CN102071948B - 用于隧道洞口的门式复合管棚套拱结构及其施工方法 - Google Patents

用于隧道洞口的门式复合管棚套拱结构及其施工方法 Download PDF

Info

Publication number
CN102071948B
CN102071948B CN 201110044651 CN201110044651A CN102071948B CN 102071948 B CN102071948 B CN 102071948B CN 201110044651 CN201110044651 CN 201110044651 CN 201110044651 A CN201110044651 A CN 201110044651A CN 102071948 B CN102071948 B CN 102071948B
Authority
CN
China
Prior art keywords
pipe
arch
reinforcement
pipe roof
pipe canopy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110044651
Other languages
English (en)
Other versions
CN102071948A (zh
Inventor
易震宇
***
傅立新
张进华
刘正刚
蒋胜波
***
刘永胜
施成华
李林林
侯兴杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Original Assignee
Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Provincial Communications Planning Survey and Design Institute Co Ltd filed Critical Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Priority to CN 201110044651 priority Critical patent/CN102071948B/zh
Publication of CN102071948A publication Critical patent/CN102071948A/zh
Application granted granted Critical
Publication of CN102071948B publication Critical patent/CN102071948B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种用于隧道洞口的门式复合管棚套拱结构及其施工方法,该结构包括位于隧道洞口顶部的管棚套拱和位于洞口两侧的预加固桩,管棚套拱与预加固桩相连接且由预加固桩支承;预加固桩的顶端固接有顶盖梁,顶盖梁与管棚套拱间填充有袋装回填土。施工方法为:先在洞口两侧开挖、浇注预加固桩,并在桩内预埋连接套管;然后开挖管棚套拱断面,并保留核心土;再在连接套管中***连接钢筋,同时浇注管棚套拱,使其与预加固桩固接成一整体,同时在该管棚套拱内预留管棚套管,设置长管棚;最后在管棚套拱上方填充袋装回填土,并浇注顶盖梁,完成施工。本发明的门式复合管棚套拱结构更加稳定,力学性能较好,能有效防止隧道洞口坍塌和边、仰坡滑移。

Description

用于隧道洞口的门式复合管棚套拱结构及其施工方法
技术领域
本发明涉及交通隧道的加固结构及其施工方法,尤其涉及一种隧道施工时的洞口加固结构及其施工方法。
背景技术
隧道洞口是隧道的咽喉,洞口部分在地质上通常比较破碎松软,易于失稳形成滑坡、坍塌等。因此,洞口段的稳定与否直接关系到隧道施工的难易与营运安全。在山岭隧道施工中,对于破碎松软的洞口地段常设置管棚套拱,通过搭设长管棚以进行洞口段加固。然而,对于地表处于临近稳定状态的情况,尽管施做了长管棚,在进行暗挖施工时,洞口段边、仰坡仍可能出现开裂、滑移,导致洞内下沉过大,常规的管棚套拱被移位开裂,进而引发洞口坍塌事故。
发明内容
本发明要解决的技术问题是克服现有技术的不足,提供一种结构稳定、力学性能较好、能有效防止隧道洞口坍塌和边、仰坡滑移的用于隧道洞口的门式复合管棚套拱结构,还相应提供一种施工步骤简单、施工效率高、施工经济性和安全性较好的门式复合管棚套拱结构的施工方法。
为解决上述技术问题,本发明提出的技术方案为一种用于隧道洞口的门式复合管棚套拱结构,所述门式复合管棚套拱结构包括位于隧道洞口顶部的管棚套拱和位于隧道洞口两侧的预加固桩,所述管棚套拱的两端分别与两侧的预加固桩相连接,且该管棚套拱由预加固桩支承;预加固桩的顶端固接有顶盖梁,所述顶盖梁与所述管棚套拱间填充有袋装回填土。
作为对上述门式复合管棚套拱结构的进一步改进,所述预加固桩内预埋有连接套管,所述管棚套拱的两端通过***该连接套管的连接钢筋与所述预加固桩相连接。
上述的用于隧道洞口的门式复合管棚套拱结构中,所述顶盖梁中优选设有长管棚。
作为一个总的技术构思,本发明还提供一种上述的门式复合管棚套拱结构的施工方法,包括以下步骤:
(1)施工预加固桩:在隧道洞口两侧开挖、浇注预加固桩,并在桩内预埋连接套管;
(2)开挖隧道管棚套拱:开挖隧道的管棚套拱断面,并保留隧道开挖断面的核心土;
(3)***连接钢筋:在所述预加固桩的连接套管中***连接钢筋;
(4)施工管棚套拱:浇注管棚套拱,使管棚套拱通过连接钢筋与所述预加固桩固接成一整体,同时在该管棚套拱内预留管棚套管,在管棚套管内设置长管棚;
(5)施工顶盖梁:所述管棚套拱的混凝土达到设计强度后,在管棚套拱上方填充袋装回填土,并在袋装回填土上方浇注顶盖梁,在该顶盖梁内预留管棚套管,并在管棚套管内设置长管棚,完成施工。
与现有技术相比,本发明的优点在于:
(1)本发明的门式复合管棚套拱采用了预加固桩与顶盖梁相结合的倒“U”形洞口加固结构,其在结构强度、稳定性及外部受力上要表现出更加优异的性能;
(2)采用本发明的门式复合管棚套拱结构可以更有效地防止隧道洞内的下沉及洞口的坍塌,大大提高隧道施工的安全性和施工效率;
(3)采用本发明的门式复合管棚套拱结构可以更有效地防止两坡(隧道洞口的边坡和仰坡)滑移,进一步提高隧道施工的安全性和施工效率;
(4)本发明的施工方法操作相对简便,施工效率高,能够大大减少施工开挖的高度,提高施工的经济性和施工效率。
附图说明
图1为本发明实施例中的门式复合管棚套拱结构的主视图。
图2为本发明实施例中的门式复合管棚套拱结构的侧视图。
图3为本发明实施例中的门式复合管棚套拱结构的俯视图。
图4为图1中A处的局部放大图。
图例说明
1. 管棚套拱;11. 管棚套管;12. 长管棚;2. 预加固桩;21. 连接套管;22. 连接钢筋;3. 仰坡;4. 核心土;5. 顶盖梁;6. 袋装回填土。
具体实施方式
以下结合说明书附图和具体实施例对本发明作进一步描述。
实施例:
一种如图1~图4所示的本发明用于隧道洞口的门式复合管棚套拱结构,该门式复合管棚套拱结构包括位于隧道洞口顶部的管棚套拱1和位于隧道洞口两侧的预加固桩2,该管棚套拱1由预加固桩2支承,管棚套拱1的两端分别与两侧的预加固桩2相连接。本实施例中,管棚套拱1的端部具体连接于预加固桩2中部偏上的位置。在预加固桩2内预埋有连接套管21,管棚套拱1的两端是通过***该连接套管21的连接钢筋22与预加固桩2相连接。在预加固桩2的顶端固接有顶盖梁5,顶盖梁5与管棚套拱1间填充有袋装回填土6。管棚套拱1和顶盖梁5中均预埋有均匀分布的管棚套管11和穿过该管棚套管11的长管棚12。
本实施例的用于隧道洞口的门式复合管棚套拱结构的施工方法包括以下步骤:
1. 施工预加固桩:在某一地质软弱、破碎的交通隧道洞口地段,先在隧道洞口两侧开挖、浇注预加固桩2,并在桩内拟连接管棚套拱的相应位置预埋连接套管21;
2. 开挖隧道管棚套拱:开挖隧道管棚套拱的断面及两侧基础,使隧道上方的仰坡3的坡度保持在1∶1,并保留隧道开挖的核心土4;
3. ***连接钢筋:管棚套拱断面开挖以后,在预加固桩2的连接套管21中***连接钢筋22;
4. 施工管棚套拱:浇注管棚套拱1,使管棚套拱1通过连接钢筋22与预加固桩2固接成一整体,同时在该管棚套拱1内预留φ127mm的钢质管棚套管11,在管棚套管11内施做长管棚12;
5. 施工顶盖梁:当管棚套拱1的混凝土达到设计强度后,在管棚套拱1上方填充袋装回填土6,并在袋装回填土6上方浇注顶盖梁5,在该顶盖梁5内预留管棚套管11,并在管棚套管11内设置长管棚12,完成施工。
在本实施例的门式复合管棚套拱结构施工完成后,即可进行后续的进洞开挖、仰拱及仰拱回填的施工。在后续的隧道开挖施工过程中,由于洞口的管棚套拱与两侧的预加固桩和顶部顶盖梁形成一受力整体,这可避免在开挖下台阶时,由于管棚套拱基础底部悬空而造成管棚套拱的下沉及开裂,因而能够大大提高隧道施工过程的安全性和经济性。

Claims (3)

1.一种用于隧道洞口的门式复合管棚套拱结构,其特征在于:所述门式复合管棚套拱结构包括位于隧道洞口顶部的管棚套拱和位于隧道洞口两侧的预加固桩,所述管棚套拱的两端分别与两侧的预加固桩相连接,且该管棚套拱由预加固桩支承;管棚套拱的端部具体连接于预加固桩中部偏上的位置,所述预加固桩内预埋有连接套管,所述管棚套拱的两端通过***该连接套管的连接钢筋与所述预加固桩相连接;预加固桩的顶端固接有顶盖梁,所述顶盖梁与所述管棚套拱间填充有袋装回填土。
2.根据权利要求1所述的用于隧道洞口的门式复合管棚套拱结构,其特征在于:所述顶盖梁中设有长管棚。
3.一种如权利要求1或2所述的门式复合管棚套拱结构的施工方法,包括以下步骤:
(1)施工预加固桩:在隧道洞口两侧开挖、浇注预加固桩,并在桩内预埋连接套管;
(2)开挖隧道管棚套拱:开挖隧道的管棚套拱断面,并保留隧道开挖断面的核心土;
(3)***连接钢筋:在所述预加固桩的连接套管中***连接钢筋;
(4)施工管棚套拱:浇注管棚套拱,使管棚套拱通过连接钢筋与所述预加固桩固接成一整体,同时在该管棚套拱内预留管棚套管,在管棚套管内设置长管棚;
(5)施工顶盖梁:所述管棚套拱的混凝土达到设计强度后,在管棚套拱上方填充袋装回填土,并在袋装回填土上方浇注顶盖梁,在该顶盖梁内预留管棚套管,并在管棚套管内设置长管棚,完成施工。
CN 201110044651 2011-02-24 2011-02-24 用于隧道洞口的门式复合管棚套拱结构及其施工方法 Active CN102071948B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110044651 CN102071948B (zh) 2011-02-24 2011-02-24 用于隧道洞口的门式复合管棚套拱结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110044651 CN102071948B (zh) 2011-02-24 2011-02-24 用于隧道洞口的门式复合管棚套拱结构及其施工方法

Publications (2)

Publication Number Publication Date
CN102071948A CN102071948A (zh) 2011-05-25
CN102071948B true CN102071948B (zh) 2013-01-16

Family

ID=44030684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110044651 Active CN102071948B (zh) 2011-02-24 2011-02-24 用于隧道洞口的门式复合管棚套拱结构及其施工方法

Country Status (1)

Country Link
CN (1) CN102071948B (zh)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536266B (zh) * 2012-02-23 2014-04-02 山东盛大矿业股份有限公司 人造巷道顶帮支护方法
CN103967504B (zh) * 2014-05-21 2016-05-18 中国能源建设集团广东省电力设计研究院有限公司 一种电厂循环水***隧洞口的支护结构及施工方法
CN104389628B (zh) * 2014-11-21 2015-09-02 山西省交通科学研究院 滑坡地段隧道加固装置及加固施工方法
CN104612719B (zh) * 2014-12-15 2016-11-02 中铁二十局集团有限公司 一种软岩隧道洞口防坍塌处理方法
CN105257301B (zh) * 2015-10-16 2017-11-03 中铁十局集团第一工程有限公司 一种浅埋暗挖隧道软弱围岩塌方加固处理方法
CN105863650B (zh) * 2016-05-20 2018-11-23 浙江省交通规划设计研究院 一种先墙后洞的隧道进洞施工方法
CN106761832A (zh) * 2016-12-30 2017-05-31 陈建强 一种地铁隧道安全施工方法
CN107035382A (zh) * 2017-06-22 2017-08-11 中铁十局集团第五工程有限公司 软弱围岩下隧道洞口支护***
CN107503360B (zh) * 2017-07-20 2020-01-24 中铁十八局集团有限公司 一种巨型松散岩堆隧道进口堆载反压加固结构
CN108119149B (zh) * 2018-01-02 2019-04-09 兰州理工大学 一种下穿既有建筑物的隧道支护结构及施工方法
CN109869163A (zh) * 2019-04-03 2019-06-11 北京市市政工程设计研究总院有限公司 一种隧道进洞的施工方法及结构
CN109944597B (zh) * 2019-04-16 2020-11-06 陕西路桥集团有限公司 一种基于保护边仰坡自然植被的隧道进洞施工方法
CN109915150A (zh) * 2019-04-26 2019-06-21 重庆交通大学 一种控制隧道沉降的桩基预加固支护结构及其施工方法
CN111365018B (zh) * 2020-03-25 2021-08-06 上海同岩土木工程科技股份有限公司 一种适用于小隧道净空的套拱加固补强方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1426495A2 (de) * 2002-12-02 2004-06-09 Tief- und Baugeräte GmbH & Co. KG Verfahren und Vorrichtung zum Herstellen eines Tunnels oder eines Troges
CN101082279A (zh) * 2007-06-27 2007-12-05 北京交通大学 桩-柱-预应力支撑体系及其施工方法
CN101260806A (zh) * 2008-04-24 2008-09-10 重庆交通科研设计院 前置式洞口工法
CN201152176Y (zh) * 2007-10-29 2008-11-19 中铁二院工程集团有限责任公司 既有电气化铁路隧道接长段构造
CN101864960A (zh) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 岩溶地区双连拱公路隧道施工方法
CN201650302U (zh) * 2010-03-25 2010-11-24 中铁二院工程集团有限责任公司 既有高速铁路隧道接长明洞构造
CN202039859U (zh) * 2011-02-24 2011-11-16 湖南省交通规划勘察设计院 用于隧道洞口的门式复合管棚套拱结构

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS527138A (en) * 1975-07-08 1977-01-20 Seiwa Kiko Kk Steel sheet pile used for method of tunnel construction
JPS55165317A (en) * 1979-06-11 1980-12-23 Nippon Keemoo Koji Kk Burying method for steel-pipe sheet pile

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1426495A2 (de) * 2002-12-02 2004-06-09 Tief- und Baugeräte GmbH & Co. KG Verfahren und Vorrichtung zum Herstellen eines Tunnels oder eines Troges
CN101082279A (zh) * 2007-06-27 2007-12-05 北京交通大学 桩-柱-预应力支撑体系及其施工方法
CN201152176Y (zh) * 2007-10-29 2008-11-19 中铁二院工程集团有限责任公司 既有电气化铁路隧道接长段构造
CN101260806A (zh) * 2008-04-24 2008-09-10 重庆交通科研设计院 前置式洞口工法
CN201650302U (zh) * 2010-03-25 2010-11-24 中铁二院工程集团有限责任公司 既有高速铁路隧道接长明洞构造
CN101864960A (zh) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 岩溶地区双连拱公路隧道施工方法
CN202039859U (zh) * 2011-02-24 2011-11-16 湖南省交通规划勘察设计院 用于隧道洞口的门式复合管棚套拱结构

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
JP昭55-165317A 1980.12.23
JP特开昭52-7138A 1977.01.20
何毅等.隧道洞口段过岩堆体的防坍技术.《西部探矿工程》.2008,(第1期), *
杨斌.大管棚预注浆超前支护技术在风霜岭隧道洞口施工中的应用.《福建建设科技》.2005,(第2期),第34-35页. *
陈学雄.曹源隧道出口段加固处理.《福建建材》.2007,(第5期),第67-39页. *

Also Published As

Publication number Publication date
CN102071948A (zh) 2011-05-25

Similar Documents

Publication Publication Date Title
CN102071948B (zh) 用于隧道洞口的门式复合管棚套拱结构及其施工方法
CN102071949B (zh) 用于隧道洞口的桩式复合管棚套拱结构及其施工方法
CN102071947B (zh) 大跨度隧道洞口软弱围岩段施工方法
CN108005664A (zh) 一种站台结构的洞桩施工方法
CN104989425B (zh) 一种暗挖进洞支护结构及其支护方法
CN105041349A (zh) 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法
CN102444405B (zh) 一种抗滑桩架拱组合结构及施工方法
CN101769154A (zh) 一种隧道施工的开挖支护方法
CN104763433A (zh) 上软下硬地层大跨地铁车站暗挖施工方法
CN105064397A (zh) 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法
CN102606168B (zh) 防止浅埋暗挖隧道开挖时沉降变形的施工方法
CN106948823A (zh) 车站风道与暗挖区间联合施作的施工方法
CN107905794B (zh) 一种保留隧道局部管片的地铁车站拓建方法
CN104632227B (zh) 单层梁拱结构的地铁车站开挖工艺
CN103898916A (zh) 迷你桩复合式支挡结构及施工方法
CN109853399B (zh) 用于拱桥的大截面倾斜隧道式拱座结构及其施工方法
CN104453948B (zh) 一种大断面暗挖隧道竖向预应力钢管支撑的施工工艺
CN108843341A (zh) 一种桩墙一体式的隧道明洞结构及其施工方法
CN107740446A (zh) 既有建筑物基础被动补充与洞内托换***的联合施工方法
CN103233753A (zh) 用于浅埋大型地下结构建造的全断面开挖的管幕棚架法
CN205077499U (zh) 一种具有横向连接构件的双排桩支护结构
CN201982105U (zh) 用于隧道洞口的桩式复合管棚套拱结构
CN114352292A (zh) 用于风化千枚岩地层的浅埋偏压连拱隧道施工方法
CN109538236A (zh) 一种隧道进洞结构及隧道进洞施工方法
CN202039859U (zh) 用于隧道洞口的门式复合管棚套拱结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 410008 No. two, Furong North Road, Changsha, Hunan, 158

Patentee after: Hunan Traffic Planning Survey and Design Institute Co Ltd

Address before: 410008 No. two, Furong North Road, Changsha, Hunan, 158

Patentee before: Hunan Communication Planning and Prospecting Design Academy

CP01 Change in the name or title of a patent holder