching desired pressure point, pressure valve is opened, and ventilation enters main drilling rod, makes the air pressure of realizing desired pressure pass into main drilling rod.Wherein, the opening point of presser sensor valve arranges 45-55 rice, more preferably, is arranged on 5kg point, i.e. 50 meters of hydraulic pressure places.
Figure 15 illustrates the valve mechanism schematic diagram between air inlet pipe and main drilling rod.As shown in figure 15, this valving comprises stage clip, valve body, taper valve core, O type circle, air valve lead and draw ring, and stage clip, taper valve core, O type circle, air valve lead and draw ring are arranged in the vertically aerial of valve body, and top is fixed by stage clip bolt.The air inlet port of valve connects air inlet pipe, and the gas outlet of valve connects main drilling rod, between air inlet port and gas outlet, by taper valve core, seals, and taper valve core upper end is pressed and put by stage clip, and stage clip is by regulating screw thread to be fixed in valve body.Spool bottom is O type circle, and O type circle connects air valve lead, and air valve lead connects draw ring.During use, the draw ring of can leaving behind when air inlet pipe connects, is communicated with air inlet port and gas outlet.Or while arriving predetermined pressure, stage clip flicks, air inlet port and gas outlet are communicated with.
Be in operation, the downward hammering of main drilling rod, tup is broken by hammering flour, the fluid dilution through passing into of chip, impurity, by hollow tup, Compress Spring cover, enter main drilling rod, air inlet pipe passes into gas by the position being connected with main drilling rod, and this gas upwards promotes the liquid on connecting portion top, through main drilling rod, discharges.And the liquid of connecting portion bottom can not be affected.Like this in hammering, upwards flow the liquid that is mixed with impurity in bottom always, gas always by the liquid in main drilling rod to extrapolation, thereby the impurity of pulverizing is discharged, this process is carried out in hammering, and does not need special shutdown process discharge process.The chip that such gas lift reverse circulation is can be faster and better cleaner under opening a hole, due to buoyancy and the election power of air self, gaslift can just can be lifted heavy strength by little power, and fragment is removed.
According to a sixth embodiment of the invention, provide a kind of crushing mechanism of rotatable drill pipe, having comprised: main drilling rod, air inlet pipe; Wherein, air inlet pipe is attached to main drilling rod one side extends from top to bottom, and is communicated with main drilling rod, via air compressor machine, by air inlet pipe, gas is pressed in main drilling rod.The outside on the top of main drilling rod arrange cutting respectively two and half on dish and two and half lower walls, on two and half, coil riveted and hold main drilling rod tightly, two and half lower wall riveteds are held main drilling rod tightly, between four and half dishes, form hollow ring, air inlet pipe is divided into two sections by the disk of riveted, epimere is connected with first dish, and hypomere is connected with second dish, and main drilling rod rotates and air inlet pipe can be wrapped on main drilling rod along with first coils residing rotating disk.
Wherein, first dish and second dish press together by platen.Need to rotate the main drilling rod in top, existing problems are exactly the side that air inlet pipe is attached to main drilling rod like this, but not with main drilling rod one, other pipe fitting that the rotation of main drilling rod can make air inlet pipe and be attached to main drilling rod forms winding on main drilling rod, and causes mechanical breakdown.
In the present invention, by air inlet pipe being divided into two sections, wherein, the epimere of air inlet pipe is along with main drilling rod rotates, and hypomere and main drilling rod keep not rotating.Particularly, the upper outside of main drilling rod arrange cutting respectively two and half on dish and two and half lower walls, coil riveted on two and half and hold main drilling rod tightly, two and half lower wall riveteds are held main drilling rod tightly, four and half form hollow ring between coiling.First dish and second dish press together by platen.First dish is connected with rotating disk, and first dish of driven by rotary disc rotates, and enters and drives main drilling rod to rotate.
Air inlet pipe is divided into two sections by the disk of riveted, and epimere is connected with first dish, and hypomere is connected with second dish.The gas that air inlet pipe passes into enters hollow ring by epimere, and the gas in hollow ring flows into the hypomere of air inlet pipe.Like this, when the rotation of main drilling rod, will not affect air inlet pipe, and also can not make air inlet pipe be wrapped on main drilling rod, can also guarantee the normal ventilation of air inlet pipe.
According to hollow tup of the present invention, when hammering, do not need hammer to remove, can remove at any time the hammering thing being crashed to pieces, save time and staff's labour intensity; Because hammering thing can be removed in time, in the bottom of hammer, no longer include " mat ", so efficiency improves greatly; Hollow tup can also pass into various materials, as liquid or be less than the material of hollow diameter, to reach different purposes and objects; Hollow tup material therefor is few, saves material, lightweight, and convenient in carrying is saved energy consumption, can also save artificial and time.
The air inlet pipe that the present invention uses is utilized the buoyancy and the election power making progress of the characteristic of air itself well, compressed air arrives the bottommost that need to remove chip simultaneously, as long as how long the pipe of corresponding conveying gas has, the degree of depth of removing chip just can reach how many, therefore changes conventional pump power completely and is inhaled the defect that the restriction of journey and lift can not reach removing chip depth requirements.Meanwhile, the speed and vigor that air compressor makes to remove chip is all suitable large, adds anti-circulation and need not shut down and change any equipment and parts, and operating efficiency is accelerated greatly like this.
Various liquid and semisolid can be ventilated, be led to the hollow of main drilling rod and the conduit of arranging in addition, import gas, liquid or semi-solid to send into the below of hammering face, or by beyond the material derivation hammer body of hammer body below (or above), or carry out cooling to hammer body.
Owing to having adopted the method for gaslift suction, only with just completing residue in several seconds, to remove, conventional method is used about 30 minutes possibly, also needs 2-3 people; Middle airlift method is only used 1 people, and mechanism of the present invention can extract larger stone, soil block out, the pulverizing of unnecessary hammering, and traditional solid hammer can only be gone out the soil block of the pulverizing of hitting or stone.
The present invention is simple in structure, easy construction, and operating efficiency is high, saves artificial 4-8 people, than original conventional method, raises the efficiency 2-3 doubly, saves consumptive material, saves the electricity charge, conserves water, and construction cost is low, and the pore-forming time is short, has high economic worth.
Practicality of the present invention and versatility are very strong, can on the existing equipments such as traditional Churn drill, abrasion drill, install additional, for old equipment, can under the prerequisite of not eliminating existing device, install additional, can under the prerequisite of utilizing the equipment falling behind, raise the efficiency, reduce investment outlay and saving resource.
In the seventh embodiment of the present invention, mechanism of the present invention can be used for Churn drill and abrasion drill, below with Churn drill example, a kind of Churn drill mechanism is provided, comprise hoisting ring device, main drilling rod, air inlet pipe, Compress Spring cover and drill hammer.Hoisting ring device is positioned at the top of Churn drill mechanism, comprises suspension ring, support and wire rope, and stent support is at well head, the main drilling rod of wire rope tractive, and wire rope lifts main drilling rod by suspension ring, makes winner's drilling rod lifting.The upper end of main drilling rod is connected to elbow, for discharging residue liquid.Air inlet pipe is attached to main drilling rod one side extends from top to bottom, and is communicated with the dreg-discharging rod of main drilling rod one side of load, and the upper end of air inlet pipe connects air compressor (abbreviation air compressor machine), by air compressor machine, air is pressed in dreg-discharging rod through air inlet pipe.Main drilling rod is connected with the top of Compress Spring cover, and the bottom of Compress Spring cover is connected with Churn drill.
The present invention can be used for the applications such as the basis, oil exploitation, explosion of railway, highway, bridge, water conservancy, electric power Foundation Design, work China Democratic National Construction Association.
The present invention can discharge the soil bits and the aggregate chips that smash in time, compares and has greatly improved drilling speed, and drilling depth is many, drilling well timeliness is high, drilling period is short, per unit size drilling depth cost is low, is the developing direction of modern steerable drilling.
Finally it should be noted that above embodiment is only in order to describe technical scheme of the present invention rather than this technical method and application are limited.

Claims (6)

1. a crushing mechanism, described crushing mechanism comprises tup, hoisting ring device, main drilling rod, air inlet pipe, Compress Spring cover, described tup comprises hollow chamber,
Wherein, the hollow chamber of described tup is divided into one or more opening at tup basal surface, described one or more opening arranged off-centre, a plurality of grooves that are interconnected of sole arrangement of described tup, the alloy sheets of a plurality of high rigidity of edge placement of described groove or alloy projection;
Wherein, in described tup bottom surface, do not arrange the position cutting of described alloy sheets, form and be communicated with;
Wherein, hoisting ring device is used for by support and the main drilling rod of steel wire tractive, and main drilling rod, Compress Spring cover and hollow tup form hollow and be communicated with, and main drilling rod is connected with the top of Compress Spring cover, and the bottom of Compress Spring cover is connected with tup; Air inlet pipe is attached to main drilling rod one side extends from top to bottom, and is communicated with main drilling rod, via air compressor machine, by air inlet pipe, gas is pressed in main drilling rod; The internal diameter of the hollow chamber of described tup is less than the internal diameter of the hollow of main drilling rod;
Wherein, the upper outside of described main drilling rod arrange cutting respectively two and half on dish and two and half lower walls, on described two and half, dish forms a disk riveted and holds main drilling rod tightly, described two and half lower walls form a disk riveted and hold main drilling rod tightly, between four and half dishes, form hollow ring, described air inlet pipe is divided into two sections by the disk of riveted, and epimere is connected with first dish, and hypomere is connected with second dish; First dish and second dish press together by platen; The epimere of air inlet pipe is along with main drilling rod rotates, and hypomere and main drilling rod keep not rotating; Wherein said crushing mechanism also comprises rotating disk, and described rotating disk is connected with first dish, first disc spins of described driven by rotary disc, and then drive main drilling rod rotation.
2. crushing mechanism claimed in claim 1, wherein, described one or more opening is circular, ellipse or rectangle.
3. crushing mechanism claimed in claim 1, wherein, the internal diameter of described opening is less than the internal diameter of hollow chamber.
4. crushing mechanism claimed in claim 3, wherein, total cross sectional area of described one or more opening is less than the cross sectional area of described hollow chamber.
5. crushing mechanism claimed in claim 1, wherein, described one or more opening is distributed in the basal surface of tup equably or unevenly.
6. crushing mechanism claimed in claim 1, wherein, described alloy sheets be shaped as circle, ellipse or rectangle.
CN201010571021.0A 2010-12-01 2010-12-01 Hammer Expired - Fee Related CN102094581B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010571021.0A CN102094581B (en) 2010-12-01 2010-12-01 Hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010571021.0A CN102094581B (en) 2010-12-01 2010-12-01 Hammer

Publications (2)

Publication Number Publication Date
CN102094581A CN102094581A (en) 2011-06-15
CN102094581B true CN102094581B (en) 2014-09-17

Family

ID=44127829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010571021.0A Expired - Fee Related CN102094581B (en) 2010-12-01 2010-12-01 Hammer

Country Status (1)

Country Link
CN (1) CN102094581B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727751A (en) * 2013-12-18 2015-06-24 天津世纪天源钻井工程有限公司 High-strength drilling rig

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1651711A (en) * 2005-03-11 2005-08-10 吉林大学 Bottom hole hammer reverse circulation follow pipe drill
EP1605133A1 (en) * 2004-05-17 2005-12-14 Bernard Lionel Gien Pneumatic hammer
CN201339442Y (en) * 2009-02-05 2009-11-04 四川隆源石油技术发展有限公司 Down-the-hole drill bit
CN201588549U (en) * 2009-12-16 2010-09-22 李保顺 High wind pressure drill bit
CN202037010U (en) * 2010-12-01 2011-11-16 卢丹 Hollow hammerhead and crusher comprising same

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2235499Y (en) * 1995-07-04 1996-09-18 四川石油管理局川东钻探公司 Pneumatic lifting and removing rock device for vertical drilling machine
CN200955357Y (en) * 2006-10-20 2007-10-03 浙江开山股份有限公司 Extrusion-formed '-' shaped alloy drill-rod head
KR100871127B1 (en) * 2007-05-25 2008-12-03 이광익 Hammer Bit
KR20080041171A (en) * 2008-04-21 2008-05-09 한동덕 Bit for rock drilling air hammer bit
KR100990201B1 (en) * 2010-05-26 2010-10-29 김미선 Variable geometry expandable hammer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1605133A1 (en) * 2004-05-17 2005-12-14 Bernard Lionel Gien Pneumatic hammer
CN1651711A (en) * 2005-03-11 2005-08-10 吉林大学 Bottom hole hammer reverse circulation follow pipe drill
CN201339442Y (en) * 2009-02-05 2009-11-04 四川隆源石油技术发展有限公司 Down-the-hole drill bit
CN201588549U (en) * 2009-12-16 2010-09-22 李保顺 High wind pressure drill bit
CN202037010U (en) * 2010-12-01 2011-11-16 卢丹 Hollow hammerhead and crusher comprising same

Also Published As

Publication number Publication date
CN102094581A (en) 2011-06-15

Similar Documents

Publication Publication Date Title
CN102003139B (en) Single body large-diameter pneumatic down-the-hole hammer
CN202621224U (en) Multifunctional knife-type smashing machine
CN202108413U (en) Crushing mechanism
CN203663910U (en) Crushing and evenly mixing device for flexible materials
CN102116133B (en) Flange mechanism
CN202117555U (en) Hammer head rotation mechanism
CN202073503U (en) A flange mechanism and a crushing mechanism containing the same
CN208482548U (en) Impact breaker
CN202039769U (en) Crushing mechanism with air inlet pipe
CN102094581B (en) Hammer
CN202152632U (en) Drilling mechanism
CN102094576B (en) Crushing mechanism
CN102094575B (en) Breaking mechanism with rotatable drill rod
CN202039768U (en) Crushing mechanism for rotatable drill pipe
CN102155159B (en) Hammer rotating mechanism
CN202037010U (en) Hollow hammerhead and crusher comprising same
CN102094578B (en) Drilling mechanism
CN102155150B (en) Crushing mechanism with gas inlet pipe
CN114412361A (en) Ultrasonic vibration steel shot jet impact auxiliary drilling system and method
CN206793873U (en) HP type moving cone of cone crusher liner plate attaching/detaching apparatus
CN201900559U (en) Grinding pressure control device of grinding head
CN106245704A (en) A kind of nitrogen explosion type high-frequency breaking hammer
CN202590878U (en) Combined type powerful swing hammer
CN206008806U (en) Multicylinder hydraulic spindle formula disintegrating machine
CN201644425U (en) Portable high-pressure cleaning machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20161201