CN102025044A - 一种重载电缆组件及其加工工艺 - Google Patents

一种重载电缆组件及其加工工艺 Download PDF

Info

Publication number
CN102025044A
CN102025044A CN2009101956685A CN200910195668A CN102025044A CN 102025044 A CN102025044 A CN 102025044A CN 2009101956685 A CN2009101956685 A CN 2009101956685A CN 200910195668 A CN200910195668 A CN 200910195668A CN 102025044 A CN102025044 A CN 102025044A
Authority
CN
China
Prior art keywords
cable
inner core
shell
contact pin
pressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009101956685A
Other languages
English (en)
Other versions
CN102025044B (zh
Inventor
严小平
秦亚桐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai and Xu automation Limited by Share Ltd
Original Assignee
SHANGHAI KEY-SOLUTION ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI KEY-SOLUTION ELECTRONIC TECHNOLOGY Co Ltd filed Critical SHANGHAI KEY-SOLUTION ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN200910195668.5A priority Critical patent/CN102025044B/zh
Publication of CN102025044A publication Critical patent/CN102025044A/zh
Application granted granted Critical
Publication of CN102025044B publication Critical patent/CN102025044B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cable Accessories (AREA)
  • Details Of Connecting Devices For Male And Female Coupling (AREA)

Abstract

本发明公开了一种重载电缆组件及其加工工艺,属于电缆连接件技术领域,重载电缆组件由外壳、电缆接头、密封圈、插针、内芯、内芯框架、高性能多芯电缆构成,电缆接头夹紧高性能多芯电缆,密封圈放置于电缆接头内部,电缆接头上的塑料螺纹与外壳上的钢制螺纹旋紧连接,电缆与插针冷压连接,内芯固定于内芯框架内,管状冷压端子与内芯框架接地螺纹冷压连接,内芯框架与外壳之间以螺纹密封连接,重载电缆组件的加工工艺包括:落料,外护套安装,外壳安装,压接,插针装接,壳体封装,本发明加工工艺简单,制备的电缆组件能够适应恶劣环境下的供电需求,且可靠性极高,抗振动性能好,防护等级高。

Description

一种重载电缆组件及其加工工艺
技术领域
本发明涉及一种电缆组件,尤其涉及一种用于大型风机及轨道车辆、船舶发电与配电中的重载电缆组件,更特别地,本发明还提供了一种重载电缆组件的加工工艺。
背景技术
在传统的工业现场环境中,控制***之间的连接或控制***与设备例如电机之间的连接,基本是电缆的直接连接或通过使用普通接线端子的连接完成的,这种传统的连接方式缺点是需在现场进行接线,安装时间较长,并且不能有效的保证连接部位的可靠性,如在风力发电行业,现场工作环境非常恶劣,长期处在湿气重、尘土高和极端高低温的环境状况,并且大型风机高度往往超过70米,根本无法长时间在现场进行接线连接调试,加上风电设备的维护十分不易,所以确保可靠稳定地长期运转是最根本的要求,风电设备因其设备昂贵,工作环境恶劣,现场不便对主要部位进行拆卸维修,以及设计上要求使用寿命长等工作特点,对连接性能提出了更高的要求。
发明内容
本发明的目的之一在于提供一种重载电缆组件,能够满足恶劣环境下工作需求,且可靠性及抗振动性能极高。
一种重载电缆组件,其主要结构包括:外壳,电缆接头,密封圈,插针,内芯,内芯框架,高性能多芯电缆,电缆接头夹紧高性能多芯电缆,密封圈放置于电缆接头内部,电缆接头上的塑料螺纹与外壳上的钢制螺纹旋紧连接,电缆与插针冷压连接,内芯固定于内芯框架内,管状冷压端子与内芯框架接地螺纹冷压连接,内芯框架与外壳之间以螺纹密封连接。
本发明的另一目的在于提供一种重载电缆组件的加工工艺,其加工的具体步骤为:
(1)落料:选取高性能多芯电缆,保障电缆表面光滑无破损,切面平整、垂直;
(2)外护套安装:将电缆两端护套各剥除80mm,并把屏蔽层挑顺,再根据电缆型号的不同挑远不同的热缩管,在护套切口处用热缩套管加热套住,并保证热缩平整、光滑、尺寸均匀,切口处的热缩管保持切口位于热缩管中间位置,不可将电缆和热缩管烤坏;
(3)外壳安装:将电缆夹后盖取下,密封圈去掉,装入转接头,把转接头和电缆夹分别装入连接器外壳尾部后用活动扳手拧紧;将电缆夹后盖套入两根电缆的两端,然后分别将两根电缆套入双孔夹紧圈,并用电缆夹锁住固定好两根电缆;
(4)压接:将所有的黑色芯线、白、棕、黄、绿线用平口剥线钳剥除8mm,将所有黄绿线用平口剥线钳剥除6mm;将电缆黑色电缆线与银色插针连接,将白、棕、黄、绿线与金色插针连接,将黄绿线和屏蔽层与黄色环形冷压头压接,并保持冷压头尾部不得有芯线分叉露出,头部屏蔽线全部露出,插针尾部不得有芯线分叉露出,颈部孔位应可见铜丝;
(5)插针装接:使用扭矩螺丝刀安装侧面接地螺栓,插针、冷压头应插到底;
(6)壳体封装:将组件平放,两端外壳相平三根电缆顺序平行不扭曲,将电缆夹全部夹紧在电缆外护套上,然后将电缆夹旋紧,然后使用高手电动扭矩螺丝刀将其安装到外壳上。
本发明加工出的重载电缆组件,能够适应恶劣环境下工作,在轨道车辆、船舶以及发电与配电中具有广泛的用途,另外还可用于设备的设计和建造、医疗技术以及建筑机械,重载连接器通过特殊的工艺方法配合高性能的电缆生产出来的重载电缆组件具有极高的可靠性,抗振动,防护等级可达到IP65甚至IP68,适用于沙漠、滩涂、海上等复杂的现场情况或者要求高效率安装的情况,即插即用,同时在后续的维护当中也会节省大量的人力成本,重载电缆组件具有接口尺寸小,可靠性高等特点,并且可以根据具体的***设计自由选择连接模块,将动力线与信号线安装在同一连接器中,节省设备的安装空间。
附图说明
图1为本发明的实施例结构示意图;
图2为本发明公端内芯结构示意图;
图3为本发明母端内芯结构示意图;
图4-a为公插针外观示意图;
图4-b为母插针外观示意图。
图中:1电缆接头,2外壳,3插针,4内芯,5螺栓,6环形冷压头,7母插针,8公插针,9电缆,10内芯框架。
具体实施方式
下面结合附图对本发明进一步进行详细描述;
参见附图1,一种新型重载电缆组件,由外壳2,电缆接头1,密封圈,插针3,内芯4,内芯框架10等组成,电缆接头1夹紧电缆9,密封圈放置于电缆接头1内部,电缆接头1上的塑料螺纹与外壳2上的钢制螺纹旋紧连接,电缆9与插针3冷压连接,插针3以塑料卡扣弹片与内芯4连接,管状冷压端子与内芯框架10接地螺纹冷压连接,内芯框架10与外壳2之间以螺纹连接。
使用时,根据组件两端所插装在控制柜的位置的不同来确定公插针8或母插针7,还根据电缆9所需要传输的介质(信号或大电流)来确定部分插针3的颜色或表面镀层,传输性能要求较高的为镀金-金色插针,其他则为镀银-银色插针,冷压端子尾部的孔径根据进行电缆线径大小选择;安装时,将电缆接头1后盖5取下,装入连接器外壳2尾部并用活动扳手拧紧,电缆接头1内设置有密封圈,将电缆接头1后盖旋紧套在电缆9上,电缆9与插针3采用冷压方式连接,插针3***内芯4内,公插针8***公内芯,母插针7***母内芯,内芯4与插针3之间采用塑料卡扣弹片连接或其他弹性连接方式,内芯4固定于内芯框架10内,外壳2与内芯框架10用螺纹旋紧连接。
一种重载电缆组件的加工工艺,其组装加工的具体步骤为:
(1)落料:选取高性能多芯电缆,保障电缆表面光滑无破损,切面平整、垂直;
(2)外护套安装:将电缆两端护套各剥除80mm,并把屏蔽层挑顺,再根据电缆型号的不同挑远不同的热缩管,在护套切口处用热缩套管加热套住,并保证热缩平整、光滑、尺寸均匀,切口处的热缩管保持切口位于热缩管中间位置,不可将电缆和热缩管烤坏;
(3)外壳安装:将电缆夹后盖取下,密封圈去掉,装入转接头,把转接头和电缆夹分别装入连接器外壳尾部后用活动扳手拧紧;将电缆夹后盖套入两根电缆的两端,然后分别将两根电缆套入双孔夹紧圈,并用电缆夹锁住固定好两根电缆;
(4)压接:将所有的黑色芯线、白、棕、黄、绿线用平口剥线钳剥除8mm,将所有黄绿线用平口剥线钳剥除6mm;将电缆黑色电缆线与银色插针连接,将白、棕、黄、绿线与金色插针连接,将黄绿线和屏蔽层与黄色环形冷压头6冷压压接,并保持冷压头尾部不得有芯线分叉露出,头部屏蔽线全部露出,插针尾部不得有芯线分叉露出,颈部孔位应可见铜丝;
(5)插针装接:使用扭矩螺丝刀安装侧面接地螺栓5,插针、冷压头应插到底;
(6)壳体封装:将组件平放,两端外壳相平三根电缆顺序平行不扭曲,将电缆夹全部夹紧在电缆外护套上,然后将电缆夹旋紧,然后使用高手电动扭矩螺丝刀将其安装到外壳上。

Claims (3)

1.一种重载电缆组件,其主要结构包括:外壳,电缆接头,密封圈,插针,内芯,内芯框架,高性能多芯电缆,其特征在于,电缆接头夹紧高性能多芯电缆,密封圈放置于电缆接头内部,电缆接头上的塑料螺纹与外壳上的钢制螺纹旋紧连接,电缆与插针冷压连接,内芯固定于内芯框架内,管状冷压端子与内芯框架接地螺纹冷压连接,内芯框架与外壳之间以螺纹密封连接。
2.根据权利要求1所述的一种重载电缆组件,其特征在于,所述的插针与内芯为弹性连接,且公插针***公内芯,母插针***母内芯。
3.如权利要求1所述的一种重载电缆组件的加工工艺,其特征在于,其加工主要流程为:
(1)落料:选取高性能多芯电缆,保障电缆表面光滑无破损,切面平整、垂直;
(2)外护套安装:将电缆两端护套各剥除80mm,并把屏蔽层挑顺,再根据电缆型号的不同挑远不同的热缩管,在护套切口处用热缩套管加热套住,并保证热缩平整、光滑、尺寸均匀,切口处的热缩管保持切口位于热缩管中间位置,不可将电缆和热缩管烤坏;
(3)外壳安装:将电缆夹后盖取下,密封圈去掉,装入转接头,把转接头和电缆夹分别装入连接器外壳尾部后用活动扳手拧紧;将电缆夹后盖套入两根电缆的两端,然后分别将两根电缆套入双孔夹紧圈,并用电缆夹锁住固定好两根电缆;
(4)压接:将所有的黑色芯线、白、棕、黄、绿线用平口剥线钳剥除8mm,将所有黄绿线用平口剥线钳剥除6mm;将电缆黑色电缆线与银色插针连接,将白、棕、黄、绿线与金色插针连接,将黄绿线和屏蔽层与黄色环形冷压头压接,并保持冷压头尾部不得有芯线分叉露出,头部屏蔽线全部露出,插针尾部不得有芯线分叉露出,颈部孔位应可见铜丝;
(5)插针装接:使用扭矩螺丝刀安装侧面接地螺栓,插针、冷压头应插到底;
(6)壳体封装:将组件平放,两端外壳相平三根电缆顺序平行不扭曲,将电缆夹全部夹紧在电缆外护套上,然后将电缆夹旋紧,然后使用高手电动扭矩螺丝刀将其安装到外壳上。
CN200910195668.5A 2009-09-15 2009-09-15 一种重载电缆组件的加工工艺 Expired - Fee Related CN102025044B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910195668.5A CN102025044B (zh) 2009-09-15 2009-09-15 一种重载电缆组件的加工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910195668.5A CN102025044B (zh) 2009-09-15 2009-09-15 一种重载电缆组件的加工工艺

Publications (2)

Publication Number Publication Date
CN102025044A true CN102025044A (zh) 2011-04-20
CN102025044B CN102025044B (zh) 2014-04-02

Family

ID=43866069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910195668.5A Expired - Fee Related CN102025044B (zh) 2009-09-15 2009-09-15 一种重载电缆组件的加工工艺

Country Status (1)

Country Link
CN (1) CN102025044B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102826235A (zh) * 2012-08-31 2012-12-19 北京航天易联科技发展有限公司 一种无人机尾罩封装工艺
CN106450903A (zh) * 2016-10-26 2017-02-22 绵阳市金华洋电器制造有限公司 五芯电连接器插头
CN107104412A (zh) * 2017-05-31 2017-08-29 倍仕得电气科技(杭州)股份有限公司 一种一体式电缆固定头及装夹方法
CN108988074A (zh) * 2018-07-02 2018-12-11 上海微小卫星工程中心 一种具有屏蔽连续性的电缆连接
CN109787056A (zh) * 2019-03-08 2019-05-21 中船永志泰兴电子科技有限公司 一种深水密封连接器的加工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6406329B1 (en) * 1995-05-05 2002-06-18 The Boeing Company EMI terminating and grounding strain relief clamp assembly
EP1381114A2 (en) * 2002-07-08 2004-01-14 Lin Yuan Device for connecting cables
CN1241304C (zh) * 2002-06-06 2006-02-08 华为技术有限公司 在同轴电缆上装配连接器的加工方法
CN201303122Y (zh) * 2008-11-21 2009-09-02 镇江红宝利电子有限公司 一种穿墙式插孔连接器
CN201584575U (zh) * 2009-07-24 2010-09-15 上海和旭电子科技有限公司 一种新型重载电缆组件

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6406329B1 (en) * 1995-05-05 2002-06-18 The Boeing Company EMI terminating and grounding strain relief clamp assembly
CN1241304C (zh) * 2002-06-06 2006-02-08 华为技术有限公司 在同轴电缆上装配连接器的加工方法
EP1381114A2 (en) * 2002-07-08 2004-01-14 Lin Yuan Device for connecting cables
CN201303122Y (zh) * 2008-11-21 2009-09-02 镇江红宝利电子有限公司 一种穿墙式插孔连接器
CN201584575U (zh) * 2009-07-24 2010-09-15 上海和旭电子科技有限公司 一种新型重载电缆组件

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102826235A (zh) * 2012-08-31 2012-12-19 北京航天易联科技发展有限公司 一种无人机尾罩封装工艺
CN102826235B (zh) * 2012-08-31 2016-01-27 北京航天易联科技发展有限公司 一种无人机尾罩封装工艺
CN106450903A (zh) * 2016-10-26 2017-02-22 绵阳市金华洋电器制造有限公司 五芯电连接器插头
CN107104412A (zh) * 2017-05-31 2017-08-29 倍仕得电气科技(杭州)股份有限公司 一种一体式电缆固定头及装夹方法
CN108988074A (zh) * 2018-07-02 2018-12-11 上海微小卫星工程中心 一种具有屏蔽连续性的电缆连接
CN108988074B (zh) * 2018-07-02 2019-08-30 上海微小卫星工程中心 一种具有屏蔽连续性的电缆连接
CN109787056A (zh) * 2019-03-08 2019-05-21 中船永志泰兴电子科技有限公司 一种深水密封连接器的加工方法

Also Published As

Publication number Publication date
CN102025044B (zh) 2014-04-02

Similar Documents

Publication Publication Date Title
JP6088623B2 (ja) 電気コネクタアセンブリおよびエルボーコネクタアセンブリ
CN102025044B (zh) 一种重载电缆组件的加工工艺
CN102170075A (zh) 一种屏蔽件及使用该屏蔽件的电连接器插头
CN104836062A (zh) 一种电线或电缆防水快装连接器
CN201584575U (zh) 一种新型重载电缆组件
CN102176585B (zh) 一种电连接器组件
CN202363601U (zh) 双向旋压式电气接头
CN102437440A (zh) 双向旋压式电气接头
CN209544646U (zh) 快速连接端子
CN204732629U (zh) 电气设备绝缘快速连接构件
CN214542559U (zh) 一种用于光伏线缆的铜铝连接器
US9028273B2 (en) Electrical connector assembly with environmental shield
CN204597442U (zh) 一种线缆水汽阻断装置
CN203553387U (zh) 一种应用于工业控制的具有防水功能的快插电缆接头
CN209001165U (zh) 一种二次接线端子
CN210040614U (zh) 针对外螺纹接线端的电阻管所使用的螺栓型接线端子
CN208835374U (zh) 插接式电缆连接头
CN108761147B (zh) 一种电缆中间接头试验装置
CN207801448U (zh) 一种方便使用的电缆接头
CN209374701U (zh) 一种带防护功能的电缆快速连接件
CN104300324A (zh) 用于大电流电气设备或导线连接的组合连接件
CN201797143U (zh) 一种重载连接器
CN221102559U (zh) 一种快速连接的电缆连接器接头
CN214589376U (zh) 一种电气连接器
CN215897275U (zh) 一种具有防水结构的电缆中间接头

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 201707, Shanghai District, Qingpu, Guzhen, 9138 North Green Road, building 54, room 2

Patentee after: Shanghai and Xu automation Limited by Share Ltd

Address before: 201707, Shanghai District, Qingpu, Guzhen, 9138 North Green Road, building 54, room 2

Patentee before: Shanghai Key-Solution Electronic Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20180915