CN102062538A - Method for mounting head sprocket wheel of belt sintering machine - Google Patents

Method for mounting head sprocket wheel of belt sintering machine Download PDF

Info

Publication number
CN102062538A
CN102062538A CN200910219850XA CN200910219850A CN102062538A CN 102062538 A CN102062538 A CN 102062538A CN 200910219850X A CN200910219850X A CN 200910219850XA CN 200910219850 A CN200910219850 A CN 200910219850A CN 102062538 A CN102062538 A CN 102062538A
Authority
CN
China
Prior art keywords
wheel
chassis
sintering machine
star
head star
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910219850XA
Other languages
Chinese (zh)
Other versions
CN102062538B (en
Inventor
王�琦
于淑红
龚强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Original Assignee
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANGANG CONSTRUCTION CONSORTIUM Co Ltd filed Critical ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority to CN 200910219850 priority Critical patent/CN102062538B/en
Publication of CN102062538A publication Critical patent/CN102062538A/en
Application granted granted Critical
Publication of CN102062538B publication Critical patent/CN102062538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention relates to a method for mounting a head sprocket wheel of a belt sintering machine. The method comprises the following steps of: carrying the head sprocket wheel by temporarily constructing a track, a hoisting beam, an upright post and other equipment indoors; and mounting the head sprocket wheel of the sintering machine by utilizing an indoor gantry crane, a winch, a crane and other hoisting equipment. In the method, first-phase preparation work is a little, the main body equipment is quickly mounted, the construction of previous and subsequent processes and the civil engineering are not influenced, conditions are provided for ensuring whole equipment installation of the sintering machine, and the mounting cost is greatly reduced.

Description

Continuous pallettype sintering machine head star-wheel installation method
Technical field
The present invention relates to a kind of continuous pallettype sintering machine head star-wheel installation method.
Background technology
Continuous pallettype sintering machine is one of capital equipment in the sintering engineering design.It is used for the mixing sintered material agglomeration operation behind the mixer.Sintering machine head star-wheel is that weight is the heaviest in the removable component of all agglomerating plants, and the installation of head star-wheel also is the difficult point during sintering machine equipment is installed.At present, generally when civil engineering does not bind, utilize large-scale crane outside main building, directly star-wheel to be carried out hoisted in position, not only civil engineering there is restriction, simultaneously also increased operating cost greatly, danger coefficient also increases thereupon, brings a series of potential safety hazards to safety in production.
Summary of the invention
The present invention has overcome deficiency of the prior art, provides a kind of convenient, and installation in position is continuous pallettype sintering machine head star-wheel installation method accurately.
In order to address the above problem, the present invention by the following technical solutions:
A kind of continuous pallettype sintering machine head star-wheel installation method is characterized in that, utilize indoor crane gear to finish the installation of sintering machine head star-wheel, this method is carried out according to the following step:
1) elder generation is installed to sintering machine head skeleton on the platform and highly is no more than the absolute altitude that chassis gets on the right track;
2) lay two sintering pallets in orbit, two chassis are held together, can keep synchronously when making its operation with steel wire rope, fixed installation crescent moon seat on chassis, the position in the track both sides near the head star-wheel is provided with two 75KW hoist engines;
3) on Equipment Foundations according to absolute altitude configure base backing plate, on the Equipment Foundations face, finish center line, center line is also finished in position corresponding on the star-wheel;
4) overhead crane is installed at the factory building top, top, head star-wheel installation site is provided with single-beam and hangs, the lifting beam is set on the platform above the head star-wheel, the lifting beam single-beam hang and head star-wheel installation site between, two cover assembly pulleys are installed on the lifting beam, and two cranes are installed in every cover assembly pulley lower end;
5) chassis is shifted onto in the lifting zone at factory building rear portion, utilized overhead crane that sintering machine head star-wheel is lifted by crane more than the sintering machine orbital plane through hole for hoist by ground, on the crescent moon seat of two chassis, steadily place;
6) utilize hoist engine and overhead crane synchronously chassis to be pulled to the installation site, when overhead crane reaches the limit of the position, the hoist engine hook is moved to the rear portion by the chassis front portion, the chassis front portion is used the single-beam towing instead and is dragged, chassis is sling unsettled, utilize two cover assembly pulleys and four cranes that the head star-wheel is rotated adjustment in place, make the central lines on the center line and Equipment Foundations face on the star-wheel, inspection through each position, confirm under the safe and reliable situation, remove chassis, then remove lifting beam and pillar, it is in place slowly great wheel to be fallen design attitude then;
7) repetition measurement absolute altitude, position of center line and horizontal level are installed after the retest-ok.
Compared with prior art, the invention has the beneficial effects as follows:
The inventive method adopts indoor installation, and preliminary preparation is few, and main equipment is installed fast, does not influence the construction and the civil engineering duration of upper and lower procedure, for guaranteeing the sintering machine integral device condition that provides is installed.
Avoid using large-scale crane operation, finish the installation of sintering machine head star-wheel, greatly reduced installation cost, improved the installation accuracy rate by crane gears such as indoor overhead crane, hoist engine and cranes.
Description of drawings
Fig. 1 reaches the limit of scheme of installation before the position for overhead crane;
Fig. 2 reaches the limit of scheme of installation behind the position for overhead crane;
Fig. 3 adjusts head star-wheel schematic diagram for utilizing pulley.
The specific embodiment
A kind of continuous pallettype sintering machine head star-wheel installation method, this method utilizes indoor crane gear to finish the installation of sintering machine head star-wheel, and this method is carried out according to the following step:
1) sees Fig. 1, Fig. 2, Fig. 3, earlier is installed to sintering machine head skeleton on the platform 10 and highly is no more than get on the right track 2 absolute altitude of chassis 4 that the above sintering machine head frame of these track 2 absolute altitudes wouldn't be installed.
2) see Fig. 1, Fig. 2, on track 2, lay two sintering pallets 4, attention can not be installed grid section and side plate, otherwise star-wheel 3 can not lie on the chassis 4, with 4 fens steel wire ropes two chassis 4 is held together temporarily, fixes with little bayonet socket, can keep synchronous when making its operation, fixed installation crescent moon seat on chassis 4, the position in track 2 both sides near head star-wheel 3 is provided with two 75KW hoist engines 5, is used to draw two chassis 4 and moves horizontally.
3) on Equipment Foundations according to absolute altitude configure base backing plate, on the Equipment Foundations face, finish center line, center line is also finished in position corresponding on the star-wheel 3.
4) see Fig. 2, a 20t overhead crane 1 is installed at the factory building top, the top of head star-wheel installation site 6 is provided with single-beam and hangs 8, because overhead traveling crane is distance travelled limited in the factory building, can not directly head star-wheel 3 be delivered to installation site 6, so lifting beam 12 is set on the platform above the head star-wheel 3 10, lifting beam 12 adopts H shaped steel to make, the lifting beam 12 single-beam hang 8 and head star-wheel 3 installation sites between, two covers, 4 * 4 assembly pulleys are installed on the lifting beam 12, and two 10t cranes 11 are installed in every cover assembly pulley lower end; For improving the force-bearing situation of factory building beam, can between factory building platform 10, set up prop 9.
5) see Fig. 1, Fig. 2, chassis 4 is shifted onto in the lifting zone at factory building rear portion, (great wheel is naked with sintering machine head star-wheel 3 to utilize overhead crane 1, do not contain tooth plate) lift by crane the sintering machine track more than 2 by ground through hole for hoist 7, on the crescent moon seat of two interim chassis 4, steadily place, chassis 4 is not damaged thereby make each position of chassis 4 bear uniform load.
6) see Fig. 1, Fig. 2, utilize the interior overhead crane 1 of hoist engine 5 and factory building synchronously chassis 4 to be pulled to installation site 6, during near installation site 6, overhead crane 1 reaches the limit of position (frame for movement restriction, cause and to move ahead), hoist engine 5 hooks are moved to the rear portion by chassis 4 front portions, chassis 4 front portions are used single-beam instead and are hung 8 and pull, chassis 4 is sling unsettled, utilize two cover assembly pulleys and 11 pairs of head star-wheels 3 of four 10t cranes to be rotated adjustment in place, make the central lines on the center line and Equipment Foundations face on the star-wheel 3, through the inspection at each position, confirm to remove chassis 4 under the safe and reliable situation, then remove lifting beam 12 and pillar 9, it is in place slowly head star-wheel 3 to be fallen design attitude then.
7) repetition measurement absolute altitude, position of center line and horizontal level are installed after the retest-ok.

Claims (1)

1. a continuous pallettype sintering machine head star-wheel installation method is characterized in that, utilize indoor crane gear to finish the installation of sintering machine head star-wheel, this method is carried out according to the following step:
1) elder generation is installed to sintering machine head skeleton on the platform and highly is no more than the absolute altitude that chassis gets on the right track;
2) lay two sintering pallets in orbit, two chassis are held together, can keep synchronously when making its operation with steel wire rope, fixed installation crescent moon seat on chassis, the position in the track both sides near the head star-wheel is provided with two 75KW hoist engines;
3) on Equipment Foundations according to absolute altitude configure base backing plate, on the Equipment Foundations face, finish center line, center line is also finished in position corresponding on the star-wheel;
4) overhead crane is installed at the factory building top, top, head star-wheel installation site is provided with single-beam and hangs, the lifting beam is set on the platform above the head star-wheel, the lifting beam single-beam hang and head star-wheel installation site between, two cover assembly pulleys are installed on the lifting beam, and two cranes are installed in every cover assembly pulley lower end;
5) chassis is shifted onto in the lifting zone at factory building rear portion, utilized overhead crane that sintering machine head star-wheel is lifted by crane more than the sintering machine orbital plane through hole for hoist by ground, on the crescent moon seat of two chassis, steadily place;
6) utilize hoist engine and overhead crane synchronously chassis to be pulled to the installation site, when overhead crane reaches the limit of the position, the hoist engine hook is moved to the rear portion by the chassis front portion, the chassis front portion is used the single-beam towing instead and is dragged, chassis is sling unsettled, utilize two cover assembly pulleys and four cranes that the head star-wheel is rotated adjustment in place, make the central lines on the center line and Equipment Foundations face on the star-wheel, inspection through each position, confirm under the safe and reliable situation, remove chassis, then remove lifting beam and pillar, it is in place slowly great wheel to be fallen design attitude then;
7) repetition measurement absolute altitude, position of center line and horizontal level are installed after the retest-ok.
CN 200910219850 2009-11-16 2009-11-16 Method for mounting head sprocket wheel of belt sintering machine Active CN102062538B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910219850 CN102062538B (en) 2009-11-16 2009-11-16 Method for mounting head sprocket wheel of belt sintering machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910219850 CN102062538B (en) 2009-11-16 2009-11-16 Method for mounting head sprocket wheel of belt sintering machine

Publications (2)

Publication Number Publication Date
CN102062538A true CN102062538A (en) 2011-05-18
CN102062538B CN102062538B (en) 2013-03-13

Family

ID=43997923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910219850 Active CN102062538B (en) 2009-11-16 2009-11-16 Method for mounting head sprocket wheel of belt sintering machine

Country Status (1)

Country Link
CN (1) CN102062538B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105783516A (en) * 2014-12-22 2016-07-20 五冶集团上海有限公司 Installation method of 5,000,000-ton/a pellet roasting machine
CN107436094A (en) * 2016-05-27 2017-12-05 五冶集团上海有限公司 Sintering machine support installation method
CN107436093A (en) * 2016-05-27 2017-12-05 五冶集团上海有限公司 Sinter machine production line drive device installation method
CN111776939A (en) * 2020-06-23 2020-10-16 中国五冶集团有限公司 Cross-inner hoisting installation method for belt type roasting machine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RO90999B1 (en) * 1985-01-05 1987-02-28 Institutul De Inginerie Tehnologica Si Proiectare Pentru Industria Metalurgica Supporting and driving device
CN1019049B (en) * 1988-08-16 1992-11-11 东北重型机械学院 New-type head and tail spiders for sintering machine
CN2055240U (en) * 1989-05-24 1990-03-28 熊玉林 Figure-v fin and "head-tail" spider wheel of sintering trolley
JP2001116466A (en) * 1999-10-22 2001-04-27 Hitachi Zosen Corp Pallet running device for sintering machine
CN2581073Y (en) * 2002-09-25 2003-10-22 攀枝花钢铁有限责任公司钢铁研究院 Sintered star wheel body

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105783516A (en) * 2014-12-22 2016-07-20 五冶集团上海有限公司 Installation method of 5,000,000-ton/a pellet roasting machine
CN105783516B (en) * 2014-12-22 2017-11-28 五冶集团上海有限公司 One kind 5,000,000 tons/a pellet firing machine installation methods
CN107436094A (en) * 2016-05-27 2017-12-05 五冶集团上海有限公司 Sintering machine support installation method
CN107436093A (en) * 2016-05-27 2017-12-05 五冶集团上海有限公司 Sinter machine production line drive device installation method
CN111776939A (en) * 2020-06-23 2020-10-16 中国五冶集团有限公司 Cross-inner hoisting installation method for belt type roasting machine
CN111776939B (en) * 2020-06-23 2022-04-26 中国五冶集团有限公司 Cross-inner hoisting installation method for belt type roasting machine

Also Published As

Publication number Publication date
CN102062538B (en) 2013-03-13

Similar Documents

Publication Publication Date Title
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN201801319U (en) Crane for pipe pile production
CN103086279A (en) Vertical transportation construction method for building construction
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN102062538B (en) Method for mounting head sprocket wheel of belt sintering machine
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN106185677A (en) A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN202963332U (en) Device for manufacturing pile foundation reinforcement cage by using simple portal frame
CN201538531U (en) Material storage steel bin installed by cement production line flip-chip method
CN103979442B (en) The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors
CN201687218U (en) Installation device of steel shaft well
CN106865409B (en) The modularization hanging method of extra-high voltage experiment hall barricade
CN103612994A (en) Method and device for hoisting steam pocket in single hoisting point inclination manner
CN106968371B (en) A kind of construction method of the high wing articulated structure drifted by wind of curtain wall construction
CN106927377B (en) Derrick crane with comprehensive adjustment handling space of components pose function
CN202767492U (en) Multifunctional moving rail-attached lifting scaffold
CN205653077U (en) Tower crane for building site of band shift dynamic formula scaffold frame
CN211312514U (en) Movable ground anchor device for mounting conical section of steel structure cooling tower
CN109110638A (en) Blast furnace overhaul lifting furnace shells tool
CN105217437B (en) A kind of continuous casting machine revolving platform revoliving arm replacing options
CN104249979A (en) Guide rail type self-climb slewing crane
CN205294657U (en) Portable simple truck-mounted crane
CN112279097A (en) Method for hoisting long shaft vertical piece of offshore oil drilling rig
CN206985557U (en) A kind of double girder crane for preventing object crooked
CN207608234U (en) A kind of assembly type curtain wall hanging apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant