CN101943007A - Novel waterproof board for tunnels and mounting method thereof - Google Patents

Novel waterproof board for tunnels and mounting method thereof Download PDF

Info

Publication number
CN101943007A
CN101943007A CN 201010294122 CN201010294122A CN101943007A CN 101943007 A CN101943007 A CN 101943007A CN 201010294122 CN201010294122 CN 201010294122 CN 201010294122 A CN201010294122 A CN 201010294122A CN 101943007 A CN101943007 A CN 101943007A
Authority
CN
China
Prior art keywords
splash guard
woven fabric
fabric piece
waterproof board
novel tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010294122
Other languages
Chinese (zh)
Inventor
吴建民
潘叶明
卜正权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU CITY SANHENG BUILDING MATERIALS Co Ltd
Original Assignee
CHANGSHU CITY SANHENG BUILDING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU CITY SANHENG BUILDING MATERIALS Co Ltd filed Critical CHANGSHU CITY SANHENG BUILDING MATERIALS Co Ltd
Priority to CN 201010294122 priority Critical patent/CN101943007A/en
Publication of CN101943007A publication Critical patent/CN101943007A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a novel waterproof board for tunnels and a mounting method thereof. The waterproof board is provided with PET non-woven blocks which are adhered and fixed to the waterproof board by hot melt glue and are fixedly connected with connecting strips. The waterproof board of the invention is arranged only by driving nails or hooks onto a base of the tunnel in a way identical with that of the non-woven blocks on the waterproof board and then tightly tying the connecting strips on the waterproof board to the nails or the hooks. The waterproof board of the invention can be simply and firmly arranged without welding, and no damage to the integral waterproofing of the waterproof board is produced.

Description

A kind of novel tunnel splash guard and mounting method thereof
Technical field
The present invention relates to a kind of splash guard and mounting method thereof, be specifically related to a kind of tunnel splash guard and mounting method thereof.
Background technology
In the constructing tunnel process of construction, resolve waterproof problem and be and guarantee the construction of tunnel quality, fundamentally eliminate tunnel defect and increase the important step in tunnel life-span, and choose waterproofing materials and correct job practices is the key of tunnel water proofing success.
At present, mainly adopt first just nailing and plastic washer to be fixed in the tunnel basic unit for the laying of tunnel water proofing plate, and then splash guard is sticked on the plastic washer with the mode of thermal weld, splash guard is formed does not have the nail laying, can not form perforation on the splash guard like this, the overall tightness that can keep splash guard has improved water resistance greatly.But the mode of thermal weld is adopted in this laying, complex process, and easily produce dry joint, leakage weldering, burnt, the burn-through phenomenon of weldering, thus influence the integral waterproofing of splash guard.
Summary of the invention
The objective of the invention is to overcome above-mentioned shortcoming of the prior art, provide a kind of tunnel with splash guard and mounting method thereof, installs simple and reliablely, need not to weld, integral waterproofing is good.
A kind of novel tunnel splash guard of the present invention is arranged with the PET non-woven fabric piece on the described splash guard, described non-woven fabric piece is pasted and fixed on the splash guard by hot melt adhesive, is fixedly connected with connection strap on the described non-woven fabric piece.
In a preferred embodiment of the invention, every square metre has 1-2 non-woven fabric piece on the described splash guard.
In a preferred embodiment of the invention, described non-woven fabric piece is long 8-15cm, the cuboid of wide 3-8cm.
In a preferred embodiment of the invention, described PET nonwoven grammes per square metre is 300-400g/m 2
In a preferred embodiment of the invention, the long 30-50cm of described connection strap.
In a preferred embodiment of the invention, described hot melt adhesive is an EVA glue.
A kind of novel tunnel of the present invention is at first squeezed into nail or hook with the mounting method of splash guard in building basic unit, secondly the connection strap with splash guard ties up on nail or the hook; Described connection strap is fixedly connected on the PET non-woven fabric piece, and described non-woven fabric piece is pasted and fixed on the splash guard equably by hot melt adhesive, and described nail or hook are consistent with the arrange rule of non-woven fabric piece on splash guard in arranging in the basic unit.
Splash guard integral waterproofing of the present invention is good, adopts EVA glue fastness height, and selecting grammes per square metre for use is 300-400g/m 2Rectangle PET non-woven fabric piece, and the density of reasonably arranging had both guaranteed bonding strength, saved cost again.Splash guard mounting method of the present invention need not welding, and is simple and reliable, can not destroy the integral waterproofing of splash guard.
Description of drawings
Fig. 1 is a kind of example structure schematic diagram of the present invention;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the scheme of installation of Fig. 1 embodiment,
Fig. 4 is installation procedure figure of the present invention.
Among the figure: 1 is splash guard, and 2 is non-woven fabric piece, and 3 is connection strap, and 4 is the hole, and 5 is nail, and 6 is geotextiles, and 7 is layer of concrete.
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present invention is described in detail, thereby protection scope of the present invention is made more explicit defining so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that.
As Fig. 1 in conjunction with shown in Figure 2, clocklike be arranged with long 10em on the used splash guard 1 of present embodiment, the PET non-woven fabric piece 2 of wide 5cm, described non-woven fabric piece 2 is bonded on the splash guard 1 by hot melt adhesive, is fixedly connected with the connection strap 3 of long 40cm on the described non-woven fabric piece 2.Described hot melt adhesive is preferably EVA glue, and described splash guard is preferably the EVA splash guard.Connection strap in the present embodiment is two holes passing on the non-woven fabric piece 2, two ends are exposed, and part under nonwoven and non-woven fabric piece are bonded on the splash guard together, connect more firm like this, can certainly adopt the connection of other modes, here just no longer give an example.
Preferably, the used PET nonwoven grammes per square metre of non-woven fabric piece is 300-400g/m 2, non-woven fabric piece is long 8-15cm, the cuboid of wide 3-8cm, and the length of described connection strap is 30-50cm.
Arranging of non-woven fabric piece can also can be the arrangement of delegation every the transpostion interval of delegation as the latticed arrangement of alignment anyhow of present embodiment, and preferred arranging density is that 1-2 non-woven fabric piece arranged on every square metre of splash guard.
As Fig. 4 in conjunction with shown in Figure 3, in the mounting method of present embodiment, tunnel basic unit is made up of geotextiles 6 and layer of concrete 7, and splash guard 1 is when laying, at first squeeze into nail 5 or hook in tunnel basic unit, secondly the connection strap 3 with splash guard 1 ties up on nail 5 or the hook just passable firmly.Described connection strap 3 is fixedly connected on the PET non-woven fabric piece 2, and described non-woven fabric piece 2 is bonded on the splash guard 1 equably by hot melt adhesive, and described nail 5 or hook are consistent with the arrange rule of non-woven fabric piece on splash guard in arranging in the basic unit.
The above; it only is the specific embodiment of the present invention; but protection scope of the present invention is not limited thereto; any those of ordinary skill in the art are in the disclosed technical scope of the present invention; variation or the replacement that can expect without creative work all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain that claims were limited.

Claims (7)

1. a novel tunnel splash guard is characterized in that, is arranged with the PET non-woven fabric piece on the described splash guard, and described non-woven fabric piece is pasted and fixed on the splash guard by hot melt adhesive, is fixedly connected with connection strap on the described non-woven fabric piece.
2. a kind of novel tunnel splash guard according to claim 1 is characterized in that, every square metre has 1-2 non-woven fabric piece on the described splash guard.
3. a kind of novel tunnel splash guard according to claim 2 is characterized in that described non-woven fabric piece is long 8-15cm, the cuboid of wide 3-8cm.
4. a kind of novel tunnel splash guard according to claim 3 is characterized in that, described PET nonwoven grammes per square metre is 300-400g/m 2
5. a kind of novel tunnel splash guard according to claim 4 is characterized in that, the long 30-50cm of described connection strap.
6. a kind of novel tunnel splash guard according to claim 1 is characterized in that described hot melt adhesive is an EVA glue.
7. the mounting method of a novel tunnel usefulness splash guard is characterized in that, at first squeezes into nail or hook in building basic unit, and secondly the connection strap with splash guard ties up on nail or the hook; Described connection strap is fixedly connected on the PET non-woven fabric piece, and described non-woven fabric piece is pasted and fixed on the splash guard equably by hot melt adhesive, and described nail or hook are consistent with the arrange rule of non-woven fabric piece on splash guard in arranging in the basic unit.
CN 201010294122 2010-09-27 2010-09-27 Novel waterproof board for tunnels and mounting method thereof Pending CN101943007A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010294122 CN101943007A (en) 2010-09-27 2010-09-27 Novel waterproof board for tunnels and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010294122 CN101943007A (en) 2010-09-27 2010-09-27 Novel waterproof board for tunnels and mounting method thereof

Publications (1)

Publication Number Publication Date
CN101943007A true CN101943007A (en) 2011-01-12

Family

ID=43435189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010294122 Pending CN101943007A (en) 2010-09-27 2010-09-27 Novel waterproof board for tunnels and mounting method thereof

Country Status (1)

Country Link
CN (1) CN101943007A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777210A (en) * 2012-08-22 2012-11-14 中铁二院工程集团有限责任公司 Tunnel network waterproof-drainage board
CN103527222A (en) * 2013-10-31 2014-01-22 张俊峰 Novel waterproof board laying construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09310596A (en) * 1996-05-24 1997-12-02 Bridgestone Corp Waterproofing method onto internal surface of tunnel
JPH11294097A (en) * 1998-04-08 1999-10-26 Tsuuken Sangyo Kk Natm method
CN2740675Y (en) * 2004-06-22 2005-11-16 天津市楠江地下防水材料有限公司 Structure of connecting strip for water-proof sheets
CN2887960Y (en) * 2006-05-15 2007-04-11 天津市腾祥科技发展有限公司 High-strength auto-adhesive rubber composite waterproof hanging lining
CN1990225A (en) * 2005-12-29 2007-07-04 天津市兴荣非织造布有限公司 Hanging strip type composite water-proof insert
CN200964660Y (en) * 2006-07-31 2007-10-24 王天星 Three-in-one high molecule self-adhesive water-proof protective coiled material
CN201214860Y (en) * 2008-05-06 2009-04-01 秦雪辰 High-molecular self-adhering water-proof rolled material
CN101737066A (en) * 2008-11-26 2010-06-16 山东宏祥化纤集团有限公司 Tunnel suspended protective light plate and preparation method thereof
CN201778825U (en) * 2010-09-27 2011-03-30 常熟市三恒建材有限责任公司 Novel tunnel waterproof plate

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09310596A (en) * 1996-05-24 1997-12-02 Bridgestone Corp Waterproofing method onto internal surface of tunnel
JPH11294097A (en) * 1998-04-08 1999-10-26 Tsuuken Sangyo Kk Natm method
CN2740675Y (en) * 2004-06-22 2005-11-16 天津市楠江地下防水材料有限公司 Structure of connecting strip for water-proof sheets
CN1990225A (en) * 2005-12-29 2007-07-04 天津市兴荣非织造布有限公司 Hanging strip type composite water-proof insert
CN2887960Y (en) * 2006-05-15 2007-04-11 天津市腾祥科技发展有限公司 High-strength auto-adhesive rubber composite waterproof hanging lining
CN200964660Y (en) * 2006-07-31 2007-10-24 王天星 Three-in-one high molecule self-adhesive water-proof protective coiled material
CN201214860Y (en) * 2008-05-06 2009-04-01 秦雪辰 High-molecular self-adhering water-proof rolled material
CN101737066A (en) * 2008-11-26 2010-06-16 山东宏祥化纤集团有限公司 Tunnel suspended protective light plate and preparation method thereof
CN201778825U (en) * 2010-09-27 2011-03-30 常熟市三恒建材有限责任公司 Novel tunnel waterproof plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777210A (en) * 2012-08-22 2012-11-14 中铁二院工程集团有限责任公司 Tunnel network waterproof-drainage board
CN103527222A (en) * 2013-10-31 2014-01-22 张俊峰 Novel waterproof board laying construction method

Similar Documents

Publication Publication Date Title
KR100680555B1 (en) Waterproof sheet and its manufacturing method
KR100885944B1 (en) Waterproof structure of concrete surfaces and construction method the same
KR20060136038A (en) Waterproof sheet and its manufacturing method
KR101553393B1 (en) Self adhesive combination waterproofing sheet, the overlapping connection structure using the self adhesive combination waterproofing sheet and the method thereof
KR100733502B1 (en) Expansion joint pad for waterproof sheet and the waterproofing method using the same
KR100875893B1 (en) The waterproof construct method with waterproof-sheet
CN101943007A (en) Novel waterproof board for tunnels and mounting method thereof
KR101431380B1 (en) Triple composite waterproofing method applied loose laying joint type
KR200406964Y1 (en) Waterproof sheet
CN201778825U (en) Novel tunnel waterproof plate
JP4357914B2 (en) Joint structure for joints of waterproof sheet
KR101226187B1 (en) Tunnel waterproofing sheet
CN105257320A (en) Tunnel waterproof structure and construction method
JP4589344B2 (en) Seat waterproof structure and waterproof construction method
JP5720984B2 (en) Fireproof / waterproof exterior materials and fireproof / waterproof exterior structures
JP4794375B2 (en) Exterior material and exterior structure
CN205101003U (en) Tunnel water proofing structure
CN108149802A (en) A kind of high molecular polythene plate and its fish tail and waterproof layer structure and construction method
KR101419373B1 (en) Construction method for waterproofing of concrete structure
JP3971917B2 (en) Method for confirming water tightness of impermeable sheet used for surface impermeable work on wall surface
JP2011247083A (en) Heat insulating material for floor
KR101488843B1 (en) Sheet water proofing structure and its construction method
KR200211908Y1 (en) Waterproofing combined sheet
JP4156765B2 (en) Thermal insulation and waterproof structure of metal plate surface in buildings
CN210947440U (en) SBS waterproof coiled material for flashing part of roof parapet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110112