CN101980264A - Equipment defect maintenance method in power system - Google Patents
Equipment defect maintenance method in power system Download PDFInfo
- Publication number
- CN101980264A CN101980264A CN2010105161656A CN201010516165A CN101980264A CN 101980264 A CN101980264 A CN 101980264A CN 2010105161656 A CN2010105161656 A CN 2010105161656A CN 201010516165 A CN201010516165 A CN 201010516165A CN 101980264 A CN101980264 A CN 101980264A
- Authority
- CN
- China
- Prior art keywords
- defective
- equipment maintenance
- substation equipment
- defect
- repair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an equipment defect maintenance method in a power system. In the method, three aspects, namely defects, severe defects and common defects are reported by an operator, the defect processing time is arranged by a power transformation maintenance department, and the defects are analyzed by the power transformation maintenance department, are improved. The method has the advantages that: the time of the reporting process is saved, an accident can be timely handled, the power interruption time is reduced, the power supply reliability is improved, a worker combines normal work to handle the defects so as to save the cost, the defect conditions are accurately judged, the preparation of the power transformation maintenance department is full, and the defects are handled timely on site. Therefore, the invention provides a more accurate, effective, saving and convenient equipment defect maintenance method in the power system.
Description
Technical field
The invention belongs to the power equipment area of maintenance, more particularly, is equipment deficiency maintaining method in a kind of electric system.
Background technology
The equipment deficiency maintenance process comprises the registration defective in the power system, transfer the audit of logical center, skill audit (arrangement defect processing) is given birth to by districts and cities, the plan specific responsibility of substation equipment maintenance and repair section arranges to process defective, substation equipment maintenance and repair section processes defective, disappear to lack and check and accept, the links such as filing, at present, mainly report defective the operations staff, serious and general class defective arranges the defect processing time by substation equipment maintenance and repair section, substation equipment maintenance and repair section is to three aspect existing problems of defect analysis, concrete condition is, the operations staff reports the problem that defective exists: the operations staff is when finding defective, need registration, report defective to the operation specific responsibility, if critical defective, report layer by layer, the time of defective is processed in impact again.Be unfavorable for the processing of defective, have the suffering of quality; Serious and general class defective arranges the problem that the defect processing time exists by substation equipment maintenance and repair section: the substation equipment maintenance and repair ministry dispatching is according to defect type, if critical defective directly the arrangement personnel process defective; Other defect also arranges personnel in time to process, if the power failure plan is arranged this year, equipment repeats to have a power failure so, affects power supply reliability.Be unfavorable for three execution of saving; The problem that substation equipment maintenance and repair section exists defect analysis: because in the past communication etc. are undeveloped, the operations staff reports defect situation just by phone.
Summary of the invention
The objective of the invention is to address the above problem, provide a kind of more accurate, more effective, more save, equipment deficiency maintaining method in the electric system more easily, utilize the present invention, mainly report defective, seriously reach general class defective and arrange defect processing time and substation equipment maintenance and repair portion three aspects of defect analysis to be improved described method following steps by substation equipment maintenance and repair portion from the operations staff:
1, the operations staff reports defective: the operations staff is when finding defective, if critical defective directly to transferring logical center to report, by transferring logical center to order, is dwindled the accident scope, notice Biotechnology Department and substation equipment maintenance and repair section process defective.
2, seriously reach general class defective and arrange the defect processing time by substation equipment maintenance and repair section: increase the substation equipment maintenance and repair ministry dispatching according to defect type, critical defective directly arrangement personnel is processed defective, other defect in conjunction with the scheduled outage time in conjunction with planning work, the arrangement personnel process,
3, substation equipment maintenance and repair section is to defective: the plan specific responsibility of substation equipment maintenance and repair section is after receiving task, at first to power transformation operation section operator, inquire in detail defect condition, the operator on duty of power transformation operation section need to describe defective clear, gives substation equipment maintenance and repair section with defective equipment picture transmission.The plan of substation equipment maintenance and repair section is provided by the situation of the defective equipment that provides according to power transformation operation section, organizes relevant speciality man analysis defective.
The invention has the beneficial effects as follows:
1, save the time of report process, in time processing accident reduces power off time, has improved power supply reliability;
2, the staff processes defective in conjunction with normal operation, saves cost;
3, owing to accurately judged defect condition, substation equipment maintenance and repair section preparation can be very abundant, and the in-situ processing defective is timely, reports the time of process;
Embodiment
Below by specific embodiment, further specify advantage of the present invention:
Utilize the present invention, mainly report defective, seriously reach general class defective and arrange defect processing time and substation equipment maintenance and repair section that three aspects of defect analysis are improved by substation equipment maintenance and repair section from the operations staff, described concrete grammar is as follows:
1, the operations staff reports the Optimized Measures of defective: the operations staff is when finding defective, if critical defective directly to transferring logical center to report, by transferring logical center to order, is dwindled the accident scope, notice Biotechnology Department and substation equipment maintenance and repair section process defective.
2, seriously reach general class defective is arranged the defect processing time by substation equipment maintenance and repair section Optimized Measures: increase the substation equipment maintenance and repair ministry dispatching according to defect type, critical defective directly arrangement personnel is processed defective, other defect in conjunction with the scheduled outage time in conjunction with planning work, the arrangement personnel process
3, substation equipment maintenance and repair section is to the Optimized Measures of defective: the plan specific responsibility of substation equipment maintenance and repair section is after receiving task, at first to power transformation operation section operator, inquire in detail defect condition, the operator on duty of power transformation operation section need to describe defective clear, gives substation equipment maintenance and repair section with defective equipment picture transmission.The plan of substation equipment maintenance and repair section is provided by the situation of the defective equipment that provides according to power transformation operation section, organizes relevant speciality man analysis defective.
Claims (1)
1. equipment deficiency maintaining method in the electric system is characterized in that may further comprise the steps:
A, operations staff report defective: the operations staff is when finding defective, if critical defective directly to transferring logical center to report, by transferring logical center to order, is dwindled the accident scope, notice Biotechnology Department and substation equipment maintenance and repair section process defective;
B, seriously reach general class defective and arrange the defect processing time by substation equipment maintenance and repair section: increase the substation equipment maintenance and repair ministry dispatching according to defect type, critical defective directly arrangement personnel is processed defective, other defect in conjunction with the scheduled outage time in conjunction with planning work, the arrangement personnel process;
C, substation equipment maintenance and repair section are to defective: the plan specific responsibility of substation equipment maintenance and repair section is after receiving task, at first to power transformation operation section operator, inquire in detail defect condition, the operator on duty of power transformation operation section need to describe defective clear, give substation equipment maintenance and repair section with defective equipment picture transmission, the plan of substation equipment maintenance and repair section is provided by the situation of the defective equipment that provides according to power transformation operation section, organizes relevant speciality man analysis defective.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105161656A CN101980264A (en) | 2010-10-22 | 2010-10-22 | Equipment defect maintenance method in power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105161656A CN101980264A (en) | 2010-10-22 | 2010-10-22 | Equipment defect maintenance method in power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101980264A true CN101980264A (en) | 2011-02-23 |
Family
ID=43600765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105161656A Pending CN101980264A (en) | 2010-10-22 | 2010-10-22 | Equipment defect maintenance method in power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101980264A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103390217A (en) * | 2013-07-16 | 2013-11-13 | 嘉兴市恒光电力建设有限责任公司华创分公司 | Power transformation transaction management operating system |
US9672142B2 (en) | 2013-06-06 | 2017-06-06 | International Business Machines Corporation | Replacement of suspect or marginally defective computing system components during fulfillment test of build-to-order test phase |
-
2010
- 2010-10-22 CN CN2010105161656A patent/CN101980264A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9672142B2 (en) | 2013-06-06 | 2017-06-06 | International Business Machines Corporation | Replacement of suspect or marginally defective computing system components during fulfillment test of build-to-order test phase |
CN103390217A (en) * | 2013-07-16 | 2013-11-13 | 嘉兴市恒光电力建设有限责任公司华创分公司 | Power transformation transaction management operating system |
CN103390217B (en) * | 2013-07-16 | 2016-08-10 | 嘉兴市恒光电力建设有限责任公司华创分公司 | Converting equipment unusual fluctuation management operating system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103500377A (en) | Integrated maintenance-operation management method and system for electric service ATP (Automatic Train Protection) vehicle-mounted equipment in railway | |
CN103337150A (en) | Long-distance intelligent monitoring system of grinding machines | |
CN104237735A (en) | Modeling and fault analysis method combining fault indicator and power distribution terminal | |
CN101980264A (en) | Equipment defect maintenance method in power system | |
CN210298153U (en) | Remote operation and maintenance management system for street lamp | |
CN103366245A (en) | OSB (operation sevice bus)-based power grid fault information distribution method and system | |
CN106646116A (en) | Trouble shooting and locating method for power distribution network | |
CN116054403A (en) | Power grid dispatching measurement and monitoring method based on national network big data platform | |
CN206091489U (en) | Lifting and horizontal moving formula garage operation controlling means | |
CN211237572U (en) | Label for power transmission | |
CN205764565U (en) | Split type numerical control cutting platform | |
CN204314712U (en) | Based on the power transmission and transforming equipment intelligent diagnosis system of Internet of Things | |
CN101452760A (en) | Converter transformer on-site assembly method | |
CN106602714A (en) | Power distribution network fault processing method | |
CN109799630B (en) | Glass substrate retesting and reconditioning system and method thereof | |
CN114091692A (en) | Visual operation and maintenance management system for command places | |
TWI526955B (en) | Intelligent streetlight management system | |
CN201573678U (en) | Embedded type on-board signal device status surveillance device | |
CN112554277A (en) | Integrated pump set and construction method thereof | |
CN201044529Y (en) | Road lamp remote monitoring apparatus | |
CN101500357A (en) | Center control system | |
CN108521121A (en) | A kind of mode of connection selection method of cities and towns distribution wire | |
CN204793776U (en) | GW4 type isolator overhauls work platform | |
CN200974545Y (en) | Cross failure rapid diagnosis device | |
CN214057540U (en) | Handrail support structure of railway maintenance car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110223 |