CN102009911B CN201010569564.9A CN201010569564A CN102009911B CN 102009911 B CN102009911 B CN 102009911B CN 201010569564 A CN201010569564 A CN 201010569564A CN 102009911 B CN102009911 B CN 102009911B
Authority
CN
China
Prior art keywords
traveling crane
beams
groups
hanging traveling
smooth formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010569564.9A
Other languages
Chinese (zh)
Other versions
CN102009911A (en
Inventor
黄耀怡
郭欣
魏福祥
张广谭
郭梦琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Original Assignee
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Tianye Tolian Heavy Industry Co Ltd filed Critical Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority to CN201010569564.9A priority Critical patent/CN102009911B/en
Publication of CN102009911A publication Critical patent/CN102009911A/en
Application granted granted Critical
Publication of CN102009911B publication Critical patent/CN102009911B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a horizontal hanging beam travelling crane; a counterweight cross beam (4) and a standard cross beam (6) are connected through two longitudinal binding beams (13) to form a main crane frame; and two groups of fixed pulley blocks (5) are installed on the longitudinal binding beams (13) of the main crane frame. Both ends of the counterweight cross beam (4) are provided with an upper active shifter (1) and a walking power device (7); and an inactive shifter (14) is installed on both ends of the standard cross beam (6). The outer side of the standard cross beam (6) is provided with four spoon-shaped cantilevers (11); the spoon-shaped cantilevers (11) are connected with a plurality of cross binding beams (12) to form a cantilever auxiliary crane frame; and the elevation of the top surface of the auxiliary crane frame is below that of the main crane frame. The horizontal hanging beam travelling crane clears away a great barrier for tire type beam carrying vehicles that carry a high speed railway bridge girder erection machine to smoothly pass through tunnels, thereby being capable of greatly improving the building progress of bridges along a high speed railway; and the horizontal hanging beam travelling crane has large social and economic benefits.

Description

Smooth formula beam-hanging traveling crane
Technical field
The present invention relates to a kind of beam-hanging traveling crane on high speed railway Bridge Erector, particularly the smooth formula beam-hanging traveling crane of one.
Background technology
Adopting tire type beam conveying vehicle entirety to pack high speed railway Bridge Erector by one of obstacle of running into during tunnel is beam-hanging traveling crane excessive height on Bridge Erector, collides, therefore overhead traveling crane dismounting can must be crossed tunnel with top, tunnel.Obviously, this quite bothers, and time-consumingly bothersomely to take a lot of work.
Summary of the invention
Cai only have after dismounting overhead traveling crane by tunnel, the time-consuming deficiency such as to take a lot of work to overcome existing Bridge Erector, the invention provides a kind of smooth formula beam-hanging traveling crane, this invention makes the height of Bridge Erector beam-hanging traveling crane greatly reduce, thus makes tire type beam conveying vehicle entirety pack high speed railway bridge formation function to pass through tunnel smoothly.
The technical solution adopted for the present invention to solve the technical problems is: the vehicle frame of described beam-hanging traveling crane is divided into main car frame and subframe two parts.Main car frame by two vertical binding beams couple together add counterweight crossbeam and standard horizontal beams is formed, fixed pulley group integrated and overhead traveling crane traveling gear is installed in main car frame, for reducing height further, have employed four groups of shift units and walking engine installation by being arranged on the traveling gear adding counterweight crossbeam and standard horizontal beams two ends, main car frame is the main load larrying member of beam-hanging traveling crane.Four spoon shape cantilever beams are installed in the outside of standard horizontal beams, spoon shape cantilever beam and some horizontal-associate beams connect and compose cantilevered subframe, cantilevered subframe is equipped with two electric winchs, and subframe to hang outside main car frame in main car frame standard horizontal beams side and with spoon shape cantilever beam form and lower than main car frame.Like this, just by winch in prior art, the tall and big beam-hanging traveling crane be vertically superposed on fixed pulley group is spread out and becomes short smooth formula beam-hanging traveling crane.Four groups of shift units of described traveling gear adopt chain sprocket drive, can make like this to be staggeredly arranged before and after walking engine installation and shift unit, thus reduce the overall height of traveling gear.In addition, in order to beam-hanging traveling crane longitudinal plane length can be shortened, steel rope can be avoided again to enter to restrict the increase of drift angle, present invention employs steel rope and add leading sheave on counterweight crossbeam directly around on running block by being arranged on main car frame.For the needs that accommodation curve is set a roof beam in place, described beam-hanging traveling crane is also provided with sideslip oil cylinder, can make fixed pulley group overall lateral shuttle slippage nominal distance by the push-and-pull of sideslip oil cylinder.Meanwhile, in order to the overall width of constriction beam-hanging traveling crane, in order to avoid collide with the roof of a tunnel of arch, the traveling gear of overhead traveling crane is arranged on (inclined beam-and-rail) on the track on crane ' s major girder interior plate by the present invention.
The invention has the beneficial effects as follows: the smooth formula beam-hanging traveling crane of the Very Low Clearance that this invention provides, for the high speed railway Bridge Erector manufacturing and designing overall height lower creates advantage, also packing high speed railway Bridge Erector for tire type beam conveying vehicle entirety has cleared away a large obstacle by tunnel smoothly simultaneously, thus greatly can improve the erection progress of line of high-speed railway bridge, its Social and economic benef@is huge.
Accompanying drawing explanation
Fig. 1 is the front view of smooth formula beam-hanging traveling crane;
Fig. 2 is the birds-eye view of smooth formula beam-hanging traveling crane;
Fig. 3 is the A-A view profile of Fig. 1;
Fig. 4 is the steel rope winding diagram of smooth formula beam-hanging traveling crane.
In above-mentioned accompanying drawing, 1. active shift unit, 2. leading sheave, 3. sideslip oil cylinder, 4. add counterweight crossbeam (filling iron sand), 5. fixed pulley group is integrated, 6. standard horizontal beams, engine installation (chain sprocket drive) of 7. walking, 8. running block, 9. lifting assembly, 10. electric winch, 11. soup spoon shape cantilever beams, 12. horizontal-associate beams, 13. vertical binding beams, 14. passive shift units, 15. crane ' s major girders.
Detailed description of the invention
Embodiment
Fig. 1 ~ Fig. 4 is an embodiment disclosed by the invention, described smooth formula beam-hanging traveling crane, comprise integrated 5, the two groups of running blocks 8 of leading sheave 2, two groups of fixed pulley groups, lifting assembly 9 and two winchs 10, described beam-hanging traveling crane is arranged on Bridge Erector two girders 15.Couple together form main car frame structure adding counterweight crossbeam 4 and standard horizontal beams 6 two vertical binding beams 13.Two groups of fixed pulley groups integrated 5 are arranged on vertical binding beam 13, sideslip oil cylinder 3 is equipped with at the two ends of two groups of fixed pulley groups integrated 5 respectively, initiatively shift unit 1 and walking engine installation 7 are installed in the two ends adding counterweight crossbeam 4, passive shift unit 14 is installed at the two ends of standard horizontal beams 6, four spoon shape cantilever beams 11 are installed in the outside of standard horizontal beams 6, spoon shape cantilever beam 11 and some horizontal-associate beams 12 connect and compose cantilevered subframe (winch platform), and subframe end face absolute altitude is lower than main car frame.Cantilevered subframe installs two electric winchs 10, and the profile end face absolute altitude of electric winch 10 is slightly lower than the profile end face absolute altitude of fixed pulley group integrated 5.Engine installation 7 drives active shift unit 1 by chain sprocket drive and drives passive shift unit 14 in Bridge Erector two girders 15, pleurosternal track to run.(containing fixed pulley group integrated etc.) and cantilevered subframe are always conducted oneself with dignity the balance of (containing winch) in order keeping main car frame is always conducted oneself with dignity, iron sand need be loaded work as counterweight, the trim moment produced with the deadweight of balanced cantilever formula subframe and electric winch 10 in adding in counterweight crossbeam 4 of main car frame.The rope stretching of electric winch 10 directly to enter to restrict 8, two groups of running block 8 connections parallel with lifting assembly 9 of precession assembly pulley through leading sheave 2.Leading sheave 2 is arranged on the outside adding counterweight crossbeam, hoisting rope is pressed the winding of method shown in Fig. 4, finally sideslip oil cylinder 3 is installed.With loop wheel machine, smooth formula beam-hanging traveling crane is lifted on Bridge Erector two girders 15 (as shown in Figure 1), gets final product place in operation.

Claims (6)

1. a smooth formula beam-hanging traveling crane, comprise leading sheave (2), two groups of fixed pulley groups integrated (5), two groups of running blocks (8), lifting assembly (9) and two electric winchs (10), described beam-hanging traveling crane is arranged on Bridge Erector two girders (15), it is characterized in that: counterweight crossbeam (4) and standard horizontal beams (6) will be added and couple together formation main car frame with two vertical binding beams (13), described two groups of fixed pulley groups integrated (5) are arranged on main car frame and indulge on binding beam (13), initiatively shift unit (1) and walking engine installation (7) are installed in the two ends adding counterweight crossbeam (4), passive shift unit (14) is installed at the two ends of standard horizontal beams (6), 4 spoon shape cantilever beams (11) are installed in the outside of standard horizontal beams (6), spoon shape cantilever beam (11) and some horizontal-associate beams (12) connect and compose cantilevered subframe, described cantilevered subframe is equipped with two electric winchs (10), the profile end face absolute altitude of electric winch (10) is slightly lower than the profile end face absolute altitude of fixed pulley group integrated (5).
2. smooth formula beam-hanging traveling crane according to claim 1, is characterized in that: described walking engine installation (7) drives active shift unit (1) by chain sprocket drive and drives passive shift unit (14) in Bridge Erector two girders (15), pleurosternal track to run.
3. smooth formula beam-hanging traveling crane according to claim 1, is characterized in that: described in add in counterweight crossbeam (4) and load counterweight iron sand, to conduct oneself with dignity the trim moment produced to balance subframe and electric winch (10).
4. smooth formula beam-hanging traveling crane according to claim 1, is characterized in that: described in add counterweight crossbeam (4) outside install leading sheave (2).
5. the smooth formula beam-hanging traveling crane according to claim 1 or 4, it is characterized in that: the rope stretching of described electric winch (10) directly to enter to restrict precession assembly pulley (8) through leading sheave (2), two groups of running blocks (8) and lifting assembly (9) parallel connection.
6. the smooth formula beam-hanging traveling crane according to claim 1 or 4, is characterized in that: the steel rope of being drawn by electric winch (10) is direct around entering running block (8) through leading sheave (2).
CN201010569564.9A 2010-12-02 2010-12-02 Horizontal hanging beam travelling crane Active CN102009911B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010569564.9A CN102009911B (en) 2010-12-02 2010-12-02 Horizontal hanging beam travelling crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010569564.9A CN102009911B (en) 2010-12-02 2010-12-02 Horizontal hanging beam travelling crane

Publications (2)

Publication Number Publication Date
CN102009911A CN102009911A (en) 2011-04-13
CN102009911B true CN102009911B (en) 2015-03-25

Family

ID=43840275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010569564.9A Active CN102009911B (en) 2010-12-02 2010-12-02 Horizontal hanging beam travelling crane

Country Status (1)

Country Link
CN (1) CN102009911B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2652990Y (en) * 2003-10-31 2004-11-03 开封市宏达路桥设备厂 Bidirectional bridge girder erection machine
CN200974745Y (en) * 2006-12-01 2007-11-14 黎建国 Detachable tower lifter
CN201232010Y (en) * 2008-06-23 2009-05-06 北京中铁建北方路桥工程有限公司 Long ton rotary crown block
CN201284462Y (en) * 2008-10-06 2009-08-05 郑州江河重工有限公司 Bridging machine for both highway and railway
CN101851898A (en) * 2010-06-09 2010-10-06 中铁科工集团有限公司 Bridge girder erection machine capable of passing through tunnel and realizing girder erection and bridging process thereof
CN201627144U (en) * 2009-11-11 2010-11-10 秦皇岛天业通联重工股份有限公司 Double-beam transportation and erection integrated bridge girder erection machine
CN201890726U (en) * 2010-12-02 2011-07-06 秦皇岛天业通联重工股份有限公司 Flat type hanging beam overhead traveling crane

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2768282B2 (en) * 1994-11-11 1998-06-25 鹿島建設株式会社 Bridge construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2652990Y (en) * 2003-10-31 2004-11-03 开封市宏达路桥设备厂 Bidirectional bridge girder erection machine
CN200974745Y (en) * 2006-12-01 2007-11-14 黎建国 Detachable tower lifter
CN201232010Y (en) * 2008-06-23 2009-05-06 北京中铁建北方路桥工程有限公司 Long ton rotary crown block
CN201284462Y (en) * 2008-10-06 2009-08-05 郑州江河重工有限公司 Bridging machine for both highway and railway
CN201627144U (en) * 2009-11-11 2010-11-10 秦皇岛天业通联重工股份有限公司 Double-beam transportation and erection integrated bridge girder erection machine
CN101851898A (en) * 2010-06-09 2010-10-06 中铁科工集团有限公司 Bridge girder erection machine capable of passing through tunnel and realizing girder erection and bridging process thereof
CN201890726U (en) * 2010-12-02 2011-07-06 秦皇岛天业通联重工股份有限公司 Flat type hanging beam overhead traveling crane

Also Published As

Publication number Publication date
CN102009911A (en) 2011-04-13

Similar Documents

Publication Publication Date Title
CN102071650B (en) Universal bridging machine inside and outside Railway Tunnel
CN105421249B (en) Dragging- hoisting combined type hanging basket structure and construction method
CN103726421B (en) Height and span adjustable track paver for metro construction
CN104594141B (en) A kind of track paving fortune engineering truck
CN107640706A (en) A kind of crane gear and its construction method
CN108301331A (en) Steel box-girder installation erection crane and steel box girder cantilever assembling and construction method
CN110396931A (en) A kind of excessively cable-styled erection crane of center double plane cable stayed bridge and its construction method
CN202047375U (en) Universal bridging machine for inside and outside high-speed railway tunnel
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN203007850U (en) Transversely-movable overhead travelling crane of bridge erecting machine
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
CN202391104U (en) Portable rail slip form
CN201610102U (en) Ultra-low beam transport car
CN201890726U (en) Flat type hanging beam overhead traveling crane
CN207891733U (en) The mobile operation platform of steel truss arched bridge coating project
CN206635657U (en) A kind of symmetrical formula Bridge Erector of setting a roof beam in place
CN106744340B (en) A kind of multi-functional special purpose crane in laboratory applied to small space
CN102009911B (en) Horizontal hanging beam travelling crane
CN209652772U (en) Box girder bridge cantilever construction main truss cradle system
CN108532462A (en) A kind of symmetrically set a roof beam in place and its is set a roof beam in place, passing method at formula Bridge Erector
CN204608524U (en) A kind of track paving fortune engineering truck
CN202055175U (en) Hoisting device of box girder-lifting machine beam-hanging traveling crane
CN202465109U (en) Motor-driven double-beam grab bucket gantry crane
CN205114887U (en) Hand propelled removes portal frame
CN205636494U (en) HZQY900 type fortune frame all -in -one

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160622

Address after: 066004 No. 3 Tianshan Road, Qinhuangdao economic and Technological Development Zone, Hebei, China

Patentee after: QINHUANGDAO TIANYE TOLIAN HEAVY INDUSTRY CO., LTD.

Address before: 066004 No. 3 Tianshan Road, Qinhuangdao economic and Technological Development Zone, Hebei, China