CN102020203B CN2010105559057A CN201010555905A CN102020203B CN 102020203 B CN102020203 B CN 102020203B CN 2010105559057 A CN2010105559057 A CN 2010105559057A CN 201010555905 A CN201010555905 A CN 201010555905A CN 102020203 B CN102020203 B CN 102020203B
Authority
CN
China
Prior art keywords
speed regulating
regulating device
motor
battery pack
quenching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010105559057A
Other languages
Chinese (zh)
Other versions
CN102020203A (en
Inventor
刘大淮
王毓平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Heavy Industry Co Ltd
Original Assignee
Taiyuan Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Heavy Industry Co Ltd filed Critical Taiyuan Heavy Industry Co Ltd
Priority to CN2010105559057A priority Critical patent/CN102020203B/en
Publication of CN102020203A publication Critical patent/CN102020203A/en
Application granted granted Critical
Publication of CN102020203B publication Critical patent/CN102020203B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)
  • Control Of Ac Motors In General (AREA)

Abstract

The invention relates to an electronic control method for transferring heavy to a lower level in a power-off period of a quenching crane and relates to an electronic control system for a quenching crane. The invention solves the problem of quickly putting a large-size workpiece into solution by using a crane when the power grid is power-off. The method of the invention is performed by an electronic control system which comprises an AC voltage and speed regulating device, a motor, a DC voltage and speed regulating device, a charger, a logic control device, a storage battery, a lifting resistor and a brake. When the quenching crane ascends, the AC voltage and speed regulating device controls the motor to work; when the quenching crane descends, the DC voltage and speed regulating device controls the motor to work; when the power grid is power-on, the logic control device controls the charger to charge the storage battery; when the power grid is power-off, the logic control device controls the motor to run and open the brake; and the descending potential energy is consumed by the lifting resistor.

Description

When having a power failure, quenching crane transfers the electric-control method of weight
Technical field
Invention belongs to the elevator machinery electric control system, specially refer to a kind of can be when grid power blackout safety transfer the electric control method of the quenching crane of weight.
Background technology
Quenching crane is the special purpose crane in the Technology for Heating Processing, has fast down descending mechanism, and workpiece immerses in the solution soon simultaneously very much to guarantee to be quenched.When oil bath is quenched, can be on fire when workpiece contact solution, immersing the interior fire of solution can extinguish.Therefore require workpiece to be put into solution with the fastest speed.Even if grid power blackout also requires rapidly workpiece to be put into solution.
Present way is:
1. electrical network has a power failure suddenly when hoisting crane is quenching operation, leans on artificial, pneumatic or opens the support drg with other method crawl, and crawl is transferred workpiece at a slow speed.This method of transferring workpiece is slower and dangerous, and particularly large-scale workpiece and stock workpiece need the long period, also need take fire protection when therefore often large-scale workpiece quenches.
2. brake rubber block and brake wheel attrition fall on the drg because potential energy relies on fully, and the brake rubber block of drg weares and teares with brake wheel and all compares seriously.
3. longer because of the time of transferring workpiece, the very difficult quenching quality that guarantees workpiece might make workpiece scrap.
Summary of the invention
The objective of the invention is to overcome the deficiency of above prior art, make improvements, transfer the electric-control method of weight when providing a kind of quenching crane to have a power failure, when grid power blackout, can fast and safely large-scale workpiece be put into solution.
Technical scheme of the present invention is achieved in that
Transfer the electric-control method of weight when a kind of quenching crane has a power failure, it is characterized in that: the electric control system that said electric-control method is made up of AC pressure-speed regulating device, electrical motor, DC pressure-speed regulating device, charger, logic control device, battery pack, the resistor that hoists, drg is accomplished; When quenching crane rises operation, control said electrical motor work, when quenching crane descends operation, control said machine operation by said DC pressure-speed regulating device by said AC pressure-speed regulating device; When electrical network had electricity, said logic control device was controlled said charger to said battery charging; When grid cut-off, said logic control device is controlled said motor operation and is opened said drg, by the said consumed decline potential energy that hoists.
Method to said battery charging is: at first by rectifier transformer the AC380V line voltage is become the low pressure that charging needs; When detecting accumulator battery voltage, monitoring means CDB is lower than the setting value lower limit; Contactless switch 6KM coil is switched on, and system begins charging, is higher than the setting value upper limit when monitoring means CDB detects accumulator battery voltage; Contactless switch 6KM coil is opened, and system stops charging.
When grid cut-off, the control method of said logic control device is: " transferring affirmation " and " main hoisting " switch that at first closes, and 3KC connects, and carries out and transfers preparation; Press " transferring button ", 4KC connects, 1KC connects, 4KM 7KM connects; 4KM is switched to the direct current (DC) of the main electrical motor that hoists, and motor stator flows through constant DC stream; 7KM is switched to the alternating current of drg, releasing of brake.
Said direct current (DC) will become the alternating current of 50HZ from the direct current (DC) that battery pack is come by inverter, and through step-up transformer voltage risen to AC380V.
Principle of work of the present invention:
Electrical network has a power failure suddenly when hoisting crane is quenching operation, utilizes energy stored to inject constant electric current, the electronic drg of opening for the stator of driving motor; The workpiece by gravity begins to descend; The drive motor rotation, the rotor loop cutting magnetic line produces electromotive force and electric current and produces lock torque thus; When lock torque and gravitational equilibrium, workpiece is transferred with stable speed.The workpiece of rated weight can be transferred so that command speed is stable.
The present invention and prior art relatively have the following advantages:
1, before quenching, store enough electric energy, electrical network has a power failure suddenly when hoisting crane is quenching operation, and energy stored capable of using is transferred workpiece.Drg is opened fully when 2, transferring workpiece, has avoided the wearing and tearing of brake wheel and brake rubber block.3, it is fast to transfer work speed, and continuously steadily, has improved workpiece quenching quality.4, system is simple, and link is few, and fault rate is low, and the equipment of being convenient to uses and safeguards.
Description of drawings
Fig. 1 is an electric control system line chart of the present invention;
Fig. 2 is charging control principle figure;
Fig. 3 is that direct current becomes the alternating-current electric schematic diagram;
Fig. 4 is the logic control circuit;
Fig. 5 is the external interconnecting wiring diagram of logic control device.
The specific embodiment
Specify representative instance of the present invention below in conjunction with accompanying drawing.
As shown in Figure 1; Transfer the electric-control method of weight when a kind of quenching crane has a power failure, it is characterized in that: the electric control system that said electric-control method is made up of AC pressure-speed regulating device 1, electrical motor 2, DC pressure-speed regulating device 3, charger 4, logic control device 5, battery pack 6, the resistor 7 that hoists, drg 8 is accomplished; When quenching crane rises operation, by said electrical motor 2 work of said AC pressure-speed regulating device 1 control, when quenching crane descends operation, by said motor 2 work of said DC pressure-speed regulating device 3 controls; When electrical network had electricity, the said charger 4 of said logic control device 5 controls was to said battery pack 6 chargings; When grid cut-off, the operation of the said motor 2 of said logic control device 5 controls is also opened said drg 8, consumes the decline potential energy by the said resistor 7 that hoists.
As shown in Figure 2; To said battery pack 6 electrically-charged methods be: at first by rectifier transformer 9 the AC380V line voltage is become the low pressure that charging needs, be lower than the setting value lower limit when monitoring means CDB detects battery pack 6 voltages, contactless switch 6KM coil is switched on; System begins charging; Be higher than the setting value upper limit when monitoring means CDB detects battery pack 6 voltages, contactless switch 6KM coil is opened, and system stops charging.
As shown in Figure 4, when grid cut-off, the control method of said logic control device 5 is: " transferring affirmation " and " main hoisting " switch that at first closes, and 3KC connects, and carries out and transfers preparation; Press " transferring button ", 4KC connects, 1KC connects, 4KM 7KM connects; 4KM is switched to the direct current (DC) of the main electrical motor that hoists, and motor stator flows through constant DC stream; 7KM is switched to the alternating current of drg, releasing of brake.
As shown in Figure 3, said direct current (DC) will become the alternating current of 50HZ from the direct current (DC) that battery pack 6 is come by inverter 10, and through step-up transformer 11 voltage risen to AC380V.

Claims (1)

1. transfer the electric-control method of weight when a quenching crane has a power failure, it is characterized in that: the electric control system that said electric-control method is made up of AC pressure-speed regulating device (1), electrical motor (2), DC pressure-speed regulating device (3), charger (4), logic control device (5), battery pack (6), the resistor that hoists (7), drg (8) is accomplished; When quenching crane rises operation, control said electrical motor (2) work, when quenching crane descends operation, control said motor (2) work by said DC pressure-speed regulating device (3) by said AC pressure-speed regulating device (1); When electrical network had electricity, said logic control device (5) was controlled said charger (4) and is charged to said battery pack (6); When grid cut-off, said logic control device (5) is controlled the operation of said motor (2) and is opened said drg (8), consumes the decline potential energy by the said resistor that hoists (7); The electrically-charged method of said battery pack (6) is: at first by rectifier transformer (9) the AC380V line voltage is become the low pressure that charging needs; When detecting battery pack (6) voltage, monitoring means CDB is lower than the setting value lower limit; Contactless switch 6KM coil is switched on, and system begins charging, is higher than the setting value upper limit when monitoring means CDB detects battery pack (6) voltage; Contactless switch 6KM coil is opened, and system stops charging.
CN2010105559057A 2010-11-19 2010-11-19 Electronic control method for transferring heavy to lower level in power-off period of quenching crane Expired - Fee Related CN102020203B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105559057A CN102020203B (en) 2010-11-19 2010-11-19 Electronic control method for transferring heavy to lower level in power-off period of quenching crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105559057A CN102020203B (en) 2010-11-19 2010-11-19 Electronic control method for transferring heavy to lower level in power-off period of quenching crane

Publications (2)

Publication Number Publication Date
CN102020203A CN102020203A (en) 2011-04-20
CN102020203B true CN102020203B (en) 2012-04-25

Family

ID=43862036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105559057A Expired - Fee Related CN102020203B (en) 2010-11-19 2010-11-19 Electronic control method for transferring heavy to lower level in power-off period of quenching crane

Country Status (1)

Country Link
CN (1) CN102020203B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583158A (en) * 2012-02-29 2012-07-18 上海共久电气有限公司 Electric control system for quenching crane
CN103058061A (en) * 2012-12-31 2013-04-24 太原重工股份有限公司 Quenching crane and bidirectional speed adjusting system thereof
CN103204436B (en) * 2013-04-09 2014-08-20 江苏万富安机械有限公司 Emergency brake circuit of starter
CN104868818B (en) * 2015-05-29 2017-10-20 上海共久电气有限公司 A kind of method and device for realizing quenching crane speed governing
CN106976803A (en) * 2017-05-10 2017-07-25 河南新科起重机股份有限公司 Governing system and quenching crane

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1504399A (en) * 2002-12-04 2004-06-16 上海振华港口机械(集团)股份有限公 Tire type gantry container crane using super capacitor
CN1843885A (en) * 2006-03-21 2006-10-11 牡丹江建工机械有限责任公司 Slewing normally disengaged brake circuit of tower crane having emergent braking function in power turn-off situation
CN101143688A (en) * 2007-09-21 2008-03-19 沈阳重型机械集团有限责任公司 Quenching bridge type crane brake-loosing mechanism

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3896258B2 (en) * 2001-04-25 2007-03-22 株式会社日立製作所 Automotive power supply

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1504399A (en) * 2002-12-04 2004-06-16 上海振华港口机械(集团)股份有限公 Tire type gantry container crane using super capacitor
CN1843885A (en) * 2006-03-21 2006-10-11 牡丹江建工机械有限责任公司 Slewing normally disengaged brake circuit of tower crane having emergent braking function in power turn-off situation
CN101143688A (en) * 2007-09-21 2008-03-19 沈阳重型机械集团有限责任公司 Quenching bridge type crane brake-loosing mechanism

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张三豹等.变频调速控制的淬火起重机.《起重运输机械》.2008,(第11期),第43-45页. *
王志勇.淬火起重机电控***的分析和研究.《起重运输机械》.2007,(第07期),第68-69页. *

Also Published As

Publication number Publication date
CN102020203A (en) 2011-04-20

Similar Documents

Publication Publication Date Title
CN102020203B (en) Electronic control method for transferring heavy to lower level in power-off period of quenching crane
KR20070007052A (en) Improved energy storage method for load hoisting machinery
EP3323761B1 (en) Method, elevator control unit and elevator for moving an elevator car to landing floor in case of event related to main electrical power supply of the elevator
CN103434914B (en) A kind of Trolley conductor energy storage type construction elevator
CN101697429B (en) Micro power consumption elevator
CN106241571B (en) Lift car wireless power and communication device and its method of supplying power to
CN102730604A (en) Tandem hybrid fork lift truck
CN107528383B (en) Super capacitor UPS power supply device for mine hoist
CN102602768A (en) Elevator self-rescue system
CN201914806U (en) Carrying device and carrying system
CN202529671U (en) Self-rescuing system for elevator
JP2010202399A (en) Power supply device for motor driven hoisting device
CN108358064B (en) Self-powered tower crane rotating lifting appliance device
CN102838013B (en) Energy-storage type construction hoist
CN102464235A (en) Improved new-energy elevator
CN205977066U (en) Battery drive's brushless DC motor's flexible door of automation
CN104418192A (en) Elevator control apparatus
CN204823829U (en) A energy -conserving motor for hoisting equipment
CN201504220U (en) Elevator power conservation device using super capacitor
CN103376196B (en) A kind of battery impact test control circuit and control method thereof
CN106953404A (en) A kind of regular charge-discharge system of emergency power supply battery and its method
CN112366920A (en) Power supply control method for construction elevator
CN205652949U (en) Emergent power generation facility of elevator
CN201942394U (en) Modified new energy elevator
CN201990351U (en) New energy elevator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120425