CN102061747B - 高层钢结构钢柱柱脚与底板钢筋的连接方法 - Google Patents
高层钢结构钢柱柱脚与底板钢筋的连接方法 Download PDFInfo
- Publication number
- CN102061747B CN102061747B CN2010106001334A CN201010600133A CN102061747B CN 102061747 B CN102061747 B CN 102061747B CN 2010106001334 A CN2010106001334 A CN 2010106001334A CN 201010600133 A CN201010600133 A CN 201010600133A CN 102061747 B CN102061747 B CN 102061747B
- Authority
- CN
- China
- Prior art keywords
- plate
- reinforcing bar
- steel column
- steel
- reinforcing steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明涉及一种高层钢结构钢柱柱脚与底板钢筋的连接方法。其步骤是:在钢柱柱脚焊接平布置的加劲环板,该环板外缘呈矩形,板面上设置有穿筋孔;在加劲环板四边端缘焊接钢筋连接器,加劲环板四边中其中一组对应边分别开槽,通过槽内***钢筋焊接钢筋连接器,另一组对应边分别通过焊接立板再焊接钢筋连接器,两组对应边上的钢筋连接器上、下错开排列;将已焊接好加劲环板和钢筋连接器的钢柱运至施工现场,完成钢柱的安装后,将底板顶层钢筋端头加工好外螺纹后与钢筋连接器旋紧连接,即完成钢柱柱脚与底板钢筋的连接。本发明解决了现场钢筋和钢柱无法连接的问题,避免了预留柱坑,无需二次灌注,提高了功效,也提高了底板与钢柱的整体受力性能。
Description
技术领域
本发明涉及高层和超高层钢结构建筑施工方法,特别是一种高层钢结构钢柱柱脚与底板钢筋的连接方法。
背景技术
在高层钢结构建筑施工过程中,钢柱与钢筋的连接问题越来越突出的表现在设计和施工单位面前。钢构件与钢筋如何有效、便捷的连接,是实现钢结构与钢混结构有机结合的关键点。目前,在钢柱***底板的施工过程中,底板钢筋与钢结构的连接一般采取常规的底板预留柱坑和焊接钢筋连接板的做法,受到现场构件安装精度和材质差别的影响,存在如下问题:
A、现场焊接钢筋与钢构件,焊缝质量不易保证,焊接位置难以实现;
B、现场焊接工程量大,不利于施工进度;
C、预留柱坑,需二次浇注;
D、横向水平钢筋与竖向钢筋相碰,无法避开;
E、无法实现柱坑范围内两套筒之间的对拧,且柱坑范围内的该段钢筋不易直线对接。
发明内容
本发明旨在解决现有底板钢筋与钢柱连接存在的上述问题,而提供一种可增强底板与钢柱连接,简化施工工艺的高层钢结构钢柱柱脚与底板钢筋的连接方法。
本发明解决所述问题采用的技术方案是:一种高层钢结构钢柱柱脚与底板钢筋的连接方法,其步骤是:A.在工厂内完成如下步骤:a.在钢柱柱脚外周焊接水平布置的加劲环板,依钢柱型状,所述加劲环板由四块或四块以上环板组合焊接成一体,外缘呈矩形,板面上设置有穿筋孔;b.在加劲环板四边端缘焊接钢筋连接器,所述钢筋连接器为具有内螺纹的套筒,加劲环板四边中其中一组对应边分别开槽,通过槽内***钢筋焊接钢筋连接器,另外一组对应边分别通过焊接与加劲环板垂直的立板再焊接钢筋连接器,两组对应边上的钢筋连接器上、下错开排列;B.将工厂内已焊接好加劲环板和钢筋连接器的钢柱运至施工现场,完成钢柱的安装后,将底板顶层钢筋端头加工好外螺纹后与钢筋连接器旋紧连接,即完成钢柱柱脚与底板钢筋的连接。
本发明与常规方法相比,具体优点如下:
①在设计和加工阶段解决了现场钢筋和钢柱无法连接的问题;
②现场焊接钢筋难度大,质量无法保证,优化至工厂焊接,节省时间、物料、人力;
③避免了预留柱坑,无需二次灌注,一次浇注完成,功效提高,底板和钢柱的整体受力性能提高;
④环板起到抗拔作用,柱竖向钢筋穿过环板的穿筋孔,起到箍筋的作用,增强了外包混凝土和钢柱的整体性。
附图说明
图1为H型钢柱加设加劲环板和钢筋连接器的结构示意图。
图2为鱼骨型钢柱加设加劲环板和钢筋连接器的结构示意图。
图中:H型钢柱1,环板2,立板3,钢筋连接器4,加强筋板5,穿筋孔6,钢筋及钢筋连接器7, 鱼骨型钢柱8。
具体实施方式
以下结合附图及实施例详述本发明。
参见图1,图中钢柱为H型钢柱1,通过在该H型钢柱1的柱脚增加加劲环板并焊接钢筋连接器的方法,使基础钢筋与钢柱柱脚有效、简便、合理的连接,具体步骤如下:
①在工厂内做焊接工艺评定:根据环板2和钢筋连接器4的材质,进行相应焊接工艺评定,以保证环板2与钢筋连接器4与H型钢柱1的可靠连接。
②在工厂内焊接加劲环板和钢筋连接器4,并做好钢筋连接器4内螺纹头的保护:首先在H型钢柱1柱脚外周焊接水平布置的加劲环板,该加劲环板由四块环板2组合焊接成一体,外缘呈矩形,板面上设置有穿筋孔6;然后在加劲环板四边端缘焊接钢筋连接器4,该钢筋连接器4为具有内螺纹的套筒,加劲环板四边中其中一组对应边(图1中上、下边)分别开槽,通过槽内***钢筋焊的方式接钢筋及钢筋连接器7,另外一组对应边(图1中左、右边)分别通过焊接与环板2垂直的立板3再焊接钢筋连接器4,两组对应边上的钢筋连接器4上、下错开排列。为提高立板3与环板2之间的连接强度,在两者之间还焊接有三角形结构的加强筋板5。
③将工厂内已焊接好加劲环板和钢筋连接器的钢柱运至施工现场, 现场布设好底板顶层钢筋,钢结构安装人员需钻入底板钢筋内进行钢柱的安装,完成钢柱的安装后,将底板顶层钢筋端头加工好外螺纹后与钢筋连接器4旋紧连接,即完成钢柱柱脚与底板钢筋的连接。
参见图2,图2中钢柱为鱼骨型钢柱8,鱼骨型钢柱8及其它截面钢柱焊接加劲环板及钢筋连接器4的方式与H型钢柱1相同。但根据钢柱型状的不同,组成加劲环板的环板2数量有所不同,如鱼骨型钢柱8的加劲环板由五块环板2组合焊接成一体。
Claims (1)
1.一种高层钢结构钢柱柱脚与底板钢筋的连接方法,其步骤是:
A.在工厂内完成如下步骤:a.在钢柱柱脚外周焊接水平布置的加劲环板,依钢柱形状,所述加劲环板由四块以上环板组合焊接成一体,外缘呈矩形,板面上设置有穿筋孔;b.在加劲环板四边端缘焊接钢筋连接器,所述钢筋连接器为具有内螺纹的套筒,加劲环板四边中其中一组对应边分别开槽,通过槽内***钢筋焊接钢筋连接器,另外一组对应边分别通过焊接与加劲环板垂直的立板再焊接钢筋连接器,两组对应边上的钢筋连接器上、下错开排列;
B.将工厂内已焊接好加劲环板和钢筋连接器的钢柱运至施工现场,完成钢柱的安装后,将底板顶层钢筋端头加工好外螺纹后与钢筋连接器旋紧连接,即完成钢柱柱脚与底板钢筋的连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106001334A CN102061747B (zh) | 2010-12-22 | 2010-12-22 | 高层钢结构钢柱柱脚与底板钢筋的连接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106001334A CN102061747B (zh) | 2010-12-22 | 2010-12-22 | 高层钢结构钢柱柱脚与底板钢筋的连接方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102061747A CN102061747A (zh) | 2011-05-18 |
CN102061747B true CN102061747B (zh) | 2012-01-11 |
Family
ID=43997228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010106001334A Active CN102061747B (zh) | 2010-12-22 | 2010-12-22 | 高层钢结构钢柱柱脚与底板钢筋的连接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102061747B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425236A (zh) * | 2011-10-24 | 2012-04-25 | 沈阳建筑大学 | 一种新型圆形钢管混凝土柱与基础连接形式 |
CN103046648B (zh) * | 2012-12-18 | 2015-08-12 | 中冶建筑研究总院有限公司 | 混合结构钢筋连接节点 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3470697B2 (ja) * | 1993-05-17 | 2003-11-25 | Jfeスチール株式会社 | 露出型柱脚 |
CN101139849A (zh) * | 2006-09-07 | 2008-03-12 | 张兴汉 | 一种组装式建筑物构件及现场吊装的建筑方法 |
CN101403246B (zh) * | 2008-10-30 | 2010-09-22 | 杨峰 | 大吨位吊车单层厂房组合柱及单层厂房组合柱结构的制作方法 |
CN201386331Y (zh) * | 2009-04-16 | 2010-01-20 | 中天建设集团有限公司 | 型钢混凝土节点钢筋与型钢间不焊接的紧固连接装置 |
-
2010
- 2010-12-22 CN CN2010106001334A patent/CN102061747B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102061747A (zh) | 2011-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103132506B (zh) | 钻孔灌注桩双层加强箍钢筋笼加工制作方法 | |
CN105133793B (zh) | 空间约束的多腔管中管钢筋混凝土巨柱及施工方法 | |
CN205777098U (zh) | 一种可拆卸装配式圆钢管混凝土柱 | |
CN105863111A (zh) | 内嵌预制混凝土剪力墙同时抗弯的钢框架构造 | |
CN206844314U (zh) | 一种新型预制装配式梁柱节点 | |
CN102182197B (zh) | 公路岩石边坡的集束式注浆锚索加固法 | |
CN104947603A (zh) | 一种钢筋混凝土梁桥主梁加固构造及加固方法 | |
CN107130716A (zh) | 后浇齿槽连接装配式楼屋盖 | |
CN102061747B (zh) | 高层钢结构钢柱柱脚与底板钢筋的连接方法 | |
CN109371963A (zh) | 水中墩基础预制系梁施工中的倒锥形钢套箱及其施工方法 | |
CN204435406U (zh) | 一种岩石锚杆基础 | |
CN205348592U (zh) | 交叉预制混凝土梁底部钢筋连通专用连接件 | |
CN108005267A (zh) | 一种一字型装配式芯柱钢板剪力墙及其装配施工方法 | |
CN105089206B (zh) | 预制装配式混凝土构件用钢筋连接装置及连接方法 | |
CN109989478A (zh) | 一种预制预应力混凝土框架结构 | |
CN103485338A (zh) | 一种预应力抗拔桩及其施工方法 | |
CN205530819U (zh) | 一种内嵌预制混凝土剪力墙同时抗弯的钢框架构造 | |
CN105133788A (zh) | 一种cfst-rc平缀板格构柱结构及其施工方法 | |
CN205259195U (zh) | 一种玻璃纤维筋杆及包含该玻璃纤维筋杆的锚索和土钉 | |
CN103967167A (zh) | 钢管混凝土边框与剪力墙竖向接合面连接结构及施工方法 | |
CN204589831U (zh) | 一种钢筋混凝土梁桥主梁加固构造 | |
CN106013436A (zh) | 阶梯型牛腿装置及其安装方法 | |
CN105970963B (zh) | 一种预制混凝土槽形板桩桩头加固装置 | |
CN212984179U (zh) | 一种基于并筋的装配式混凝土柱连接装置 | |
CN101570998A (zh) | 一种肋梁箍筋及其应用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |