CN102010926B - Process for smelting and producing medium high carbon steel - Google Patents

Process for smelting and producing medium high carbon steel Download PDF

Info

Publication number
CN102010926B
CN102010926B CN2010105562384A CN201010556238A CN102010926B CN 102010926 B CN102010926 B CN 102010926B CN 2010105562384 A CN2010105562384 A CN 2010105562384A CN 201010556238 A CN201010556238 A CN 201010556238A CN 102010926 B CN102010926 B CN 102010926B
Authority
CN
China
Prior art keywords
steel
tapping
alloy
alloying
molten steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010105562384A
Other languages
Chinese (zh)
Other versions
CN102010926A (en
Inventor
胡道峰
赵军
翟卫江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel Co Ltd
Original Assignee
Nanjing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel Co Ltd filed Critical Nanjing Iron and Steel Co Ltd
Priority to CN2010105562384A priority Critical patent/CN102010926B/en
Publication of CN102010926A publication Critical patent/CN102010926A/en
Application granted granted Critical
Publication of CN102010926B publication Critical patent/CN102010926B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The invention relates to a process for producing a steel, in particular to a process for smelting and producing a medium high carbon steel. The process comprises the steps of adding silicon aluminum calcium alloy, low-melting-point synthetic slag and alloyed alloy at the time of 1/10 of the whole tapping time in turn, ending the process of adding all the alloys at the time of 2/3 of the whole tapping time, blowing in Ar in the whole tapping process in order to turn the low-melting-point synthetic slag into emulsion droplet to be scattered into the molten steel, and blowing Ar into the molten steel for at least eight minutes after finishing tapping, wherein 3kg of silicon aluminum calcium alloy is added into a ton of steel; 5kg of low-melting-point synthetic slag is added into a ton of steel; 7-10.5 kg of high carbon in the alloyed alloy is added into a ton of steel; and 3.5kg of FeSi in the alloyed alloy is added into a ton of steel. The process of the invention can replace the medium high C steel LF refining treating process and solve the problem that the refining treating capability in the quick steel-making production is insufficient.

Description

A kind of smelting process for production of medium and high carbon steel
Technical field
The present invention relates to a kind of production technique of steel, specifically a kind of smelting process for production of medium and high carbon steel.
Background technology
The smelting process for production route of high C steel is in producing in the prior art: converter smelting-tapping to 1/3 when (whole tapping time 1/3) deoxidation alloying → tapping (whole tapping time 2/3) all deoxygenated alloy alloys add that (not adding the lower melting point synthetic slag)--the Ar-continuous-casting steel pouring is blown in the LF refining to 2/3, wherein the tapping deoxidization alloying is in proper order: alloying alloy → deoxygenated alloy (Alsical).The drawback that this working method exists in the prior art is: the silicon in the alloying alloy, manganese are participated in deoxygenation; Generating more silicate is mingled with; And be difficult for removing, in addition if the LF affinability is not enough, the lifting and the variety steel that will seriously restrict quality product are produced in batches.
Summary of the invention
Technical problem to be solved by this invention is: to the shortcoming of above prior art existence; A kind of smelting process for production of medium and high carbon steel is proposed; High C steel LF refining treatment operation in can substituting; Solve refining treatment scarce capacity problem in the production of steel-making fast pace, and steel quality satisfies final performance requriements.
The technical scheme that the present invention solves above technical problem is:
A kind of smelting process for production of medium and high carbon steel, its production process route is: converter smelting-tapping deoxidization alloying--blow Ar station processing-continuous casting;
Converter smelting: metal charge goes into that stove → oxygen supply air-blowing refining → converting process adds lime, returns mine, rhombspar slag making → terminal point P, S reach smelt steel grade requirement → converter tapping to ladle.
The tapping deoxidization alloying is in proper order: 1/10 o'clock in the whole tapping time begins to add successively Alsical, lower melting point synthetic slag and alloying alloy, and 2/3 o'clock all alloy in the whole tapping time add; The Alsical add-on is 3~4Kg/ ton steel; Lower melting point synthetic slag add-on is 5~7Kg/ ton steel; The alloying alloy addition is: high-carbon FeMn is 7~10.5Kg/ ton steel, and FeSi is 3~5Kg/ ton steel;
Blowing Ar station processing sequence is: tapping process whole process is blown Ar, is distributed in the molten steel to impel the lower melting point synthetic slag to form emulsion droplet; Tapping finishes the back molten steel and blows Ar, blows 8~15 minutes Ar time.
Continuous casting: ladle molten steel → continuous casting tundish → continuous cast mold → water quench → qualified strand.
The technical scheme that the present invention further limits is:
The smelting process for production of aforesaid medium and high carbon steel, tapping finish the back molten steel and blow the Ar process control and be: molten steel is stirred blew Ar in 3~4 minutes earlier, stop afterwards stirring and blew Ar 5~10 minutes, to guarantee that slag fully reacts and deoxidation products fully floats.
The smelting process for production of aforesaid medium and high carbon steel, in the continuous casting operation: on the molten steel during continuous caster free oxygen be controlled at 15~30ppm.
The smelting process for production of aforesaid medium and high carbon steel, the lower melting point synthetic slag is composed of the following components by weight percentage, sees table 1:
Table 1
Chemical ingredients % SiO2 ∑(M) CaO Al2O3 MgO H2O
Synthetic wash heat ≤8 8~12 45~55 25~35 ≤5 ≤0.5
∑ (M) is a total metal content.
The smelting process for production of aforesaid medium and high carbon steel, Alsical are composed of the following components by weight percentage, see table 2:
Table 2
Chemical ingredients % Si Ca Al Fe
SiAlCa 14~20 17~25 25~33 Surplus
The smelting process for production of aforesaid medium and high carbon steel, in the alloying alloy, high-carbon FeMn is composed of the following components by weight percentage, sees table 3:
Table 3
Chemical ingredients % Mn C Fe
High-carbon FeMn 43~70 ≤57 Surplus
In the alloying alloy, FeSi is composed of the following components by weight percentage, sees table 4:
Table 4
Chemical ingredients % Si Fe
FeSi 72~80 Surplus
The Composition Control of lower melting point synthetic slag, Alsical and alloying alloy, to guarantee to reach the cleanliness factor of this steel grade molten steel requirement, steel quality satisfies final performance requriements, and the inclusion grade detects and can reach below 1.0 grades in the strand
Advantage of the present invention is: the present invention is put steel in converter and is added synthetic slag in earlier stage; Blowing Ar stirring merit by force through tapping process ballistic work and tapping process makes synthetic slag in molten steel, form emulsion droplet; Improve the ability of catching deoxidation products, synthetic slag is mingled with in floating-upward process absorption, polymerization is grown up and reached the effect of purify hot metal.High C steel LF refining treatment operation in can substituting through the present invention; Solve refining treatment scarce capacity problem in the production of steel-making fast pace; And energy-saving and emission-reduction, high C steel grade inclusion grade is controlled in 1.5 grades in the production, can reach the cleanliness factor of this steel grade molten steel requirement; Steel quality satisfies final performance requriements, and the inclusion grade detects and can reach below 1.0 grades in the strand.
Embodiment
Embodiment one
Present embodiment is a kind of smelting process for production of medium and high carbon steel, and its production process route is: converter smelting-tapping deoxidization alloying--blow Ar station processing-continuous casting.
Converter smelting: metal charge goes into that stove → oxygen supply air-blowing refining → converting process adds lime, returns mine, rhombspar slag making → terminal point P, S reach smelt steel grade requirement → converter tapping to ladle.
The tapping deoxidization alloying is in proper order: 1/10 o'clock in the whole tapping time begins to add successively Alsical, lower melting point synthetic slag and alloying alloy, and 2/3 o'clock all alloy in the whole tapping time add; The Alsical add-on is a 3Kg/ ton steel; Lower melting point synthetic slag add-on is a 5Kg/ ton steel; The alloying alloy addition is: high-carbon FeMn is a 7Kg/ ton steel, and FeSi is a 3Kg/ ton steel.
The lower melting point synthetic slag is composed of the following components by weight percentage, sees table 5:
Table 5
Chemical ingredients % SiO2 ?∑(M) CaO Al2O3 MgO H2O
Synthetic wash heat 8 ?8 53.5 25 5 0.5
Alsical is composed of the following components by weight percentage, sees table 6:
Table 6
Chemical ingredients % Si Ca Al Fe
SiAlCa 14 17 33 Surplus
In the alloying alloy, high-carbon FeMn is composed of the following components by weight percentage, sees table 7:
Table 7
Chemical ingredients % Mn C Fe
High-carbon FeMn 43 55 Surplus
In the alloying alloy, FeSi is composed of the following components by weight percentage, sees table 8:
Table 8
Chemical ingredients % Si Fe
FeSi 72 Surplus
Blowing Ar station processing sequence is: tapping process whole process is blown Ar, is distributed in the molten steel to impel the lower melting point synthetic slag to form emulsion droplet; Tapping finishes the back molten steel and blows Ar, blows 8 minutes Ar time, blows the Ar process control and is: molten steel is stirred blew Ar in 3 minutes earlier, stop afterwards stirring and blew Ar 5 minutes, to guarantee that slag fully reacts and deoxidation products fully floats.
Continuous casting: ladle molten steel → continuous casting tundish → continuous cast mold → water quench → qualified strand, in the continuous casting operation on the molten steel during continuous caster free oxygen be controlled at 15ppm.
Embodiment two
Present embodiment is a kind of smelting process for production of medium and high carbon steel, and its production process route is: converter smelting-tapping deoxidization alloying--blow Ar station processing-continuous casting.
Converter smelting: metal charge goes into that stove → oxygen supply air-blowing refining → converting process adds lime, returns mine, rhombspar slag making → terminal point P, S reach smelt steel grade requirement → converter tapping to ladle.
The tapping deoxidization alloying is in proper order: 1/10 o'clock in the whole tapping time begins to add successively Alsical, lower melting point synthetic slag and alloying alloy, and 2/3 o'clock all alloy in the whole tapping time add; The Alsical add-on is a 3.5Kg/ ton steel; Lower melting point synthetic slag add-on is a 6Kg/ ton steel; The alloying alloy addition is: high-carbon FeMn is a 9Kg/ ton steel, and FeSi is a 4Kg/ ton steel.
The lower melting point synthetic slag is composed of the following components by weight percentage, sees table 9:
Table 9
Chemical ingredients % SiO2 ?∑(M) CaO Al2O3 MgO H2O
Synthetic wash heat 7 ?10 48.7 30 4 0.3
Alsical is composed of the following components by weight percentage, sees table 2:
Table 10
Chemical ingredients % Si Ca Al Fe
SiAlCa 18 20 30 Surplus
In the alloying alloy, high-carbon FeMn is composed of the following components by weight percentage, sees table 3:
Table 11
Chemical ingredients % Mn C Fe
High-carbon FeMn 55 40 Surplus
In the alloying alloy, FeSi is composed of the following components by weight percentage, sees table 4:
Table 12
Chemical ingredients % Si Fe
FeSi 78 Surplus
Blowing Ar station processing sequence is: tapping process whole process is blown Ar, is distributed in the molten steel to impel the lower melting point synthetic slag to form emulsion droplet; Tapping finishes the back molten steel and blows Ar, blows 12 minutes Ar time, blows the Ar process control and is: molten steel is stirred blew Ar in 3.5 minutes earlier, stop afterwards stirring and blew Ar8 minute, to guarantee that slag fully reacts and deoxidation products fully floats.
Continuous casting: ladle molten steel → continuous casting tundish → continuous cast mold → water quench → qualified strand, in the continuous casting operation on the molten steel during continuous caster free oxygen be controlled at 22ppm.
Embodiment three
Present embodiment is a kind of smelting process for production of medium and high carbon steel, and its production process route is: converter smelting-tapping deoxidization alloying--blow Ar station processing-continuous casting.
Converter smelting: metal charge goes into that stove → oxygen supply air-blowing refining → converting process adds lime, returns mine, rhombspar slag making → terminal point P, S reach smelt steel grade requirement → converter tapping to ladle.
The tapping deoxidization alloying is in proper order: 1/10 o'clock in the whole tapping time begins to add successively Alsical, lower melting point synthetic slag and alloying alloy, and 2/3 o'clock all alloy in the whole tapping time add; The Alsical add-on is a 4Kg/ ton steel; Lower melting point synthetic slag add-on is a 7Kg/ ton steel; The alloying alloy addition is: high-carbon FeMn is a 10.5Kg/ ton steel, and FeSi is a 5Kg/ ton steel.
The lower melting point synthetic slag is composed of the following components by weight percentage, sees table 13:
Table 13
Chemical ingredients % SiO2 ?∑(M) CaO Al2O3 MgO H2O
Synthetic wash heat 5 ?12 55 26.9 1 ≤0.1
Alsical is composed of the following components by weight percentage, sees table 14:
Table 14
Chemical ingredients % Si Ca Al Fe
SiAlCa 20 25 33 Surplus
In the alloying alloy, high-carbon FeMn is composed of the following components by weight percentage, sees table 15:
Table 15
Chemical ingredients % Mn C Fe
High-carbon FeMn 70 29 Surplus
In the alloying alloy, FeSi is composed of the following components by weight percentage, sees table 16:
Table 16
Chemical ingredients % Si Fe
FeSi 80 Surplus
Blowing Ar station processing sequence is: tapping process whole process is blown Ar, is distributed in the molten steel to impel the lower melting point synthetic slag to form emulsion droplet; Tapping finishes the back molten steel and blows Ar, blows 15 minutes Ar time, blows the Ar process control and is: molten steel is stirred blew Ar in 4 minutes earlier, stop afterwards stirring and blew Ar 10 minutes, to guarantee that slag fully reacts and deoxidation products fully floats.
Continuous casting: ladle molten steel → continuous casting tundish → continuous cast mold → water quench → qualified strand, in the continuous casting operation on the molten steel during continuous caster free oxygen be controlled at 30ppm.
The present invention can also have other embodiment, and the technical scheme that equal replacement of all employings or equivalent transformation form all drops within the scope of requirement protection of the present invention.

Claims (3)

1. the smelting process for production of a medium and high carbon steel, it is characterized in that: its production process route is: converter smelting-tapping deoxidization alloying--blow Ar station processing-continuous casting;
Said tapping deoxidization alloying is in proper order: 1/10 o'clock in the whole tapping time begins to add successively Alsical, lower melting point synthetic slag and alloying alloy, and 2/3 o'clock all alloy in the whole tapping time add; Said Alsical add-on is 3~4Kg/ ton steel; Said lower melting point synthetic slag add-on is 5~7Kg/ ton steel; Said alloying alloy addition is: high-carbon FeMn is 7~10.5Kg/ ton steel, and FeSi is 3~5Kg/ ton steel;
The said Ar of blowing station processing sequence is: tapping process whole process is blown Ar, is distributed in the molten steel to impel the lower melting point synthetic slag to form emulsion droplet; Tapping finishes the back molten steel and blows Ar, blows 8~15 minutes Ar time;
Said lower melting point synthetic slag is composed of the following components by weight percentage: SiO 2:≤8%, ∑ (M): 8~12%, CaO:45~55%, Al 2O 3: 25~35%, MgO :≤5%, H 2O :≤0.5%, ∑ (M) is a total metal content;
Said Alsical is composed of the following components by weight percentage: Si:14~20%, Ca:17~25%, Al:25~33%, Fe: surplus;
In the said alloying alloy, high-carbon FeMn is composed of the following components by weight percentage: Mn:43~70%, and C :≤57%, Fe: surplus; In the said alloying alloy, FeSi is composed of the following components by weight percentage: Si:72~80%, Fe: surplus.
2. the smelting process for production of medium and high carbon steel as claimed in claim 1; It is characterized in that: tapping end back molten steel blows the Ar process control and is: molten steel is stirred blew Ar in 3~4 minutes earlier; Stop afterwards stirring and blew Ar 5~10 minutes, to guarantee that slag fully reacts and deoxidation products fully floats.
3. the smelting process for production of medium and high carbon steel as claimed in claim 1 is characterized in that: in the said continuous casting operation: on the molten steel during continuous caster free oxygen be controlled at 15~30ppm.
CN2010105562384A 2010-11-24 2010-11-24 Process for smelting and producing medium high carbon steel Expired - Fee Related CN102010926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105562384A CN102010926B (en) 2010-11-24 2010-11-24 Process for smelting and producing medium high carbon steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105562384A CN102010926B (en) 2010-11-24 2010-11-24 Process for smelting and producing medium high carbon steel

Publications (2)

Publication Number Publication Date
CN102010926A CN102010926A (en) 2011-04-13
CN102010926B true CN102010926B (en) 2012-06-06

Family

ID=43841254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105562384A Expired - Fee Related CN102010926B (en) 2010-11-24 2010-11-24 Process for smelting and producing medium high carbon steel

Country Status (1)

Country Link
CN (1) CN102010926B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102688992A (en) * 2012-06-13 2012-09-26 鞍钢股份有限公司 Method for synthetic slag washing of tundish
CN106399632B (en) * 2016-09-09 2018-06-08 武汉钢铁有限公司 A kind of high-carbon steel carburetion method
CN106563780B (en) * 2016-10-31 2018-11-13 山东钢铁股份有限公司 The continuous cast method of high alloy tool steel large round billet in a kind of medium high carbon

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1377977A (en) * 2002-01-17 2002-11-06 刘跃 Synthetic slag for reducing oxygen and sulfur content in molten steel and its slag making method
CN1441068A (en) * 2002-02-25 2003-09-10 孙富卿 Molten mixed slag for refining and desulfurizing steel
CN101403021A (en) * 2008-11-08 2009-04-08 山西太钢不锈钢股份有限公司 Utilization method for steel scoria

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1377977A (en) * 2002-01-17 2002-11-06 刘跃 Synthetic slag for reducing oxygen and sulfur content in molten steel and its slag making method
CN1441068A (en) * 2002-02-25 2003-09-10 孙富卿 Molten mixed slag for refining and desulfurizing steel
CN101403021A (en) * 2008-11-08 2009-04-08 山西太钢不锈钢股份有限公司 Utilization method for steel scoria

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP昭5534653A 1980.03.11

Also Published As

Publication number Publication date
CN102010926A (en) 2011-04-13

Similar Documents

Publication Publication Date Title
CN112359277B (en) Control method for segregation and net carbon of 86-level high-strength cord steel wire rod
CN102618782B (en) Large-specification Z-direction H-steel and preparation method thereof
CN106834960B (en) A kind of automobile using boracic top grade gear steel and its production technology
CN101705334B (en) Aluminum-calcium-magnesium-cerium composite alloy used for strong desulfurization, final desoxidation, and quenching and tempering of liquid steel
CN103334050B (en) Process utilizing sheet billet continuous casting to manufacture low aluminum silicon calm carbon structural steel
CN102994871B (en) Method for smelting medium/high-carbon hard-wired steel by vanadium-titanium containing molten iron
CN102618781A (en) Hot-rolled H-steel for low temperature-resistance structure and preparation method for hot-rolled H-steel
CN103074545B (en) High-strength low temperature hot rolling resistant channel steel for forklift gantry and preparation method for channel steel
CN108004374A (en) A kind of method realized oxide in cord steel and be mingled with low Young's modulus
CN102851447B (en) Outside-furnace refining production method of steel used in carbon steel welding wire
CN103215410B (en) A kind of method improved containing Nb, Ti steel cleanness
CN103614517A (en) Low-cost deoxygenation method for low-aluminum medium-carbon steel
CN103436654A (en) Low-cost production method for container steel casting blanks
CN104043797A (en) Ultra-low-sulfur high-chromium steel continuous casting method and bloom prepared by same
CN108866276A (en) Improve the smelting process of heavy rail steel cleanness
CN104294149A (en) 350MPa-level low temperature resistant H-shaped steel and preparation method thereof
CN102010926B (en) Process for smelting and producing medium high carbon steel
CN103834861A (en) 320MPa low-temperature resistant hot-rolled H-shaped steel and preparation method thereof
CN104060020B (en) A kind of dephosphorization method for making steel improving converter terminal molten steel Fe content
CN103643117B (en) A kind of ultralow aluminum steel and smelting process thereof
CN105177408A (en) Low-cost hot-rolled thin strip steel containing boron and manufacturing method thereof
CN108330240A (en) Method of the aluminium without calcification processing drops in continuous casting Q235 steel grades
CN102400052A (en) Narrow-hardenability pinion steel and preparation method thereof
CN113388710A (en) Smelting control method of ultrahigh-strength cord steel
CN108796173A (en) Improve the smelting process of heavy rail steel cleanness

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120606

Termination date: 20191124