CN101962924A - Mounting method of welded rail - Google Patents

Mounting method of welded rail Download PDF

Info

Publication number
CN101962924A
CN101962924A CN 201010298555 CN201010298555A CN101962924A CN 101962924 A CN101962924 A CN 101962924A CN 201010298555 CN201010298555 CN 201010298555 CN 201010298555 A CN201010298555 A CN 201010298555A CN 101962924 A CN101962924 A CN 101962924A
Authority
CN
China
Prior art keywords
track
rail
embedded board
basis
embedded plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010298555
Other languages
Chinese (zh)
Other versions
CN101962924B (en
Inventor
丁学芳
吕志宝
孟威
白金元
王晨旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN 201010298555 priority Critical patent/CN101962924B/en
Publication of CN101962924A publication Critical patent/CN101962924A/en
Application granted granted Critical
Publication of CN101962924B publication Critical patent/CN101962924B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses a mounting method of a welded rail, comprising the following steps of: (1) chiseling and anchoring a mounting base of the rail to expose a reinforcing steel bar; (2) manufacturing a rail embedded plate and welding nuts around the rail embedded plate; (3) welding a rail pressure plate on the rail embedded plate and fixing the rail on the rail embedded plate; (4) placing the rail on the mounting base; (5) roughly adjusting the center line of the rail; (6) mounting adjustment bolts in threaded connection with the nuts of the rail embedded plate in the nuts of the rail embedded plate, pressing the adjustment bolts on the reinforcing steel bar of the mounting base, screwing the adjustment bolts, and jacking the rail embedded plate by the reinforcing steel bar of the mounting base so as to adjust the height of the rail; (7) finely adjusting the center line of the rail; (8) welding and fixing the adjustment bolts with the reinforcing steel bar of the mounting base; (9) rechecking the upper plane elevation, the levelness and the center line deviation of the rail until determining that the design requirement is satisfied; and (10) grouting under the rail. The invention can improve the mounting efficiency and reduce the mounting cost.

Description

The mounting method of weld type track
Technical field
The present invention relates to a kind of mounting method of track, particularly a kind of mounting method of weld type track.
Background technology
At present, in the plant equipment installing engineering, it is higher that the installation of track belongs to installation accuracy, and very loaded down with trivial details installation project.General comparatively common method is divided into two kinds, and first method is by combination mat the foundation of civil work built-in fitting to be adjusted, and makes the bottom absolute altitude of track pressing plate meet the design document requirement; Second method is by seat slurry method, controls the bottom absolute altitude of track pressing plate by the combined altitudes of adjusting taper liner iron.Their weak point is: 1) grinding the configurations parallels need grind the basis, the taper liner iron of processing and fabricating plain cushion iron and process mating, the time that needs is long, and be in course of adjustment and have the process of having bad luck and the layoutprocedure of parallels, it is not convenient to install, and needs wide variety of materials and running stores simultaneously.2) seat slurry method construction, need root out foundation ditch, wetting, the seat slurry carried out proportioning, strength test check, and make diaphragm capsule, fall aid such as hammer.Also want processing and fabricating seat slurry flat bolster and processing taper liner iron simultaneously.The technology more complicated, complex operation.In construction unit, if the installation quantity of goods produced of track is more, more than the constructor that needs of two kinds of mounting methods many, the time is long, and is totally unfavorable to the integral body duration and the arrangement of labour, and required adjustment backing plate also can strengthen construction cost.
Summary of the invention
The present invention provides a kind of mounting method that can improve installation effectiveness and reduce the weld type track of installation cost for solving the technical problem that exists in the known technology.
The technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: a kind of mounting method of weld type track may further comprise the steps:
1) anchor is cut a hole on the installation basis of track, made it expose reinforcing bar;
2) make the track embedded board, and around it welded nut;
3) the track pressing plate is welded on the track embedded board, and the track embedded board is fixed on the soffit of track;
4) track is placed on the installation basis;
5) center line of coarse adjustment track;
6) the adjustment bolt that is threaded with it is installed in the nut of track embedded board, is adjusted bolt and be crimped on the reinforcing bar that the basis is installed, screw the adjustment bolt, the reinforcing bar jacking track embedded board on basis is installed, and then adjust orbit altitude;
7) center line of accurate adjustment track;
8) will adjust bolt fixes with the reinforcing bar welding that the basis is installed;
9) plane absolute altitude, levelness, centerline deviation on the check track are until confirming that it meets design requirement;
10) enforcement grouting below track.
After described step 10) was finished, after the final set of waiting to be in the milk, the part that bolt exposes embedded board was adjusted in excision.
The advantage that the present invention has with good effect is: compare with present prior art, have the following advantages:
1) making of a large amount of equipment plain cushion iron and the processing of taper liner iron have been avoided
The seat pulp material that has needed when 2) having avoided seat slurry method configuration parallels,
3) simplified the program and the seat slurry program of grinding the basis,
4) saved cost, reduced consumption, improved simultaneously efficiency greatly, bigger shortening the construction period.
In a word, use jackscrew mud jacking of the present invention can reduce the backing plate use amount, it is convenient to construct, and operating personnel's technical level is required lower, universal easily.The adjustment time of an embedded iron is about 20 minutes, and can organize personnel's operation simultaneously more, has greatly shortened the track set-up time.
Description of drawings
Fig. 1 is an elevation of using the weld type track of the present invention's installation;
Fig. 2 is the vertical view of Fig. 1.
Among the figure: 1, track, 2, the track pressing plate, 3, pre-embedded bolt, 4, reinforcing bar, 5, nut, 6, the track embedded board, 7, adjust bolt.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
See also Fig. 1~Fig. 2, be installed as example with certain unit horizontal loop ground rail, the one-sided length of kink trolley track of entry loop and outlet kink is respectively 92m and 64m, and installation accuracy requires to be levelness 0.1/1000mm that the levelness of track total length is not more than ± 1mm.Adopt the jackscrew mud jacking to install, may further comprise the steps:
1) according to the requirement of designing technique file anchor is cut a hole on the installation basis of track, be as the criterion can make foundation of civil work expose reinforcing bar 4.
2) processing and fabricating track embedded board 6, and around it, weld M10 nut 5;
3) track pressing plate 2 is welded on the track embedded board 6 according to the designing technique documentation requirements, and track embedded board 6 is fixed on the soffit of track 1.
4) by lifting operation track 1 is placed into the installation site.
5) center line of extension piano wire coarse adjustment track 1.
6) the adjustment bolt 7 of use M10 * 70 is adjusted the bottom absolute altitude of track embedded boards 6, the adjustment bolt 7 that is threaded with it is installed in the nut 5 of track embedded board, adjusting bolt 7 is crimped on the reinforcing bar 4 that the basis is installed, screw and adjust bolt 7, the reinforcing bar 4 jacking track embedded boards 6 on basis are installed, and then are adjusted track 1 height.
7) center line of extension piano wire accurate adjustment track 1.
8) will adjust bolt 7 and weld together, prevent that track embedded board 6 from moving with the reinforcing bar 4 that the basis is installed.
9) check plane absolute altitude, levelness, centerline deviation on the track 1, until confirming that it meets design requirement.
10) below track 1, implement back-grouting.
11) will adjust the part excision that bolt 7 exposes track embedded board 6, so that the engineering appearance looks elegant.
Although in conjunction with the accompanying drawings the preferred embodiments of the present invention are described above; but the present invention is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.

Claims (2)

1. the mounting method of a weld type track is characterized in that, may further comprise the steps:
1) anchor is cut a hole on the installation basis of track, made it expose reinforcing bar;
2) make the track embedded board, and around it welded nut;
3) the track pressing plate is welded on the track embedded board, and the track embedded board is fixed on the soffit of track;
4) track is placed on the installation basis;
5) center line of coarse adjustment track;
6) the adjustment bolt that is threaded with it is installed in the nut of track embedded board, is adjusted bolt and be crimped on the reinforcing bar that the basis is installed, screw the adjustment bolt, the reinforcing bar jacking track embedded board on basis is installed, and then adjust orbit altitude;
7) center line of accurate adjustment track;
8) will adjust bolt fixes with the reinforcing bar welding that the basis is installed;
9) plane absolute altitude, levelness, centerline deviation on the check track are until confirming that it meets design requirement;
10) enforcement grouting below track.
2. the mounting method of weld type track according to claim 1 is characterized in that, after described step 10) was finished, after the final set of waiting to be in the milk, the part that bolt exposes the track embedded board was adjusted in excision.
CN 201010298555 2010-09-30 2010-09-30 Mounting method of welded rail Expired - Fee Related CN101962924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010298555 CN101962924B (en) 2010-09-30 2010-09-30 Mounting method of welded rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010298555 CN101962924B (en) 2010-09-30 2010-09-30 Mounting method of welded rail

Publications (2)

Publication Number Publication Date
CN101962924A true CN101962924A (en) 2011-02-02
CN101962924B CN101962924B (en) 2012-02-08

Family

ID=43515966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010298555 Expired - Fee Related CN101962924B (en) 2010-09-30 2010-09-30 Mounting method of welded rail

Country Status (1)

Country Link
CN (1) CN101962924B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102538443A (en) * 2012-02-10 2012-07-04 马鞍山十七冶工程科技有限责任公司 Inverse-suspension mounting method for backing plates for rail rest of arc furnace with screwed-off furnace cover
CN103771265A (en) * 2014-01-16 2014-05-07 山东杭萧钢构有限公司 Ground rail fixing device
CN105438742A (en) * 2014-08-15 2016-03-30 上海船厂船舶有限公司 Trolley rack for blowout preventer of moon poll of drilling ship and track installation method
CN105970748A (en) * 2016-06-13 2016-09-28 中国十九冶集团有限公司 Method for adjusting track
CN106427977A (en) * 2016-11-30 2017-02-22 任长英 Rail assembly for air cushion vehicle
CN108442196A (en) * 2018-05-29 2018-08-24 中国铁路设计集团有限公司 A kind of non-fragment orbit deformation adjustment structure and method of adjustment
CN108799705A (en) * 2017-04-28 2018-11-13 中国二十冶集团有限公司 Profiled rail method of adjustment
CN112593947A (en) * 2020-12-11 2021-04-02 腾达建设集团股份有限公司 Translation device and method for shield tunneling machine rear matching trolley
CN114250973A (en) * 2021-12-31 2022-03-29 中交一航局第三工程有限公司 Construction method of fine adjustment pre-tightening tool system
CN115030506A (en) * 2022-06-21 2022-09-09 中国五冶集团有限公司 Installation method of light I-steel rail

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5285964A (en) * 1992-05-22 1994-02-15 Etablissements Vape Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
EP0894897A1 (en) * 1997-07-07 1999-02-03 Walo Bertschinger AG Process for making a track structure
CN101061274A (en) * 2004-10-19 2007-10-24 潘得路有限公司 Railway track construction shim and method of constructing railway track
CN101450769A (en) * 2007-11-29 2009-06-10 沈阳铝镁设计研究院 Processing method of concrete crane beam roof leveling blanket

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5285964A (en) * 1992-05-22 1994-02-15 Etablissements Vape Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
EP0894897A1 (en) * 1997-07-07 1999-02-03 Walo Bertschinger AG Process for making a track structure
CN101061274A (en) * 2004-10-19 2007-10-24 潘得路有限公司 Railway track construction shim and method of constructing railway track
CN101450769A (en) * 2007-11-29 2009-06-10 沈阳铝镁设计研究院 Processing method of concrete crane beam roof leveling blanket

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102538443B (en) * 2012-02-10 2014-04-09 马鞍山十七冶工程科技有限责任公司 Inverse-suspension mounting method for backing plates for rail rest of arc furnace with screwed-off furnace cover
CN102538443A (en) * 2012-02-10 2012-07-04 马鞍山十七冶工程科技有限责任公司 Inverse-suspension mounting method for backing plates for rail rest of arc furnace with screwed-off furnace cover
CN103771265A (en) * 2014-01-16 2014-05-07 山东杭萧钢构有限公司 Ground rail fixing device
CN103771265B (en) * 2014-01-16 2016-05-18 山东杭萧钢构有限公司 Track fixture
CN105438742A (en) * 2014-08-15 2016-03-30 上海船厂船舶有限公司 Trolley rack for blowout preventer of moon poll of drilling ship and track installation method
CN105970748B (en) * 2016-06-13 2017-07-25 中国十九冶集团有限公司 Method for adjusting track
CN105970748A (en) * 2016-06-13 2016-09-28 中国十九冶集团有限公司 Method for adjusting track
CN106427977A (en) * 2016-11-30 2017-02-22 任长英 Rail assembly for air cushion vehicle
CN108799705A (en) * 2017-04-28 2018-11-13 中国二十冶集团有限公司 Profiled rail method of adjustment
CN108442196A (en) * 2018-05-29 2018-08-24 中国铁路设计集团有限公司 A kind of non-fragment orbit deformation adjustment structure and method of adjustment
CN112593947A (en) * 2020-12-11 2021-04-02 腾达建设集团股份有限公司 Translation device and method for shield tunneling machine rear matching trolley
CN114250973A (en) * 2021-12-31 2022-03-29 中交一航局第三工程有限公司 Construction method of fine adjustment pre-tightening tool system
CN114250973B (en) * 2021-12-31 2023-04-07 中交一航局第三工程有限公司 Construction method of fine adjustment pre-tightening tool system
CN115030506A (en) * 2022-06-21 2022-09-09 中国五冶集团有限公司 Installation method of light I-steel rail
CN115030506B (en) * 2022-06-21 2023-08-22 中国五冶集团有限公司 Installation method of light I-steel rail

Also Published As

Publication number Publication date
CN101962924B (en) 2012-02-08

Similar Documents

Publication Publication Date Title
CN101962924B (en) Mounting method of welded rail
CN102296813B (en) A kind of construction method of steel kind design and steel column base structure thereof
CN104652293B (en) A kind of Cable-Stayed Bridge Structure for reinforcing PSC Continuous Box Girder Bridge and construction method
CN204850152U (en) Vertical connection preloading device of precast concrete shear force wall
CN201447879U (en) Steel column base calibrating and fine adjusting device
CN106438213A (en) Tower drum used for wind driven generator
CN104652244B (en) A kind of Suspension bridge structure for reinforcing PSC Continuous Box Girder Bridge and construction method
CN205502025U (en) Stagnant water stake is gone along with sb. to guard him to foundation ditch and shaped steel encloses connection structure between purlin
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN201087322Y (en) Large tonnage box beam construction temporary support saddle
CN201412170Y (en) Mechanical support system used for controlling great deformation of steel frame in tunnel construction
CN101736751A (en) Connecting structure between wind measurement tower and pile foundation of offshore wind power station
CN206233363U (en) Steel structure modularization building steel column base and foundation connection positioning device
CN203238639U (en) Lattice column with adjustable height
CN201982898U (en) Equipment installation base plate regulating device
CN106149546A (en) Steel-rubber concrete combined bridge beam slab
CN103452326A (en) Method and equipment for sequentially constructing ultra-long hanging posts
CN104404975A (en) Universal five-point support loading type tower crane foundation and construction method
CN206289530U (en) One kind subtracts shock insulation rubber bearing
CN201713940U (en) Steel column base structure
CN114687567B (en) Method for hanging construction tool of ultrahigh heavy embedded part
CN201224868Y (en) U type beam accurate positioning spiral jacking type temporary support base
CN204401646U (en) Universal 5 support ballast formula foundation for tower crane
CN201512809U (en) Bolt connecting box-shaped prefabricated assembly type concrete tower crane foundation
CN208010018U (en) A kind of extra-high compressed steel pylon connecting flange

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120208