CN102030270A - Auxiliary tool and method for replacing wire rope of bridge crane - Google Patents

Auxiliary tool and method for replacing wire rope of bridge crane Download PDF

Info

Publication number
CN102030270A
CN102030270A CN2009101875828A CN200910187582A CN102030270A CN 102030270 A CN102030270 A CN 102030270A CN 2009101875828 A CN2009101875828 A CN 2009101875828A CN 200910187582 A CN200910187582 A CN 200910187582A CN 102030270 A CN102030270 A CN 102030270A
Authority
CN
China
Prior art keywords
steel cable
reel
forehead
old
new steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009101875828A
Other languages
Chinese (zh)
Other versions
CN102030270B (en
Inventor
刘兰芳
李劲松
杨维博
王作学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN2009101875828A priority Critical patent/CN102030270B/en
Publication of CN102030270A publication Critical patent/CN102030270A/en
Application granted granted Critical
Publication of CN102030270B publication Critical patent/CN102030270B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention relates to an auxiliary tool and a method for replacing a wire rope of a bridge crane. A gantry frame is manufactured on a cover plate on the upper part of a fixed pulley block of a drum of a bridge crane trolley; lifting rings are arranged on the two sides of the gantry frame; a chain hoist and a fixed pulley are arranged on the lifting rings on the two sides respectively; thus the old wire rope is replaced by a new one. Compared with the prior art, the auxiliary tool and the method have the advantages that: after the device is used, the time for replacing the wire rope is greatly shortened each time, the personal safety of construction personnel is guaranteed, the labor intensity of workers is relieved, the labor productivity is improved, and smooth running of workshop production is guaranteed.

Description

A kind of traverse crane is the accessory appliances and the method for change steel rope more
Technical field
The present invention relates to the accessory machinery field of tool, relate in particular to a kind of traverse crane more accessory appliances and the method for change steel rope.
Background technology
Crane in bridge type is that modern industry is produced indispensable equipment, be widely used in the operation such as lifting, transportation, loading and unloading, installation of various materials, alleviate physical labor intensity greatly, improved labor efficiency, finished the work that the people can't finish sometimes.Steel rope is as the spare part that directly bears weight, and its degree of wear has reached the standard of scrapping of steel rope, just should in time change, otherwise will produce the serious person and equipment breakdown.When the crane in bridge type steel cable is changed at present, what in most cases adopt is that chaining hangs and fixed pulley on the monorail crane of factory building girder, finish the replacing of dismounting, installation and the new and old rope of forehead, because this upkeep operation one is to be subjected to environmental constraints: the stop position of hoisting crane must be that two winding drum is aligned monorail crane and main house beam below, and manufacturing line is stopped production; The 2nd, need to creep on 40 meters high of frame workers' the factory building girder on distance ground, will overhaul with chain hoist and fixed pulley and hang on the girder, cause work efficiency low, dangerous big, although take safety measures, also be difficult to guarantee workmen's personal safety.
Summary of the invention
Purpose of the present invention provides a kind of lifting tonnage in the traverse crane more than hundred tons more accessory appliances and the method for change steel rope, and is easy and safe to operate, increases work efficiency.
For solving the problems of the technologies described above, technical scheme of the present invention is:
A kind of traverse crane is the accessory appliances of change steel rope more, it is characterized in that, makes a door type frame on the cover plate of the fixed pulley group top of OTC's trolley reel, and the door type frame both sides are provided with suspension ring; On the suspension ring of both sides, be respectively equipped with chain hoist and fixed pulley.
The traverse crane of the described accessory appliances of employing claim 1 is the method for change steel rope more, it is characterized in that this method comprises the steps
1) with chain hoist the forehead of old steel cable is pinned and mention, remove the connecting link pin of forehead and equalizing bar, this end that makes old steel cable is a free end;
2) the dismantle forehead of old steel cable is with the fag end of new steel cable and the fag end solder together of old steel cable;
3) reel forward scrolling is brought new steel cable into the fixed pulley group with old steel cable, after with several circles of new steel cable winding reel, new steel cable and old steel cable weld is cut off, and with clamp new steel cable fag end is locked on the OTC's trolley car body;
4) the reverse scrolling of reel puts down old steel cable and fag end is untied from reel;
5) new steel cable fag end is fixed on the reel;
6) scrolling reel on reel, is put new steel cable to movable pulley with the new steel cable of the other end and to be cut off after equalizing bar length, loads onto forehead at new steel cable fag end, mentions to the equalizing bar place;
7) with chain hoist forehead is pinned, the connecting link pin of forehead and equalizing bar is installed.
Compared with prior art, the invention has the beneficial effects as follows: after utilizing this device, shortened the time of each replacing steel cable greatly, workmen's personal safety is guaranteed, alleviate worker's labour intensity, raised labour productivity, guaranteed the direct motion of Workshop Production.
Description of drawings
Fig. 1 is the more scheme drawing of change steel rope of traverse crane.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described further:
A kind of traverse crane is the accessory appliances and the method for change steel rope more, comprises the steps
1) make a door type frame 1 on the fixed pulley group 12 top cover plates 3 of OTC's trolley reel 11, door type frame 1 both sides respectively are provided with two suspension ring 2;
2) chain hoist 4 and fixed pulley 5 are hung on the suspension ring 2;
2) with chain hoist 4 forehead 6 of old steel cable is pinned and mention, remove the connecting link pin 8 of forehead 6 and equalizing bar 7; This step is that the side fag end with old steel cable becomes free end;
3) coir rope 9 one ends are connected with forehead 6, and the other end is walked around fixed pulley 5 and hung down to ground, and the ground staff slowly loosens coir rope 9, and forehead 6 and old steel cable 10 are fallen to the ground, and writes down the number of turns of old steel cable on the reel 11 this moment;
4) the dismantle forehead 6 of old steel cable is with the fag end of new steel cable 10 and the fag end solder together of old steel cable;
5) reel 11 forward scrollings are brought new steel cable 10 into fixed pulley group 12 after with 11 liang of circles of new steel cable 10 winding reels with old steel cable, and new steel cable 10 and old steel cable weld are cut off, and with clamp new steel cable fag end are locked on the OTC's trolley car body;
6) reel 11 reverse scrollings put down old steel cable and fag end is untied from reel;
7) new steel cable 10 fag ends are fixed on the reel 11;
8) the scrolling reel 11, with new steel cable 10 on the reel set by step 3) remember the number of turns, the new steel cable of the other end is put to movable pulley to equalizing bar is cut off after 7 length, load onto 6 of volumes at new steel cable 11 fag ends, mention to equalizing bar 7 places with coir rope 9;
9) with chain hoist 4 forehead 6 is pinned, the connecting link pin 8 of forehead 6 and equalizing bar 7 is installed.
The application of this device has solved that the hoisting crane stop position was limited in the past, cause manufacturing line to stop production, when workmen's chain type hoisting crane and fixed pulley, a difficult problem of creeping on the factory building girder that need are 40 meters high on distance ground has guaranteed worker's personal safety, reduce labour intensity, raise labour productivity, chassis maintenance or repairing are changed steel cable simultaneously, and another hoisting crane normally moves, the assurance continuous casting line is produced, for the production direct motion provides condition.

Claims (2)

1. the traverse crane accessory appliances of change steel rope more is characterized in that make a door type frame on the cover plate of the fixed pulley group top of OTC's trolley reel, the door type frame both sides are provided with suspension ring; On the suspension ring of both sides, be respectively equipped with chain hoist and fixed pulley.
2. the traverse crane that adopts the described accessory appliances of claim 1 is the method for change steel rope more, it is characterized in that this method comprises the steps
1) with chain hoist the forehead of old steel cable is pinned and mention, remove the connecting link pin of forehead and equalizing bar, this end that makes old steel cable is a free end;
2) the dismantle forehead of old steel cable is with the fag end of new steel cable and the fag end solder together of old steel cable;
3) reel forward scrolling is brought new steel cable into the fixed pulley group with old steel cable, after with several circles of new steel cable winding reel, new steel cable and old steel cable weld is cut off, and with clamp new steel cable fag end is locked on the OTC's trolley car body;
4) the reverse scrolling of reel puts down old steel cable and fag end is untied from reel;
5) new steel cable fag end is fixed on the reel;
6) scrolling reel on reel, is put new steel cable to movable pulley with the new steel cable of the other end and to be cut off after equalizing bar length, loads onto forehead at new steel cable fag end, mentions to the equalizing bar place;
7) with chain hoist forehead is pinned, the connecting link pin of forehead and equalizing bar is installed.
CN2009101875828A 2009-09-24 2009-09-24 Auxiliary tool and method for replacing wire rope of bridge crane Active CN102030270B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101875828A CN102030270B (en) 2009-09-24 2009-09-24 Auxiliary tool and method for replacing wire rope of bridge crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101875828A CN102030270B (en) 2009-09-24 2009-09-24 Auxiliary tool and method for replacing wire rope of bridge crane

Publications (2)

Publication Number Publication Date
CN102030270A true CN102030270A (en) 2011-04-27
CN102030270B CN102030270B (en) 2012-07-18

Family

ID=43883800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101875828A Active CN102030270B (en) 2009-09-24 2009-09-24 Auxiliary tool and method for replacing wire rope of bridge crane

Country Status (1)

Country Link
CN (1) CN102030270B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103508323A (en) * 2013-09-24 2014-01-15 马钢(集团)控股有限公司 Lifting method and device for crane overhauled wearing parts in smelting process
CN103588092A (en) * 2013-11-28 2014-02-19 莱芜钢铁集团有限公司 Auxiliary device and method for replacing steel wire rope
CN106672804A (en) * 2017-01-10 2017-05-17 西王金属科技有限公司 Travelling hoist rope changing auxiliary device
RU2629549C2 (en) * 2015-10-07 2017-08-31 Акционерное общество "Государственный ракетный центр имени академика В.П. Макеева" Method of replacement of crane rope
RU2702326C1 (en) * 2018-09-25 2019-10-07 Акционерное общество "Государственный ракетный центр имени академика В.П. Макеева" Method of replacement a steel rope at hoisting crane
CN112357777A (en) * 2020-11-10 2021-02-12 鞍钢股份有限公司 Method for quickly replacing steel rope of hook beam of gantry crane

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103508323A (en) * 2013-09-24 2014-01-15 马钢(集团)控股有限公司 Lifting method and device for crane overhauled wearing parts in smelting process
CN103508323B (en) * 2013-09-24 2016-03-23 马钢(集团)控股有限公司 A kind of handling method and apparatus of the travelling crane inspection consumable accessory be applied in smelting process
CN103588092A (en) * 2013-11-28 2014-02-19 莱芜钢铁集团有限公司 Auxiliary device and method for replacing steel wire rope
CN103588092B (en) * 2013-11-28 2015-12-09 莱芜钢铁集团有限公司 A kind of method adopting auxiliary device more change steel rope
RU2629549C2 (en) * 2015-10-07 2017-08-31 Акционерное общество "Государственный ракетный центр имени академика В.П. Макеева" Method of replacement of crane rope
CN106672804A (en) * 2017-01-10 2017-05-17 西王金属科技有限公司 Travelling hoist rope changing auxiliary device
RU2702326C1 (en) * 2018-09-25 2019-10-07 Акционерное общество "Государственный ракетный центр имени академика В.П. Макеева" Method of replacement a steel rope at hoisting crane
CN112357777A (en) * 2020-11-10 2021-02-12 鞍钢股份有限公司 Method for quickly replacing steel rope of hook beam of gantry crane

Also Published As

Publication number Publication date
CN102030270B (en) 2012-07-18

Similar Documents

Publication Publication Date Title
CN102030270B (en) Auxiliary tool and method for replacing wire rope of bridge crane
CN101786577B (en) Dual-machine loading-and-walking type hydraulic numerical control deck erection gantry and control system and control method
CN201351084Y (en) Dual-machine load walking type hydraulic numerical control cross cable crane
CN105800490A (en) Method for replacing crane main hook steel wire rope
CN102190254A (en) Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms
CN107298388A (en) Bridge crane with suspender maintenance rig
CN202848940U (en) Chamber roof truss overall declining removal device of large gas chamber
CN106044574B (en) The synchronous method for changing ladle carne gantry beam and steel wire rope
CN107150945A (en) Headframe formula four-rope friction winder head rope replacing options
CN204873574U (en) Hoist girder construction of stretching out and drawing back
CN110294427B (en) Method for replacing steel wire rope of main hoisting system of large tower crane
CN202729645U (en) Tower crane with elevator
CN204281039U (en) A kind of special hanger lifting box plate
CN204057758U (en) A kind of hoisting device for overhaul of the equipments in large height industrial building
CN105776034A (en) Explosion-poof bridge crane
CN202481984U (en) Electric block transferring device for lifting scaffolds
CN107555319A (en) Change CLTS system Gray bus guard methods during crane girder
CN205653060U (en) Explosion -protection bridge crane
CN205590168U (en) Overturning lifting device
CN201647851U (en) Multifunctional building crane
CN203976242U (en) A kind of generator unit stator associating hanging apparatus
CN110203825B (en) Blast furnace inclined bridge dismantling method
CN104097961B (en) Between a kind of slot type coal hopper accessible maintenance of train car unloader
CN202787930U (en) Hanging basket for high-place operations
CN201605087U (en) Goods hoisting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant