CN101962029A - Axle counting automatic interpost block system - Google Patents

Axle counting automatic interpost block system Download PDF

Info

Publication number
CN101962029A
CN101962029A CN2009100725819A CN200910072581A CN101962029A CN 101962029 A CN101962029 A CN 101962029A CN 2009100725819 A CN2009100725819 A CN 2009100725819A CN 200910072581 A CN200910072581 A CN 200910072581A CN 101962029 A CN101962029 A CN 101962029A
Authority
CN
China
Prior art keywords
block
circuit
axle
institute
axle counting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009100725819A
Other languages
Chinese (zh)
Inventor
吴笔
王洪
董世伟
彭立群
周文生
王丽萍
赵拂明
郭万岭
韩飞
阎晓明
王君
孙朝生
孟维民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEILONGJIANG RAILWAY SIGNAL TECHNOLOGY Co Ltd
Original Assignee
HEILONGJIANG RAILWAY SIGNAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEILONGJIANG RAILWAY SIGNAL TECHNOLOGY Co Ltd filed Critical HEILONGJIANG RAILWAY SIGNAL TECHNOLOGY Co Ltd
Priority to CN2009100725819A priority Critical patent/CN101962029A/en
Publication of CN101962029A publication Critical patent/CN101962029A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to an axle counting automatic interspost block system which is a train operation safety safeguard system applied to a single track railway section. Axle counting wheel detectors are additionally mounted between stations to serve as dividing points to divide the operation line into two or numerous interpost sections; juxtaposition block post block signals are arranged at the uplink and the downlink of the block posts; the axle counting wheel detectors are arranged at the block post block signals; the axle counting devices are used for inspecting the occupation state and the idle state of the interpost sections; approach continuous cab signalling and distant signals are arranged at the distant signals; automatic block track circuit devices are applied to approach track sections to provide coded information for cab signals and can serve as the counting axle to remove judgement basis of +/-1 axle and prevent advanced deblocking of the system, the effective operating distance of the cab signals is no less than 1200m; the dividing points are confirmed to be unmanned wiring-free block posts; equipment service rooms are arranged at the block posts for placing devices such as the counting axles, the track circuits and power supplies; through cables are arranged between two train stations and the section dividing points for transmitting axle counting information and directional circuit safety information; and relay combination circuits are arranged at the train stations to realize functions such as switching between the directional circuits, signal control and the like. The axle counting interpost block is a basic block method, after the axle counting automatic interpost block system is out of service due to failures, operation according to the 64D semiautomatic block method is applied between stations; and when the 64D semiautomatic block method fails or the 64D equipment encounters failure, operation according to the telephone block method is adopted.

Description

The meter axle is block system between institute automatically
Affiliated field: the present invention is applied in railway systems, belongs to the traffic safety control system.
Background technology: along with the great-leap-forward development of Chinese Railway, will serve as theme, and push forward technology innovation and system innovation comprehensively to improve transport capacity and lift technique equipment.Particularly CTC (centralized traffic control) builds the quickening day by day of process, and the demand that Semi-automatic Block District is realized taking inspection is more and more urgent.Clear and definite in " Ministry of Railways's Major Technical Policies " of (2004) No. 78 file distribution of iron science and technology: " the single line Semi-automatic Block District should be improved shuttle train and take safety inspection equipment, realizes inaccessible between the station automatically ".At present, China railways single line section accounts for 2/3, its interval 64D type all-relay semi-automatic block system that adopts mostly.This block equipment is adapted to that China single-track railway distance between sites is short, train moves in pairs and follow the trail of the little operating line of coefficient, guarantee traffic safety, improve conevying efficiency, the aspect such as improve working conditions brought into play remarkable effect.But more than 15km, even reach 40km~50km for some single line section length, adopt 64D type all-relay semi-automatic block system tissue to drive a vehicle, can not satisfy current freight volume demand.
For the demand, we have developed the technical solution of " meter shaft is block system between institute automatically " raising capacity.This scheme is at a kind of obturation modes of non-automatic block district based on the principle development of the meter axle and the direction circuit that automatically closes up, a kind of investment that is solution non-automatic block district transport capacity anxiety is little, the effective technology measure of instant effect is the important component part of control travelling facility.
Summary of the invention: block system is to use tricks a wheel sensor as train spacing point between the station between the automatic institute of meter axle, be divided into two or more block section between posts, train spacing point is equivalent to unmanned circuit place circuit uplink and downlink of living in and establishes and put signal that circuit passes through, and by the signal place meter axle wheel sensor is set in circuit institute, utilize axis-counting device to check taking of each block section between posts and idle condition.Arrange near continuous type cab signaling and distant signal by semaphore foreign side at circuit, adopt the track circuit equipment that automatically closes up near track section, for cab signal provides coding information, and can remove as meter shaft ± basis for estimation that 1 axle disturbs, anti-locking system shifts to an earlier date release, and the cab signal effective working distance is not less than 1200m; Separation is defined as unmanned no wiring line institute, at the set equipment back shop of circuit, for laying the equipment such as meter shaft, track circuit and power supply; Between two stations and the interval separation perforation optical cable is set, is used for transmitting axle information and direction circuit security information; Relay combinative circuit is established at the station, realizes the functions such as direction circuit, signal controlling switching.Meter shaft automatically between institute obturation be basic block system, meter shaft automatic between block equipment Out of order after, change between standing by 64D semiautomatic block method and drive a vehicle; When switching the semi-automatic unsuccessful or 64D equipment fault of 64D, press telephone blocking method between standing and drive a vehicle.
Adopt automatically block system between institute of meter shaft, set up in the interval unmanned no wiring line few, the construction period weak point of formula investing, instant effect.
Description of drawings
Fig. 1 system construction drawing
Fig. 2 meter roller systematic schematic diagram
Fig. 3 direction circuit subsystem schematic diagram
Fig. 4 circuit institute signal aspect and indication subsystem schematic diagram
Fig. 5 ZPW-2000R type naked frequency-shift automatic blocking system schematic diagram
Fig. 6 circuit institute power subsystem constructional drawing
The specific embodiment:
As Fig. 1.Obturation is divided into six sub-systems between the automatic institute of meter shaft.Be respectively meter roller system, direction circuit subsystem, circuit institute signal aspect and indication subsystem, circuit institute track circuit subsystem, circuit institute's power subsystem and monitoring subsystem.
1 roller system
The meter shaft subsystem comprises station axis-counting device, circuit institute's axis-counting device and meter shaft transmission channel.
1.1 axle-counting points setting
System construction drawing as shown in Figure 2.Block section between stations is divided into two block section between posts 3 axle-counting points need be set, be used to check the idle condition that takies of block section between stations and block section between posts.Axle-counting points is arranged on 1 meter~2 meters, side in adjacent throat side home signals 2 meters~3 meters, interior side, two end stations and the corresponding insulation joint of semaphore that circuit passes through.
1.2 transmission channel setting
Transmission channel comprises between the station transmission channel between transmission channel and institute, and optical cable lays separately.
1.3 meter roller system radical function
A) block section between stations the free time/take inspection;
B) block section between posts the free time/take inspection;
C) stand between, security information transmission between institute;
D) offer monitoring subsystem information.
2 direction circuit subsystems
The direction circuit subsystem is on maturation utilization standard four-wire system traffic direction circuit basis for many years, does not change principle and the structure of former direction circuit, realizes the direction circuit function.
Need cabling, the construction costs height between the four-wire system direction circuit station of primary standard typing.In order to reduce construction costs.Take four measures: the first, cable between cancellation direction circuit station, on the four-wire system direction circuit basis of primary standard typing, utilize the security information transfer function of axis-counting device, the solution party is to the transfer problem of Power Supplies Condition on fiber channel.The second, circuit utilize the security information transfer function of axis-counting device by the signal state of lighting a lamp, determine current of traffic by circuit institute axis-counting device, pass through one of signal condition as lighting circuit.Three, utilize the security information transfer function of axis-counting device, solve in the two Station Supervision avd intervals JQJ by light tunnel state consistency problem.Four, owing to cancel cable between the station, the directional traffic power source power supply changes by our station to be provided.Revise the rear to schematic block circuit diagram such as Fig. 3.
3 circuits institute signal aspect and indication subsystem
3.1 systemic-function
As Fig. 4.Provide block section between posts status condition and traffic direction condition according to circuit institute axis-counting device, realize the control by semaphore and distant signal demonstration to separation circuit institute.
3.2 display requirement
3.2.1 the separation circuit of corresponding traffic direction show by semaphore and automatically light with the state of protection block section between posts.Its non-counterparty locatees at red light by signal to the train spacing point circuit.
3.2.2 circuit institute is open by semaphore, answer continuous review traffic direction state correct and protect the block section between posts free time.
3.2.3 when circuit institute by semaphore at open state, circuit institute is by distant signal point green light; When semaphore that circuit passes through in off position, circuit institute is by distant signal point amber light.
3.2.4 the train entry-line the block section between posts that protects by semaphore, this semaphore autoshutdown.
3.3 signal
3.3.1 signal that circuit passes through
At separation and put two stringing semaphores that the road is passed through, corresponding uplink and downlink respectively are in order to protect traffic direction the place ahead block section between posts.This signal adopts signal that circuit passes through two shows signal mechanisms.
3.3.2 distant signal that circuit passes through
By semaphore the place ahead distant signal is set at circuit, respectively corresponding uplink and downlink direction.
4 circuits institute track circuit subsystem
Separation uplink and downlink circuit near track section ZPW-2000 series track circuit is set respectively by semaphore.Institute adopts mechanical insulated joint by the semaphore place at circuit, passes through 1200m place, semaphore the place ahead at circuit and is mechanical insulated joint or electrical insulation section.Systematic schematic diagram is seen shown in Figure 5.
4.1 systemic-function
Be used for to check separation by take near track section, idle condition, and for cab signaling equipment provides coding information, and can remove as meter shaft ± basis for estimation that 1 axle disturbs, anti-locking system shifts to an earlier date release.
4.2 system coding principle
Be fixed as 1700Hz 4.2.1 correspondence is descending by the transmitter carrier frequency near track section, correspondence is up to be fixed as 2000Hz by the transmitter carrier frequency near track section.
4.2.2 transmitter low frequency coding has two kinds.See Table 1.
Table 1 transmitter low-frequency information meaning
Sequence number Frequency (Hz) Cab signal shows meaning Remarks
1 11.4 Green code The section free time
2 26.8 The reddish yellow code Section takies or fault
5 circuits institute power subsystem
The input power of circuit institute power subsystem is from connecting power supply between the station.
5.1 systemic-function
As Fig. 6.Circuit institute power subsystem provides power supply for circuit institute axis-counting device, track circuit equipment, enviromental monitoring equipment, signal apparatus, relay etc.And outside in the situation of grid cut-off, keep power supply by UPS battery, keep separation all devices power supply 1 hour.
5.2 power supply panel
Requirement by [2008] No. 36 " railway signal power supply screen " provisional engineering factor of Ministry of Railways's science and technology fortune is carried out.Except power module of voltage regulation, ups power are the stand-alone configuration, all the other power modules are all by the configuration of 1+1 hot backup redundancy, and each road output is suspend over the ground power supply, not shared module.Ups power satisfies continued power requirement in 1 hour; System arranges monitoring unit.For monitoring subsystem provides RS485 interface, but real time on-line monitoring I/O, power module mode of operation.
6 monitoring subsystems
Be used for the environmental monitoring of the mode of operation and the circuit institute back shop of monitoring equipment, for plant maintenance provides foundation.The monitoring content comprises axis-counting device mode of operation, relay status, power supply panel alarm message, track circuit operating technology parameter and alarm message and environmental monitoring information (temperature, smog etc.).

Claims (4)

  1. Meter shaft automatically between institute block system be a kind of obturation modes of developing based on the principle of meter shaft and the direction circuit that automatically closes up at non-automatic block district.
  2. Meter shaft automatically between institute block system by between the station, setting up the meter shaft wheel detector as separation, be divided into two or more block section between posts, separation is defined as unmanned no wiring line institute, establish and put semaphore that circuit passes through at circuit uplink and downlink of living in, adopt two display mechanisms, arrange near continuous type cab signaling and distant signal by semaphore foreign side at circuit.And by the signal place meter axle wheel sensor is set in circuit institute, utilize axis-counting device to check taking of each block section between posts and idle condition.
  3. 3. separation adopts the track circuit equipment that automatically closes up near track section, for cab signal provides coding information, and can remove as meter shaft ± basis for estimation that 1 axle disturbs, and anti-locking system shifts to an earlier date release.
  4. 4. between two stations and the interval separation perforation optical cable is set, is used for transmitting axle information and direction circuit security information.Cable between cancellation direction circuit station on the four-wire system direction circuit basis of primary standard typing, utilizes the security information transfer function of axis-counting device, and the solution party is to the transfer problem of Power Supplies Condition on fiber channel.
CN2009100725819A 2009-07-24 2009-07-24 Axle counting automatic interpost block system Pending CN101962029A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100725819A CN101962029A (en) 2009-07-24 2009-07-24 Axle counting automatic interpost block system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100725819A CN101962029A (en) 2009-07-24 2009-07-24 Axle counting automatic interpost block system

Publications (1)

Publication Number Publication Date
CN101962029A true CN101962029A (en) 2011-02-02

Family

ID=43515137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100725819A Pending CN101962029A (en) 2009-07-24 2009-07-24 Axle counting automatic interpost block system

Country Status (1)

Country Link
CN (1) CN101962029A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102837718A (en) * 2012-09-13 2012-12-26 北京全路通信信号研究设计院有限公司 Scattered object control terminal system for CTCS
CN104661890A (en) * 2012-09-27 2015-05-27 西门子公司 Method and arrangement for monitoring a route section which is bounded by two axle-counting sensor units
CN107291014A (en) * 2017-07-26 2017-10-24 黑龙江瑞兴科技股份有限公司 A kind of track traffic control relay circuit
CN107380212A (en) * 2017-05-19 2017-11-24 中国神华能源股份有限公司 Movable block degraded running system and method
CN109649450A (en) * 2018-12-26 2019-04-19 交控科技股份有限公司 It is a kind of heavy duty movable block under Automatic inter-station block control method and system
CN110341759A (en) * 2019-05-31 2019-10-18 北京全路通信信号研究设计院集团有限公司 Station inner side line vehicle receiving control method
CN112793627A (en) * 2021-03-23 2021-05-14 中国铁道科学研究院集团有限公司通信信号研究所 Railway section block safety function implementation method based on formal language
CN113859300A (en) * 2021-10-29 2021-12-31 中铁武汉电气化局集团第一工程有限公司 Four-wire system and two-wire system direction circuit combined transition control system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102837718A (en) * 2012-09-13 2012-12-26 北京全路通信信号研究设计院有限公司 Scattered object control terminal system for CTCS
CN104661890A (en) * 2012-09-27 2015-05-27 西门子公司 Method and arrangement for monitoring a route section which is bounded by two axle-counting sensor units
CN107380212A (en) * 2017-05-19 2017-11-24 中国神华能源股份有限公司 Movable block degraded running system and method
CN107291014A (en) * 2017-07-26 2017-10-24 黑龙江瑞兴科技股份有限公司 A kind of track traffic control relay circuit
CN107291014B (en) * 2017-07-26 2023-03-24 黑龙江瑞兴科技股份有限公司 Relay control circuit for rail transit
CN109649450A (en) * 2018-12-26 2019-04-19 交控科技股份有限公司 It is a kind of heavy duty movable block under Automatic inter-station block control method and system
CN110341759A (en) * 2019-05-31 2019-10-18 北京全路通信信号研究设计院集团有限公司 Station inner side line vehicle receiving control method
CN110341759B (en) * 2019-05-31 2021-07-20 北京全路通信信号研究设计院集团有限公司 Station inner side line vehicle receiving control method
CN112793627A (en) * 2021-03-23 2021-05-14 中国铁道科学研究院集团有限公司通信信号研究所 Railway section block safety function implementation method based on formal language
CN112793627B (en) * 2021-03-23 2023-02-17 中国铁道科学研究院集团有限公司通信信号研究所 Railway section block safety function implementation method based on formal language
CN113859300A (en) * 2021-10-29 2021-12-31 中铁武汉电气化局集团第一工程有限公司 Four-wire system and two-wire system direction circuit combined transition control system
CN113859300B (en) * 2021-10-29 2024-04-30 中铁武汉电气化局集团第一工程有限公司 Four-wire system two-wire system direction circuit combined transition control system

Similar Documents

Publication Publication Date Title
CN101962029A (en) Axle counting automatic interpost block system
CN201268315Y (en) Axle counter track circuit
EP2250066B1 (en) Railway sensor communication system and method
CN107403580B (en) Railway signal integrated system experiment platform
CN208978874U (en) Train operation control system based on Big Dipper short message
CN103754242A (en) City regional railway signal system and control method thereof
CN104527725B (en) The system of station track circuit section shunting badness is solved based on distance measuring sensor
KR20110061480A (en) A control system of electric railway using power line communication and private communication network
CN103707779B (en) Coal mine roadway single file rail adaptive segmentation electric power system and method
CN201721463U (en) Real-time broken rail detection device
RU141628U1 (en) TEMPORARY BLOCK-POST MODULE FOR CODE AUTO-LOCK SITES
CN106672017A (en) Rail transit turnout remote control system based on mobile terminal and method
CN202783251U (en) System solving poor rail shunting circuit with axle counter
CN102404364A (en) Cab signal wireless transmission system and method
EP2857277B1 (en) Programmable railway level crossing safeguarding equipment with communication coupling to external intelligent peripherals and the method for controlling this equipment's activity
CN101954915A (en) Broken rail real-time detection device and detection method thereof
CN103213518A (en) Detection system and detection method of ground automatic passing split-phase locomotive position
CN102632912B (en) subway train anti-collision early warning system and method
CN106627669A (en) Switchyard discrete control system
CN201501411U (en) Locomotive shunting signal anti-overrunning system
CN206710885U (en) A kind of existing the anticollision speed-adjusting and control system of hump yard field humping of cars
CN204399206U (en) Railway list group track switch remote control switch control system
CN208544284U (en) A kind of signal system that urban track traffic area equipment depth is concentrated
RU122066U1 (en) SYSTEM OF INTERVAL REGULATION OF TRAIN TRAFFIC AT THE TRANSFER
CN102815321B (en) System for solving poor shunting of track circuit by using axle counting equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110202