CN101980264A - Equipment defect maintenance method in power system - Google Patents

Equipment defect maintenance method in power system Download PDF

Info

Publication number
CN101980264A
CN101980264A CN2010105161656A CN201010516165A CN101980264A CN 101980264 A CN101980264 A CN 101980264A CN 2010105161656 A CN2010105161656 A CN 2010105161656A CN 201010516165 A CN201010516165 A CN 201010516165A CN 101980264 A CN101980264 A CN 101980264A
Authority
CN
China
Prior art keywords
defective
equipment maintenance
substation equipment
defect
repair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105161656A
Other languages
Chinese (zh)
Inventor
李小永
王俊良
蒋延磊
钱泽文
王学礼
岳俊峰
王敏
张涛
王旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN2010105161656A priority Critical patent/CN101980264A/en
Publication of CN101980264A publication Critical patent/CN101980264A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an equipment defect maintenance method in a power system. In the method, three aspects, namely defects, severe defects and common defects are reported by an operator, the defect processing time is arranged by a power transformation maintenance department, and the defects are analyzed by the power transformation maintenance department, are improved. The method has the advantages that: the time of the reporting process is saved, an accident can be timely handled, the power interruption time is reduced, the power supply reliability is improved, a worker combines normal work to handle the defects so as to save the cost, the defect conditions are accurately judged, the preparation of the power transformation maintenance department is full, and the defects are handled timely on site. Therefore, the invention provides a more accurate, effective, saving and convenient equipment defect maintenance method in the power system.

Description

Equipment deficiency maintaining method in a kind of electric system
Technical field
The invention belongs to the power equipment area of maintenance, more particularly, is equipment deficiency maintaining method in a kind of electric system.
Background technology
The equipment deficiency maintenance process comprises the registration defective in the power system, transfer the audit of logical center, skill audit (arrangement defect processing) is given birth to by districts and cities, the plan specific responsibility of substation equipment maintenance and repair section arranges to process defective, substation equipment maintenance and repair section processes defective, disappear to lack and check and accept, the links such as filing, at present, mainly report defective the operations staff, serious and general class defective arranges the defect processing time by substation equipment maintenance and repair section, substation equipment maintenance and repair section is to three aspect existing problems of defect analysis, concrete condition is, the operations staff reports the problem that defective exists: the operations staff is when finding defective, need registration, report defective to the operation specific responsibility, if critical defective, report layer by layer, the time of defective is processed in impact again.Be unfavorable for the processing of defective, have the suffering of quality; Serious and general class defective arranges the problem that the defect processing time exists by substation equipment maintenance and repair section: the substation equipment maintenance and repair ministry dispatching is according to defect type, if critical defective directly the arrangement personnel process defective; Other defect also arranges personnel in time to process, if the power failure plan is arranged this year, equipment repeats to have a power failure so, affects power supply reliability.Be unfavorable for three execution of saving; The problem that substation equipment maintenance and repair section exists defect analysis: because in the past communication etc. are undeveloped, the operations staff reports defect situation just by phone.
Summary of the invention
The objective of the invention is to address the above problem, provide a kind of more accurate, more effective, more save, equipment deficiency maintaining method in the electric system more easily, utilize the present invention, mainly report defective, seriously reach general class defective and arrange defect processing time and substation equipment maintenance and repair portion three aspects of defect analysis to be improved described method following steps by substation equipment maintenance and repair portion from the operations staff:
1, the operations staff reports defective: the operations staff is when finding defective, if critical defective directly to transferring logical center to report, by transferring logical center to order, is dwindled the accident scope, notice Biotechnology Department and substation equipment maintenance and repair section process defective.
2, seriously reach general class defective and arrange the defect processing time by substation equipment maintenance and repair section: increase the substation equipment maintenance and repair ministry dispatching according to defect type, critical defective directly arrangement personnel is processed defective, other defect in conjunction with the scheduled outage time in conjunction with planning work, the arrangement personnel process,
3, substation equipment maintenance and repair section is to defective: the plan specific responsibility of substation equipment maintenance and repair section is after receiving task, at first to power transformation operation section operator, inquire in detail defect condition, the operator on duty of power transformation operation section need to describe defective clear, gives substation equipment maintenance and repair section with defective equipment picture transmission.The plan of substation equipment maintenance and repair section is provided by the situation of the defective equipment that provides according to power transformation operation section, organizes relevant speciality man analysis defective.
The invention has the beneficial effects as follows:
1, save the time of report process, in time processing accident reduces power off time, has improved power supply reliability;
2, the staff processes defective in conjunction with normal operation, saves cost;
3, owing to accurately judged defect condition, substation equipment maintenance and repair section preparation can be very abundant, and the in-situ processing defective is timely, reports the time of process;
Embodiment
Below by specific embodiment, further specify advantage of the present invention:
Utilize the present invention, mainly report defective, seriously reach general class defective and arrange defect processing time and substation equipment maintenance and repair section that three aspects of defect analysis are improved by substation equipment maintenance and repair section from the operations staff, described concrete grammar is as follows:
1, the operations staff reports the Optimized Measures of defective: the operations staff is when finding defective, if critical defective directly to transferring logical center to report, by transferring logical center to order, is dwindled the accident scope, notice Biotechnology Department and substation equipment maintenance and repair section process defective.
2, seriously reach general class defective is arranged the defect processing time by substation equipment maintenance and repair section Optimized Measures: increase the substation equipment maintenance and repair ministry dispatching according to defect type, critical defective directly arrangement personnel is processed defective, other defect in conjunction with the scheduled outage time in conjunction with planning work, the arrangement personnel process
3, substation equipment maintenance and repair section is to the Optimized Measures of defective: the plan specific responsibility of substation equipment maintenance and repair section is after receiving task, at first to power transformation operation section operator, inquire in detail defect condition, the operator on duty of power transformation operation section need to describe defective clear, gives substation equipment maintenance and repair section with defective equipment picture transmission.The plan of substation equipment maintenance and repair section is provided by the situation of the defective equipment that provides according to power transformation operation section, organizes relevant speciality man analysis defective.

Claims (1)

1. equipment deficiency maintaining method in the electric system is characterized in that may further comprise the steps:
A, operations staff report defective: the operations staff is when finding defective, if critical defective directly to transferring logical center to report, by transferring logical center to order, is dwindled the accident scope, notice Biotechnology Department and substation equipment maintenance and repair section process defective;
B, seriously reach general class defective and arrange the defect processing time by substation equipment maintenance and repair section: increase the substation equipment maintenance and repair ministry dispatching according to defect type, critical defective directly arrangement personnel is processed defective, other defect in conjunction with the scheduled outage time in conjunction with planning work, the arrangement personnel process;
C, substation equipment maintenance and repair section are to defective: the plan specific responsibility of substation equipment maintenance and repair section is after receiving task, at first to power transformation operation section operator, inquire in detail defect condition, the operator on duty of power transformation operation section need to describe defective clear, give substation equipment maintenance and repair section with defective equipment picture transmission, the plan of substation equipment maintenance and repair section is provided by the situation of the defective equipment that provides according to power transformation operation section, organizes relevant speciality man analysis defective.
CN2010105161656A 2010-10-22 2010-10-22 Equipment defect maintenance method in power system Pending CN101980264A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105161656A CN101980264A (en) 2010-10-22 2010-10-22 Equipment defect maintenance method in power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105161656A CN101980264A (en) 2010-10-22 2010-10-22 Equipment defect maintenance method in power system

Publications (1)

Publication Number Publication Date
CN101980264A true CN101980264A (en) 2011-02-23

Family

ID=43600765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105161656A Pending CN101980264A (en) 2010-10-22 2010-10-22 Equipment defect maintenance method in power system

Country Status (1)

Country Link
CN (1) CN101980264A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390217A (en) * 2013-07-16 2013-11-13 嘉兴市恒光电力建设有限责任公司华创分公司 Power transformation transaction management operating system
US9672142B2 (en) 2013-06-06 2017-06-06 International Business Machines Corporation Replacement of suspect or marginally defective computing system components during fulfillment test of build-to-order test phase

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9672142B2 (en) 2013-06-06 2017-06-06 International Business Machines Corporation Replacement of suspect or marginally defective computing system components during fulfillment test of build-to-order test phase
CN103390217A (en) * 2013-07-16 2013-11-13 嘉兴市恒光电力建设有限责任公司华创分公司 Power transformation transaction management operating system
CN103390217B (en) * 2013-07-16 2016-08-10 嘉兴市恒光电力建设有限责任公司华创分公司 Converting equipment unusual fluctuation management operating system

Similar Documents

Publication Publication Date Title
CN103500377A (en) Integrated maintenance-operation management method and system for electric service ATP (Automatic Train Protection) vehicle-mounted equipment in railway
CN103337150A (en) Long-distance intelligent monitoring system of grinding machines
CN104237735A (en) Modeling and fault analysis method combining fault indicator and power distribution terminal
CN101980264A (en) Equipment defect maintenance method in power system
CN210298153U (en) Remote operation and maintenance management system for street lamp
CN103366245A (en) OSB (operation sevice bus)-based power grid fault information distribution method and system
CN106646116A (en) Trouble shooting and locating method for power distribution network
CN116054403A (en) Power grid dispatching measurement and monitoring method based on national network big data platform
CN206091489U (en) Lifting and horizontal moving formula garage operation controlling means
CN211237572U (en) Label for power transmission
CN205764565U (en) Split type numerical control cutting platform
CN204314712U (en) Based on the power transmission and transforming equipment intelligent diagnosis system of Internet of Things
CN101452760A (en) Converter transformer on-site assembly method
CN106602714A (en) Power distribution network fault processing method
CN109799630B (en) Glass substrate retesting and reconditioning system and method thereof
CN114091692A (en) Visual operation and maintenance management system for command places
TWI526955B (en) Intelligent streetlight management system
CN201573678U (en) Embedded type on-board signal device status surveillance device
CN112554277A (en) Integrated pump set and construction method thereof
CN201044529Y (en) Road lamp remote monitoring apparatus
CN101500357A (en) Center control system
CN108521121A (en) A kind of mode of connection selection method of cities and towns distribution wire
CN204793776U (en) GW4 type isolator overhauls work platform
CN200974545Y (en) Cross failure rapid diagnosis device
CN214057540U (en) Handrail support structure of railway maintenance car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110223